CN209308050U - A kind of double-wall cofferdam and pier construction device - Google Patents

A kind of double-wall cofferdam and pier construction device Download PDF

Info

Publication number
CN209308050U
CN209308050U CN201822030384.8U CN201822030384U CN209308050U CN 209308050 U CN209308050 U CN 209308050U CN 201822030384 U CN201822030384 U CN 201822030384U CN 209308050 U CN209308050 U CN 209308050U
Authority
CN
China
Prior art keywords
double
wall
cofferdam
wall cofferdam
guide plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201822030384.8U
Other languages
Chinese (zh)
Inventor
巩天才
王海波
耿进军
郑辉
韩瑞宾
付超
孔琪
徐刚
薛国强
周童
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangzhou Railway Group Engineering Co Ltd
China Railway Sixth Group Co Ltd
Original Assignee
Guangzhou Railway Group Engineering Co Ltd
China Railway Sixth Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangzhou Railway Group Engineering Co Ltd, China Railway Sixth Group Co Ltd filed Critical Guangzhou Railway Group Engineering Co Ltd
Priority to CN201822030384.8U priority Critical patent/CN209308050U/en
Application granted granted Critical
Publication of CN209308050U publication Critical patent/CN209308050U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

This application involves technical field of bridge construction, more particularly, to a kind of double-wall cofferdam and the pier construction device including the double-wall cofferdam.Double-wall cofferdam includes that an at least section double-wall cofferdam unit, double-wall cofferdam unit includes wall body, blade foot, inner bracing piece and guiding mechanism;Blade foot is set to wall body bottom end, and inner bracing piece is positioned horizontally in the inside of wall body inner panel, and is connected with the inner panel of wall body;Guiding mechanism includes connecting rod and guide plate, and guide plate is connected by connecting rod with wall body inner panel, and the curvature of the casing outside wall surface of the curvature and drilled pile of guide plate is adapted, and has spacing between guide plate and casing outside wall surface.Inner bracing piece can enhance the stability of double-wall cofferdam.Guide plate can play guiding and positioning action to the decentralization process of double-wall cofferdam.Therefore, the structural strength, stability of the double-wall cofferdam of the application are high, and water-stagnating effect is good, reasonable in design, are repeatedly adjusted without structure in the construction process, guarantee going on smoothly for engineering.

