CN209325188U - A kind of civil engineering steel construction petroleum pipeline bracket - Google Patents
A kind of civil engineering steel construction petroleum pipeline bracket Download PDFInfo
- Publication number
- CN209325188U CN209325188U CN201821968866.1U CN201821968866U CN209325188U CN 209325188 U CN209325188 U CN 209325188U CN 201821968866 U CN201821968866 U CN 201821968866U CN 209325188 U CN209325188 U CN 209325188U
- Authority
- CN
- China
- Prior art keywords
- column
- bracket
- crossbeam
- rubber
- support
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Road Signs Or Road Markings (AREA)
Abstract
The utility model provides a kind of civil engineering steel construction petroleum pipeline bracket, includes: column, crossbeam, bracket;The inner bottom of column and the second column is provided with crossbeam, and column and the second column are connected with crossbeam by welding manner;The bosom of crossbeam offers through-hole;The both upper ends thereof of crossbeam on the downside of the inner end of column and the second column is arranged in reinforcing rib and the second reinforcing rib, and reinforcing rib and the second reinforcing rib are connected with column, the second column and crossbeam by welding manner;Protrusion is offered on the upside of the inner end of column and the second column, and column and the second column are an integral structure with protrusion and are connected;The bosom of protrusion offers internal thread hole;The utility model combines the prior art by the improvement in structure, has structure superior, practical, and advantage time saving and energy saving when filling pipeline, solves the problem and deficiency in existing apparatus technology, is allowed to purpose more with practicability.
Description
Technical field
The utility model relates to technical field of civil engineering, more specifically, more particularly to a kind of civil engineering steel construction
Petroleum pipeline bracket.
Background technique
Petroleum pipeline is made of oil pipe and its attachment, and according to the needs of process flow, is equipped with corresponding oil pump machine
Group, design are mounted to a complete pipe-line system, unload for completing oil plant and defeated turn task;The tubing of petroleum pipeline is general
For steel pipe, long-distance pipe is connected into using attachment devices such as welding and flanges, and control and flow is opened and closed using valve
It adjusts;Oil pipeline mainly has the conveying techniques such as isothermal conveying, heated transportation and sequentially-fed.
It makes discovery from observation, existing petroleum pipeline needs to be arranged in pipeline external when carrying out being laid with installation over long distances
Many places support of pipelines is supported protection to pipeline, and the existing generally existing structure of petroleum pipeline bracket is single, and the practicability is poor,
And time-consuming and laborious problem brings certain limitation in the actual use process when filling pipeline, then, how to mention
Civil engineering steel construction petroleum pipeline bracket superior for a kind of structure, practical and time saving and energy saving when filling pipeline, becomes
The important topic that current needs solve.
In view of this, being studied improvement for existing problem, a kind of civil engineering steel construction petroleum pipeline branch is provided
Frame structure is single, and the practicability is poor, and problem time-consuming and laborious when filling pipeline, it is intended to by the technology, reach solve the problems, such as with
Improve the purpose of practical value.
Utility model content
The purpose of this utility model is to provide a kind of civil engineering steel construction petroleum pipeline brackets, to solve above-mentioned background
The structure proposed in technology is single, and the practicability is poor, and problem and deficiency time-consuming and laborious when filling pipeline.
To achieve the above object, the utility model provides a kind of civil engineering steel construction petroleum pipeline bracket, by following
Particular technique means are reached:
A kind of civil engineering steel construction petroleum pipeline bracket, comprising: column, reinforcing rib, crossbeam, the second reinforcing rib, second
In column, rubber, bracket, screw rod, the second rubber, second support, protrusion, internal thread hole, through-hole, the second internal thread hole and third
Threaded hole;The inner bottom of the column and the second column is provided with crossbeam, and column and the second column and crossbeam pass through welding
Mode is connected;The bosom of the crossbeam offers through-hole;The reinforcing rib and the setting of the second reinforcing rib are in column and the
The both upper ends thereof of crossbeam on the downside of the inner end of two columns, and reinforcing rib and the second reinforcing rib pass through with column, the second column and crossbeam
Welding manner is connected;Protrusion, and column and the second column and protrusion are offered on the upside of the inner end of the column and the second column
It is an integral structure and is connected;The bosom of the protrusion offers internal thread hole;The inner end of the column and the second column
It is provided with bracket, and column and the second column are connected with bracket by snap fit;The top of protrusion is arranged in the bracket,
And bracket is connected by screw rod with the mode of being screwed on is projected through;The rubber is arranged in the inner wall upper end of bracket, and rubber with
Bracket is connected by bonding mode;The top of bracket is arranged in the second support, and second support passes through screw rod and bracket
It is connected by the mode of being screwed on;Second rubber is arranged on the inner wall of second support, and the second rubber and second support are logical
Bonding mode is crossed to be connected;The inside both ends of the bracket offer the second internal thread hole;The inside both ends of the second support
Offer third internal thread hole.
