CN209244293U - Temporary fixing device for movable arched rod - Google Patents
Temporary fixing device for movable arched rod Download PDFInfo
- Publication number
- CN209244293U CN209244293U CN201821968202.5U CN201821968202U CN209244293U CN 209244293 U CN209244293 U CN 209244293U CN 201821968202 U CN201821968202 U CN 201821968202U CN 209244293 U CN209244293 U CN 209244293U
- Authority
- CN
- China
- Prior art keywords
- wire rope
- plane
- wirerope
- temporary fixing
- rod
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 59
- 239000010959 steel Substances 0.000 claims abstract description 59
- 230000000694 effects Effects 0.000 claims description 3
- 210000005069 ears Anatomy 0.000 claims 2
- 239000007787 solid Substances 0.000 claims 1
- 239000003351 stiffener Substances 0.000 claims 1
- 230000000087 stabilizing effect Effects 0.000 abstract description 43
- 238000009434 installation Methods 0.000 abstract description 13
- 238000010276 construction Methods 0.000 abstract description 6
- 239000002994 raw material Substances 0.000 description 6
- 238000005096 rolling process Methods 0.000 description 6
- 238000000034 method Methods 0.000 description 4
- 230000009471 action Effects 0.000 description 3
- 239000003973 paint Substances 0.000 description 3
- 238000003860 storage Methods 0.000 description 3
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 description 2
- 238000003723 Smelting Methods 0.000 description 2
- 239000004568 cement Substances 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 239000000428 dust Substances 0.000 description 2
- 238000006748 scratching Methods 0.000 description 2
- 230000002393 scratching effect Effects 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000008859 change Effects 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 230000007613 environmental effect Effects 0.000 description 1
- 238000003912 environmental pollution Methods 0.000 description 1
- 229910052742 iron Inorganic materials 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 230000036316 preload Effects 0.000 description 1
- 230000008569 process Effects 0.000 description 1
- 230000006641 stabilisation Effects 0.000 description 1
- 238000011105 stabilization Methods 0.000 description 1
- 238000005728 strengthening Methods 0.000 description 1
- 238000003466 welding Methods 0.000 description 1
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
本实用新型公开了一种活动拱形杆临时固定装置,包括临时固定单元件、至少两根面内限位钢丝绳和至少四根面外稳定钢丝绳,面内限位钢丝绳固定于临时固定单元件的底部,面外稳定钢丝绳固定于临时固定单元件的侧部。本实用新型通过面内限位钢丝绳防止临时固定单元件沿拱形杆杆径方向移动,通过面外稳定钢丝绳增加拱形杆的面外稳定性,避免拱形杆安装过程中发生倾覆现象;在安装拱形杆过程中,能将高空作业转化为地面操作,增加施工安全性,能适用于各类管径的拱形杆安装,而且能使拱形杆平稳地保持在设计位置处,便于拱形杆与其他构件连接成整体。
The utility model discloses a temporary fixing device for a movable arched rod, which comprises a temporary fixing unit component, at least two in-plane limit wire ropes and at least four out-of-plane stabilizing steel wire ropes. Bottom, out-of-plane stabilizing wire ropes are fastened to the sides of the temporary fixing unit. The utility model uses the in-plane limit wire rope to prevent the temporary fixing unit from moving along the radial direction of the arched rod, increases the out-of-plane stability of the arched rod through the out-of-plane stabilizing wire rope, and avoids the overturning phenomenon during the installation of the arched rod; During the installation of the arched rod, the high-altitude operation can be transformed into the ground operation, which increases the construction safety. The rod is connected with other components as a whole.
Description
技术领域technical field
本实用新型属于拱形杆安装技术领域,具体涉及一种活动拱形杆临时固定装置。The utility model belongs to the technical field of installation of an arched rod, in particular to a temporary fixing device for a movable arched rod.
背景技术Background technique
火电能源、水泥工业与钢铁冶炼等企业使用的露天原料堆场,不仅会因原料粉尘飞散造成原料损失,更会因原料粉尘飞散造成环境污染。随着环保、节能、节材意识的加强,火电能源、水泥工业与钢铁冶炼等企业正在大力新建、改建、扩建封闭原料储存封闭场。从使用功能、经济性等多方面综合考虑,目前原料储存封闭场工程主要优选大跨度拱形钢结构。The open-air raw material storage yard used by thermal power energy, cement industry and steel smelting enterprises will not only cause raw material loss due to the scattering of raw material dust, but also cause environmental pollution due to the scattering of raw material dust. With the strengthening of awareness of environmental protection, energy saving and material saving, thermal power energy, cement industry and iron and steel smelting and other enterprises are vigorously building, rebuilding and expanding closed raw material storage and closed yards. From the comprehensive consideration of use function, economy and other aspects, the current raw material storage closed yard project mainly chooses large-span arched steel structure.
大跨度拱形钢结构具有造价低、大空间、造型新颖和抗震性能好等优点,在公共建筑和大型场馆等公共设施中得到广泛应用。大跨度拱形钢结构施工方法主要特点为:(1)土建结构为混凝土梁板,上部为箱形变截面钢结构主拱,主拱生根于四个拱脚基础上;(2)在混凝土顶板上设置支撑搭架,混凝土顶板下局部设满堂红架体支撑;(3)采用分段吊装、现场拼装焊接。The long-span arched steel structure has the advantages of low cost, large space, novel shape and good seismic performance, and is widely used in public facilities such as public buildings and large venues. The main features of the construction method of long-span arched steel structure are: (1) The civil structure is concrete beam slab, the upper part is the main arch of box-shaped section steel structure, and the main arch is rooted on the foundation of four arch feet; (2) On the concrete roof Set up supporting frames, and partially under the concrete roof are equipped with full-house red frame supports; (3) Use segmented hoisting and on-site assembly and welding.
在大跨度拱形钢结构施工中,拱形杆还未同其他构件连成整体时,其面外稳定性较差,很容易发生倾覆现象。In the construction of large-span arched steel structures, when the arched rod has not been connected with other components as a whole, its out-of-plane stability is poor, and it is easy to overturn.
实用新型内容Utility model content
本实用新型目的在于解决现有技术中存在的上述不足,提供一种活动拱形杆临时固定装置,通过面内限位钢丝绳连接临时固定单元件与拱形杆的端部节点,可防止临时固定单元件沿拱形杆杆径方向移动,同时,通过面外稳定钢丝绳对称设置,可增加拱形杆的面外稳定性,避免拱形杆安装过程中发生倾覆现象;在安装拱形杆过程中,能将高空作业转化为地面操作,增加施工安全性,同时整个活动拱形杆临时固定装置拆装方便,拱形杆安装灵活,适用于各类管径的拱形杆安装,而且可调整面外稳定钢丝绳的长度,将临时固定单元件调整到水平位置,使得拱形杆平稳地保持在设计位置处,便于拱形杆与其他构件连接成整体。The purpose of the utility model is to solve the above-mentioned deficiencies in the prior art, and to provide a temporary fixing device for a movable arched rod, which connects the temporary fixing element and the end node of the arched rod through an in-plane limit wire rope, which can prevent temporary fixing The single element moves along the radial direction of the arched rod, and at the same time, the out-of-plane stability of the arched rod can be increased through the symmetrical arrangement of the out-of-plane stable steel wire rope, so as to avoid the overturning phenomenon during the installation of the arched rod; during the installation of the arched rod , It can convert high-altitude operation into ground operation and increase construction safety. At the same time, the entire movable arched rod temporary fixing device is easy to disassemble and assemble, and the arched rod can be installed flexibly. The length of the outer stabilized steel wire rope is adjusted to the horizontal position of the temporary fixing unit, so that the arched rod can be stably maintained at the design position, and it is convenient for the arched rod to be connected with other components as a whole.