Description

A kind of double-wall cofferdam and pier construction device
Technical field
This application involves technical field of bridge construction, more particularly, to a kind of double-wall cofferdam and including the pier of the double-wall cofferdam Body constructing device.
Background technique
Currently, China is in railroad bridge and builds fast-developing period, large quantities of across river, cross a river, Long span over strait Railroad bridge is built.Deep water foundation cushion cap is the main projects of this kind of mega project, by natural conditions and technical reason Influence, construction be often difficult to control, seriously affect its construction speed.Key technology as such bridge construction success or failure: steel Cofferdam construction technology is constantly reformed.Currently, steel cofferdam becomes with steel sheet pile in the construction of Chinese Railway bridge deepwater foundation 2 kinds of main water-retaining structures and construction method.
But since steel cofferdam, steel sheet pile etc. are interim water-retaining structure objects, generally by unit in charge of construction's designed, designed, processing, Decentralization etc., is easy to appear situations such as unreasonable structure engineering accident happens occasionally in the construction process.Water-retaining structure object is common Accident mainly has: (1) structural strength, stability are inadequate, easily occur unstable phenomenon in the flood season, i.e. engineering circles are so-called " making dumplings " causes property loss and progress to lag, hinders going on smoothly for engineering;(2) water-stagnating effect is poor, in work progress A large amount of people must be spent to be blocked under water because of this power, material resources;(3) structure design owe rationally, in the construction process will to structure into It goes and repeatedly adjusts, or even be transformed these to structural system all can seriously hinder construction progress, caused to unit in charge of construction not small Influence.
Utility model content
The application's is designed to provide a kind of double-wall cofferdam and the pier construction device including the double-wall cofferdam, to solve In the prior art steel cofferdam with steel sheet pile water-retaining structure stability is poor, water-stagnating effect is poor, needs repeatedly to adjust in work progress Technical problem.
This application provides a kind of double-wall cofferdams, including an at least section double-wall cofferdam unit, the double-wall cofferdam unit packet Include wall body, blade foot, inner bracing piece and guiding mechanism;
The blade foot is set to the wall body bottom end, and the inner bracing piece is positioned horizontally in the inside of the wall body inner panel, And it is connected with the inner panel of the wall body;The guiding mechanism includes connecting rod and guide plate, and the guide plate passes through described Connecting rod is connected with the wall body inner panel, and the curvature of the casing outside wall surface of the curvature and drilled pile of the guide plate is mutually fitted Match, and there is spacing between the guide plate and the casing outside wall surface.
Further, the double-wall cofferdam includes double-wall cofferdam unit described in two sections, and double-wall cofferdam unit described in two sections is perpendicular To splicing.
Further, the horizontal cross-section of the double-wall cofferdam is rectangle.
Further, the quantity of the guiding mechanism be it is multiple, multiple guiding mechanisms respectively with the drilled pile Casing is corresponding.
Further, the spacing of the guide plate and the casing outside wall surface is 4cm.
Further, the junction of the connecting rod and the wall body inner panel is additionally provided with stiffener.
Further, be provided with lifting lug between the inner panel and outer panels of the wall body, the quantity of the lifting lug be it is multiple, Multiple lifting lugs are located at identical height and are uniformly arranged around the circumferential direction of the double-wall cofferdam.
Further, communicating pipe is provided between the inner panel and outer panels of the wall body.
Further, the quantity of the inner bracing piece is multiple, multiple inner bracing pieces transpostion interval along the vertical direction Setting, is separated into multilayer for the double-wall cofferdam unit.
Present invention also provides a kind of pier construction devices, including double-wall cofferdam described in any of the above-described technical solution.
Compared with prior art, the application has the beneficial effect that
The application's provides a kind of double-wall cofferdam, including an at least section double-wall cofferdam unit, the double-wall cofferdam unit Including wall body, blade foot, inner bracing piece and guiding mechanism;
The blade foot is set to the wall body bottom end, and the inner bracing piece is positioned horizontally in the inside of the wall body inner panel, And it is connected with the inner panel of the wall body;The guiding mechanism includes connecting rod and guide plate, and the guide plate passes through described Connecting rod is connected with the wall body inner panel, and the curvature of the casing outside wall surface of the curvature and drilled pile of the guide plate is mutually fitted Match, and there is spacing between the guide plate and the casing outside wall surface.
