jump
support frame
board support
column
hanging plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201822273788.XU
Other languages
Chinese (zh)
Inventor
李胜新
王晓煜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuchang Shipbuilding Industry Group Co Ltd
Original Assignee
Wuchang Shipbuilding Industry Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuchang Shipbuilding Industry Group Co Ltd filed Critical Wuchang Shipbuilding Industry Group Co Ltd
Priority to CN201822273788.XU priority Critical patent/CN209274856U/en
Application granted granted Critical
Publication of CN209274856U publication Critical patent/CN209274856U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of for quickly taking the special tooling of jump.Hanging plate and hull supporting element are arranged on column, jump board support frame is also disposed on column.What manufacture was completed, which takes jump tooling, directly to be hung on ship side by hanging plate, when needing to carry out hull the operations such as polishing and/or touch-up paint, only springboard need to be set up on jump board support frame, construction personnel can stand to polish and/or touch-up paint operation in the springboard, without specially setting up scaffold, thus the time-consuming and laborious in the prior art and very low technical problem of construction operation safety is solved, it realizes to take and jumps the time saving and energy saving technical effect with the safety for improving construction operation of operation, working efficiency is not only increased, and ensure that the personal safety of staff.

Description

It is a kind of for quickly taking the special tooling of jump
Technical field
The utility model relates to mechanical engineering technical fields more particularly to a kind of for quickly taking the special tooling of jump.
Background technique
Building berth construction phase and harbour installation and debugging stage during shipbuilding, it is often necessary in stem or line style The place of big rise and fall carries out such as polishing, touch-up paint operation.Due to these position line style big rise and falls, upper-lower height difference is larger, The difference in height of some positions has been even up to more than 20 meters, and it is difficult temporarily to set up scaffold, not only time-consuming and laborious, Er Qieshi The safety for the industry that works is very low, and the dangerous situation that operating personnel slips occurs often.
Utility model content
The utility model is a kind of for quickly taking the special tooling of jump by providing, and solves time-consuming and laborious in the prior art The very low technical problem of safety with construction operation realizes and takes that jump operation time saving and energy saving and improve the safety of construction operation Technical effect.
The utility model provides a kind of for quickly taking the special tooling of jump, comprising: hanging plate, column, jump board support frame And hull supporting element;The hanging plate and the hull supporting element are arranged on the column, and the hanging plate and the hull Supporting element is respectively positioned on the first side of the column, and the hull supporting element is located at the lower section of the hanging plate;The jump board support Second side of the column is arranged in frame.
Further, further includes: connecting plate;The first end of the connecting plate is connect with the hanging plate, the connecting plate Second end is connect with the column.
Further, the jump board support frame includes: jump board support frame and guardrail;The jump board support frame is vertically set Set second side in the column;The guardrail is connect with the jump board support frame.
Further, the guardrail includes: guardrail pipe-in-pipe and guardrail pipe;The first end of the guardrail pipe-in-pipe with it is described The second end of the guardrail pipe-in-pipe is arranged in the connection of jump board support frame, the guardrail pipe.
Further, the jump board support frame further include: set square;The set square is arranged in the jump board support frame With the junction of the column.
Further, the jump board support frame further include: tilted supporter;The first end of the tilted supporter and the column connect It connects, the second end of the tilted supporter is connect with the jump board support frame.
Further, the hanging plate is coupling type structure.
The one or more technical solutions provided in the utility model, have at least the following technical effects or advantages:
Hanging plate and hull supporting element are arranged on column, jump board support frame is also disposed on column.Manufacture is completed Take and jump tooling and can directly be hung on ship side by hanging plate, when needing to carry out hull polishing and/or the operations such as touch-up paint, only need Set up springboard on jump board support frame, construction personnel can stand to polish and/or touch-up paint operation in the springboard, without special Door sets up scaffold, thus solves the time-consuming and laborious in the prior art and very low technical problem of construction operation safety, real Show to take and jumped the time saving and energy saving technical effect with the safety for improving construction operation of operation, has not only increased working efficiency, and It ensure that the personal safety of staff.
