CN209228070U - A kind of innovative panellised wall installs the operating platform - Google Patents

A kind of innovative panellised wall installs the operating platform Download PDF

Info

Publication number
CN209228070U
CN209228070U CN201821745157.7U CN201821745157U CN209228070U CN 209228070 U CN209228070 U CN 209228070U CN 201821745157 U CN201821745157 U CN 201821745157U CN 209228070 U CN209228070 U CN 209228070U
Authority
CN
China
Prior art keywords
operating platform
installs
shingle nail
innovative panellised
fixture
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821745157.7U
Other languages
Chinese (zh)
Inventor
李永文
黄斯导
熊龙
何明君
林顺金
黄登辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Provincial Architectural Members Engineering Co
Original Assignee
Guangdong Provincial Architectural Members Engineering Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Provincial Architectural Members Engineering Co filed Critical Guangdong Provincial Architectural Members Engineering Co
Priority to CN201821745157.7U priority Critical patent/CN209228070U/en
Application granted granted Critical
Publication of CN209228070U publication Critical patent/CN209228070U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model relates to a kind of innovative panellised walls to install the operating platform, including steel column, purlin, operating platform, shingle nail and boom hoist cable, it is linked together between the steel column by purlin and forms building sides, the side of building sides is erected with operating platform, the bottom of the operating platform is equipped with lower margin pulley, and Overthrow preventing device is respectively set with middle part at the top of operating platform, the bottom of the shingle nail is installed by collet, the top installs fixture of shingle nail, fixed pulley is installed at the top of the operating platform, the bottom of operating platform is equipped with bottle gouard moved by hands, passing through on bottle gouard moved by hands has boom hoist cable, the other end of the boom hoist cable is connected on collet around the fixture on fixed pulley pass through wall surface plate.The utility model construction safety, can guarantee indeformable in wallboard installation process, reduce the effect of construction cost.

