CN209363981U - An a kind of track beam assembly spelling point tooling - Google Patents
An a kind of track beam assembly spelling point tooling Download PDFInfo
- Publication number
- CN209363981U CN209363981U CN201920043668.2U CN201920043668U CN209363981U CN 209363981 U CN209363981 U CN 209363981U CN 201920043668 U CN201920043668 U CN 201920043668U CN 209363981 U CN209363981 U CN 209363981U
- Authority
- CN
- China
- Prior art keywords
- beam assembly
- track beam
- positioning
- plate
- hole
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Joining Of Building Structures In Genera (AREA)
Abstract
本实用新型公开一种履带梁总成拼点工装,涉及挖掘机履带梁工装设备领域,包括底座和位于底座上的前端座、后端座、上定位组件、左右两组支撑座和两个侧定位座,每组支撑座包括前后两个支撑座;履带梁总成两端分别由前端座和后端座固定,两个侧定位座位于履带梁总成的同一侧并与履带梁总成的前后两个横梁座一一对应连接,履带梁总成放置在一组支撑座上,上定位组件固定连接履带梁总成的数个安装耳。本实用新型通过设置前端座、后端座、上定位组件和两组支撑座,从上下左右四个方向对履带梁总成进行限位,还设有两个侧定位座,保证履带梁总成的两个横梁座定位准确,提高了履带梁总成的拼焊精度和拼焊效率。
The utility model discloses a track beam assembly splicing tooling, which relates to the field of excavator track beam tooling equipment, comprising a base, a front end seat on the base, a rear end seat, an upper positioning assembly, two left and right supporting seats and two side Positioning seat, each set of supporting seats includes two supporting seats at the front and rear; the two ends of the track beam assembly are respectively fixed by the front end seat and the rear end seat, and the two side positioning seats are located on the same side of the track beam assembly and connected with the track beam assembly The front and rear beam seats are connected one by one, the track beam assembly is placed on a set of support seats, and the upper positioning component is fixedly connected to several mounting ears of the track beam assembly. The utility model sets the front end seat, the rear end seat, the upper positioning assembly and two sets of support seats to limit the track beam assembly from four directions: up, down, left, and right, and also has two side positioning seats to ensure that the track beam assembly The positioning of the two beam seats is accurate, which improves the tailor welding accuracy and tailor welding efficiency of the track beam assembly.
Description
技术领域technical field
本实用新型涉及挖掘机履带梁工装设备领域,特别是涉及一种履带梁总成拼点工装。The utility model relates to the field of excavator crawler beam tooling equipment, in particular to a crawler beam assembly splicing tooling.
背景技术Background technique
挖掘机履带梁总成通常采用拼焊技术进行组装制造,由于挖掘机履带梁总成形状复杂,为了提高拼焊精度和效率,需要一款能适应履带梁总成的拼点工装。The excavator track beam assembly is usually assembled and manufactured by tailor-welding technology. Due to the complex shape of the excavator track beam assembly, in order to improve the precision and efficiency of tailor-welding, a piece-to-point tooling that can adapt to the track beam assembly is required.
实用新型内容Utility model content
本实用新型的目的在于提供一种履带梁总成拼点工装,以提高履带梁总成的拼焊精度和拼焊效率。The purpose of the utility model is to provide a splicing point tooling for a crawler beam assembly, so as to improve the precision and efficiency of tailor welding of the crawler beam assembly.
为实现上述目的,本实用新型采用了以下技术方案:In order to achieve the above object, the utility model adopts the following technical solutions:
一种履带梁总成拼点工装,包括底座和位于底座上的前端座、后端座、上定位组件、左右两组支撑座和两个侧定位座,每组支撑座包括前后两个支撑座;履带梁总成两端分别由前端座和后端座固定,两个侧定位座位于履带梁总成的同一侧并与履带梁总成的前后两个横梁座一一对应连接,履带梁总成放置在一组支撑座上,各支撑座上设有定位板和数个插销,插销插入履带梁总成的底板的对应孔中,定位板伸入履带梁总成的底板的让位通孔中,定位板的宽度与履带梁总成底板的让位通孔的宽度相匹配,定位板限制履带梁总成产生左右移动,上定位组件固定连接履带梁总成的数个安装耳。A crawler beam assembly splicing tool, including a base, a front end seat on the base, a rear end seat, an upper positioning assembly, two sets of left and right support seats and two side positioning seats, each set of support seats includes two front and rear support seats The two ends of the track beam assembly are respectively fixed by the front end seat and the rear end seat, and the two side positioning seats are located on the same side of the track beam assembly and are connected with the front and rear beam seats of the track beam assembly one by one. Place them on a set of support bases. Each support base is provided with a positioning plate and several pins. The pins are inserted into the corresponding holes of the bottom plate of the track beam assembly, and the positioning plate extends into the relief through hole of the bottom plate of the track beam assembly. Among them, the width of the positioning plate matches the width of the relief through hole of the bottom plate of the track beam assembly, the positioning plate restricts the left and right movement of the track beam assembly, and the upper positioning component is fixedly connected to several mounting ears of the track beam assembly.