Wherein, the setting of inner bracing piece can enhance the stability of double-wall cofferdam.In guide plate and double-wall cofferdam unit The corresponding setting of casing outside bottom hole stake can play guiding and positioning action to the decentralization process of double-wall cofferdam, it is ensured that Double-wall cofferdam is precisely transferred, and has at regular intervals between guide plate and the casing outside wall surface, guarantees the smooth of double-wall cofferdam Decentralization, avoids in the construction process repeatedly adjusting double-wall cofferdam.
Therefore, the structural strength, stability of double-wall cofferdam provided by the embodiments of the present application are high, and water-stagnating effect is good, and structure is set Meter rationally, is repeatedly adjusted without structure in the construction process, guarantees going on smoothly for engineering.
Detailed description of the invention
It, below will be right in order to illustrate more clearly of specific embodiment of the present invention or technical solution in the prior art Specific embodiment or attached drawing needed to be used in the description of the prior art are briefly described, it should be apparent that, it is described below In attached drawing be that some embodiments of the utility model are not paying creativeness for those of ordinary skill in the art Under the premise of labour, it is also possible to obtain other drawings based on these drawings.
Fig. 1 is structural schematic diagram of the double-wall cofferdam provided by the embodiments of the present application in vertical view;
Fig. 2 is side structure schematic view of the double-wall cofferdam provided by the embodiments of the present application under the first visual angle;
Fig. 3 is side structure schematic view of the double-wall cofferdam provided by the embodiments of the present application under the second visual angle;
Fig. 4 is the position view of the guiding mechanism of double-wall cofferdam provided by the embodiments of the present application;
Fig. 5 is the overlooking structure diagram of the guiding mechanism of double-wall cofferdam provided by the embodiments of the present application;
Fig. 6 is the side structure schematic view of the guiding mechanism of double-wall cofferdam provided by the embodiments of the present application;
Fig. 7 is the structural schematic diagram of the lifting lug of double-wall cofferdam provided by the embodiments of the present application;
Fig. 8 is the structural schematic diagram of the lifting lug installation site of double-wall cofferdam provided by the embodiments of the present application.
Wherein, 1- wall body, 11- inner panel, 12- outer panels, 2- blade foot, 3- inner bracing piece, 4- guiding mechanism, 41- connection Bar, 42- guide plate, 43- stiffener, 5- casing, 6- lifting lug, 61- base plate, 62- otic placode, 7- pin shaft, 8- communicating pipe.
Specific embodiment
The technical solution of the utility model is clearly and completely described below in conjunction with attached drawing, it is clear that described Embodiment is the utility model a part of the embodiment, instead of all the embodiments.
The component of the utility model embodiment for usually describing and showing in attached drawing here can be with a variety of different Configuration is to arrange and design.It therefore, is not below purport to the detailed description of the embodiments of the present invention provided in the accompanying drawings In the range of limitation claimed invention, but it is merely representative of the selected embodiment of the utility model.
Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work Every other embodiment obtained, fall within the protection scope of the utility model.
It is in the description of the present invention, it should be noted that term " center ", "upper", "lower", "left", "right", " perpendicular Directly ", the orientation or positional relationship of the instructions such as "horizontal", "inner", "outside" is to be based on the orientation or positional relationship shown in the drawings, and is only For ease of description the utility model and simplify description, rather than the device or element of indication or suggestion meaning must have it is specific Orientation, be constructed and operated in a specific orientation, therefore should not be understood as limiting the present invention.In addition, term " the One ", " second ", " third " are used for descriptive purposes only and cannot be understood as indicating or suggesting relative importance.
In the description of the present invention, it should be noted that unless otherwise clearly defined and limited, term " is pacified Dress ", " connected ", " connection " shall be understood in a broad sense, for example, it may be being fixedly connected, may be a detachable connection, or integrally Connection;It can be mechanical connection, be also possible to be electrically connected;Can be directly connected, can also indirectly connected through an intermediary, It can be the connection inside two elements.For the ordinary skill in the art, above-mentioned art can be understood with concrete condition The concrete meaning of language in the present invention.
It describes referring to Fig. 1 to Fig. 8 according to the double-wall cofferdam of some embodiments of the application and including the double-wall cofferdam Pier construction device.
Embodiments herein provides a kind of double-wall cofferdam, including an at least section double-wall cofferdam unit, double-wall cofferdam list Member includes wall body 1, blade foot 2, inner bracing piece 3 and guiding mechanism 4;