为了解决上述技术问题,本实用新型采用如下技术方案:In order to solve the above-mentioned technical problems, the utility model adopts the following technical solutions:
一种活动拱形杆临时固定装置,其特征在于:包括临时固定单元件、至少两根面内限位钢丝绳和至少四根面外稳定钢丝绳,面内限位钢丝绳固定于临时固定单元件的底部,面外稳定钢丝绳固定于临时固定单元件的侧部。本实用新型将拱形杆设置在临时固定单元件中,通过面内限位钢丝绳连接临时固定单元件与拱形杆的端部节点,可防止临时固定单元件沿拱形杆杆径方向移动,同时,通过面外稳定钢丝绳对称设置,可增加拱形杆的面外稳定性,避免拱形杆安装过程中发生倾覆现象。A temporary fixing device for a movable arched rod, characterized in that it comprises a temporary fixing unit, at least two in-plane limit wire ropes and at least four out-of-plane stabilizing wire ropes, and the in-plane limit wire ropes are fixed on the bottom of the temporary fixing unit , the out-of-plane stabilizing wire rope is fixed on the side of the temporary fixing unit. In the utility model, the arched rod is arranged in the temporary fixing unit, and the end node of the temporary fixing unit and the arched rod is connected by the in-plane limit wire rope, which can prevent the temporary fixing unit from moving along the radial direction of the arched rod. At the same time, the out-of-plane stability of the arched rod can be increased by the symmetrical arrangement of the out-of-plane stabilizing wire ropes, and the overturning phenomenon during the installation of the arched rod can be avoided.
进一步,临时固定单元件包括两块对称固定连接的抱箍,两块抱箍之间设有高强螺栓,两个抱箍之间采用高强螺栓连接,便于安装和拆卸临时固定单元件,同时可增加预紧力防止抱箍松动。抱箍的底部设有第一通孔,面内限位钢丝绳固定于第一通孔上,抱箍的两个侧部均设有穿孔耳板,穿孔耳板设有第二通孔,面外稳定钢丝绳固定于第二通孔上,实现面内限位钢丝绳固定于临时固定单元件的底部,面外稳定钢丝绳固定于临时固定单元件的侧部。Further, the temporary fixing unit includes two hoops that are symmetrically fixed and connected, high-strength bolts are arranged between the two hoops, and high-strength bolts are used to connect the two hoops, which facilitates the installation and removal of the temporary fixing unit, and can increase the The preload prevents the hoop from loosening. The bottom of the hoop is provided with a first through hole, the in-plane limit wire rope is fixed on the first through hole, the two sides of the hoop are provided with perforated ear plates, and the perforated ear plate is provided with a second through hole, and the out-of-plane The stabilizing wire rope is fixed on the second through hole, so that the in-plane limit wire rope is fixed on the bottom of the temporary fixing unit, and the out-plane stabilizing wire rope is fixed on the side of the temporary fixing unit.
进一步,抱箍与穿孔耳板之间焊接有加劲板,增加抱箍与穿孔耳板之间的连接强度。Further, a stiffening plate is welded between the hoop and the perforated ear plate to increase the connection strength between the hoop and the perforated ear plate.
进一步,抱箍的顶部设有滚轮组,滚轮组包括两块钢板、圆钢和钢滚筒,钢滚筒嵌套于圆钢上,两块钢板分别焊接于圆钢的两端。可将临时固定装置与拱形杆的滑动摩檫调整为滚动摩擦。可在滚动摩擦力的作用下,通过牵引面外稳定钢丝绳调整临时固定单元件的位置以及完成后期的拆卸工作;同时也能更好地保护拱形杆外表面的完整性,避免抱箍刮擦拱形杆外表面的油漆。Further, the top of the hoop is provided with a roller group, the roller group includes two steel plates, a round steel and a steel drum, the steel drum is nested on the round steel, and the two steel plates are welded to the two ends of the round steel respectively. The sliding friction between the temporary fixing device and the arched rod can be adjusted to rolling friction. Under the action of rolling friction, the position of the temporary fixed unit can be adjusted by pulling the out-of-plane stable wire rope and the later disassembly work can be completed; at the same time, the integrity of the outer surface of the arched rod can be better protected, and the hoop can be prevented from scratching. Paint on the outer surface of the arched rods.
进一步,第一通孔的直径比面内限位钢丝绳的直径大4~10mm,方便将面内限位钢丝绳固定于第一通孔上。Further, the diameter of the first through hole is 4-10 mm larger than the diameter of the in-plane limit wire rope, which facilitates fixing the in-plane limit wire rope on the first through hole.
进一步,第二通孔的直径比面外稳定钢丝绳的直径大4~10mm,方便将面外稳定钢丝绳固定于第二通孔上。Further, the diameter of the second through hole is 4-10 mm larger than the diameter of the out-of-plane stabilizing wire rope, which facilitates fixing the out-of-plane stabilizing wire rope on the second through hole.
进一步,还包括钢丝绳固定装置,面外稳定钢丝绳与钢丝绳固定装置固定连接,钢丝绳固定装置包括固定钢板、固定座和调整座,固定座焊接于固定钢板上,固定钢板的顶部焊接有滑轨,调整座的底部设有滑槽,滑槽滑动于滑轨上,固定座设有导向块,调整座设有导向杆,导向杆穿过导向块,导向块设有顶紧螺栓,顶紧螺栓固定导向杆,调整座的侧部设有夹紧座,面外稳定钢丝绳分别穿过夹紧座、调整座和固定座,夹紧座的侧部焊接有第一卡块,第一卡块设有钢丝绳卡槽,面外稳定钢丝绳设于钢丝绳卡槽中,第一卡块的侧部设有螺纹杆,螺纹杆滑入有第二卡块,单根螺纹杆设有两个螺母,两个螺母分别设于第二卡块的两侧上,第二卡块压紧面外稳定钢丝绳。先在临时固定单元件左右两侧的已安装结构上安装钢丝绳固定装置,再将面外稳定钢丝绳分别穿过夹紧座、调整座和固定座,初步调整面外稳定钢丝绳的长度,接着拧动第一卡块侧部的螺纹杆上的螺母,调整第二卡块处于螺纹杆上位置,使得第二卡块将面外稳定钢丝绳压紧在第一卡块的钢丝绳卡槽中,然后将调整座在固定钢板顶部的滑轨上滑动,同时导向杆在导向块中滑动,再次调整面外稳定钢丝绳的长度,当临时固定单元件调整到水平位置时,将导向块处的顶紧螺栓固定导向杆。这样可调整面外稳定钢丝绳的长度,将临时固定单元件调整到水平位置,使得拱形杆平稳地保持在设计位置处,便于拱形杆与其他构件连接成整体。Further, it also includes a wire rope fixing device. The out-of-plane stable wire rope is fixedly connected to the wire rope fixing device. The wire rope fixing device includes a fixed steel plate, a fixed seat and an adjustment seat. The fixed seat is welded on the fixed steel plate. The bottom of the seat is provided with a chute, the chute slides on the slide rail, the fixed seat is provided with a guide block, the adjustment seat is provided with a guide rod, the guide rod passes through the guide block, the guide block is provided with a top bolt, and the top bolt is fixed and guided rod, the side of the adjustment seat is provided with a clamping seat, the out-of-plane stable wire rope passes through the clamping seat, the adjustment seat and the fixing seat respectively, the side of the clamping seat is welded with a first clamping block, and the first clamping block is provided with a steel wire rope The clamping groove, the out-of-plane stable wire rope is arranged in the wire rope clamping groove, the side of the first clamping block is provided with a threaded rod, the threaded rod slides into a second clamping block, and a single threaded rod is provided with two nuts, the two nuts are respectively It is arranged on both sides of the second clamping block, and the second clamping block presses the out-of-plane stable wire rope. First, install the wire rope fixing devices on the installed structures on the left and right sides of the temporary fixing unit, then pass the out-of-plane stable wire rope through the clamping seat, the adjustment seat and the fixed seat respectively, and preliminarily adjust the length of the out-of-plane stable wire rope. The nut on the threaded rod on the side of the first block, adjust the second block to be on the threaded rod, so that the second block presses the out-of-plane stable wire rope into the wire rope groove of the first block, and then adjust the The seat slides on the slide rail on the top of the fixed steel plate, while the guide rod slides in the guide block, and adjust the length of the out-of-plane stable wire rope again. rod. In this way, the length of the out-of-plane stabilizing wire rope can be adjusted, and the temporary fixing unit can be adjusted to a horizontal position, so that the arched rod can be stably maintained at the designed position, and it is convenient for the arched rod to be connected with other components as a whole.
进一步,第一卡块设有弹性导向板,弹性导向板与第一卡块的连接处设于钢丝绳卡槽的下方,能控制面外稳定钢丝绳拉设角度,使得面外稳定钢丝绳拉设位置与拉设点铅垂线成30~60°夹角。Further, the first clamping block is provided with an elastic guide plate, and the connection between the elastic guide plate and the first clamping block is arranged below the wire rope clamping groove, which can control the pulling angle of the out-of-plane stable wire rope, so that the pulling position of the out-of-plane stable wire rope is different from that of the wire rope. The vertical line of the drawing point is at an angle of 30 to 60°.
一种活动拱形杆临时固定装置对拱形杆安装方法,其特征在于包括如下步骤:A method for installing an arched rod by a temporary fixing device for a movable arched rod is characterized by comprising the following steps:
a、按照设计要求对临时固定单元件进行制作;a. According to the design requirements, make the temporary fixed unit components;
b、安装拱形杆:b. Install the arched rod:
1)采用两个抱箍放置在拱形杆的最高点处,再调节抱箍之间的缝隙,使得抱箍抱紧拱形杆,并用两个抱箍之间拧入高强螺栓,将临时固定单元件与拱形杆临时固定;1) Place two hoops at the highest point of the arched rod, and then adjust the gap between the hoops so that the hoops hold the arched rod tightly, and screw high-strength bolts between the two hoops to temporarily fix it. Temporary fixing of single unit and arched rod;
2)对完成安装临时固定单元件的拱形杆进行吊装;2) Hoist the arched rods that have completed the installation of the temporary fixing unit;
3)吊装拱形杆完成后,将两根面内限位钢丝绳的其中一端固定在抱箍底部预留的第一通孔上,再将面内限位钢丝绳的另一端固定在拱形杆的端部节点处;3) After the hoisting of the arched rod is completed, fix one end of the two in-plane limit wire ropes on the first through hole reserved at the bottom of the hoop, and then fix the other end of the in-plane limit wire rope on the end of the arched rod. at the end node;
4)将四根面外稳定钢丝绳的其中一端固定在穿孔耳板的第二通孔上,再将面外稳定钢丝绳的另一端设置在临时固定单元件左右两侧的已安装结构上,并调整面外稳定钢丝绳的长度,将临时固定单元件调整到水平位置,然后将调整后的面外稳定钢丝绳与已安装结构固定连接,面外稳定钢丝绳拉设位置与拉设点铅垂线成30~60°夹角;4) Fix one end of the four out-of-plane stabilizing wire ropes on the second through hole of the perforated lug plate, and then set the other end of the out-of-plane stabilizing wire rope on the installed structures on the left and right sides of the temporary fixing unit, and adjust To stabilize the length of the out-of-plane stable wire rope, adjust the temporary fixing unit to the horizontal position, and then fix the adjusted out-of-plane stable wire rope to the installed structure. 60° included angle;
5)将拱形杆与其他构件连接成整体;5) Connect the arched rod with other components as a whole;
c、进行拆除工作:c. Carry out dismantling work:
1)将四根面外稳定钢丝绳的端部均从临时固定单元件左右两侧的已安装结构上拆除,并将其中一根面内限位钢丝绳的端部从拱形杆的端部节点处拆除;1) Remove the ends of the four out-of-plane stabilizing wire ropes from the installed structures on the left and right sides of the temporary fixing unit, and remove the end of one of the in-plane limiting wire ropes from the end node of the arched rod. tear down;
2)牵引未从拱形杆的端部节点处拆除的另一根面内限位钢丝绳,将临时固定单元件沿着拱形杆滑落下来;2) Pull another in-plane limit wire rope that has not been removed from the end node of the arched rod, and slide the temporary fixing unit down along the arched rod;
3)临时固定单元件滑落至地面后,将四根面外稳定钢丝绳的端部均从穿孔耳板的第二通孔上拆除,并将从拱形杆的端部节点处拆除的面内限位钢丝绳的端部从抱箍底部的第一通孔上拆除;3) After the temporary fixing unit slides down to the ground, remove the ends of the four out-of-plane stabilizing wire ropes from the second through hole of the perforated lug plate, and remove the in-plane limit from the end node of the arched rod. Remove the end of the steel wire rope from the first through hole at the bottom of the hoop;
4)将剩余的面内限位钢丝绳从拱形杆的端部节点处和抱箍底部的第一通孔上拆除;4) Remove the remaining in-plane limit wire rope from the end node of the arched rod and the first through hole at the bottom of the hoop;
5)将抱箍之间的高强螺栓拧出,使抱箍与拱形杆分离。5) Unscrew the high-strength bolts between the hoop to separate the hoop from the arched rod.
进一步,步骤b的4)部分中,调整面外稳定钢丝绳的长度的具体操作为先根据面外稳定钢丝绳拉设角度,在临时固定单元件左右两侧的已安装结构上倾斜安装钢丝绳固定装置,将夹紧座对准面外稳定钢丝绳设置,再将面外稳定钢丝绳分别穿过夹紧座、调整座和固定座,初步调整面外稳定钢丝绳的长度,接着拧动第一卡块侧部的螺纹杆上的螺母,调整第二卡块处于螺纹杆上位置,使得第二卡块将面外稳定钢丝绳压紧在第一卡块的钢丝绳卡槽中,然后将调整座在固定钢板顶部的滑轨上滑动,同时导向杆在导向块中滑动,再次调整面外稳定钢丝绳的长度,当临时固定单元件调整到水平位置时,将导向块处的顶紧螺栓固定导向杆。可调整面外稳定钢丝绳的长度,将临时固定单元件调整到水平位置,使得拱形杆平稳地保持在设计位置处,便于拱形杆与其他构件连接成整体。Further, in the 4) part of step b, the specific operation of adjusting the length of the out-of-plane stable wire rope is to firstly install the wire rope fixing device on the installed structure on the left and right sides of the temporary fixing unit according to the angle of the out-of-plane stable wire rope, Align the clamping base with the out-of-plane stable wire rope, and then pass the out-of-plane stable wire rope through the clamping base, the adjustment base and the fixed base respectively, and preliminarily adjust the length of the out-of-plane stable wire rope. The nut on the threaded rod, adjust the second clamping block to the position on the threaded rod, so that the second clamping block presses the out-of-plane stable wire rope into the wire rope groove of the first clamping block, and then slide the adjustment seat on the top of the fixed steel plate. Sliding on the rail, while the guide rod slides in the guide block, adjust the length of the out-of-plane stable wire rope again. When the temporary fixing unit is adjusted to the horizontal position, fix the guide rod with the tightening bolt at the guide block. The length of the out-of-plane stabilizing wire rope can be adjusted, and the temporary fixing unit can be adjusted to a horizontal position, so that the arched rod can be stably maintained at the designed position, and it is convenient for the arched rod to be connected with other components as a whole.
本实用新型由于采用了上述技术方案,具有以下有益效果:The utility model has the following beneficial effects due to the adoption of the above-mentioned technical solutions:
1、本实用新型将拱形杆设置在临时固定单元件中,通过面内限位钢丝绳连接临时固定单元件与拱形杆的端部节点,可防止临时固定单元件沿拱形杆杆径方向移动,同时,通过面外稳定钢丝绳对称设置,可增加拱形杆的面外稳定性,避免拱形杆安装过程中发生倾覆现象。1. In the present invention, the arched rod is arranged in the temporary fixed unit, and the end nodes of the temporary fixed unit and the arched rod are connected by the in-plane limit wire rope, which can prevent the temporary fixed unit from moving along the radial direction of the arched rod. At the same time, the out-of-plane stability of the arched rod can be increased by the symmetrical arrangement of the out-of-plane stable steel wire rope, and the overturning phenomenon during the installation of the arched rod can be avoided.
2、本实用新型的临时固定单元件包括两块对称固定连接的抱箍,两块抱箍之间设有高强螺栓,两个抱箍之间采用高强螺栓连接,便于安装和拆卸临时固定单元件,同时可增加预紧力防止抱箍松动。抱箍的底部设有第一通孔,面内限位钢丝绳固定于第一通孔上,抱箍的两个侧部均设有穿孔耳板,穿孔耳板设有第二通孔,面外稳定钢丝绳固定于第二通孔上,实现面内限位钢丝绳固定于临时固定单元件的底部,面外稳定钢丝绳固定于临时固定单元件的侧部。2. The temporary fixing unit of the present invention includes two symmetrically fixedly connected hoops, high-strength bolts are arranged between the two hoops, and high-strength bolts are used to connect the two hoops, which is convenient for installation and removal of the temporary fixing unit. , and at the same time can increase the pre-tightening force to prevent the hoop from loosening. The bottom of the hoop is provided with a first through hole, the in-plane limit wire rope is fixed on the first through hole, the two sides of the hoop are provided with perforated ear plates, and the perforated ear plate is provided with a second through hole, and the out-of-plane The stabilizing wire rope is fixed on the second through hole, so that the in-plane limit wire rope is fixed on the bottom of the temporary fixing unit, and the out-plane stabilizing wire rope is fixed on the side of the temporary fixing unit.
3、本实用新型的抱箍的顶部设有滚轮组,滚轮组包括两块钢板、圆钢和钢滚筒,钢滚筒嵌套于圆钢上,两块钢板分别焊接于圆钢的两端。可将临时固定装置与拱形杆的滑动摩檫调整为滚动摩擦。可在滚动摩擦力的作用下,通过牵引面外稳定钢丝绳调整临时固定单元件的位置以及完成后期的拆卸工作;同时也能更好地保护拱形杆外表面的完整性,避免抱箍刮擦拱形杆外表面的油漆。3. The top of the hoop of the present invention is provided with a roller group, the roller group includes two steel plates, a round steel and a steel drum, the steel drum is nested on the round steel, and the two steel plates are welded to the two ends of the round steel respectively. The sliding friction between the temporary fixing device and the arched rod can be adjusted to rolling friction. Under the action of rolling friction, the position of the temporary fixed unit can be adjusted by pulling the out-of-plane stable wire rope and the later disassembly work can be completed; at the same time, the integrity of the outer surface of the arched rod can be better protected, and the hoop can be prevented from scratching. Paint on the outer surface of the arched rods.
4、本实用新型在安装拱形杆过程中,临时固定单元件的两个抱箍上方留有空隙,便于安装上部连接件的同时,方便自临时固定单元件两端拆卸抱箍,并且可通过调节两个抱箍之间的缝隙改变抱箍之间的空间大小,灵活度高,适用于各类管径的拱形杆。本实用新型通过将四根面外稳定钢丝绳的端部均从临时固定单元件左右两侧的已安装结构上拆除,并将其中一根面内限位钢丝绳的端部从拱形杆的端部节点处拆除,再牵引未从拱形杆的端部节点处拆除的另一根面内限位钢丝绳,将临时固定单元件沿着拱形杆滑落下来,然后对临时固定单元件拆除,能将高空作业转化为地面操作,增加施工安全性,整个活动拱形杆临时固定装置拆装方便。而且本实用新型采用钢丝绳固定装置两次调整面外稳定钢丝绳的长度,将临时固定单元件调整到水平位置,使得拱形杆平稳地保持在设计位置处,便于拱形杆与其他构件连接成整体。4. In the process of installing the arched rod of the present invention, there is a gap above the two hoops of the temporary fixing unit, which is convenient for installing the upper connecting piece, and at the same time, it is convenient to remove the hoop from both ends of the temporary fixing unit, and can pass Adjust the gap between the two hoops to change the space between the hoops, with high flexibility, suitable for arched rods of various pipe diameters. The utility model removes the ends of the four out-of-plane stabilizing wire ropes from the installed structures on the left and right sides of the temporary fixing unit, and removes the end of one of the in-plane limiting wire ropes from the end of the arched rod. Remove it at the node, and then pull another in-plane limit wire rope that has not been removed from the end node of the arched rod, slide the temporary fixing unit down along the arched rod, and then remove the temporary fixing unit, which can remove the temporary fixing unit. The high-altitude operation is transformed into the ground operation, which increases the construction safety, and the temporary fixing device of the whole movable arched rod is easy to disassemble and assemble. Moreover, the utility model adopts the wire rope fixing device to adjust the length of the out-of-plane stable wire rope twice, and adjusts the temporary fixing unit to the horizontal position, so that the arched rod is stably kept at the design position, and it is convenient for the arched rod to be connected with other components as a whole .
附图说明Description of drawings
下面结合附图对本实用新型作进一步说明:Below in conjunction with accompanying drawing, the utility model is further described:
图1为本实用新型中一种活动拱形杆临时固定装置的结构示意图;Fig. 1 is the structural representation of a kind of movable arched rod temporary fixing device in the utility model;
图2为本实用新型中临时固定单元件的结构示意图;Fig. 2 is the structural representation of the temporary fixing unit in the utility model;
图3为本实用新型中抱箍的结构示意图;Fig. 3 is the structural representation of the hoop in the utility model;
图4为本实用新型中穿孔耳板的结构示意图;Fig. 4 is the structural representation of the perforated lug plate in the utility model;
图5为本实用新型中加劲板的结构示意图;Fig. 5 is the structural representation of the stiffening plate in the utility model;
图6为本实用新型中滚轮组的结构示意图;Fig. 6 is the structural representation of the roller group in the utility model;
图7为本实用新型中钢丝绳固定装置的结构示意图;Fig. 7 is the structural representation of the wire rope fixing device in the utility model;
图8为本实用新型中夹紧座的结构示意图;Fig. 8 is the structural representation of the clamping seat in the utility model;
图9为本实用新型中调整座的结构示意图;Fig. 9 is the structural representation of the adjusting seat in the utility model;
图10为本实用新型中固定座的结构示意图;10 is a schematic structural diagram of a fixed seat in the utility model;
图11为本实用新型中拱形杆与其他构件连接成整体后的结构示意图;Figure 11 is a schematic structural diagram of the utility model after the arched rod and other components are connected as a whole;
图12为图11中A-A向的结构示意图。FIG. 12 is a schematic view of the structure in the direction A-A in FIG. 11 .
图中,1-临时固定单元件;2-面内限位钢丝绳;3-面外稳定钢丝绳;4-抱箍;5-高强螺栓;6-第一通孔;7-穿孔耳板;8-第二通孔;9-加劲板;10-滚轮组;11-钢板;12-圆钢;13-钢滚筒;14-拱形杆;15-钢丝绳固定装置;16-固定钢板;17-固定座;18-调整座;19-滑轨;20-滑槽;21-导向块;22-导向杆;23-顶紧螺栓;24-夹紧座;25-第一卡块;26-钢丝绳卡槽;27-螺纹杆;28-第二卡块;29-螺母;30-弹性导向板。In the figure, 1- temporary fixing unit; 2- in-plane limit wire rope; 3- out-of-plane stabilization wire rope; 4- hoop; 5- high-strength bolt; 6- first through hole; 7- perforated lug plate; 8- The second through hole; 9- stiffening plate; 10- roller group; 11- steel plate; 12- round steel; 13- steel drum; 14- arched rod; 15- steel wire rope fixing device; 16- fixed steel plate; ;18- Adjustment seat; 19- Slide rail; 20- Chute; 21- Guide block; 22- Guide rod; 23- Top bolt; 24- Clamp seat; ; 27-threaded rod; 28-second block; 29-nut; 30-elastic guide plate.
具体实施方式Detailed ways
如图1至图12所示,为本实用新型中一种活动拱形杆临时固定装置,包括临时固定单元件1、至少两根面内限位钢丝绳2和至少四根面外稳定钢丝绳3,面内限位钢丝绳2固定于临时固定单元件1的底部,面外稳定钢丝绳3固定于临时固定单元件1的侧部。本实用新型将拱形杆设置在临时固定单元件1中,通过面内限位钢丝绳2连接临时固定单元件1与拱形杆的端部节点,可防止临时固定单元件1沿拱形杆杆径方向移动,同时,通过面外稳定钢丝绳3对称设置,可增加拱形杆的面外稳定性,避免拱形杆安装过程中发生倾覆现象。As shown in Figures 1 to 12, it is a temporary fixing device for a movable arched rod in the present invention, comprising a temporary fixing unit 1, at least two in-plane limit wire ropes 2 and at least four out-of-plane stabilizing wire ropes 3, The in-plane limit wire rope 2 is fixed to the bottom of the temporary fixing unit 1 , and the out-of-plane stabilizing wire rope 3 is fixed to the side of the temporary fixing unit 1 . In the utility model, the arched rod is arranged in the temporary fixing unit 1, and the end node of the temporary fixing unit 1 and the arched rod is connected by the in-plane limit wire rope 2, which can prevent the temporary fixing unit 1 from being along the arched rod. At the same time, the out-of-plane stability of the steel wire rope 3 is symmetrically arranged, which can increase the out-of-plane stability of the arched rod and avoid the overturning phenomenon during the installation of the arched rod.
临时固定单元件1包括两块对称固定连接的抱箍4,两块抱箍4之间设有高强螺栓5,两个抱箍4之间采用高强螺栓5连接,便于安装和拆卸临时固定单元件1,同时可增加预紧力防止抱箍4松动。抱箍4的底部设有第一通孔6,面内限位钢丝绳2固定于第一通孔6上;抱箍4的两个侧部均设有穿孔耳板7,穿孔耳板7设有第二通孔8,面外稳定钢丝绳3固定于第二通孔8上,实现面内限位钢丝绳2固定于临时固定单元件1的底部,面外稳定钢丝绳3固定于临时固定单元件1的侧部。第一通孔6的直径比面内限位钢丝绳2的直径大4~10mm,方便将面内限位钢丝绳2固定于第一通孔6上。第二通孔8的直径比面外稳定钢丝绳3的直径大4~10mm,方便将面外稳定钢丝绳3固定于第二通孔8上。抱箍4与穿孔耳板7之间焊接有加劲板9,加劲板9能增加抱箍4与穿孔耳板7之间的连接强度。The temporary fixing unit 1 includes two pieces of hoops 4 that are symmetrically and fixedly connected, high-strength bolts 5 are arranged between the two hoops 4, and high-strength bolts 5 are used to connect the two hoops 4 to facilitate the installation and removal of the temporary fixing unit. 1. At the same time, the pre-tightening force can be increased to prevent the hoop 4 from loosening. The bottom of the hoop 4 is provided with a first through hole 6, and the in-plane limit wire rope 2 is fixed on the first through hole 6; both sides of the hoop 4 are provided with perforated lugs 7, and the perforated lugs 7 are provided The second through hole 8, the out-of-plane stabilizing wire rope 3 is fixed on the second through-hole 8, so that the in-plane limit wire rope 2 is fixed on the bottom of the temporary fixing unit 1, and the out-of-plane stabilizing wire rope 3 is fixed on the bottom of the temporary fixing unit 1. side. The diameter of the first through hole 6 is 4-10 mm larger than the diameter of the in-plane limit wire rope 2 , which facilitates fixing the in-plane limit wire rope 2 on the first through hole 6 . The diameter of the second through hole 8 is 4-10 mm larger than the diameter of the out-of-plane stabilizing wire rope 3 , which facilitates fixing the out-of-plane stabilizing wire rope 3 on the second through hole 8 . A stiffening plate 9 is welded between the hoop 4 and the perforated ear plate 7 , and the stiffening plate 9 can increase the connection strength between the hoop 4 and the perforated ear plate 7 .