进一步的,所述的前端座包括立柱和左右两个前固定板,各前固定板连接在立柱后方,各前固定板上设有四个两两对称的插销孔,各插销孔与履带梁总成的前端面上的通孔一一对应,履带梁总成的前端面通过插销实现与其中一个前固定板的可拆卸连接。Further, the front end seat includes a column and two left and right front fixing plates, each front fixing plate is connected to the rear of the column, and each front fixing plate is provided with four two-by-two symmetrical pin holes, and each pin hole is connected with the crawler beam. The through holes on the formed front end face are in one-to-one correspondence, and the front end face of the crawler beam assembly is detachably connected to one of the front fixing plates through a bolt.
进一步的,所述的后端座包括支架,支架上设有左右两个后固定板,后固定板上设有六个插销孔,各插销孔与履带梁总成的后端面上的通孔一一对应,履带梁总成的后端面通过插销实现与其中一个后固定板的可拆卸连接。Further, the rear end seat includes a bracket, and the bracket is provided with two left and right rear fixing plates, and the rear fixing plate is provided with six pin holes, and each pin hole is aligned with the through hole on the rear end surface of the crawler beam assembly. One-to-one correspondence, the rear end surface of the track beam assembly is detachably connected to one of the rear fixing plates through a bolt.
进一步的,所述的支架上设有H型定位架,H型定位架的左右两个侧板上设有插销孔,履带梁总成的侧连接座上设有通孔,履带梁总成的侧连接座通过插销与H型定位架的一个侧板连接定位。Further, the bracket is provided with an H-shaped positioning frame, and the left and right side plates of the H-shaped positioning frame are provided with pin holes, and the side connecting seat of the track beam assembly is provided with a through hole. The side connection seat is connected and positioned with a side plate of the H-shaped spacer through a bolt.
进一步的,所述的支架上设有一对U型板,两个U型板分别位于H型定位架两侧,各U型板底部设有一个通孔,履带梁总成上设有一个柱状凸起,该柱状凸起的端面上设有圆孔,履带梁总成的柱状凸起通过插销连接一个U型板。Further, the bracket is provided with a pair of U-shaped plates, and the two U-shaped plates are respectively located on both sides of the H-shaped positioning frame. A through hole is provided at the bottom of each U-shaped plate, and a columnar protrusion is provided on the crawler beam assembly. A round hole is arranged on the end face of the columnar protrusion, and the columnar protrusion of the crawler beam assembly is connected to a U-shaped plate through a bolt.
进一步的,所述的侧定位座包括横向设置的方管,方管两端设有侧固定板,履带梁总成的横梁座通过插销与对应的侧固定板连接。Further, the side positioning seat includes a horizontally arranged square tube, and side fixing plates are arranged at both ends of the square tube, and the beam seat of the crawler beam assembly is connected to the corresponding side fixing plate through a bolt.
进一步的,所述的上定位组件包括第一定位组件和两个第二定位组件,第一定位组件固定连接履带梁总成的第一安装耳,两个第二定位组件分别连接履带梁总成的两个第二安装耳。Further, the upper positioning assembly includes a first positioning assembly and two second positioning assemblies, the first positioning assembly is fixedly connected to the first mounting ear of the track beam assembly, and the two second positioning assemblies are respectively connected to the track beam assembly the two second mounting ears.
进一步的,所述的第一定位组件和第二定位组件均设有左右两个翻转块,第二定位组件的翻转块末端设有通孔,第二定位组件的翻转块通过插销与对应的履带梁总成的第二安装耳连接;第一定位组件的两个翻转块末端各设有一个连接板,各连接板随与其对应的翻转块翻转,履带梁总成的第一安装耳通过插销与其中一个翻转至水平位置的连接板固定。Further, both the first positioning assembly and the second positioning assembly are provided with left and right turning blocks, the end of the turning block of the second positioning assembly is provided with a through hole, and the turning block of the second positioning assembly is connected to the corresponding crawler belt through the latch. The second mounting ear of the track beam assembly is connected; the ends of the two overturning blocks of the first positioning component are respectively provided with a connecting plate, and each connecting plate is overturned with the corresponding overturning block, and the first mounting ear of the track beam assembly is connected with the bolt through the pin. One of the connecting plates flipped to a horizontal position is secured.