Detailed description of the invention
Fig. 1 is provided by the embodiment of the utility model for quickly taking the structural schematic diagram of the special tooling of jump;
Wherein, 1- hanging plate, 2- column, 3- hull supporting element, 4- jump board support frame, 5- guardrail pipe-in-pipe, 6- guardrail pipe, 7- set square, 8- tilted supporter, 9- steel pipe seal plate, 10- connecting plate.
Specific embodiment
The utility model embodiment is a kind of for quickly taking the special tooling of jump by providing, and solves expense in the prior art When the very low technical problem of laborious and construction operation safety, realize to take and jump that operation is time saving and energy saving and raising construction operation The technical effect of safety.
The technical scheme in the embodiment of the utility model is to solve the above problems, general thought is as follows:
Hanging plate and hull supporting element are arranged on column, jump board support frame is also disposed on column.Manufacture is completed Take and jump tooling and can directly be hung on ship side by hanging plate, when needing to carry out hull polishing and/or the operations such as touch-up paint, only need Set up springboard on jump board support frame, construction personnel can stand to polish and/or touch-up paint operation in the springboard, without special Door sets up scaffold, thus solves the time-consuming and laborious in the prior art and very low technical problem of construction operation safety, real Show to take and jumped the time saving and energy saving technical effect with the safety for improving construction operation of operation, has not only increased working efficiency, and It ensure that the personal safety of staff.
Above-mentioned technical proposal in order to better understand, in conjunction with appended figures and specific embodiments to upper Technical solution is stated to be described in detail.
It is provided by the embodiment of the utility model for quickly taking the special tooling of jump, comprising: hanging plate 1, column referring to Fig. 1 2, jump board support frame and hull supporting element 3;Hanging plate 1 and hull supporting element 3 are arranged on column 2, and hanging plate 1 and hull support Part 3 is respectively positioned on the first side of column 2, and hull supporting element 3 is located at the lower section of hanging plate 1;The of column 2 is arranged in jump board support frame Two sides.
When the special tooling provided by the embodiment of the utility model for quickly taking jump when in use, hull supporting element 3 is made It is supported for fulcrum to jump tooling is taken, to improve provided by the embodiment of the utility model for quickly taking the special tool of jump The stability of assembling structure, and then ensured the personal safety of operating personnel.
Structure provided by the embodiment of the utility model for quickly taking the special tooling of jump is further described, also It include: connecting plate 10;The first end of connecting plate 10 is connect with hanging plate 1, and the second end of connecting plate 10 is connect with column 2.
In the present embodiment, connecting plate 10 is welded and fixed with hanging plate 1, and connecting plate 10 is also welded and fixed with column 2.
The structure of jump board support frame is specifically described, jump board support frame includes: jump board support frame 4 and guardrail;It jumps Plate braced frame 4 is vertically set on second side of column 2;Guardrail is connect with jump board support frame 4.
In the present embodiment, jump board support frame 4 is welded and fixed with column 2, and guardrail and jump board support frame 4 also weld admittedly It is fixed.
The structure of guardrail is specifically described, guardrail includes: guardrail pipe-in-pipe 5 and guardrail pipe 6;Guardrail pipe-in-pipe 5 First end is connect with jump board support frame 4, and the second end of guardrail pipe-in-pipe 5 is arranged in guardrail pipe 6.
In the present embodiment, guardrail pipe-in-pipe 5 is welded and fixed with jump board support frame 4, guardrail pipe 6 and guardrail pipe-in-pipe 5 Also it is welded and fixed.
It is provided by the embodiment of the utility model for quickly taking the structural strength of the special tooling of jump in order to improve, to protect Demonstrate,prove the personal safety of construction personnel, jump board support frame further include: set square 7;The setting of set square 7 is in jump board support frame 4 and stands The junction of column 2.
In the present embodiment, set square 7 is weldingly fixed on the junction of jump board support frame 4 Yu column 2.