Description

A kind of innovative panellised wall installs the operating platform
Technical field
The utility model relates to build constructing technology field, installed the operating platform more particularly, to a kind of innovative panellised wall.
Background technique
Since wallboard weight is larger, intensity is insufficient, and in addition on-site construction road is narrow, the total cost of incorporation engineering, work Phase and actual situations of construction, according to the installation method of conventional manual's lifting, wallboard is easily broken, leads to not sling installation;If adopting With automobile crane operation, construction operation is difficult to operate, and the economic benefit is not high, and in addition the duration opposite will extend.
The Chinese patent that existing Authorization Notice No. is CN203359889 discloses a kind of wallboard and is promoted and installation integration behaviour Make platform comprising mobile door-type scaffold, hoist engine, guide wheel, wirerope, suspension hook and clump weight, clump weight, hoist engine are set to Mobile door-type scaffold bottom, guide wheel are set at the top of mobile door-type scaffold, and wirerope passes through guide wheel, and one end is connect with hoist engine, Other end suspension hook.Using means of transport by by conveying sheet to mobile door-type scaffold side, pass through suspension hook using hoist engine By plate with regard to mentioning on the ground, plate dropping place to installation point is corrected fixation by hand fit, in this way, facilitate the installation of plate, Operation in place, in this way, the installation for wallboard provides convenience.
Prior art among the above has the following deficiencies: 1, when plate wallboard weight is excessive, and clump weight can not reach To the effect for pushing down mobile door-type scaffold, it is easy to cause the generation for the contingencies such as scaffold collapses;2, only using suspension hook into Row promotes wallboard, not can guarantee wallboard vertical ascent, not easy to install;3, it is easy to cause wallboard to fracture.
Utility model content
The purpose of the utility model is to provide a kind of innovative panellised walls to install the operating platform, with construction safety, Neng Goubao It is indeformable in card wallboard installation process, reduce the effect of construction cost.
The above-mentioned purpose of utility model of the utility model has the technical scheme that
A kind of innovative panellised wall installs the operating platform, including steel column, purlin, operating platform, shingle nail and boom hoist cable, institute It states to link together between steel column by purlin and forms building sides, the side of building sides is erected with operating platform, and the operation is flat The bottom of platform is equipped with lower margin pulley, and Overthrow preventing device, the bottom of the shingle nail is respectively arranged with middle part at the top of operating platform Collet is installed, the top installs fixture of shingle nail is equipped with fixed pulley, the bottom peace of operating platform at the top of the operating platform Equipped with bottle gouard moved by hands, passing through on bottle gouard moved by hands has boom hoist cable, and the other end of the boom hoist cable passes through wall around fixed pulley Fixture on panel is connected on collet.
By using above-mentioned technical proposal, operating platform is fixed on building sides side using Overthrow preventing device, pulling mentions Reinforcing bar rope is risen, lifting reinforcing bar rope slowly pulls collet under the action of bottle gouard moved by hands, so that being mounted on the metope on collet Plate is slowly promoted, and when shingle nail is promoted to scheduled height, is fixed on shingle nail along purlin, is then removed wall Collet and fixture on panel promote and fix in the same way second piece of shingle nail, second piece of shingle nail side edge Snapping, elevation line alignment, left and right alignment, adjustment plate surface evenness, such one piece one piece of installation, until factory are used with the 1st block of plate After the wallboard of one side elevation of room is installed, uniformly does dado and bear down on one.
The utility model is further arranged to: the operating platform is the Slidable space being assembled by upright bar and cross bar Truss structure, and operating platform longitudinal direction is provided with vertical bracing every three steps.
By using above-mentioned technical proposal, facilitate the installation and disassembly of operating platform, and the setting of vertical bracing makes Whole device it is more stable, safety is higher.
The utility model is further arranged to: the lower margin pulley is specially two-way lower margin pulley, and is set on lower margin pulley It is equipped with braking service brake.