Referring to as 1 to shown in Fig. 5, blade foot 2 is set to 1 bottom end of wall body, and inner bracing piece 3 is positioned horizontally in 1 inner panel 11 of wall body Inside, and be connected with the inner panel of wall body 1 11;Guiding mechanism 4 includes connecting rod 41 and guide plate 42, and guide plate 42 passes through Connecting rod 41 is connected with 1 inner panel 11 of wall body, and the curvature of 5 outside wall surface of casing of the curvature and drilled pile of guide plate 42 is mutually fitted Match, and there is spacing between 5 outside wall surface of guide plate 42 and casing.
Double-wall cofferdam provided by the embodiments of the present application includes an at least section double-wall cofferdam unit, and double-wall cofferdam unit includes wall Body 1, blade foot 2, inner bracing piece 3 and guiding mechanism 4.
Wherein, to shown in Fig. 3, wall body 1 is the double-deck wall body 1, including inner panel 11 and outer panels 12 for reference such as 1;Inner panel Steel case, panel back cord, ring flat-plate and circumferential angle steel, steel case, panel back cord, ring flat-plate and circumferential angle are provided between 11 and outer panels 12 The structure of double-wall cofferdam of the set-up mode and prior art of steel is identical, is no longer described in detail herein.
Referring to as shown in 2 and Fig. 3, blade foot 2 is set to the lower end surface of wall body 1, and blade foot 2 includes 2 panel of blade foot, 2 jiaos of blade foot The set-up mode of steel, siffener angle and panel back cord, and 2 panel of blade foot, 2 angle steel of blade foot, siffener angle and panel back cord also with The structure of the double-wall cofferdam of the prior art is identical, is no longer described in detail herein.
Referring to as shown in Figure 1 to Figure 3, inner bracing piece 3 is set to inside wall body 1, and specifically, inner bracing piece 3 is set to interior The space interior that panel 11 surrounds, inner bracing piece 3 is horizontally disposed, and the both ends of inner bracing piece 3 are connected with inner panel 11 respectively. The setting of inner bracing piece 3 can enhance the stability of double-wall cofferdam.
Referring to as shown in Figures 4 to 6, guiding mechanism 4 is also disposed on inner panel 11, and guiding mechanism 4 includes connecting rod 41 With guide plate 42, one end of connecting rod 41 is mutually welded with the inner wall of inner panel 11, the other end and guide plate 42 of connecting rod 41 It mutually welds, the setting corresponding with the casing 5 outside the bottom hole stake in double-wall cofferdam unit of guide plate 42, the transverse direction of guide plate 42 Section is in bending, and is bent to 5 direction of casing, and the curvature of guide plate 42 is corresponding with the curvature of 5 outside wall surface of casing consistent, is led Setting to plate 42 can play guiding and positioning action to the decentralization process of double-wall cofferdam, it is ensured that and double-wall cofferdam is precisely transferred, And have at regular intervals between 5 outside wall surface of guide plate 42 and casing, guarantee the smooth decentralization of double-wall cofferdam, avoids in work progress In double-wall cofferdam is repeatedly adjusted.
Therefore, the structural strength, stability of double-wall cofferdam provided by the embodiments of the present application are high, and water-stagnating effect is good, and structure is set Meter rationally, is repeatedly adjusted without structure in the construction process, guarantees going on smoothly for engineering.
To sum up, double-wall cofferdam provided by the embodiments of the present application is suitable for railway, highway, harbour, harbour etc. The water is deep and the current fast to cover The deepwater foundation construction or construction period of the complex geological conditions such as cap rock thickness are nervous, the double-wall steel cofferdam construction in mud.
In one embodiment of the application, it is preferable that double-wall cofferdam includes two section double-wall cofferdam units, and two section double-walleds enclose Weir unit vertically splices.
In this embodiment, design double-wall cofferdam includes two section double-wall cofferdam units, respectively first segment double-wall cofferdam list Member and the second section double-wall cofferdam unit, two section double-wall cofferdam units vertically splice.In splicing, first segment double-wall cofferdam list First butt welding between member and the second section double-wall cofferdam unit, then the elongated steel plate strip of wide 10cm thickness 10mm is pasted, fillet weld seam, Weld bead height 6mm guarantees the accuracy and stability of two section double-wall cofferdam unit spliceds.
It should be noted that can according to the practical situations of double-wall cofferdam design double-wall cofferdam include a section, three sections or More more piece double-wall cofferdam unit, and the height of every section double-wall cofferdam unit is also arranged as the case may be, does not do specific limit herein It is fixed.
Reference is as shown in Figure 1 to Figure 3, in one embodiment of the application, it is preferable that the horizontal cross-section of double-wall cofferdam is Rectangle.
In this embodiment, the horizontal cross-section of double-wall cofferdam is rectangle, i.e., entire double-wall cofferdam is square cofferdam structure.And The direction across bridge of double-wall cofferdam is designed as 28.6m, and vertical bridge is to being designed as 21.6m.
In one embodiment of the application, it is preferable that the quantity of guiding mechanism 4 is multiple, multiple difference of guiding mechanisms 4 It is corresponding with the casing 5 of drilled pile.