It should be noted that provided by the embodiment of the utility model for quickly taking the special tool of jump in order to further increase The structural strength of dress is also equipped with set square in the junction of hanging plate 1 and column 2.
It is provided by the embodiment of the utility model for quickly taking the structural strength of the special tooling of jump in order to further increase, To be further ensured that the personal safety of construction personnel, jump board support frame further include: tilted supporter 8;The first end of tilted supporter 8 and vertical Column 2 connects, and the second end of tilted supporter 8 is connect with jump board support frame 4.
In the present embodiment, tilted supporter 8 is welded and fixed with column 2, and tilted supporter 8 is also welded and fixed with jump board support frame 4.
Structure provided by the embodiment of the utility model for quickly taking the special tooling of jump is further explained, Further include: steel pipe seal plate 9;Steel pipe seal plate 9 is arranged on column 2, and is located at steel pipe seal.
In the present embodiment, hanging plate 1 is coupling type structure.
It should be noted that multilayer jump board support frame can be vertically arranged, on column 2 in the different height of hull Carry out the operations such as polishing and/or touch-up paint.
After the special tooling provided by the embodiment of the utility model for quickly taking jump completes, hanging plate 1 is hung over On ship side, for use at any time.After the completion of taking jump tooling installation settings, a circle security protection is set from up drawing again below Net ensures the safety of operating personnel so as to further increase the safety of construction operation.When needing to polish hull And/or when the operations such as touch-up paint, springboard need to be only set up on the jump board support frame 4 of corresponding height, construction personnel is at station in the jump Plate carries out polishing and/or touch-up paint operation, without specially setting up scaffold.
[technical effect]
1, hanging plate 1 and hull supporting element 3 are arranged on column 2, jump board support frame is also disposed on column 2.System It makes taking for completion to jump tooling and can directly hang on ship side by hanging plate 1, when needing to carry out hull polishing and/or the operations such as touch-up paint When, only it need to set up springboard on jump board support frame, construction personnel can stand to polish and/or touch-up paint operation in the springboard, Without specially setting up scaffold, thus solves the time-consuming and laborious in the prior art and very low technology of construction operation safety Problem realizes to take and jumps the time saving and energy saving technical effect with the safety for improving construction operation of operation, not only increases work effect Rate, and ensure that the personal safety of staff.
2, set square 7 is arranged in the junction of jump board support frame 4 Yu column 2, improves the utility model embodiment The structural strength of the special tooling for quickly taking jump provided, further ensures the personal safety of construction personnel.
3, it by the application to tilted supporter 8, further improves provided by the embodiment of the utility model for quickly taking jump Special tooling structural strength, to further ensure the personal safety of construction personnel.
Special tooling provided by the embodiment of the utility model for quickly taking jump has structure simple, and operating performance is good Well, the features such as single weight is light can quickly complete take jump operation at shipboard one week.Taking for manufacturing and designing at present has jumped tooling It largely puts into production use, and achieves good result, facilitate and temporarily take jump operation during shipbuilding, alleviate labor Fatigue resistance improves operating efficiency, improves the safety temporarily taken and jump operation, shortens construction period, and it is raw to obtain company Produce workshop and each department and the extensive favorable comment of leader.
Although the preferred embodiment of the utility model has been described, once a person skilled in the art knows basic Creative concept, then additional changes and modifications may be made to these embodiments.It is wrapped so the following claims are intended to be interpreted as It includes preferred embodiment and falls into all change and modification of the scope of the utility model.
Obviously, it is practical without departing from this can to carry out various modification and variations to the utility model by those skilled in the art Novel spirit and scope.If in this way, these modifications and variations of the present invention belong to the utility model claims and Within the scope of its equivalent technologies, then the utility model is also intended to include these modifications and variations.