As advanced optimizing for the technical program, a kind of civil engineering steel construction petroleum pipeline bracket institute of the utility model
It states column and the second column side view is the setting of drum steel construction, and the inner end of column and the second column is connect with beam engagement.
As advanced optimizing for the technical program, a kind of civil engineering steel construction petroleum pipeline bracket institute of the utility model
The detachable setting of bracket and second support side view semicircular in shape shape structure is stated, and the inside both ends of bracket and second support are opened
Equipped with the second internal thread hole and third internal thread hole being connected at two with screw rod.
As advanced optimizing for the technical program, a kind of civil engineering steel construction petroleum pipeline bracket institute of the utility model
State rubber and the second rubber side view be rubber plastic structure, and rubber and the second rubber with a thickness of 1 centimetre.
As advanced optimizing for the technical program, a kind of civil engineering steel construction petroleum pipeline bracket institute of the utility model
Bracket and second support is stated to be flexibly connected with column and the engaging of the second column.
As advanced optimizing for the technical program, a kind of civil engineering steel construction petroleum pipeline bracket institute of the utility model
Crossbeam section view is stated in rectangular slat body structure setting, and the bosom of crossbeam offers the circular through-hole of a director.
Due to the application of the above technical scheme, the utility model has the advantage that compared with prior art
1, the utility model is the setting of drum steel construction, and column and the second column by column and the second column side view
Inner end connect with beam engagement, the drum steel construction of column and the second column has support degree big, and performance is strong, and realization finishes
The superior advantage of structure.
2, the utility model is by the detachable setting of bracket and second support side view semicircular in shape shape structure, and bracket and
The inside both ends of second support offer the second internal thread hole and third internal thread hole being connected at two with screw rod, bracket and
The detachable structure of second support is convenient for the filling of petroleum pipeline, makes it have time saving and energy saving advantage.
3, the utility model is flexibly connected by bracket and second support with column and the engaging of the second column, bracket and second
The mode that is connected together of bracket and column and the second column, it is easy to disassemble, it is practical.
4, the utility model has structure superior by the improvement to civil engineering steel construction petroleum pipeline bracket, practical
Property is strong, and advantage time saving and energy saving when filling pipeline, so that effective solution the utility model is in one Xiang Zhongti of background technique
Out the problem of and deficiency.
Detailed description of the invention
The attached drawing constituted part of this application is used to provide a further understanding of the present invention, the utility model
Illustrative embodiments and their description are not constituteed improper limits to the present invention for explaining the utility model.In attached drawing
In:
Fig. 1 is that the axis of the utility model regards structural schematic diagram;
Fig. 2 is that the axis of the utility model regards decomposition texture schematic diagram;
Fig. 3 is that the axis of the utility model crossbeam regards structural schematic diagram.
In figure: column 1, reinforcing rib 2, crossbeam 3, the second reinforcing rib 4, the second column 5, rubber 6, bracket 7, screw rod 8, second
Rubber 9, second support 10, raised 101, internal thread hole 1011, through-hole 301, the second internal thread hole 701, third internal thread hole
1001。
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model
Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole
Embodiment.
It should be noted that in the description of the present invention, unless otherwise indicated, the meaning of " plurality " is two or two
More than a;The instructions such as term " on ", "lower", "left", "right", "inner", "outside", " front end ", " rear end ", " head ", " tail portion "
Orientation or positional relationship is to be based on the orientation or positional relationship shown in the drawings, and is merely for convenience of description the utility model and simplification
Description, rather than the device or element of indication or suggestion meaning must have a particular orientation, constructed and grasped with specific orientation
Make, therefore should not be understood as limiting the present invention.
In addition, term " first ", " second ", " third " etc. are used for description purposes only, it is not understood to indicate or imply
Relative importance.
Meanwhile in the description of the present invention, unless otherwise clearly defined and limited, term " connected ", " connection "
It shall be understood in a broad sense, for example, it may be being fixedly connected, may be a detachable connection, or be integrally connected;It can be mechanical connect
It connects, is also possible to be electrically connected;It can be directly connected, it can also be indirectly connected through an intermediary.For the general of this field
For logical technical staff, the concrete meaning of above-mentioned term in the present invention can be understood with concrete condition.
Referring to Figure 1 to Fig. 3, the utility model provides a kind of particular technique of civil engineering steel construction petroleum pipeline bracket
Embodiment:
A kind of civil engineering steel construction petroleum pipeline bracket, comprising: column 1, reinforcing rib 2, crossbeam 3, the second reinforcing rib 4,
Second column 5, rubber 6, bracket 7, screw rod 8, the second rubber 9, second support 10, raised 101, internal thread hole 1011, through-hole
301, the second internal thread hole 701 and third internal thread hole 1001;The inner bottom of column 1 and the second column 5 is provided with crossbeam 3,
And column 1 and the second column 5 are connected with crossbeam 3 by welding manner;The bosom of crossbeam 3 offers through-hole 301;Add
Strengthening tendons 2 and the second reinforcing rib 4 are arranged in the both upper ends thereof of crossbeam 3 on the downside of the inner end of column 1 and the second column 5, and reinforcing rib 2 and
Second reinforcing rib 4 is connected with column 1, the second column 5 and crossbeam 3 by welding manner;The inner end of column 1 and the second column 5
Upside offers protrusion 101, and column 1 and the second column 5 are an integral structure with protrusion 101 and are connected;The inside of protrusion 101
Centre offers internal thread hole 1011;The inner end of column 1 and the second column 5 is provided with bracket 7, and column 1 and the second column 5
It is connected with bracket 7 by snap fit;The top of protrusion 101 is arranged in bracket 7, and bracket 7 passes through screw rod 8 and protrusion 101
It is connected by the mode of being screwed on;The inner wall upper end of bracket 7 is arranged in rubber 6, and rubber 6 is connected with bracket 7 by bonding mode
It connects;The top of bracket 7 is arranged in second support 10, and second support 10 is connected with bracket 7 by the mode of being screwed on by screw rod 8
It connects;Second rubber 9 is arranged on the inner wall of second support 10, and the second rubber 9 is connected with second support 10 by bonding mode
It connects;The inside both ends of bracket 7 offer the second internal thread hole 701;The inside both ends of second support 10 offer third internal screw thread
Hole 1001.
Specifically, column 1 and 5 side view of the second column are the setting of drum steel construction, and column 1 and the second column 5 is interior
End is cooperatively connected with crossbeam 3, and the drum steel construction of column and the second column has support degree big, and performance is strong, realizes structure
Superior advantage.
Specifically, the detachable of 10 side view semicircular in shape shape structure of bracket 7 and second support is arranged, and bracket 7 and second
The inside both ends of bracket 10 offer the second internal thread hole 701 and third internal thread hole being connected at two with screw rod 8
1001, the detachable structure of bracket and second support is convenient for the filling of petroleum pipeline, makes it have time saving and energy saving advantage.
Specifically, rubber 6 and 9 side view of the second rubber are rubber plastic structure, and the thickness of rubber 6 and the second rubber 9
It is 1 centimetre, rubber 6 and the second rubber 9 can enhance stabilization when petroleum pipeline is filled with bracket and second support, petroleum pipeline
It is not easy to skid.
Specifically, bracket 7 and second support 10 are flexibly connected with column 1 and the engaging of the second column 5, bracket and second support
It is easy to disassemble with the mode that is connected together of column and the second column, it is practical.
Specifically, 3 section view of crossbeam is in rectangular slat body structure setting, and the bosom of crossbeam 3 offers director circle
The through-hole 301 of shape is operated by the oblong through-hole 301 opened up convenient for the installation of device.
Specific implementation step:
Firstly, the built-in fitting in concrete block is run through with by through-hole 301 with crossbeam 3, and crossbeam is locked by bolt,
At this point, the upper surface of crossbeam 3 maintains an equal level;The connectivity port of petroleum pipeline is placed on to the interior upper end of bracket 7, and makes petroleum pipeline
Outer surface is contacted with rubber 6, meanwhile, second support 10 is fastened on to the top of bracket 7 and petroleum pipeline by the second rubber 9,
Internal thread hole 1011, the second internal thread hole 701 and third internal thread hole 1001 are locked by screw rod 8.
In summary: a kind of civil engineering steel construction petroleum pipeline bracket is by column and the second column side view
The setting of drum steel construction, and the inner end of column and the second column is connect with beam engagement, the drum steel knot of column and the second column
Structure has support degree big, and performance is strong, realizes the superior advantage of structure;Pass through bracket and second support side view semicircular in shape shape
The detachable of structure is arranged, and the inside both ends of bracket and second support offer spiral shell in second to be connected at two with screw rod
The detachable structure of pit and third internal thread hole, bracket and second support is convenient for the filling of petroleum pipeline, makes it have time saving
Laborsaving advantage;Is flexibly connected by bracket and second support with column and the engaging of the second column, bracket and second support with stand
The mode that is connected together of column and the second column, it is easy to disassemble, it is practical;It is single to solve the structure occurred among the above, it is practical
Property is poor, and problem time-consuming and laborious when filling pipeline.
While there has been shown and described that the embodiments of the present invention, for the ordinary skill in the art,
It is understood that these embodiments can be carried out with a variety of variations in the case where not departing from the principles of the present invention and spirit, repaired
Change, replacement and variant, the scope of the utility model is defined by the appended claims and the equivalents thereof.
Claims (6)
1. a kind of civil engineering steel construction petroleum pipeline bracket, comprising: column (1), reinforcing rib (2), crossbeam (3), second are reinforced
Muscle (4), the second column (5), rubber (6), bracket (7), screw rod (8), the second rubber (9), second support (10), raised (101),
Internal thread hole (1011), through-hole (301), the second internal thread hole (701) and third internal thread hole (1001);It is characterized by: institute
The inner bottom for stating column (1) and the second column (5) is provided with crossbeam (3), and column (1) and the second column (5) and crossbeam (3)
It is connected by welding manner;The bosom of the crossbeam (3) offers through-hole (301);The reinforcing rib (2) and second plus
The both upper ends thereof of strengthening tendons (4) setting crossbeam (3) on the downside of the inner end of column (1) and the second column (5), and reinforcing rib (2) and the
Two reinforcing ribs (4) are connected with column (1), the second column (5) and crossbeam (3) by welding manner;The column (1) and second
It is offered on the upside of the inner end of column (5) raised (101), and column (1) and the second column (5) and raised (101) are integral type knot
Structure is connected;The bosom of the protrusion (101) offers internal thread hole (1011);The column (1) and the second column (5)
Inner end be provided with bracket (7), and column (1) and the second column (5) are connected with bracket (7) by snap fit;The branch
Frame (7) setting is on the top of raised (101), and bracket (7) is connected with raised (101) by the mode of being screwed on by screw rod (8);
The rubber (6) is arranged in the inner wall upper end of bracket (7), and rubber (6) is connected with bracket (7) by bonding mode;It is described
Second support (10) setting is on the top of bracket (7), and second support (10) passes through the side of being screwed on by screw rod (8) and bracket (7)
Formula is connected;Second rubber (9) is arranged on the inner wall of second support (10), and the second rubber (9) and second support
(10) it is connected by bonding mode;The inside both ends of the bracket (7) offer the second internal thread hole (701);Described second
The inside both ends of bracket (10) offer third internal thread hole (1001).
2. a kind of civil engineering steel construction petroleum pipeline bracket according to claim 1, it is characterised in that: the column
(1) and the second column (5) side view is the setting of drum steel construction, and the inner end of column (1) and the second column (5) and crossbeam (3)
It is cooperatively connected.
3. a kind of civil engineering steel construction petroleum pipeline bracket according to claim 1, it is characterised in that: the bracket
(7) and the detachable of second support (10) side view semicircular in shape shape structure is arranged, and the inside of bracket (7) and second support (10)
Both ends offer the second internal thread hole (701) and third internal thread hole (1001) being connected at two with screw rod (8).
4. a kind of civil engineering steel construction petroleum pipeline bracket according to claim 1, it is characterised in that: the rubber
(6) and the second rubber (9) side view is rubber plastic structure, and rubber (6) and the second rubber (9) with a thickness of 1 centimetre.
5. a kind of civil engineering steel construction petroleum pipeline bracket according to claim 1, it is characterised in that: the bracket
(7) and second support (10) is flexibly connected with column (1) and the second column (5) engaging.
6. a kind of civil engineering steel construction petroleum pipeline bracket according to claim 1, it is characterised in that: the crossbeam
(3) section view is in rectangular slat body structure setting, and the bosom of crossbeam (3) offers the circular through-hole of a director (301).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821968866.1U CN209325188U (en) | 2018-11-28 | 2018-11-28 | A kind of civil engineering steel construction petroleum pipeline bracket |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821968866.1U CN209325188U (en) | 2018-11-28 | 2018-11-28 | A kind of civil engineering steel construction petroleum pipeline bracket |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209325188U true CN209325188U (en) | 2019-08-30 |
Family
ID=67711729
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821968866.1U Expired - Fee Related CN209325188U (en) | 2018-11-28 | 2018-11-28 | A kind of civil engineering steel construction petroleum pipeline bracket |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209325188U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110778792A (en) * | 2019-09-23 | 2020-02-11 | 中国二十冶集团有限公司 | Pipeline butt joint device and pipeline butt joint method |
-
2018
- 2018-11-28 CN CN201821968866.1U patent/CN209325188U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110778792A (en) * | 2019-09-23 | 2020-02-11 | 中国二十冶集团有限公司 | Pipeline butt joint device and pipeline butt joint method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN209325188U (en) | A kind of civil engineering steel construction petroleum pipeline bracket | |
CN202718228U (en) | Steel strip reinforced polyethylene spiral corrugated pipe type inspection well | |
CN203404596U (en) | Horizontal dual-layer underground storage tank | |
CN104235595B (en) | The horizontal buried basin of bilayer | |
CN209354855U (en) | A kind of hydraulic pressure turnover device of pipeline no-dig technique integral lining reparation | |
CN208750233U (en) | A kind of plastics movable joint structure | |
CN208107362U (en) | A kind of petroleum pipeline attachment device | |
CN205678346U (en) | A kind of valve fittings | |
CN207621654U (en) | A kind of low-loss oil plant changes barrel | |
CN205480170U (en) | Low temperature jar | |
CN205296289U (en) | No negative pressure water supply equipment of box intelligence of automatically cleaning | |
CN206873390U (en) | A kind of construction of hydro project support safety protection device | |
CN209633378U (en) | With model multi-pipe-diameter well mold | |
CN208371400U (en) | A kind of agricultural and sideline product shop vegetables sell frame | |
CN207507321U (en) | A kind of automatically mixed gas air distributing device | |
CN208296300U (en) | A kind of novel stainless reinforced plastic water container | |
CN206436981U (en) | A kind of hot and cold mixing wastewater with air water-saving vehicle washing system | |
CN104033676A (en) | Pipeline joint | |
CN205207722U (en) | Flat concrete check valve | |
CN204356801U (en) | Prefabricated profiled plastics communication well | |
CN205132139U (en) | Whole detachable liquid storage pot | |
CN204693032U (en) | Pressurized container | |
CN209213433U (en) | A kind of engineering machinery joint lubrication oil filling apparatus | |
CN207420704U (en) | A kind of engine water outlet with strong leakproofness | |
CN208471515U (en) | Raw material tank car device for discharging |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20190830 Termination date: 20201128 |
|
CF01 | Termination of patent right due to non-payment of annual fee |