抱箍4的顶部设有滚轮组10,滚轮组10包括两块钢板11、圆钢12和钢滚筒13,钢滚筒13嵌套于圆钢12上,两块钢板11分别焊接于圆钢12的两端。可将临时固定装置与拱形杆的滑动摩檫调整为滚动摩擦。可在滚动摩擦力的作用下,通过牵引面外稳定钢丝绳3调整临时固定单元件1的位置以及完成后期的拆卸工作;同时也能更好地保护拱形杆外表面的完整性,避免抱箍4刮擦拱形杆外表面的油漆。The top of the hoop 4 is provided with a roller group 10, the roller group 10 includes two steel plates 11, a round steel 12 and a steel drum 13, the steel drum 13 is nested on the round steel 12, and the two steel plates 11 are welded to the round steel 12 respectively. both ends. The sliding friction between the temporary fixing device and the arched rod can be adjusted to rolling friction. Under the action of rolling friction, the position of the temporary fixing unit 1 can be adjusted by pulling the out-of-plane stabilizing wire rope 3 and the later disassembly work can be completed; at the same time, the integrity of the outer surface of the arched rod can be better protected and the hoop can be avoided. 4 Scratch the paint on the outside surface of the arched rod.
该活动拱形杆临时固定装置还包括钢丝绳固定装置15,面外稳定钢丝绳3与钢丝绳固定装置15固定连接。钢丝绳固定装置15包括固定钢板16、固定座17和调整座18,固定座17焊接于固定钢板16上。固定钢板16的顶部焊接有滑轨19,调整座18的底部设有滑槽20,滑槽20滑动于滑轨19上。固定座17设有导向块21,调整座18设有导向杆22,导向杆22穿过导向块21,导向块21设有顶紧螺栓23,顶紧螺栓23固定导向杆22。调整座18的侧部设有夹紧座24,面外稳定钢丝绳3分别穿过夹紧座24、调整座18和固定座17。夹紧座24的侧部焊接有第一卡块25,第一卡块25设有钢丝绳卡槽26,面外稳定钢丝绳3设于钢丝绳卡槽26中。第一卡块25的侧部设有螺纹杆27,螺纹杆27滑入有第二卡块28,单根螺纹杆27设有两个螺母29,两个螺母29分别设于第二卡块28的两侧上,第二卡块28压紧面外稳定钢丝绳3。先在临时固定单元件1左右两侧的已安装结构上安装钢丝绳固定装置15,再将面外稳定钢丝绳3分别穿过夹紧座24、调整座18和固定座17,初步调整面外稳定钢丝绳3的长度,接着拧动第一卡块25侧部的螺纹杆27上的螺母29,调整第二卡块28处于螺纹杆27上位置,使得第二卡块28将面外稳定钢丝绳3压紧在第一卡块25的钢丝绳卡槽26中,然后将调整座18在固定钢板16顶部的滑轨19上滑动,同时导向杆22在导向块21中滑动,再次调整面外稳定钢丝绳3的长度,当临时固定单元件1调整到水平位置时,将导向块21处的顶紧螺栓23固定导向杆22。这样可调整面外稳定钢丝绳3的长度,将临时固定单元件1调整到水平位置,使得拱形杆平稳地保持在设计位置处,便于拱形杆与其他构件连接成整体。第一卡块25设有弹性导向板30,弹性导向板30与第一卡块25的连接处设于钢丝绳卡槽26的下方,能控制面外稳定钢丝绳3拉设角度,使得面外稳定钢丝绳3拉设位置与拉设点铅垂线成30~60°夹角。The movable arched rod temporary fixing device further includes a wire rope fixing device 15, and the out-of-plane stable wire rope 3 is fixedly connected with the wire rope fixing device 15. The wire rope fixing device 15 includes a fixing steel plate 16 , a fixing seat 17 and an adjusting seat 18 , and the fixing seat 17 is welded on the fixing steel plate 16 . The top of the fixed steel plate 16 is welded with a slide rail 19 , and the bottom of the adjustment seat 18 is provided with a slide groove 20 , and the slide groove 20 slides on the slide rail 19 . The fixed seat 17 is provided with a guide block 21 , the adjustment seat 18 is provided with a guide rod 22 , the guide rod 22 passes through the guide block 21 , and the guide block 21 is provided with a jacking bolt 23 , and the jacking bolt 23 fixes the guide rod 22 . The side of the adjustment seat 18 is provided with a clamping seat 24 , and the out-of-plane stabilizing wire rope 3 passes through the clamping seat 24 , the adjustment seat 18 and the fixing seat 17 respectively. A first clamping block 25 is welded to the side of the clamping seat 24 , the first clamping block 25 is provided with a wire rope clamping groove 26 , and the out-of-plane stable wire rope 3 is arranged in the wire rope clamping groove 26 . A threaded rod 27 is provided on the side of the first clamping block 25, and the threaded rod 27 is slid into a second clamping block 28. A single threaded rod 27 is provided with two nuts 29, and the two nuts 29 are respectively disposed on the second clamping block 28. On both sides, the second block 28 presses the out-of-plane stabilizing wire rope 3. First, install the wire rope fixing devices 15 on the installed structures on the left and right sides of the temporary fixing unit 1, and then pass the out-of-plane stabilizing wire rope 3 through the clamping seat 24, the adjusting seat 18 and the fixing seat 17 respectively, and preliminarily adjust the out-of-plane stabilizing wire rope 3, then screw the nut 29 on the threaded rod 27 on the side of the first block 25, and adjust the second block 28 to be on the threaded rod 27, so that the second block 28 compresses the out-of-plane stable wire rope 3 In the wire rope groove 26 of the first block 25, the adjusting seat 18 is then slid on the slide rail 19 on the top of the fixed steel plate 16, while the guide rod 22 slides in the guide block 21, and the length of the out-of-plane stable wire rope 3 is adjusted again. , when the temporary fixing unit 1 is adjusted to the horizontal position, fix the guide rod 22 with the jacking bolt 23 at the guide block 21 . In this way, the length of the out-of-plane stabilizing wire rope 3 can be adjusted, and the temporary fixing unit 1 can be adjusted to a horizontal position, so that the arched rod can be stably maintained at the designed position, and it is convenient for the arched rod to be connected with other components as a whole. The first block 25 is provided with an elastic guide plate 30, and the connection between the elastic guide plate 30 and the first block 25 is arranged below the wire rope clamping groove 26, which can control the pulling angle of the out-of-plane stable wire rope 3, so that the out-of-plane stable wire rope 3 The drawing position and the vertical line of the drawing point form an included angle of 30-60°.