In this embodiment, referring to shown in Fig. 4, the quantity of guiding mechanism 4 be it is multiple, multiple guiding mechanisms 4 respectively with brill The casing 5 of hole stake is corresponding, guarantees that at least one guiding mechanism 4 of the casing 5 of the drilled pile of outer ring is corresponding to it and plays guiding Effect.
Specifically, guiding mechanism 4 can be set to 12, to guarantee that cofferdam is smoothly transferred.
In such an embodiment, it is preferable the guiding mechanism 4 on inner panel 11 is provided with upper layer and lower layer along the vertical direction, on Lower two layers of guiding mechanism 4 is corresponding on same vertical line, to can play twice guiding in double-wall cofferdam decentralization process Positioning action further ensures the precision of double-wall cofferdam decentralization.
In one embodiment of the application, it is preferable that the spacing of guide plate 42 and 5 outside wall surface of casing is 4cm.
In this embodiment, shown in referring to figure 5 and figure 6, between designing between guide plate 42 and corresponding 5 outside wall surface of casing Away from for 4cm, here away from the lower smooth decentralization that can either guarantee double-wall cofferdam, guide plate 42 can play guiding role again, protect Demonstrate,prove the accurate decentralization of double-wall cofferdam.
It should be noted that scene can be according to the plan-position of casing and verticality adjustment 42 length of guide plate and guide plate Spacing size between 42 and corresponding casing outside wall surface, to ensure that cofferdam decentralization is smooth.And the rigidity to guarantee guiding, guiding All weld seams of mechanism 4 are fully welded, weld bead height 8mm, guarantee weldquality.
In one embodiment of the application, it is preferable that shown in referring to figure 5 and figure 6, connecting rod 41 and 1 inner panel of wall body 11 junction is additionally provided with stiffener 43.
In this embodiment, the stability being connect for enhancing guiding mechanism 4 with wall body 1, in connecting rod 41 and 1 inner face of wall body The junction of plate 11 is additionally provided with stiffener 43.
In one embodiment of the application, it is preferable that referring to shown in Fig. 7 and Fig. 8, the inner panel 11 of wall body 1 and outside Be provided with lifting lug 6 between plate 12, the quantity of lifting lug 6 be it is multiple, multiple lifting lugs 6 are located at identical height and the circumferential direction around double-wall cofferdam It is uniformly arranged.
For convenience of the lifting of double-wall cofferdam, in this embodiment, it is provided between the inner panel 11 and outer panels 12 of wall body 1 Lifting lug 6, the axis direction of the lifting hole(eyelet) of lifting lug 6 is perpendicular to inner panel 11 and outer panels 12, and lifting hole(eyelet) runs through inner panel 11 and outside Plate 12.In lifting, pin shaft 7 is inserted into lifting hole(eyelet), for hanging apparatus by being connected with pin shaft 7, double-wall cofferdam is hung in realization Dress.
Specifically, the quantity of lifting lug 6 is multiple, and multiple lifting lugs 6 are uniformly arranged and are located at identical around the circumferential direction of double-wall cofferdam Highly, double-wall cofferdam is lifted simultaneously by multiple lifting lugs 6 when lifting, the stability of lifting is more preferable.Preferably, lifting lug 6 Quantity be set as 8.
Preferably, referring to shown in Fig. 7, the structure of lifting lug 6 includes base plate 61 and otic placode 62, and otic placode 62 is set to bottom block On, and the junction of otic placode 62 and base plate 61 is provided with stiffener 43 to enhance the intensity of lifting lug 6.
Specifically, lifting lug 6 is welded using the Q235B steel plate of thickness 10mm, and 6 component of lifting lug is fillet weld, and welding angle is high Degree is not less than 8mm, and weld seam is second-order weld or more.Base plate 61 is mutually welded with 1 ring flat-plate of wall body, it is ensured that stress point safety.
In one embodiment of the application, it is preferable that shown in referring to Fig.1, the inner panel 11 and outer panels 12 of wall body 1 it Between be provided with communicating pipe 8.
In this embodiment, it is the realization smooth suck sediment subsidence of double-wall cofferdam to design position, and keeps hydraulic pressure inside and outside cofferdam Balance is provided with communicating pipe 8 between the inner panel 11 and outer panels 12 of wall body 1, is connected to inside and outside cofferdam communicating pipe 8.
Preferably, the quantity of communicating pipe 8 is multiple, and multiple communicating pipes 8 are uniformly distributed on cofferdam, and.Specifically, it is connected to The quantity of pipe 8 is 16, and communicating pipe 8 is the steel pipe of Φ 300mm.
Preferably, multiple communicating pipes 8 are located at the identical height on cofferdam.
In one embodiment of the application, it is preferable that referring to figs. 1 to shown in Fig. 3, the quantity of inner bracing piece 3 be it is multiple, Transpostion interval is arranged multiple inner bracing pieces 3 along the vertical direction, and double-wall cofferdam unit is separated into multilayer.
In this embodiment, the quantity of the inner bracing piece 3 of each double-wall cofferdam unit is multiple, multiple 3 edges of inner bracing piece Vertical direction parallel interval square crossing setting, so that double-wall cofferdam unit is separated into multilayer, the inner bracing piece 3 of the bottom is First layer inner bracing piece 3, upwards in turn respectively second layer inner bracing piece 3, third layer inner bracing piece 3 etc..It is multiple by being arranged Spaced inner bracing piece 3 along the vertical direction can play multiple supporting role, so that double-wall cofferdam is under to double-wall cofferdam It puts more preferable with stability in work progress.