本实用新型通过设置前端座、后端座、上定位组件和两组支撑座,从上下左右四个方向对履带梁总成进行限位,还设有两个侧定位座,保证履带梁总成的两个横梁座定位准确,提高了履带梁总成的拼焊精度和拼焊效率。The utility model sets the front end seat, the rear end seat, the upper positioning assembly and two sets of support seats to limit the track beam assembly from four directions: up, down, left, and right. It is also provided with two side positioning seats to ensure that the track beam assembly The positioning of the two beam seats is accurate, which improves the tailor welding accuracy and tailor welding efficiency of the track beam assembly.
附图说明Description of drawings
图1是一种履带梁总成和本实用新型的履带梁总成拼点工装的示意图;Fig. 1 is a schematic diagram of a crawler beam assembly and a track beam assembly of the present invention;
图2是图1的另一角度示意图;Fig. 2 is another perspective schematic diagram of Fig. 1;
图3是将履带梁总成安装至本实用新型的履带梁总成拼点工装的示意图;Fig. 3 is a schematic diagram of installing the track beam assembly to the track beam assembly assembly point tooling of the utility model;
图4是图3的另一角度示意图;Fig. 4 is another perspective schematic diagram of Fig. 3;
图5本实用新型的履带梁总成拼点工装的俯视图。Fig. 5 is a top view of the assembly point tooling of the track beam assembly of the utility model.
具体实施方式Detailed ways
现结合附图和具体实施方式对本实用新型作进一步说明。The utility model will be further described in conjunction with accompanying drawing and specific embodiment now.
如图1和图2所示,一种履带梁总成10,包括履带梁101、座板102和底板。座板102一侧设有两个横梁座103和一个侧连接座104,座板102上设有一个柱状凸起105,该柱状凸起105的端面设有圆孔,座板102上方设有一个第一安装耳106和两个第二安装耳107。履带梁总成的前后端面、横梁座103、侧连接座104、第一安装耳106和第二安装耳107上均设有通孔,底板上设有安装孔和让位通孔。As shown in FIGS. 1 and 2 , a track beam assembly 10 includes a track beam 101 , a seat plate 102 and a bottom plate. One side of the seat plate 102 is provided with two beam seats 103 and a side connection seat 104. The seat plate 102 is provided with a columnar protrusion 105. A first mounting ear 106 and two second mounting ears 107 . The front and rear end faces of the crawler beam assembly, the beam seat 103, the side connection seat 104, the first mounting ear 106 and the second mounting ear 107 are all provided with through holes, and the base plate is provided with mounting holes and through holes for giving way.
如图1至图5所示,一种履带梁总成拼点工装20,包括底座1和位于底座1上的前端座2、后端座3、上定位组件6、两个侧定位座4和左右两组支撑座,每组支撑座包括前后两个支撑座5。履带梁总成10两端分别由前端座2和后端座3固定,两个侧定位座4位于履带梁总成10的同一侧并与履带梁总成10的前后两个横梁座103一一对应连接,上定位组件6固定连接履带梁总成10的数个安装耳。As shown in Fig. 1 to Fig. 5, a track beam assembly assembly point tooling 20 includes a base 1 and a front end seat 2, a rear end seat 3, an upper positioning assembly 6, two side positioning seats 4 and There are two groups of supporting seats on the left and right, and each group of supporting seats includes two supporting seats 5 in the front and back. The two ends of the track beam assembly 10 are respectively fixed by the front end seat 2 and the rear end seat 3, and the two side positioning seats 4 are located on the same side of the track beam assembly 10 and are connected to the front and rear two beam seats 103 of the track beam assembly 10 one by one. Corresponding to the connection, the upper positioning component 6 is fixedly connected to several mounting ears of the crawler beam assembly 10 .
各支撑座5上设有定位板51和数个插销52,履带梁总成10放置在一组支撑座5上,插销52插入履带梁总成10底板上的对应孔中,定位板51伸入履带梁总成10的底板的让位通孔中。定位板51的长度与履带梁总成10底板的让位通孔的长度相匹配,避免履带梁总成10产生左右移动。Each support base 5 is provided with a positioning plate 51 and several bolts 52. The crawler beam assembly 10 is placed on a set of support bases 5. The latches 52 are inserted into the corresponding holes on the bottom plate of the crawler beam assembly 10, and the positioning plate 51 extends into In the give way through hole of the base plate of crawler beam assembly 10. The length of the positioning plate 51 matches the length of the through hole of the bottom plate of the crawler beam assembly 10 to avoid the left and right movement of the crawler beam assembly 10 .
前端座2包括立柱21和左右两个前固定板22,各前固定板22通过两个斜撑连接在立柱21后方,各前固定板22上设有四个两两对称的插销孔,各插销孔与履带梁总成10的前端面上的通孔一一对应,履带梁总成10的前端面通过插销实现与其中一个前固定板22的可拆卸连接。The front end seat 2 includes a column 21 and two front fixing plates 22 on the left and right. Each front fixing plate 22 is connected to the rear of the column 21 through two diagonal braces. Each front fixing plate 22 is provided with four pairwise symmetrical bolt holes. The holes correspond to the through holes on the front end surface of the track beam assembly 10 one by one, and the front end surface of the track beam assembly 10 is detachably connected to one of the front fixing plates 22 through a bolt.
后端座3包括支架31,支架31上设有左右两个后固定板32,每个后固定板32上设有六个插销孔,各插销孔与履带梁总成10的后端面上的通孔一一对应,履带梁总成10的后端面通过插销实现与其中一个后固定板32的可拆卸连接。The rear end seat 3 includes a bracket 31, and the bracket 31 is provided with two left and right rear fixing plates 32, and each rear fixing plate 32 is provided with six bolt holes, and each bolt hole is connected to the rear end surface of the crawler beam assembly 10. The holes are in one-to-one correspondence, and the rear end surface of the crawler beam assembly 10 is detachably connected to one of the rear fixing plates 32 through a bolt.
支架31上设有H型定位架33,H型定位架33的左右两个侧板上设有插销孔,履带梁总成10的侧连接座104上设有通孔,履带梁总成10的侧连接座104通过插销与H型定位架33的一个侧板连接定位。The bracket 31 is provided with an H-shaped positioning frame 33, and the left and right side plates of the H-shaped positioning frame 33 are provided with pin holes, and the side connection seat 104 of the crawler beam assembly 10 is provided with a through hole. The side connecting seat 104 is connected and positioned with a side plate of the H-shaped positioning frame 33 through a bolt.
支架31上设有一对U型板34,两个U型板34分别位于H型定位架33两侧,各U型板34底部设有一个通孔,履带梁总成10上设有一个柱状凸起105,该柱状凸起105的端面上设有圆孔,采用插销连接履带梁总成10的柱状凸起105和一个U型板34。A pair of U-shaped plates 34 are arranged on the support 31, and the two U-shaped plates 34 are respectively located on both sides of the H-shaped positioning frame 33. A through hole is provided at the bottom of each U-shaped plate 34, and a columnar convex hole is provided on the crawler beam assembly 10. 105, the end surface of the columnar projection 105 is provided with a round hole, and the columnar projection 105 and a U-shaped plate 34 of the crawler beam assembly 10 are connected by a bolt.
侧定位座4包括横向设置的方管,方管两端设有侧固定板41,履带梁总成10的横梁座103通过插销与对应的侧固定板41连接。The side positioning seat 4 includes a horizontally arranged square tube, and side fixing plates 41 are arranged at both ends of the square tube, and the beam seat 103 of the crawler beam assembly 10 is connected to the corresponding side fixing plate 41 through a bolt.
上定位组件6包括第一定位组件61和两个第二定位组件62,第一定位组件61固定连接履带梁总成10的第一安装耳106,两个第二定位组件62分别连接履带梁总成10的两个第二安装耳107。第一定位组件61和第二定位组件62均设有左右两个翻转块。第二定位组件62的翻转块末端设有通孔,第二定位组件62的翻转块通过插销与对应的履带梁总成10的第二安装耳107连接。The upper positioning assembly 6 includes a first positioning assembly 61 and two second positioning assemblies 62. The first positioning assembly 61 is fixedly connected to the first mounting ear 106 of the track beam assembly 10, and the two second positioning assemblies 62 are respectively connected to the track beam assembly. into two second mounting ears 107 of 10. Both the first positioning assembly 61 and the second positioning assembly 62 are provided with left and right turning blocks. The end of the turning block of the second positioning assembly 62 is provided with a through hole, and the turning block of the second positioning assembly 62 is connected with the second mounting ear 107 of the corresponding track beam assembly 10 through a bolt.
第一定位组件61的两个翻转块末端各设有一个连接板611,各连接板611上设有插销孔,各连接板611随与其对应的翻转块翻转,履带梁总成10的第一安装耳106通过插销与其中一个翻转至水平位置的连接板611固定。The ends of the two turning blocks of the first positioning assembly 61 are respectively provided with a connecting plate 611, each connecting plate 611 is provided with a pin hole, and each connecting plate 611 is turned over with the corresponding turning block, the first installation of the track beam assembly 10 The ear 106 is fixed to one of the connecting plates 611 turned to a horizontal position by a bolt.
履带梁总成拼点工装的底座1上还设有左右两个限位块7,通过限位块7对履带梁总成进行纵向定位。The base 1 of the assembly point tooling of the crawler beam assembly is also provided with two limit blocks 7 on the left and right, through which the track beam assembly is longitudinally positioned.
以上所记载,仅为利用本创作技术内容的实施例,任何熟悉本项技艺者运用本创作所做的修饰、变化,皆属本创作主张的专利范围,而不限于实施例所揭示者。The above records are only examples of using the technical content of this creation. Any modifications and changes made by those who are familiar with this technology using this creation belong to the scope of patents claimed by this creation, and are not limited to those disclosed in the examples.
Claims (8)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201920043668.2U CN209363981U (en) | 2019-01-11 | 2019-01-11 | An a kind of track beam assembly spelling point tooling |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201920043668.2U CN209363981U (en) | 2019-01-11 | 2019-01-11 | An a kind of track beam assembly spelling point tooling |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN209363981U true CN209363981U (en) | 2019-09-10 |
Family
ID=67825368
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201920043668.2U Expired - Fee Related CN209363981U (en) | 2019-01-11 | 2019-01-11 | An a kind of track beam assembly spelling point tooling |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN209363981U (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN113753156A (en) * | 2021-08-06 | 2021-12-07 | 江苏恒义汽配制造有限公司 | An upper beam assembly assembly fixture |
-
2019
- 2019-01-11 CN CN201920043668.2U patent/CN209363981U/en not_active Expired - Fee Related
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN113753156A (en) * | 2021-08-06 | 2021-12-07 | 江苏恒义汽配制造有限公司 | An upper beam assembly assembly fixture |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN209363981U (en) | An a kind of track beam assembly spelling point tooling | |
| CN211032819U (en) | Carbon fiber automobile body attaches together frock | |
| CN209850192U (en) | Push away shovel gyro wheel mounting panel welding frock | |
| CN218657521U (en) | Tool for welding and positioning mounting seat of steering mechanism of agricultural robot | |
| KR20180094269A (en) | Connection piece for support frames and connection method using the cooenction piece | |
| JP4898627B2 (en) | Circuit board support device and circuit board support pin | |
| CN213197419U (en) | Auxiliary assembly fixture that maglev train crossbeam is constituteed | |
| CN202041146U (en) | Fixed platform for vehicle frame | |
| CN104470287B (en) | Multi-piece display backplane | |
| CN111017072B (en) | Fender positioning device and fender positioning method | |
| CN210334898U (en) | Turnover angle lock assembling tool | |
| CN117464279B (en) | outrigger positioning fixture | |
| CN222779030U (en) | Pole cutting and tire frame bending parts | |
| CN214418077U (en) | A fast tailor welding positioning device for gearbox bracket | |
| CN210766390U (en) | Main saddle and suspension bridge | |
| CN210592129U (en) | Head-cross beam connecting seat convenient to install | |
| CN204747892U (en) | Frame cross assembly welding positioner | |
| CN213946392U (en) | Real instrument strorage device for room of instructing | |
| CN212823618U (en) | Push away shovel frame group and to frock | |
| CN106217288B (en) | Vehicle frame detecting system high accuracy alignment positioning device | |
| CN217667487U (en) | Grid piece welding jig | |
| CN216977686U (en) | Seat assembly detection tool capable of being detached and replacing vehicle model imitation block | |
| CN222448812U (en) | Pole cutting frame module | |
| CN219033840U (en) | Grille pedal | |
| CN223130497U (en) | Arm belly plate hydraulic valve nut block assembly tooling |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20190910 |