By using above-mentioned technical proposal, guarantee that braking service brake is in tight shape of stopping before operating platform sliding and after in place State guarantees the personal safety of construction personnel, and enable to metope to guarantee that operating platform will not just moved in the course of work The positioning of plate is more accurate, improves construction efficiency.
The utility model is further arranged to: the Overthrow preventing device includes safe steel wire steel tube fastener, operating platform Two sides steel column is snapped with steel tube fastener, and the both ends of safety steel cable are connected on steel tube fastener, and safety steel cable is trapped among behaviour Make on the outside of platform.
By using above-mentioned technical proposal, prevent whole operation platform from toppling over, and safety steel cable can be flat with operation The movement of platform and slide on the operational platform, guarantee safety in the case where do not influence construction efficiency.
The utility model is further arranged to: the shingle nail is fastened on purlin by self-tapping screw.
By using above-mentioned technical proposal, guaranteeing that shingle nail is fastened on building sides will not loosen.
The utility model is further arranged to: the setting of two sides at the top of the shingle nail is set on the fixture there are two fixture It is equipped with through-hole, boom hoist cable is divided into the through-hole that two are each passed through two fixtures above shingle nail and is connected on collet.
By using above-mentioned technical proposal, front panel is promoted in the case where enabling boom hoist cable to pull collet, and Collet can be dismantled very easily with fixture, convenient for the installation of next piece of shingle nail, promote working efficiency.
The utility model is further arranged to: the cross bar is connected using sleeve couple, sleeve couple interlaced arrangement, up and down The spreading position of upright bar is staggeredly arranged.
By using above-mentioned technical proposal, so that whole operation platform is more firm, security performance is improved.
The utility model is further arranged to: it is equipped with bamboo sheathing scaffold board on the operating platform, the four of bamboo sheathing scaffold board Guardrail, staircase and safety net are installed in week.
By using above-mentioned technical proposal, guardrail and safety net can prevent from worker from slipping during the work time falling, help Ladder can facilitate on the operational platform up and down.
In conclusion the advantageous effects of the utility model are as follows:
1, installation quality is greatly improved, guarantees that plate is indeformable in installation process, it is ensured that installation verticality, flatness;
2, Overthrow preventing device can be avoided operating platform and collapse, and improve the safety of construction, can avoid crosshead collapsing, people Member such as falls at the generations of accidents;
3, by manually with mechanical bond in the way of operated, reduce construction cost, reduce plate fracture;
4, operating platform integral installation method is simple, quickly grasps convenient for construction personnel, to accelerate construction progress.
Detailed description of the invention
Fig. 1 is that a kind of innovative panellised wall of the utility model installs the operating platform front schematic view;
Fig. 2 is that a kind of innovative panellised wall of the utility model installs the operating platform sectional view;
Fig. 3 is that a kind of innovative panellised wall of the utility model installs the operating platform top view.
In figure, 1, steel column;2, purlin;3, operating platform;4, shingle nail;5, boom hoist cable;6, Overthrow preventing device;7, bottom Support;8, fixture;9, bottle gouard moved by hands;10, fixed pulley;11, lower margin pulley;12, safety steel cable.
Specific embodiment
The utility model is described in further detail below in conjunction with attached drawing.
A kind of innovative panellised wall disclosed by the utility model installs the operating platform, referring to Fig.1 comprising operating platform 3 and builds Face is built, operating platform 3 is mounted on the side of building sides, steel column 1 and purlin 2 are provided on building sides, in the present embodiment, adjacent It is connected between steel column 1 by purlin 2.
Referring to Figures 1 and 2,3 bottom of operating platform is equipped with lower margin pulley 11, and the top of operating platform 3, which is equipped with, determines cunning Wheel 10, in the present embodiment, lower margin pulley 11 are specially two-way lower margin pulley 11, and are provided with brake shoe on lower margin pulley 11 It stops.
Referring to Fig.1, shingle nail 4 is mounted on collet 7, and the top of shingle nail 4 is equipped with fixture 8, in the present embodiment, Through-hole is provided on fixture 8.
Referring to Figures 1 and 2,3 bottom of operating platform is provided with bottle gouard moved by hands 9, and passing through on bottle gouard moved by hands 9 has lifting steel wire Rope, the lifting wirerope are connected on collet 7 around the through-hole for passing through fixture 8 after fixed pulley 10.In the present embodiment, pulling mentions Wirerope 5 is risen so that boom hoist cable 5 mentions shingle nail 4 vertically in the effect promotion collet 7 of chain block It rises.
Referring to Fig.1, the outside of operating platform 3 is provided with Overthrow preventing device 6, in the present embodiment, the two of Overthrow preventing device 6 End is connected on steel column 1.
Referring to Fig.1, the operating platform 3 is the Slidable space truss structure being assembled by upright bar and cross bar, and is grasped Make 3 longitudinal direction of platform and three steps are provided with vertical bracing, in the present embodiment, cross bar is connected using sleeve couple, to buckle Part interlaced arrangement, the connector of two adjacent crossbars should not be arranged in it is synchronous or with across interior, it is asynchronous or different adjacent across two The distance that head is staggered in the horizontal direction is no less than 500mm;The distance of each connector center to nearest host node is not preferably greater than advance 1/3.The spreading position of upper sheer pole is staggeredly arranged, and the distance that is staggered is not less than the 1/3 of advance.The lap of splice is not less than 1m, And 3 rotary buckles of spaced set are fixed.
Referring to Fig.1, be equipped with bamboo sheathing scaffold board on operating platform 3, the surrounding of bamboo sheathing scaffold board be equipped with guardrail, staircase and Safety net.
Referring to Fig. 3, Overthrow preventing device 6 includes safety steel cable 12 and steel tube fastener, and the two sides steel column 1 of operating platform 3 is equal It is snapped with steel tube fastener, the both ends of safety steel cable 12 are connected on steel tube fastener, and safety steel cable 12 is trapped among operating platform 3 Outside, in the present embodiment, safety steel cable 12 are constantly in light tension, it is ensured that when oblique pull wallboard, will not topple.
Referring to Fig.1, shingle nail 4 is fastened on purlin 2 by self-tapping screw.
The implementation principle of the present embodiment are as follows: when needing to carry out the installation of shingle nail 4, carry out setting up for operating platform 3, benefit first The Slidable space truss structure being assembled into upright bar and cross bar, is then equipped with bamboo sheathing scaffold board, bamboo on operating platform 3 The surrounding of basketry scaffold board is equipped with guardrail, staircase and safety net, is connected to the steel pipe on steel column 1 followed by safety steel cable 12 Overthrow preventing device 6 is made on fastener, Overthrow preventing device 6 is wound on 3 outside of operating platform, puts 4 bottom of shingle nail into collet 7 at this time Interior, 4 top installs fixture 8 of shingle nail passes through fixture 8 using boom hoist cable 5 at this time and is connected on collet 7, boom hoist cable 5 The other end be connected in bottle gouard moved by hands 9 around fixed pulley 10, boom hoist cable 5 is manually pulled at this time, in the work of bottle gouard moved by hands 9 With lower slow promotion shingle nail 4, shingle nail 4 is promoted to after predetermined position, artificial to carry out sideline alignment, checks plate face flatness, Be adjusted to after meeting the requirements, fixed along purlin 2 with self-tapping screw on shingle nail 4, at this time by front panel fixture 8 and bottom Support 7 removes, and unclamps after boom hoist cable 5 falls collet 7 and fixture 8 and installs second piece of shingle nail 4, mentions in the same way Second piece of shingle nail 4 is risen and fixes, second piece of 4 side of shingle nail uses snapping, elevation line alignment, left and right along with the 1st block of plate Alignment, adjustment plate surface evenness, such one piece one piece of installation, until uniformly being done after the wallboard of one side elevation of workshop is installed Dado bears down on one.
The embodiment of present embodiment is the preferred embodiment of the utility model, and not limitation is originally practical new according to this The protection scope of type, therefore: the equivalence changes that all structures, shape, principle according to the utility model are done should all be covered by practical Within novel protection scope.

Claims (8)

1. a kind of innovative panellised wall installs the operating platform, including steel column (1), purlin (2), operating platform (3), shingle nail (4) and mention It rises wirerope (5), is linked together between the steel column (1) by purlin (2) and form building sides, the side of building sides is erected with Operating platform (3), it is characterised in that: the bottom of the operating platform (3) is equipped with lower margin pulley (11), and operating platform (3) Top and middle part are respectively arranged Overthrow preventing device (6), and collet (7) are installed in the bottom of the shingle nail (4), the top of shingle nail (4) Installs fixture (8) is equipped with fixed pulley (10) at the top of the operating platform (3), and the bottom of operating platform (3) is equipped with manually Cucurbit (9), across there is boom hoist cable (5) on bottle gouard moved by hands (9), the other end of the boom hoist cable (5) bypasses fixed pulley (10) fixture (8) on pass through wall surface plate (4) is connected on collet (7).
2. a kind of innovative panellised wall according to claim 1 installs the operating platform, it is characterised in that: the operating platform (3) The Slidable space truss structure being assembled by upright bar and cross bar, and operating platform (3) be longitudinally provided with every three steps it is vertical Scissors straight support.
3. a kind of innovative panellised wall according to claim 1 installs the operating platform, it is characterised in that: the lower margin pulley (11) Specially two-way lower margin pulley (11), and braking service brake is provided on lower margin pulley (11).
4. a kind of innovative panellised wall according to claim 1 installs the operating platform, it is characterised in that: the Overthrow preventing device It (6) include safety steel cable (12) and steel tube fastener, the two sides steel column (1) of operating platform (3) is snapped with steel tube fastener, safety The both ends of wirerope (12) are connected on steel tube fastener, and safety steel cable (12) is trapped among on the outside of operating platform (3).
5. a kind of innovative panellised wall according to claim 1 installs the operating platform, it is characterised in that: the shingle nail (4) is logical Self-tapping screw is crossed to be fastened on purlin (2).
6. a kind of innovative panellised wall according to claim 1 installs the operating platform, it is characterised in that: shingle nail (4) top There are two the two sides settings in portion fixture (8), is provided with through-hole on the fixture (8), boom hoist cable (5) is above shingle nail (4) It is divided into the through-hole that two are each passed through two fixtures (8) to be connected on collet (7).
7. a kind of innovative panellised wall according to claim 2 installs the operating platform, it is characterised in that: the cross bar is using docking Fastener connection, the spreading position of sleeve couple interlaced arrangement, upper and lower upright bar is staggeredly arranged.
8. a kind of innovative panellised wall according to claim 1 installs the operating platform, it is characterised in that: the operating platform (3) On be equipped with bamboo sheathing scaffold board, the surrounding of bamboo sheathing scaffold board is equipped with guardrail, staircase and safety net.
CN201821745157.7U 2018-10-25 2018-10-25 A kind of innovative panellised wall installs the operating platform Active CN209228070U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821745157.7U CN209228070U (en) 2018-10-25 2018-10-25 A kind of innovative panellised wall installs the operating platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821745157.7U CN209228070U (en) 2018-10-25 2018-10-25 A kind of innovative panellised wall installs the operating platform

Publications (1)

Publication Number Publication Date
CN209228070U true CN209228070U (en) 2019-08-09

Family

ID=67500869

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821745157.7U Active CN209228070U (en) 2018-10-25 2018-10-25 A kind of innovative panellised wall installs the operating platform

Country Status (1)

Country Link
CN (1) CN209228070U (en)

Similar Documents

Publication Publication Date Title
CN106958346B (en) Intelligent attached lifting scaffold equipment for curved surface super high-rise building and construction method
CN201506699U (en) Electric lifting bridge rack for construction
CN201826525U (en) Climbing shuttering system device for buildings
CN206053274U (en) The external scaffolding device of the perpendicular BAIYE outer visor of skyscraper and glass curtain wall dual-purpose
CN111021749A (en) Simple hoisting mechanism for bare concrete exterior wall cladding and construction method thereof
CN116136122A (en) Integrated attached type inclined lifting climbing frame system and use method thereof
CN209703984U (en) A kind of high-altitude mobile security platform for structure for steel structure roof inner slab installation
JP2006299559A (en) Self climbing scaffold and self climbing method by use of it
CN209228070U (en) A kind of innovative panellised wall installs the operating platform
CN213418443U (en) Self-climbing type elevator shaft operation platform
CN113062584A (en) Multipoint elevator shaft construction lifting platform and construction method
CN209568688U (en) A kind of elevating construction platform
CN111851982A (en) Scaffold frame liftable prevents weighing down safety device
CN110817709A (en) High-rise tower crane driver climbing device
CN211923574U (en) Construction device for constructing top floor of building
CN113120785A (en) Safety device attached to climbing frame for people on tower crane
CN208648493U (en) A kind of no scaffold installation elevator operation platform device
CN2209702Y (en) Saffold
CN210655915U (en) Connecting device for climbing frame and tower crane
CN216196742U (en) A wallboard installation device for position is striden to height
CN112376885A (en) Track climbing type integral building construction scaffold convenient to disassemble
CN220393054U (en) Unit plate lifting carrier suitable for circular rail curtain wall
CN210857952U (en) Novel attached lifting scaffold
CN205933127U (en) Erection equipment of various steel inner panel in factory building roof
CN219118718U (en) Climbing frame horizontal protection

Legal Events