Claims (7)

1. a kind of for quickly taking the special tooling of jump characterized by comprising hanging plate, column, jump board support frame and hull branch Support member;The hanging plate and the hull supporting element are arranged on the column, and the hanging plate and the hull supporting element are equal Positioned at the first side of the column, and the hull supporting element is located at the lower section of the hanging plate;The jump board support frame setting exists Second side of the column.
2. as described in claim 1 for quickly taking the special tooling of jump, which is characterized in that further include: connecting plate;The company The first end of fishplate bar is connect with the hanging plate, and the second end of the connecting plate is connect with the column.
3. as described in claim 1 for quickly taking the special tooling of jump, which is characterized in that the jump board support frame includes: Jump board support frame and guardrail;The jump board support frame is vertically set on second side of the column;The guardrail with it is described The connection of jump board support frame.
4. as claimed in claim 3 for quickly taking the special tooling of jump, which is characterized in that the guardrail includes: guardrail pipe Casing and guardrail pipe;The first end of the guardrail pipe-in-pipe is connect with the jump board support frame, and the guardrail pipe is arranged in institute State the second end of guardrail pipe-in-pipe.
5. as claimed in claim 3 for quickly taking the special tooling of jump, which is characterized in that the jump board support frame also wraps It includes: set square;The junction of the jump board support frame and the column is arranged in the set square.
6. as claimed in claim 3 for quickly taking the special tooling of jump, which is characterized in that the jump board support frame also wraps It includes: tilted supporter;The first end of the tilted supporter is connect with the column, the second end of the tilted supporter and the jump board support frame Frame connection.
7. as of any of claims 1-6 for quickly taking the special tooling of jump, which is characterized in that the hanging plate is Coupling type structure.
CN201822273788.XU 2018-12-29 2018-12-29 It is a kind of for quickly taking the special tooling of jump Active CN209274856U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201822273788.XU CN209274856U (en) 2018-12-29 2018-12-29 It is a kind of for quickly taking the special tooling of jump

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201822273788.XU CN209274856U (en) 2018-12-29 2018-12-29 It is a kind of for quickly taking the special tooling of jump

Publications (1)

Publication Number Publication Date
CN209274856U true CN209274856U (en) 2019-08-20

Family

ID=67608328

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201822273788.XU Active CN209274856U (en) 2018-12-29 2018-12-29 It is a kind of for quickly taking the special tooling of jump

Country Status (1)

Country Link
CN (1) CN209274856U (en)

Similar Documents

Publication Publication Date Title
CN206569235U (en) A kind of ship hanger bracket and boat scaffold
CN204826589U (en) Folding suspension type operation platform
CN104925680B (en) A kind of method of stabilizer tower crane body
CN113152873A (en) Heightening hanging basket system
CN103276907B (en) Hoisting method for large-span hinged type herringbone steel arch
CN209274856U (en) It is a kind of for quickly taking the special tooling of jump
CN207581233U (en) A kind of easy pipe fitting lifting device
CN205132926U (en) Special well word hoist of hydroelectric set tail water ell
CN205472340U (en) People's passageway on instrument formula tower crane
CN204938800U (en) Tower crane rood beam basis
CN204802891U (en) Jib crane undersetting
CN204571255U (en) Simple and easy hanging basket
CN209179519U (en) Hang the truss splicing steel construction moulding bed of auxiliary installation in a kind of gymnasium top
CN204897164U (en) A truss -like compensating beam for hoist and mount of large -scale electromechanical device
CN206346497U (en) A kind of lifting-up support unit, device and system
CN205396963U (en) Base is put things in good order to whole steel pipe on scaffold
CN203878957U (en) Protective screen module unit
CN204967130U (en) A hanging flower basket for high altitude cable laying operation
CN101597956A (en) Suspended scaffold
CN209723570U (en) Steel column docking installation operation platform
CN204212069U (en) A kind of building operations Hanging Basket
CN205224356U (en) Unit side hangs sign indicating number system
CN204875557U (en) Rhombus false work
CN204002511U (en) A kind of three-dimensional arrangement ladder
CN216042530U (en) Heightening hanging basket system

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant