CN209328346U - A kind of project management live simulation sand table - Google Patents
A kind of project management live simulation sand table Download PDFInfo
- Publication number
- CN209328346U CN209328346U CN201821603173.2U CN201821603173U CN209328346U CN 209328346 U CN209328346 U CN 209328346U CN 201821603173 U CN201821603173 U CN 201821603173U CN 209328346 U CN209328346 U CN 209328346U
- Authority
- CN
- China
- Prior art keywords
- sand table
- supporting leg
- support frame
- project management
- main body
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Abstract
The utility model relates to a kind of project management live simulation sand tables, including sand table main body, supporting leg and lay flat support frame, the sand table body lower surface four corners are equipped with connector, the connector is fixedly connected with sand table main body, the connector lower end is rotatably connected to supporting leg by shaft, the supporting leg lower end is equipped with traveling wheel, the supporting leg is additionally provided with relative to the lateral surface upper end of shaft tangent line and lays flat support frame, it is outer flaring groove profile that this, which lays flat support frame horizontal cross-section, and the slot bottom is fixedly connected by bolt with supporting leg lateral surface, support frame is laid flat by the supporting leg lateral surface setting in sand table, it is rotatablely connected between supporting leg and sand table simultaneously, so that sand table is not only merely to demonstrate under the action of supporting leg, it more can be after supporting leg be closed flat, conference table middle position is placed in using support frame is laid flat, everybody is facilitated to watch and record, improve device Applicability, while the design of traveling wheel avoid sand table quality big and caused by it is mobile difficult, improve its service efficiency.
Description
Technical field
The utility model belongs to project management techniques field more particularly to a kind of project management live simulation sand table.
Background technique
Sand table English name sandbox, is also sandbox, as the term suggests can regard a kind of container as, the inside done all
It can make a new start, sand table be commonly used in military affairs to carry out the terrain simulation in some war regions, sand can be pushed away by being out of use
Flat to come again, what sand table was comprehensive now is extended to all trades and professions, is also commonly used sand table in construction management, Lai Jinhang and
When the report of the effective project site operation progress situation and reaction of problem.
Utility model content
The utility model is to solve well-known technique and provide: a kind of project management live simulation is husky
Disk.
The utility model is adopted the technical scheme that solve well-known technique: a kind of project management
Live simulation sand table, including sand table main body, supporting leg and support frame is laid flat, the sand table body lower surface four corners are equipped with connection
Part, the connector are fixedly connected with sand table main body, and the connector lower end is rotatably connected to supporting leg by shaft, the supporting leg lower end
Equipped with traveling wheel, the supporting leg is additionally provided with relative to the lateral surface upper end of shaft tangent line and lays flat support frame, this lays flat support frame water
Plane section is outer flaring groove profile, and the slot bottom is fixedly connected by bolt with supporting leg lateral surface, after the sand table body upper surface
Row is equipped with several working face nameplates and responsible person's nameplate, and the working face nameplate is located on the left of responsible person's nameplate, the work
It is equipped with progress in front of the nameplate of face and shows item, the progress, which is shown, is equipped with time contrast module, the time contrast module in front of item
Front is additionally provided with problem summarizing module.
Further, the traveling wheel is universal wheel, and which is provided with brake apparatus.
Further, described square of support frame provides limit effect when supporting leg is vertically placed for supporting leg.
Further, the progress shows that item is LED light bar, and LED lamp bead is 10,20 or 40 thereon.
Further, whether the time contrast module includes progression time and plans node, qualified to analyze progress.
The utility model has the advantage that as follows with good effect:
1. the utility model lays flat support frame by the supporting leg lateral surface setting in sand table, while turning between supporting leg and sand table
Dynamic connection can more be supported after supporting leg is closed flat using laying flat so that sand table is not only merely to demonstrate under the action of supporting leg
Frame is placed in conference table middle position, facilitates everybody to watch and record, improves the applicability of device, while the design of traveling wheel
Avoid sand table quality big and caused by it is mobile difficult, improve its service efficiency.
2. the utility model by setting LED lamp bead form progress show item, it is more intuitive reacted now into
Degree can quickly determine whether construction speed meets timing node requirement, electricity original part and sand now by time contrast module
Disk is effectively combined, so that its effect shows more intuitive, the operation is more convenient.
Detailed description of the invention
Fig. 1 is device entirety front view provided by the embodiment of the utility model;
Fig. 2 is device overall top view provided by the embodiment of the utility model;
Fig. 3 is provided by the embodiment of the utility model to lay flat support frame cutting schematic diagram.
In figure: 1, sand table main body;2, connector;3, traveling wheel;4, supporting leg;5, support frame is laid flat;6, shaft;7, progress is aobvious
Show item;8, working face nameplate;9, responsible person's nameplate;10, time contrast module;11, problem summarizing module;12, bolt.
Specific embodiment
For the invention, features and effects that can further appreciate that the utility model, following embodiment is hereby enumerated, and is cooperated
Detailed description are as follows for attached drawing.
It is explained in detail below with reference to a kind of project management live simulation sand table of Fig. 1-3 pairs of the utility model: a kind of
Project management live simulation sand table, including sand table main body 1, supporting leg 4 and support frame 5 is laid flat, the 1 lower surface quadrangle of sand table main body
Place is equipped with connector 2, which is fixedly connected with sand table main body 1, and 2 lower end of connector is rotatably connected to by shaft 6
Supporting leg 4,4 lower end of supporting leg are equipped with traveling wheel 3, and the supporting leg 4 is additionally provided with relative to the lateral surface upper end of 6 tangent line of shaft and lays flat branch
Support 5, it is outer flaring groove profile that this, which lays flat 5 horizontal cross-section of support frame, and the slot bottom connects by the way that bolt 12 and 4 lateral surface of supporting leg are fixed
It connects, the 1 upper surface heel row of sand table main body is equipped with several working face nameplates 8 and responsible person's nameplate 9, the working face nameplate 8
Positioned at 9 left side of responsible person's nameplate, the progress that is equipped in front of the working face nameplate 8 shows item 7, and the progress shows and sets in front of item 7
Having time contrast module 10, problem summarizing module 11 is additionally provided in front of the time contrast module 10, and the traveling wheel 3 is universal
Wheel, and which is provided with brake apparatus, described square of support frame 5 provides limit effect when supporting leg 4 is vertically placed for supporting leg 4, institute
State progress show item 7 be LED light bar, and thereon LED lamp bead be 10,20 or 40, the time contrast module 10 include into
Time and plan node are spent, it is whether qualified to analyze progress.
Working principle: the utility model lays flat support frame 5 by 4 lateral surface of the supporting leg setting in sand table, at the same supporting leg 4 with
It is rotatablely connected between sand table main body 1, so that sand table main body 1 is not only merely to demonstrate under the action of supporting leg 4, can more prop up
After leg 4 is closed flat, it is placed in conference table middle position using support frame 5 is laid flat, facilitates everybody to watch and record, improves device
Applicability, at the same the design of traveling wheel 3 avoid sand table quality big and caused by it is mobile difficult, its service efficiency is improved, by setting
The progress for setting LED lamp bead composition shows item, and the more intuitive progress reacted now can be fast by time contrast module
Speed determines whether construction speed meets timing node requirement now, and electricity original part is effectively combined with sand table, so that its effect is aobvious
Show that more intuitively the operation is more convenient.
The above is only the preferred embodiment to the utility model, is not made in any form to the utility model
Limitation, it is all according to the technical essence of the utility model any simple modification made to the above embodiment, equivalent variations with
Modification, is all within the scope of the technical scheme of the utility model.
Claims (5)
1. a kind of project management live simulation sand table, including sand table main body (1), supporting leg (4) and lay flat support frame (5), feature
It is, sand table main body (1) the lower surface four corners are equipped with connector (2), the connector (2) and sand table main body (1) fixed company
It connecing, connector (2) lower end is rotatably connected to supporting leg (4) by shaft (6), which is equipped with traveling wheel (3),
The supporting leg (4) is additionally provided with relative to the lateral surface upper end of shaft (6) tangent line and lays flat support frame (5), this lays flat support frame (5) water
Plane section is outer flaring groove profile, and the slot bottom is fixedly connected by bolt (12) with supporting leg (4) lateral surface, the sand table main body
(1) upper surface heel row is equipped with several working face nameplates (8) and responsible person's nameplate (9), and the working face nameplate (8), which is located at, is responsible for
Progress is equipped on the left of people's nameplate (9), in front of the working face nameplate (8) and shows item (7), and the progress shows and sets in front of item (7)
Having time contrast module (10), time contrast module (10) front are additionally provided with problem summarizing module (11).
2. a kind of project management live simulation sand table according to claim 1, which is characterized in that the traveling wheel (3) is
Universal wheel, and which is provided with brake apparatus.
3. a kind of project management live simulation sand table according to claim 1, which is characterized in that described to lay flat support frame
(5) limit effect is provided for supporting leg (4) when supporting leg (4) is vertically placed.
4. a kind of project management live simulation sand table according to claim 1, which is characterized in that the progress shows item
It (7) is LED light bar, and LED lamp bead is 10,20 or 40 thereon.
5. a kind of project management live simulation sand table according to claim 1, which is characterized in that the time contrast module
(10) include progression time and plan node, it is whether qualified to analyze progress.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821603173.2U CN209328346U (en) | 2018-09-29 | 2018-09-29 | A kind of project management live simulation sand table |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821603173.2U CN209328346U (en) | 2018-09-29 | 2018-09-29 | A kind of project management live simulation sand table |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209328346U true CN209328346U (en) | 2019-08-30 |
Family
ID=67707551
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821603173.2U Expired - Fee Related CN209328346U (en) | 2018-09-29 | 2018-09-29 | A kind of project management live simulation sand table |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209328346U (en) |
-
2018
- 2018-09-29 CN CN201821603173.2U patent/CN209328346U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102259812A (en) | Levelling leg of aerial working platform | |
CN107041623A (en) | It is a kind of to create the Portable table that visitor uses | |
CN207425133U (en) | The multimedia teaching apparatus that a kind of Korean teaching uses | |
CN209328346U (en) | A kind of project management live simulation sand table | |
CN204403691U (en) | A kind of shock-absorbing support frame | |
CN205140474U (en) | Liftable billboard bracket | |
CN206297314U (en) | Mapping Flat | |
CN204306315U (en) | A kind of multifunctional conference presides over dais | |
CN204081464U (en) | Ruggedized construction bottom a kind of aluminum alloy mould plate | |
CN206180664U (en) | Novel convertible AC plug charger | |
CN202147875U (en) | Medical electric lifting packing table | |
CN203935557U (en) | A kind of barbell disc laying rack | |
CN206286135U (en) | A kind of small-sized auxiliary dispensing instrument | |
CN204402070U (en) | The convenient building support regulating height | |
CN204514306U (en) | A kind of portable railway calibration equipment | |
CN204363477U (en) | A kind of intelligent bench in park | |
CN206426720U (en) | Primary school teaching Portable blackboard | |
CN207236441U (en) | Double-face easel | |
CN204720022U (en) | A kind of teacher gos over examination papers device | |
CN206105775U (en) | Support frock of engine restoration usefulness | |
CN205140471U (en) | Convenient billboard bracket who dismantles | |
CN206227948U (en) | A kind of Multifunctional financial budget platform | |
CN207367402U (en) | A kind of career planing multimedia teaching apparatus | |
CN205038606U (en) | High formula can be finely tuned and key dish is calculated | |
CN204479888U (en) | A kind of portable photographic platform |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20190830 Termination date: 20200929 |