In one embodiment of the application, it is preferable that 2 height 150cm of blade foot;Double-wall cofferdam inner panel 11 and outer panels 12 are all made of 6mm steel plate, and the inside and outside panel 12 of steel case uses 8mm steel plate;Panel back cord uses 75 × 50 × 8 angle steel of ∠, standard Spacing 30cm;Panel back cord uses 12.6 fashioned iron, spacing 30cm at interior Support Position;Circumferential angle steel using 2 ∠ 100 × 10;Ring flat-plate uses 10mm steel plate, and corner's steel case ring flat-plate uses 12mm steel plate, and partition panel uses 10mm steel plate.Manufacture craft must It must guarantee its design size and weldquality, meet the requirement of water-retaining structure.
Embodiments herein additionally provides a kind of pier construction device, the double-wall cofferdam including any of the above-described embodiment.
In this embodiment, it due to the double-wall cofferdam that pier construction device includes above-described embodiment, thus is enclosed with double-walled Whole beneficial effects on weir, then this repeats no more.
The embodiments of the present invention also provide a kind of double-wall cofferdam progress pier construction using any of the above-described embodiment Method, it is mainly Muddy Bottoms clay and layer of sand that the double-wall cofferdam of the application, which is applied to geology at cofferdam construction, is tightly grabbed in construction Firmly the essence of sinking of cofferdam is exactly to reduce the frictional resistance of cofferdam wall and the soil body, and cofferdam is enable to sink by self weight (or added counterweight) Reach design position, theory accordingly, before Double-Wall Steel Boxed Cofferdam sinks in use and is taken based on soil with high-front shovel excavation, suction mud, In jetting, cabin the various ways such as counterweight and use supplemented by comprehensive construction method, accelerate construction progress, it is ensured that cofferdam transfer precision.
Specifically, comprising the following steps:
Step 100, after the completion of pile foundation construction, remove drilling platform;
Step 200, double-wall cofferdam unit segmentation internal field workshop make, including blanking, widgets welding equipment, siding jigsaw, Tire production molding in segmentation, cofferdam factory integration production;
Double-Wall Steel Boxed Cofferdam transport using two barges parallel, tugboat tow by the way of transported, in the processing factory of cofferdam by 600t gantry crane merogenesis is lifted to flat top barge, is then transported to bridge location;
Carry out live preparation before step 300, construction first, crane barge casts anchor positioning, utilizes 600t crane barge lifting double-wall cofferdam Unit first segment, sinking cofferdam to homeostasis pour blade foot concrete;
If step 400, double-wall cofferdam unit are more piece, the second section double-wall cofferdam unit is lifted using crane barge and first segment is double Wall cofferdam unit is spliced, is welded, and weldquality is ensured during spelling;It repeats to lift, completes more piece double-wall cofferdam unit Splicing;
Step 500 is cut the earth by high-front shovel, and cooperation airlift suction dredger inhales the sinking measure of mud, keeps double-wall cofferdam whole Body uniformly sinks to design position, throwing slabstone and rubble screed-coat, pours bottom concrete;
It draws water in step 600, double-wall cofferdam, then removes guidance system, cut off steel pile casting, dig pile crown;
Step 700, binding cushion cap reinforcing bar, pour first layer cushion cap concrete, after its intensity reaches design strength, remove First layer cofferdam inner bracing piece, second layer cushion cap of constructing;It repeats to construct, completes whole pier construction.
Wherein, in above-mentioned work progress, in coxopodite double-wall cofferdam unit lifting from after floating stablize, with concrete pouring blade foot, To increase the stiffness and strength in blade foot sinking watching, after having poured blade foot concrete cofferdam stabilization, installation connects high platform and faces When connect high limition orientation.It connects high guiding to be arranged using 10# channel steel spacing 50cm, berm width 1.5m, wheel platform uses diameter 16mm screw-thread steel spacing 8cm welding.It temporarily connects high limition orientation to be arranged using 20 I-steel of Two bors d's oeuveres, guiding is higher by interface position At 50cm, spacing 4-5m setting one.
Be using the advantages of above-mentioned cofferdam structure and construction method: the equipment used except high-front shovel generally use compared with Few outer, other equipment are commonly used equipment, and the land used that cofferdam assembled sinking in situ occupies is less.Cofferdam is kept off as bearing platform construction Water-bound, while being used as cushion cap template, the time is saved for next procedure construction.
Finally, it should be noted that the above various embodiments is only to illustrate the technical solution of the utility model, rather than it is limited System;Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should Understand: it is still possible to modify the technical solutions described in the foregoing embodiments, or to some or all of Technical characteristic is equivalently replaced;And these are modified or replaceed, it does not separate the essence of the corresponding technical solution, and this is practical new The range of each embodiment technical solution of type.

Claims (10)

1. a kind of double-wall cofferdam, which is characterized in that including an at least section double-wall cofferdam unit, the double-wall cofferdam unit includes wall Body, blade foot, inner bracing piece and guiding mechanism;
The blade foot is set to the wall body bottom end, and the inner bracing piece is positioned horizontally in the inside of the wall body inner panel, and with The inner panel of the wall body is connected;The guiding mechanism includes connecting rod and guide plate, and the guide plate passes through the connection Bar is connected with the wall body inner panel, and the curvature of the casing outside wall surface of the curvature and drilled pile of the guide plate is adapted, And there is spacing between the guide plate and the casing outside wall surface.
2. double-wall cofferdam according to claim 1, which is characterized in that including double-wall cofferdam unit described in two sections, two section institutes Double-wall cofferdam unit is stated vertically to splice.
3. double-wall cofferdam according to claim 1, which is characterized in that the horizontal cross-section of the double-wall cofferdam is rectangle.
4. double-wall cofferdam according to claim 1, which is characterized in that the quantity of the guiding mechanism is multiple, Duo Gesuo It is corresponding with the casing of the drilled pile respectively to state guiding mechanism.
5. double-wall cofferdam according to claim 1, which is characterized in that the spacing of the guide plate and the casing outside wall surface For 4cm.
6. double-wall cofferdam according to claim 1, which is characterized in that the connection of the connecting rod and the wall body inner panel Place is additionally provided with stiffener.
7. double-wall cofferdam according to claim 1, which is characterized in that be arranged between the inner panel and outer panels of the wall body Have a lifting lug, the quantity of the lifting lug be it is multiple, multiple lifting lugs are located at identical height and around the circumferential equal of the double-wall cofferdam Even setting.
8. double-wall cofferdam according to claim 1, which is characterized in that be arranged between the inner panel and outer panels of the wall body There is communicating pipe.
9. double-wall cofferdam according to claim 1, which is characterized in that the quantity of the inner bracing piece is multiple, Duo Gesuo Stating inner bracing piece, transpostion interval is arranged along the vertical direction, and the double-wall cofferdam unit is separated into multilayer.
10. a kind of pier construction device, which is characterized in that including double-wall cofferdam as described in any one of claim 1 to 9.
CN201822030384.8U 2018-12-04 2018-12-04 A kind of double-wall cofferdam and pier construction device Expired - Fee Related CN209308050U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201822030384.8U CN209308050U (en) 2018-12-04 2018-12-04 A kind of double-wall cofferdam and pier construction device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201822030384.8U CN209308050U (en) 2018-12-04 2018-12-04 A kind of double-wall cofferdam and pier construction device

Publications (1)

Publication Number Publication Date
CN209308050U true CN209308050U (en) 2019-08-27

Family

ID=67675815

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201822030384.8U Expired - Fee Related CN209308050U (en) 2018-12-04 2018-12-04 A kind of double-wall cofferdam and pier construction device

Country Status (1)

Country Link
CN (1) CN209308050U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109371997A (en) * 2018-12-04 2019-02-22 中铁六局集团有限公司 A kind of double-wall cofferdam and pier construction method
CN111395371A (en) * 2020-04-26 2020-07-10 中铁十一局集团第一工程有限公司 Accurate adjusting device of double-walled steel cofferdam
CN112302028A (en) * 2020-10-23 2021-02-02 中国五冶集团有限公司 A guider that is used for double-walled steel cofferdam to transfer location

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109371997A (en) * 2018-12-04 2019-02-22 中铁六局集团有限公司 A kind of double-wall cofferdam and pier construction method
WO2020114523A1 (en) * 2018-12-04 2020-06-11 中铁六局集团有限公司 Double-wall cofferdam and pier construction method
CN111395371A (en) * 2020-04-26 2020-07-10 中铁十一局集团第一工程有限公司 Accurate adjusting device of double-walled steel cofferdam
CN112302028A (en) * 2020-10-23 2021-02-02 中国五冶集团有限公司 A guider that is used for double-walled steel cofferdam to transfer location

Similar Documents

Publication Publication Date Title
CN109371997A (en) A kind of double-wall cofferdam and pier construction method
CN103741657B (en) The construction method of large-sized multifunction waterborne traffic accident
CN104532813B (en) A kind of aquatic building operation platform and erection method, using method
CN103835283B (en) Full wet joint prefabricated prestressed underground continuous wall and construction method thereof
CN102251530B (en) Construction process of double-wall steel cofferdam for construction of pier bearing platform in main river water of Yellow River
CN107524138B (en) Construction method of ultra-deep foundation pit underground diaphragm wall
CN209308050U (en) A kind of double-wall cofferdam and pier construction device
CN104895093B (en) A kind of half coercion underground continuous wall and its construction method
CN108049393A (en) For the attached building enclosure construction technology in subway station under the conditions of rich water thick sand bed
CN101538833A (en) Vertical subsection double-wall steel cofferdam water stopping construction method
CN108505529A (en) A kind of construction method of the bearing platform construction steel cofferdam of Through Steel case arch bridge
CN108867672A (en) A kind of Double-Wall Steel Boxed Cofferdam joining method
CN107059902A (en) A kind of reusable steel boxed cofferdam structure and its construction method
CN109707002B (en) Device and method for accurately positioning, sinking and installing large water intake head
CN106223355A (en) A kind of high bearing platform supported on piles in deep water Hold Hoop method has device and the construction method of end steel jacket box
CN110644363A (en) Construction method of underwater main tower of cross-river cable-stayed bridge of high-speed railway
CN107620311A (en) A kind of mud off pore-creating filling pile prevents the method that aperture casing sinks
CN103015442B (en) Method for constructing split type cofferdam
CN106758759A (en) A kind of trestle pile foundation and its anchoring process for deep water drift net riverbed
CN203654196U (en) Guide apparatus for large and multifunctional over-water construction platform
CN107299640A (en) A kind of variable cross-section well shaft type ground continuous wall base and its construction method
CN215211057U (en) H-shaped steel structure for lap joint of underground continuous walls with different thicknesses
JP6068985B2 (en) Pile core positioning member
JP6282316B2 (en) Underwater pile construction method
CN206495214U (en) A kind of underwater concrete perfusion conduit

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190827

Termination date: 20211204

CF01 Termination of patent right due to non-payment of annual fee