一种活动拱形杆临时固定装置对拱形杆安装方法,包括如下步骤:A method for installing a movable arched rod temporary fixing device to an arched rod, comprising the following steps:
a、按照设计要求对临时固定单元件1进行制作。a. Manufacture the temporary fixing unit 1 according to the design requirements.
b、安装拱形杆14:b. Install the arched rod 14:
1)采用两个抱箍4放置在拱形杆14的最高点处,再调节抱箍4之间的缝隙,使得抱箍4抱紧拱形杆14,并用两个抱箍4之间拧入高强螺栓5,将临时固定单元件1与拱形杆14临时固定。1) Use two hoops 4 to be placed at the highest point of the arched rod 14, and then adjust the gap between the hoops 4, so that the hoops 4 hold the arched rod 14 tightly, and screw in between the two hoops 4. The high-strength bolts 5 temporarily fix the temporary fixing unit 1 and the arched rod 14 .
2)对完成安装临时固定单元件1的拱形杆14进行吊装。2) The arched rod 14 on which the temporary fixing unit 1 has been installed is hoisted.
3)吊装拱形杆14完成后,将两根面内限位钢丝绳2的其中一端固定在抱箍4底部预留的第一通孔6上,再将面内限位钢丝绳2的另一端固定在拱形杆14的端部节点处。3) After the hoisting of the arched rod 14 is completed, one end of the two in-plane limit wire ropes 2 is fixed on the first through hole 6 reserved at the bottom of the hoop 4, and then the other end of the in-plane limit wire rope 2 is fixed. At the end nodes of the arched rods 14 .
4)将四根面外稳定钢丝绳3的其中一端固定在穿孔耳板7的第二通孔8上,再将面外稳定钢丝绳3的另一端设置在临时固定单元件1左右两侧的已安装结构上,并调整面外稳定钢丝绳3的长度,将临时固定单元件1调整到水平位置。然后将调整后的面外稳定钢丝绳3与已安装结构固定连接,面外稳定钢丝绳3拉设位置与拉设点铅垂线成30~60°夹角。4) Fix one end of the four out-of-plane stabilizing wire ropes 3 on the second through hole 8 of the perforated lug plate 7, and then set the other end of the out-of-plane stabilizing wire rope 3 on the installed left and right sides of the temporary fixing unit 1. Structurally, and adjust the length of the out-of-plane stabilizing wire rope 3, and adjust the temporary fixing unit 1 to a horizontal position. Then, the adjusted out-of-plane stable wire rope 3 is fixedly connected to the installed structure, and the pulling position of the out-of-plane stable wire rope 3 forms an included angle of 30-60° with the vertical line of the pulling point.
调整面外稳定钢丝绳3的长度的具体操作为:先根据面外稳定钢丝绳3拉设角度,在临时固定单元件1左右两侧的已安装结构上倾斜安装钢丝绳固定装置15,将夹紧座24对准面外稳定钢丝绳3设置,再将面外稳定钢丝绳3分别穿过夹紧座24、调整座18和固定座17,初步调整面外稳定钢丝绳3的长度。接着拧动第一卡块25侧部的螺纹杆27上的螺母29,调整第二卡块28处于螺纹杆27上位置,使得第二卡块28将面外稳定钢丝绳3压紧在第一卡块25的钢丝绳卡槽26中。然后将调整座18在固定钢板16顶部的滑轨19上滑动,同时导向杆22在导向块21中滑动,再次调整面外稳定钢丝绳3的长度。当临时固定单元件1调整到水平位置时,将导向块21处的顶紧螺栓23固定导向杆22。可调整面外稳定钢丝绳3的长度,将临时固定单元件1调整到水平位置,使得拱形杆14平稳地保持在设计位置处,便于拱形杆14与其他构件连接成整体。The specific operation for adjusting the length of the out-of-plane stabilizing wire rope 3 is as follows: first, according to the pulling angle of the out-of-plane stabilizing wire rope 3, install the wire rope fixing device 15 obliquely on the installed structures on the left and right sides of the temporary fixing unit 1, and place the clamping seat 24 Align the out-of-plane stabilizing wire rope 3 and set it, and then pass the out-of-plane stabilizing wire rope 3 through the clamping seat 24 , the adjusting seat 18 and the fixing seat 17 respectively to preliminarily adjust the length of the out-of-plane stabilizing wire rope 3 . Then, screw the nut 29 on the threaded rod 27 on the side of the first clamping block 25, and adjust the second clamping block 28 to be on the threaded rod 27, so that the second clamping block 28 presses the out-of-plane stable wire rope 3 against the first clamping block 28. in the wire rope slot 26 of the block 25 . Then, the adjusting seat 18 is slid on the sliding rail 19 on the top of the fixed steel plate 16, and the guide rod 22 is slid in the guide block 21 at the same time, and the length of the out-of-plane stable wire rope 3 is adjusted again. When the temporary fixing unit 1 is adjusted to the horizontal position, the guide rod 22 is fixed by the jacking bolt 23 at the guide block 21 . The length of the out-of-plane stabilizing wire rope 3 can be adjusted, and the temporary fixing unit 1 can be adjusted to a horizontal position, so that the arched rod 14 can be stably maintained at the designed position, which is convenient for connecting the arched rod 14 with other components as a whole.
5)将拱形杆14与其他构件连接成整体。5) Connect the arched rod 14 with other components as a whole.
c、进行拆除工作:c. Carry out dismantling work:
1)将四根面外稳定钢丝绳3的端部均从临时固定单元件1左右两侧的已安装结构上拆除,并将其中一根面内限位钢丝绳2的端部从拱形杆14的端部节点处拆除。1) Remove the ends of the four out-of-plane stabilizing wire ropes 3 from the installed structures on the left and right sides of the temporary fixing unit 1, and remove the end of one of the in-plane limiting wire ropes 2 from the end of the arched rod 14. Removed at the end node.
2)牵引未从拱形杆14的端部节点处拆除的另一根面内限位钢丝绳2,将临时固定单元件1沿着拱形杆14滑落下来。2) Pull another in-plane limit wire rope 2 that has not been removed from the end node of the arched rod 14 , and slide the temporary fixing unit 1 down along the arched rod 14 .
3)临时固定单元件1滑落至地面后,将四根面外稳定钢丝绳3的端部均从穿孔耳板7的第二通孔8上拆除,并将从拱形杆14的端部节点处拆除的面内限位钢丝绳2的端部从抱箍4底部的第一通孔6上拆除。3) After the temporary fixing unit 1 slides down to the ground, remove the ends of the four out-of-plane stabilizing wire ropes 3 from the second through holes 8 of the perforated lugs 7, and remove them from the end nodes of the arched rods 14. The end of the removed in-plane limit wire rope 2 is removed from the first through hole 6 at the bottom of the hoop 4 .
4)将剩余的面内限位钢丝绳2从拱形杆14的端部节点处和抱箍4底部的第一通孔6上拆除。4) Remove the remaining in-plane limit wire rope 2 from the end node of the arched rod 14 and the first through hole 6 at the bottom of the hoop 4 .
5)将抱箍4之间的高强螺栓5拧出,使抱箍4与拱形杆14分离。5) Unscrew the high-strength bolts 5 between the hoop 4 to separate the hoop 4 from the arched rod 14.
本实用新型在安装拱形杆14过程中,临时固定单元件1的两个抱箍4上方留有空隙,便于安装上部连接件的同时,方便自临时固定单元件1两端拆卸抱箍4,并且可通过调节两个抱箍4之间的缝隙改变抱箍4之间的空间大小,灵活度高,适用于各类管径的拱形杆14。本实用新型通过将四根面外稳定钢丝绳3的端部均从临时固定单元件1左右两侧的已安装结构上拆除,并将其中一根面内限位钢丝绳2的端部从拱形杆14的端部节点处拆除,再牵引未从拱形杆14的端部节点处拆除的另一根面内限位钢丝绳2,将临时固定单元件1沿着拱形杆14滑落下来,然后对临时固定单元件1拆除,能将高空作业转化为地面操作,增加施工安全性,整个活动拱形杆14临时固定装置拆装方便。而且本实用新型采用钢丝绳固定装置15两次调整面外稳定钢丝绳3的长度,将临时固定单元件1调整到水平位置,使得拱形杆14平稳地保持在设计位置处,便于拱形杆14与其他构件连接成整体。In the present invention, during the installation of the arched rod 14, a space is left above the two hoops 4 of the temporary fixing unit 1, which is convenient for installing the upper connecting piece, and at the same time, it is convenient to remove the hoop 4 from both ends of the temporary fixing unit 1. In addition, the size of the space between the hoops 4 can be changed by adjusting the gap between the hoops 4, the flexibility is high, and it is suitable for the arched rods 14 of various pipe diameters. In the present invention, the ends of the four out-of-plane stabilizing wire ropes 3 are all removed from the installed structures on the left and right sides of the temporary fixing unit 1, and the end of one of the in-plane limiting wire ropes 2 is removed from the arched rod. Remove the end node of 14, then pull another in-plane limit wire rope 2 that has not been removed from the end node of the arched rod 14, slide the temporary fixing unit 1 down along the arched rod 14, and then align it. The dismantling of the temporary fixing unit 1 can convert high-altitude operations into ground operations and increase construction safety. Moreover, the utility model adopts the wire rope fixing device 15 to adjust the length of the out-of-plane stable wire rope 3 twice, and adjusts the temporary fixing unit 1 to the horizontal position, so that the arched rod 14 is stably maintained at the designed position, and it is convenient for the arched rod 14 to be connected to the horizontal position. The other components are connected as a whole.
以上仅为本实用新型的具体实施例,但本实用新型的技术特征并不局限于此。任何以本实用新型为基础,为解决基本相同的技术问题,实现基本相同的技术效果,所作出的简单变化、等同替换或者修饰等,皆涵盖于本实用新型的保护范围之中。The above are only specific embodiments of the present invention, but the technical features of the present invention are not limited thereto. Any simple changes, equivalent replacements or modifications made on the basis of the present invention in order to solve basically the same technical problems and achieve basically the same technical effects are all included in the protection scope of the present invention.
Claims (8)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201821968202.5U CN209244293U (en) | 2018-11-27 | 2018-11-27 | Temporary fixing device for movable arched rod |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201821968202.5U CN209244293U (en) | 2018-11-27 | 2018-11-27 | Temporary fixing device for movable arched rod |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN209244293U true CN209244293U (en) | 2019-08-13 |
Family
ID=67528940
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201821968202.5U Expired - Fee Related CN209244293U (en) | 2018-11-27 | 2018-11-27 | Temporary fixing device for movable arched rod |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN209244293U (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN109372276A (en) * | 2018-11-27 | 2019-02-22 | 浙江中南建设集团钢结构有限公司 | A kind of activity arch bar temporary fastening device and its to arch bar installation method |
-
2018
- 2018-11-27 CN CN201821968202.5U patent/CN209244293U/en not_active Expired - Fee Related
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN109372276A (en) * | 2018-11-27 | 2019-02-22 | 浙江中南建设集团钢结构有限公司 | A kind of activity arch bar temporary fastening device and its to arch bar installation method |
| CN109372276B (en) * | 2018-11-27 | 2024-01-19 | 浙江中南绿建科技集团有限公司 | Temporary fixing device for movable arch bar and method for installing movable arch bar |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN104631343A (en) | Self-travelling diamond-shaped pin-connected truss-type form traveler structure and form traveler travelling and constructing method | |
| CN212175496U (en) | Super gravity anchor cantilever formwork system | |
| CN109629424B (en) | Cantilever support and construction method of concrete flange of steel-concrete composite bridge using cantilever support | |
| CN206397132U (en) | One kind can have enough to meet the need top support type truss floor support plate temporary support instrument | |
| CN204198225U (en) | A kind of suspension bracket of lifting for prefabricated U-shaped aqueduct and device | |
| CN101701494A (en) | Detachable convenient support device of steel structure building template and use method thereof | |
| CN201539098U (en) | Detachable and convenient support device for steel structure building formwork | |
| CN205557349U (en) | Device is changed to jib | |
| CN203188612U (en) | Beam frame type building template system | |
| CN203238971U (en) | Combination and adjustment device of truss end portions | |
| CN114481829B (en) | Temporary cable saddle device on the top of the tower that can quickly unload prestressed | |
| CN201460238U (en) | steering block | |
| CN206554483U (en) | A kind of full fabricated scaffold is encorbelmented component | |
| CN210798994U (en) | Concrete structure wall body unilateral template structure | |
| CN210418967U (en) | Connecting device for I-steel rail of crane | |
| CN103510521A (en) | Connecting component | |
| CN109372276B (en) | Temporary fixing device for movable arch bar and method for installing movable arch bar | |
| CN203403681U (en) | Temporary supporting frame of string beam | |
| CN210420898U (en) | Novel No. 0 block support of steel box girder | |
| CN220434208U (en) | Detachable integral hoisting double-sided large template for settlement joint of residential building | |
| CN207122132U (en) | A kind of building template | |
| CN205863747U (en) | A kind of disconnecting link overhaul support platform | |
| CN220182515U (en) | Suspended steel bar joint assembly | |
| CN222467898U (en) | I-beam safety belt suspension device | |
| CN205151577U (en) | Fix small -size hoisting machine on steel support of groove |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CP03 | Change of name, title or address | ||
| CP03 | Change of name, title or address |
Address after: 311400 No.18, Changkou East Street, Changkou Town, Fuyang District, Hangzhou City, Zhejiang Province Patentee after: Zhejiang Zhongnan Lvjian Technology Group Co.,Ltd. Address before: No.245, BINKANG Road, Binjiang District, Hangzhou City, Zhejiang Province 310052 Patentee before: ZHEJIANG ZHONGNAN CONSTRUCTION GROUP STEEL STRUCTURE Co.,Ltd. |
|
| CF01 | Termination of patent right due to non-payment of annual fee | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20190813 |