CN209353300U - A kind of core-wall partitioned organization of high gravelly soil core wall rockfill dam - Google Patents
A kind of core-wall partitioned organization of high gravelly soil core wall rockfill dam Download PDFInfo
- Publication number
- CN209353300U CN209353300U CN201821950953.4U CN201821950953U CN209353300U CN 209353300 U CN209353300 U CN 209353300U CN 201821950953 U CN201821950953 U CN 201821950953U CN 209353300 U CN209353300 U CN 209353300U
- Authority
- CN
- China
- Prior art keywords
- core
- wall
- dam
- height
- partitioned organization
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 239000002689 soil Substances 0.000 title claims abstract description 37
- 230000008520 organization Effects 0.000 title claims abstract description 17
- 239000000463 material Substances 0.000 claims abstract description 28
- 238000011144 upstream manufacturing Methods 0.000 claims description 14
- 230000007704 transition Effects 0.000 claims description 10
- 238000010276 construction Methods 0.000 abstract description 11
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 abstract description 5
- 238000005192 partition Methods 0.000 abstract description 2
- 238000000034 method Methods 0.000 description 3
- 230000009286 beneficial effect Effects 0.000 description 1
- 239000004927 clay Substances 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 239000008187 granular material Substances 0.000 description 1
- 230000035939 shock Effects 0.000 description 1
Landscapes
- Revetment (AREA)
Abstract
The utility model belongs to hydraulic and hydroelectric engineering technical field, specifically discloses a kind of core-wall partitioned organization of high gravelly soil core wall rockfill dam, and the partitioned organization being mainly made of in the middle part of core-wall lower part, core-wall and core-wall top, central wall lower part is by P5The gravel earth material that content is 40%~50% fills, and core-wall top is by P5The gravel earth material that content is 30%~40% fills, and effectively control the height of each partition sections, core-wall settling amount requirement can either be met, guarantee core-wall bearing capacity with higher, facilitate the construction of heavy machinery, it can satisfy dam body seepage and stress deformation requirement again, guarantee core-wall water resistant power splitting parameter;Meanwhile the soil property core-wall of the structure is filled using the gravel earth material of different gradation and also reduces difficulty of construction, is shortened the duration, is saved construction investment.
Description
Technical field
The utility model belongs to hydraulic and hydroelectric engineering technical field, and in particular to a kind of heart of high gravelly soil core wall rockfill dam
Wall partitioned organization.
Background technique
Rock-fill dams are one of to be most widely used in Dam constructions with dam type with fastest developing speed.Rock-fill dams reduce investment outlay,
Convenient for gathering materials on the spot, construction is simple, shock resistance good good to landform geological conditions adaptability the advantages that.The portion being arranged by impervious body
Position, construction method and operational mode, native core wall rockfill dam are broadly divided into clay core wall rockfill dam, gravelly soil core wall rockfill dam and drip
Green concrete core-wall rock-fill dams.It is existing soil core wall rockfill dam generally comprise Parallel to the flow direction be successively set on it is upper on foundation plane
Swim rockfill area, upstream transition layer, upstream loaded filter, soil property core-wall, downstream loaded filter, downstream transition layer and downstream rockfill area.
Currently, in native Design of rockfill dam with earth core, core-wall material from dam body bottom to dam body top all only with a kind of material
Material, the physico mechanical characteristic at each elevation position of soil property core-wall are essentially identical.For high native core wall rockfill dam, core-wall material dosage is huge
Greatly, single earth material field reserves or quality are often difficult to meet entire core wall filling building requirement, merely using cohesive soil as core-wall
Material, mechanical property is poor, intensity is lower and compressibility is bigger than normal, and merely using wide grading of gravelly soil as core-wall material, then again
The problems such as complicated construction technique, process is tedious, costly can be brought.
Utility model content
The utility model provides a kind of core-wall partitioned organization of high gravelly soil core wall rockfill dam, it is intended to solve existing height
The core-wall of native core wall rockfill dam cannot be considered in terms of the problem of mechanical property and engineering cost.
The technical scheme adopted by the utility model to solve the technical problem is as follows: a kind of heart of high gravelly soil core wall rockfill dam
Wall partitioned organization is successively set on upstream rockfill area on foundation plane, upstream transition layer, upstream anti-filter including Parallel to the flow direction
Layer, soil property core-wall, downstream loaded filter, downstream transition layer and downstream rockfill area, the soil property core-wall include successively setting from the bottom up
Core-wall lower part, core-wall middle part and the core-wall top set;The core-wall lower part is by P5Content is greater than 40% and is less than or equal to 50%
Gravel earth material fills, and the height of core-wall lower part is less than or equal to half height of dam;The core-wall top is by P5Content is greater than
Gravel earth material equal to 30% and less than 40% fills, and the height on core-wall top is less than or equal to one third height of dam.
Further, being set to half height of dam between 2/3rds heights of dam in the middle part of the core-wall.
Further, the soil property core-wall is sloping core.
Further, the height of dam on dam where a kind of core-wall partitioned organization of the high gravelly soil core wall rockfill dam be 200m with
On.
The beneficial effects of the utility model are: a kind of soil property heart of the core-wall partitioned organization of high gravelly soil core wall rockfill dam
Wall is the partitioned organization being mainly made of in the middle part of core-wall lower part, core-wall and core-wall top, and central wall lower part is by P5Content is greater than
It 40% and is filled less than or equal to 50% gravel earth material, core-wall top is by P5Content is more than or equal to 30% and less than 40%
Gravel earth material fills, and effectively controls the height of each partition sections, can either meet core-wall settling amount requirement, guarantees core-wall
Bearing capacity with higher, facilitates the construction of heavy machinery, and can satisfy dam body seepage and stress deformation requirement, guarantees core-wall
Water resistant power splitting parameter;Meanwhile with it is existing it is simple using wide grading of gravelly soil as the native core wall rockfill dam of height of core-wall material and
Speech, the soil property core-wall of the structure is filled using the gravel earth material of different gradation also reduces difficulty of construction, shortens the duration, saves
Construction investment.
Detailed description of the invention
Fig. 1 is the implementation structural schematic diagram of the utility model;
In the figure, it is marked as foundation plane 10, upstream rockfill area 20, upstream transition layer 30, upstream loaded filter 40, soil property core-wall
50, core-wall lower part 51, core-wall middle part 52, core-wall top 53, downstream loaded filter 60, downstream transition layer 70, downstream rockfill area 80.
Specific embodiment
The utility model is described in further detail with reference to the accompanying drawing.
As shown in Figure 1, a kind of core-wall partitioned organization of high gravelly soil core wall rockfill dam, including Parallel to the flow direction are set gradually
Upstream rockfill area 20, upstream transition layer 30, upstream loaded filter 40, soil property core-wall 50, downstream loaded filter 60 on foundation plane 10,
Downstream transition layer 70 and downstream rockfill area 80, the soil property core-wall 50 include the core-wall lower part 51 set gradually from the bottom up, the heart
Wall middle part 52 and core-wall top 53;The core-wall lower part 51 is by P5Content is greater than 40% and the gravel earth material less than or equal to 50% is filled out
It builds, the height of core-wall lower part 51 is less than or equal to half height of dam;The core-wall top 53 is by P5Content is more than or equal to
30% and the gravel earth material less than 40% fill, the height on core-wall top 53 is less than or equal to one third height of dam.
The height of dam on dam is usually 200m or more, soil property where a kind of core-wall partitioned organization of the high gravelly soil core wall rockfill dam
Core-wall 50 can be straight core-wall or sloping core.Wherein, P5Content refers to granule content of the partial size greater than 5mm in earth material.
For high native core wall rockfill dam, since height of dam is higher, the core-wall soil body will bear biggish stress, and according to dam three
The analysis of finite Element Stress strain calculation is tieed up, dam body maximum settlement is located at about 1/2 height of dam position of core-wall position, therefore, in order to meet
The requirement of intensity and compressibility uses P5Content is greater than 40% and the gravel earth material less than or equal to 50% carries out filling to form the heart
Wall lower part 51, and the height limitation of core-wall lower part 51 is wanted in half height of dam hereinafter, can satisfy core-wall settling amount in this way
It asks, guarantees core-wall bearing capacity with higher, facilitate the construction of heavy machinery.
52 can be formed by the natural earth material filling building of local earth material field output in the middle part of core-wall, can also be filled by artificial spike
It forms, preferably by P5The gravel earth material that content is 40% fills;52 height can be according to different heights of dam, storage in the middle part of core-wall
Water speed, the factors such as library water luffing are determined, in order to reach the optimal case for taking into account core-wall mechanical property and engineering cost, make
52 are set to half height of dam between 2/3rds heights of dam in the middle part of core-wall.
The stress level as suffered by the top of soil property core-wall 50 is lower, deforms index and mechanics to the dam material on core-wall top 53
Index request is not high, but at this is the district occurred frequently of hydraulic fracture, therefore, in order to enable core-wall top 53 has preferable crack
Self-healing effect uses P5Content is more than or equal to 30% and the gravel earth material less than 40% carries out filling to form core-wall top 53,
And by the height limitation on core-wall top 53 in one third height of dam hereinafter, being both able to satisfy dam body seepage and stress deformation is wanted in this way
It asks, ensures that core-wall water resistant power splitting parameter;The height for usually making core-wall top 53 is 1/5~1/3 height of dam.
Claims (4)
1. a kind of core-wall partitioned organization of high gravelly soil core wall rockfill dam, including Parallel to the flow direction are successively set on foundation plane (10)
On upstream rockfill area (20), upstream transition layer (30), upstream loaded filter (40), soil property core-wall (50), downstream loaded filter (60),
Downstream transition layer (70) and downstream rockfill area (80), it is characterised in that: the soil property core-wall (50) includes successively setting from the bottom up
Core-wall lower part (51), the core-wall middle part (52) and core-wall top (53) set;The core-wall lower part (51) is by P5Content is greater than 40%
And the gravel earth material less than or equal to 50% fills, the height of core-wall lower part (51) is less than or equal to half height of dam;It is described
Core-wall top (53) is by P5Content is more than or equal to 30% and the gravel earth material less than 40% fills, the height of core-wall top (53)
Degree is less than or equal to one third height of dam.
2. a kind of core-wall partitioned organization of high gravelly soil core wall rockfill dam as described in claim 1, it is characterised in that: the heart
(52) are set to half height of dam between 2/3rds heights of dam in the middle part of wall.
3. a kind of core-wall partitioned organization of high gravelly soil core wall rockfill dam as claimed in claim 1 or 2, it is characterised in that: institute
Stating soil property core-wall (50) is sloping core.
4. a kind of core-wall partitioned organization of high gravelly soil core wall rockfill dam as claimed in claim 3, it is characterised in that: the one kind
The height of dam on dam is 200m or more where the core-wall partitioned organization of high gravelly soil core wall rockfill dam.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201821950953.4U CN209353300U (en) | 2018-11-23 | 2018-11-23 | A kind of core-wall partitioned organization of high gravelly soil core wall rockfill dam |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201821950953.4U CN209353300U (en) | 2018-11-23 | 2018-11-23 | A kind of core-wall partitioned organization of high gravelly soil core wall rockfill dam |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN209353300U true CN209353300U (en) | 2019-09-06 |
Family
ID=67784149
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201821950953.4U Active CN209353300U (en) | 2018-11-23 | 2018-11-23 | A kind of core-wall partitioned organization of high gravelly soil core wall rockfill dam |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN209353300U (en) |
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN110987634A (en) * | 2019-11-15 | 2020-04-10 | 河海大学 | Test device and test method for hydraulic fracture of gravel-doped core wall |
| CN111705752A (en) * | 2020-07-20 | 2020-09-25 | 中国电建集团华东勘测设计研究院有限公司 | Clay core wall dam with anti-seepage self-healing function and its implementation method |
| CN117057007A (en) * | 2023-07-27 | 2023-11-14 | 中国电建集团成都勘测设计研究院有限公司 | High-soil core wall rock-fill dam design method for sandstone rock-fill material source |
| CN120649423A (en) * | 2025-07-16 | 2025-09-16 | 中国电建集团成都勘测设计研究院有限公司 | Design construction method for deep overburden high gravel soil core wall rock-fill dam |
-
2018
- 2018-11-23 CN CN201821950953.4U patent/CN209353300U/en active Active
Cited By (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN110987634A (en) * | 2019-11-15 | 2020-04-10 | 河海大学 | Test device and test method for hydraulic fracture of gravel-doped core wall |
| CN111705752A (en) * | 2020-07-20 | 2020-09-25 | 中国电建集团华东勘测设计研究院有限公司 | Clay core wall dam with anti-seepage self-healing function and its implementation method |
| CN117057007A (en) * | 2023-07-27 | 2023-11-14 | 中国电建集团成都勘测设计研究院有限公司 | High-soil core wall rock-fill dam design method for sandstone rock-fill material source |
| CN117057007B (en) * | 2023-07-27 | 2024-08-06 | 中国电建集团成都勘测设计研究院有限公司 | High-soil core wall rock-fill dam design method for sandstone rock-fill material source |
| CN120649423A (en) * | 2025-07-16 | 2025-09-16 | 中国电建集团成都勘测设计研究院有限公司 | Design construction method for deep overburden high gravel soil core wall rock-fill dam |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN108343102B (en) | Pile foundation settlement reinforcement jacking leveling structure and construction method thereof | |
| CN110387896B (en) | Foundation pit dewatering well design method | |
| CN101205720A (en) | A Super-large Steel Cofferdam Decentralization, Implantation and Subsidence Control Technology | |
| CN113818402B (en) | Reinforcement structure and construction method of clay core rockfill dam | |
| CN110646329A (en) | Slow-dip-angle weak structural surface penetration deformation field test method after grouting and sample device thereof | |
| CN204491624U (en) | The synchronous excavation supporting system of the asymmetric deep big foundation pit in soft clay area | |
| CN212477620U (en) | Structure for building gravity dam on deep and thick covering layer | |
| CN111472326B (en) | A method and structure for building a gravity dam on a thick overburden layer | |
| CN118793086A (en) | Ultra-deep overburden dam foundation anti-seepage system and construction method thereof | |
| CN100455731C (en) | Guide pit type manual pot holing pile reinforing and underpinning method for building foundation and composite supporting pile | |
| CN107237343A (en) | A multi-wall nodular underground diaphragm wall bridge foundation for soft soil foundation | |
| CN113123301A (en) | Partition structure of gravel soil core wall dam | |
| CN211773790U (en) | Water intake reserved rock ridge water retaining cofferdam reinforcing system under reservoir operation water level | |
| CN104389294A (en) | Concrete faced rockfill dam on deep covering layer and construction method | |
| CN113585236B (en) | A deep foundation pit anchorage and its construction method | |
| CN114482013A (en) | A suspension type rock-socketed composite pile structure of a prefabricated pile with expansion and introduction hole and its construction method | |
| CN118257244B (en) | Method for quickly constructing composite foundation through broken stone expanded pile | |
| CN110512571A (en) | A kind of RCC dam and its construction method containing rock-fill concrete core-wall | |
| CN206015619U (en) | A kind of rock for reducing panel stress strain level | |
| CN209538173U (en) | Eliminate the prefabricated pile of breathing soil layer frictional force | |
| CN103628467B (en) | Based on the method for processing foundation that differential settlement dynamically accurately controls | |
| CN215252687U (en) | Partition structure of gravel soil core wall dam | |
| CN207998831U (en) | A kind of river course slope protection masonry and river course slope protection | |
| CN209429054U (en) | Seepage prevention of dam founda structure in ultra-deep thick-covering | |
| CN105133629B (en) | A kind of determination method of refuse landfill Groundwater Control System Halt water curtain |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant |