CN209210199U - Double drainage wire lifting tool - Google Patents
Double drainage wire lifting tool Download PDFInfo
- Publication number
- CN209210199U CN209210199U CN201821794366.0U CN201821794366U CN209210199U CN 209210199 U CN209210199 U CN 209210199U CN 201821794366 U CN201821794366 U CN 201821794366U CN 209210199 U CN209210199 U CN 209210199U
- Authority
- CN
- China
- Prior art keywords
- hoop
- connecting rod
- clamping hoop
- assembly
- fixed
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 229920001296 polysiloxane Polymers 0.000 claims description 23
- 125000006850 spacer group Chemical group 0.000 claims description 13
- 239000000741 silica gel Substances 0.000 claims description 8
- 229910002027 silica gel Inorganic materials 0.000 claims description 8
- 210000005069 ears Anatomy 0.000 abstract description 8
- 238000009434 installation Methods 0.000 abstract description 8
- 238000010276 construction Methods 0.000 abstract description 3
- 238000012423 maintenance Methods 0.000 abstract description 3
- 230000009466 transformation Effects 0.000 abstract 1
- 238000010586 diagram Methods 0.000 description 4
- 238000000034 method Methods 0.000 description 3
- VYPSYNLAJGMNEJ-UHFFFAOYSA-N Silicium dioxide Chemical compound O=[Si]=O VYPSYNLAJGMNEJ-UHFFFAOYSA-N 0.000 description 2
- 230000000712 assembly Effects 0.000 description 1
- 238000000429 assembly Methods 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000003247 decreasing effect Effects 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 239000003292 glue Substances 0.000 description 1
- 238000011900 installation process Methods 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 238000005457 optimization Methods 0.000 description 1
- 230000001681 protective effect Effects 0.000 description 1
Landscapes
- Load-Engaging Elements For Cranes (AREA)
Abstract
本实用新型涉及电力变电施工、检修应用技术领域,是一种双引流导线吊装工具,包括U形吊臂连接板、可调垂直固定杆组件、n形可调连接杆组件、角度调节螺杆、左卡线箍组件和右卡线箍组件。本实用新型结构合理而紧凑,使用方便,其一方面通过调节垂直支杆套装在垂直套管内的长度,能够方便调节该实用新型的高度,另一方面通过在左夹紧箍和右夹紧箍分别设置固定耳,并且固定耳通过螺栓和螺母固定,能够实现快速拆装导线的功能,从而能够有效的解决变电站引流导线安装不方便和易损坏的问题,具有安全、省力、简便、高效的特点。
The utility model relates to the technical field of power transformation construction and maintenance application, and is a double drainage wire hoisting tool, which includes a U-shaped boom connecting plate, an adjustable vertical fixing rod assembly, an n-shaped adjustable connecting rod assembly, an angle adjusting screw rod, Left cable clamp assembly and right cable clamp assembly. The utility model has a reasonable and compact structure and is easy to use. On the one hand, the height of the utility model can be adjusted conveniently by adjusting the length of the vertical support rod set in the vertical sleeve; The fixed ears are set separately, and the fixed ears are fixed by bolts and nuts, which can realize the function of quick disassembly and assembly of wires, so as to effectively solve the problem of inconvenient installation and easy damage of substation drainage wires. It has the characteristics of safety, labor saving, simplicity and high efficiency .
Description
技术领域technical field
本实用新型涉及电力变电施工、检修应用技术领域,是一种双引流导线吊装工具。The utility model relates to the technical field of electric power substation construction and maintenance application, and is a double-drainage wire hoisting tool.
背景技术Background technique
目前在电力高压变电站进行引流施工、检修安装过程中,由于导线本身质量重,安装孔位精度要求高,在应用吊臂安装过程中,往往出现动作幅度过大或导线固定可靠性低等问题。At present, in the process of drainage construction, maintenance and installation in high-voltage power substations, due to the heavy weight of the wire itself, the accuracy of the installation hole position is high. In the installation process of using the boom, problems such as excessive movement range or low reliability of wire fixing often occur.
但是现有的吊装工具不方便根据使用需求调节吊装工具的高度,对导线进行吊装时容易造成导线损坏,不方便调节导线之间的间距和变电站引流导线安装不方便等问题。However, the existing hoisting tools are inconvenient to adjust the height of the hoisting tool according to the needs of use, and the wires are easily damaged when hoisting the wires, the distance between the wires is inconvenient to adjust, and the installation of the substation drainage wires is inconvenient.
发明内容Contents of the invention
本实用新型提供了一种双引流导线吊装工具,克服了上述现有技术之不足,其能有效解决变电站引流导线安装时,现有吊装工具高度不易调节、引流导线吊装不方便和易损坏的问题。The utility model provides a double-drainage wire hoisting tool, which overcomes the above-mentioned deficiencies in the prior art, and can effectively solve the problems that the height of the existing hoisting tool is difficult to adjust, and the hoisting of the drainage wire is inconvenient and easily damaged when the substation drainage wire is installed. .
本实用新型的技术方案是通过以下措施来实现的:一种双引流导线吊装工具,包括开口朝上的U形吊臂连接板、可调垂直固定杆组件、n形可调连接杆组件、角度调节螺杆、左卡线箍组件和右卡线箍组件,可调垂直固定杆组件顶部与U形吊臂连接板中间下部固定安装在一起,n形可调连接杆组件上部中间部位与可调垂直固定杆组件下部固定安装在一起,角度调节螺杆固定安装在n形可调连接杆组件后侧上部,左卡线箍组件和右卡线箍组件铰接在n形可调连接杆组件下部。The technical scheme of the utility model is achieved through the following measures: a double drainage wire hoisting tool, including a U-shaped boom connecting plate with the opening facing upwards, an adjustable vertical fixing rod assembly, an n-shaped adjustable connecting rod assembly, an angle The adjusting screw, the left cable hoop assembly and the right cable hoop assembly, the top of the adjustable vertical fixed rod assembly and the lower middle part of the U-shaped boom connecting plate are fixedly installed together, and the upper middle part of the n-shaped adjustable connecting rod assembly is connected to the adjustable vertical The lower part of the fixed rod assembly is fixedly installed together, the angle adjustment screw rod is fixedly installed on the upper part of the rear side of the n-shaped adjustable connecting rod assembly, and the left cable hoop assembly and the right cable hoop assembly are hinged on the lower part of the n-shaped adjustable connecting rod assembly.
下面是对上述实用新型技术方案的进一步优化或/和改进:Below is the further optimization or/and improvement to above-mentioned utility model technical scheme:
上述U形吊臂连接板左侧设置有至少两个连接插孔,U形吊臂连接板右侧设置有与U形吊臂连接板左侧对应的连接插孔。The left side of the U-shaped boom connecting plate is provided with at least two connecting jacks, and the right side of the U-shaped boom connecting plate is provided with connecting jacks corresponding to the left side of the U-shaped boom connecting plate.
上述可调垂直固定杆组件括垂直套管、垂直支杆和调节螺栓,垂直支杆套装在垂直套管的内侧下部,垂直支杆底部固定安装有连接螺母,垂直支杆右侧由上至下依次设置有至少两个内螺纹孔,垂直套管右侧下部由上至下依次设置有至少两个与垂直支杆对应的内螺纹孔,垂直套管右侧的一个内螺纹孔上安装有调节螺栓。The above-mentioned adjustable vertical fixing rod assembly includes a vertical sleeve, a vertical support rod and an adjustment bolt. The vertical support rod is set on the inner lower part of the vertical sleeve, and the bottom of the vertical support rod is fixedly installed with a connecting nut. There are at least two internally threaded holes in sequence, and at least two internally threaded holes corresponding to the vertical support rods are arranged in the lower part of the right side of the vertical sleeve from top to bottom. An internally threaded hole on the right side of the vertical sleeve is equipped with an adjustment bolt.
上述n形可调连接杆组件包括横向固定架、左纵向连接杆、右纵向连接杆、左调节箍、右调节箍、连接螺栓和固定螺栓,左纵向连接杆和右纵向连接杆上部分别设置有螺纹,左调节箍和右调节箍中间分别设置有与左纵向连接杆和右纵向连接杆上部螺纹配合的螺纹孔,左纵向连接杆上部与左调节箍通过固定螺栓固定安装在横向固定架左端,右纵向连接杆上部与右调节箍通过固定螺栓固定安装在横向固定架右端,在横向固定架中间设置有与垂直支杆底部连接螺母内侧螺纹相同的定位孔,横向固定架的定位孔与垂直支杆底部的连接螺母通过连接螺栓固定安装在一起,左纵向连接杆底部与左卡线箍组件前上部铰接,右纵向连接杆底部与右卡线箍组件前上部铰接,左纵向连接杆后侧上部和右纵向连接杆后侧上部分别固定安装有连接架,连接架后端均设置有与角度调节螺杆外侧纵向螺纹配合的螺纹孔,角度调节螺杆上部与连接架后端固定安装在一起,角度调节螺杆底部分别与左卡线箍组件和右卡线箍组件的后上部铰接,在横向固定架左右两端分别设置有外环台。The above-mentioned n-shaped adjustable connecting rod assembly includes a horizontal fixing frame, a left longitudinal connecting rod, a right longitudinal connecting rod, a left adjusting hoop, a right adjusting hoop, connecting bolts and fixing bolts. The upper parts of the left longitudinal connecting rod and the right longitudinal connecting rod are respectively provided with Screw threads, the middle of the left adjusting hoop and the right adjusting hoop are respectively provided with threaded holes that match the upper parts of the left longitudinal connecting rod and the upper part of the right longitudinal connecting rod. The upper part of the right longitudinal connecting rod and the right adjusting hoop are fixed and installed on the right end of the horizontal fixing frame through fixing bolts. In the middle of the horizontal fixing frame, there is a positioning hole which is the same as the inner thread of the connecting nut at the bottom of the vertical support. The positioning hole of the horizontal fixing frame is connected with the vertical support. The connecting nuts at the bottom of the rod are fixed and installed together by connecting bolts, the bottom of the left longitudinal connecting rod is hinged with the front upper part of the left cable hoop assembly, the bottom of the right longitudinal connecting rod is hinged with the front upper part of the right cable hoop assembly, and the rear upper part of the left longitudinal connecting rod and the upper part of the rear side of the right longitudinal connecting rod are respectively fixedly installed with a connecting frame, and the rear end of the connecting frame is provided with a threaded hole matching with the longitudinal thread on the outer side of the angle adjusting screw, and the upper part of the angle adjusting screw is fixedly installed with the rear end of the connecting frame, and the angle adjustment The bottom of the screw rod is respectively hinged with the rear upper parts of the left and right cable hoop assemblies, and outer ring platforms are respectively arranged at the left and right ends of the horizontal fixing frame.
上述右卡线箍组件包括右夹紧箍、硅胶垫块、连接轴、透气垫网,硅胶垫块胶接在右夹紧箍的内壁上,透气垫网胶接在硅胶垫块的内侧,右夹紧箍中间右侧部位固定安装有至少两个连接轴,右夹紧箍中间左侧部位设置有固定耳,固定耳通过螺栓和螺母固定,右夹紧箍外侧上后部与角度调节螺杆底部铰接;左卡线箍组件包括左夹紧箍、硅胶垫块、连接轴、透气垫网,硅胶垫块胶接在左夹紧箍的内壁上,透气垫网胶接在硅胶垫块的内侧,左夹紧箍中间左侧部位固定安装有至少两个连接轴,左夹紧箍中间右侧部位设置有固定耳,固定耳通过螺栓和螺母固定,左夹紧箍外侧上后部与角度调节螺杆底部铰接。The above-mentioned right clamping hoop assembly includes the right clamping hoop, the silicone spacer, the connecting shaft, and the air-permeable cushion net. At least two connecting shafts are fixedly installed on the right side of the middle of the clamping hoop, and fixed ears are arranged on the left side of the middle of the right clamping hoop, and the fixing ears are fixed by bolts and nuts. Hinged; the left clamping hoop assembly includes the left clamping hoop, silicone cushion block, connecting shaft, and breathable cushion net. The silicone cushion block is glued to the inner wall of the left clamping hoop, and the breathable cushion net is glued to the inner side of the silicone cushion block. There are at least two connecting shafts fixedly installed on the left side of the middle of the left clamping hoop, and fixed ears are arranged on the right side of the middle of the left clamping hoop, and the fixing ears are fixed by bolts and nuts. Bottom hinged.
本实用新型结构合理而紧凑,使用方便,其一方面通过调节垂直支杆套装在垂直套管内的长度,能够方便调节该实用新型的高度,另一方面通过在左夹紧箍和右夹紧箍分别设置固定耳,并且固定耳通过螺栓和螺母固定,能够实现快速拆装导线的功能,从而能够有效的解决变电站引流导线安装不方便和易损坏的问题,具有安全、省力、简便、高效的特点。The utility model has a reasonable and compact structure and is easy to use. On the one hand, the height of the utility model can be adjusted conveniently by adjusting the length of the vertical support rod set in the vertical sleeve; The fixed ears are set separately, and the fixed ears are fixed by bolts and nuts, which can realize the function of quick disassembly and assembly of wires, so as to effectively solve the problem of inconvenient installation and easy damage of substation drainage wires. It has the characteristics of safety, labor saving, simplicity and high efficiency .
附图说明Description of drawings
附图1为本实用新型的主视结构示意图。Accompanying drawing 1 is the front view structure schematic diagram of the utility model.
附图2为本实用新型的侧视结构示意图。Accompanying drawing 2 is the side view structure diagram of the utility model.
附图3为附图1中的可调垂直固定杆组件主视结构示意图。Accompanying drawing 3 is a front structural schematic diagram of the adjustable vertical fixing rod assembly in accompanying drawing 1.
附图4为附图1中的n形可调连接杆组件主视结构示意图。Accompanying drawing 4 is a front structural schematic diagram of the n-shaped adjustable connecting rod assembly in accompanying drawing 1.
附图5为附图1中的右卡线箍组件主视结构示意图。Accompanying drawing 5 is a front structural schematic view of the right clamp assembly in accompanying drawing 1.
附图中的编码分别为:1为U形吊臂连接板,2为连接插孔,3为可调垂直固定杆组件,4为n形可调连接杆组件,5为连接螺栓,6为角度调节螺杆,7为连接架,8为右卡线箍组件,9为左卡线箍组件,31为垂直套管,32为垂直支杆,33为连接螺母,34为调节螺栓,35为内螺纹孔,41为横向固定架,42为定位孔,43为纵向连接杆,44为调节箍,45为固定螺栓,46为外环台,81为夹紧箍,82为固定耳,83为连接轴,84为硅胶垫块,85为透气垫网。The codes in the drawings are: 1 is the U-shaped boom connecting plate, 2 is the connecting jack, 3 is the adjustable vertical fixed rod assembly, 4 is the n-shaped adjustable connecting rod assembly, 5 is the connecting bolt, and 6 is the angle Adjusting screw, 7 is the connecting frame, 8 is the right cable hoop assembly, 9 is the left cable hoop assembly, 31 is the vertical sleeve, 32 is the vertical pole, 33 is the connecting nut, 34 is the adjusting bolt, 35 is the internal thread Holes, 41 is a horizontal fixing frame, 42 is a positioning hole, 43 is a longitudinal connecting rod, 44 is an adjusting hoop, 45 is a fixing bolt, 46 is an outer ring platform, 81 is a clamping hoop, 82 is a fixed ear, and 83 is a connecting shaft , 84 is a silica gel block, and 85 is a breathable pad net.
具体实施方式Detailed ways
本实用新型不受下述实施例的限制,可根据本实用新型的技术方案与实际情况来确定具体的实施方式。The utility model is not limited by the following examples, and the specific implementation manner can be determined according to the technical scheme of the utility model and actual conditions.
在本实用新型中,为了便于描述,各部件的相对位置关系的描述均是根据说明书附图1的布图方式来进行描述的,如:前、后、上、下、左、右等的位置关系是依据说明书附图1的布图方向来确定的。In this utility model, for the convenience of description, the description of the relative positional relationship of each component is described according to the layout method of Fig. The relationship is determined according to the layout direction of Figure 1 of the specification.
下面结合实施例及附图对本实用新型作进一步描述:Below in conjunction with embodiment and accompanying drawing, the utility model is further described:
如附图1所示,该双引流导线吊装工具包括开口朝上的U形吊臂连接板1、可调垂直固定杆组件3、n形可调连接杆组件4、角度调节螺杆6、左卡线箍组件9和右卡线箍组件8,可调垂直固定杆组件3顶部与U形吊臂连接板1中间下部固定安装在一起,n形可调连接杆组件4上部中间部位与可调垂直固定杆组件3下部固定安装在一起,角度调节螺杆6固定安装在n形可调连接杆组件4后侧上部,左卡线箍组件9和右卡线箍组件8铰接在n形可调连接杆组件4下部。本实用新型使用过程中,通过快速调整可调垂直固定杆组件3的高度,可以方便调节该实用新型的高度,从而减少导线吊装时造成的损坏;左卡线箍组件9和右卡线箍组件8铰接在n形可调连接杆组件4下部,在吊装导线时,有利于能够实现快速拆装导线的功能,从而能够有效解决变电站引流导线安装不方便的问题。As shown in Figure 1, the double drainage wire hoisting tool includes a U-shaped boom connecting plate 1 with the opening facing upward, an adjustable vertical fixed rod assembly 3, an n-shaped adjustable connecting rod assembly 4, an angle adjustment screw rod 6, a left clamp The wire hoop assembly 9 and the right clamp wire hoop assembly 8, the top of the adjustable vertical fixed rod assembly 3 and the middle lower part of the U-shaped boom connecting plate 1 are fixedly installed together, and the upper middle part of the n-shaped adjustable connecting rod assembly 4 is connected to the adjustable vertical The lower part of the fixed rod assembly 3 is fixedly installed together, the angle adjustment screw rod 6 is fixedly installed on the upper part of the rear side of the n-shaped adjustable connecting rod assembly 4, and the left clamping hoop assembly 9 and the right clamping hoop assembly 8 are hinged on the n-shaped adjustable connecting rod Assembly 4 lower part. During the use of the utility model, the height of the utility model can be adjusted conveniently by quickly adjusting the height of the adjustable vertical fixed rod assembly 3, thereby reducing the damage caused when the wire is hoisted; the left wire clamp assembly 9 and the right clamp assembly 8 are hinged on the bottom of the n-shaped adjustable connecting rod assembly 4. When the wire is hoisted, it is beneficial to realize the function of quickly disassembling the wire, thereby effectively solving the problem of inconvenient installation of the substation drainage wire.
可根据实际需要,对上述双引流导线吊装工具作进一步优化或/和改进:According to actual needs, the above-mentioned double drainage wire lifting tool can be further optimized or/and improved:
如附图1所示,U形吊臂连接板1左侧设置有至少两个连接插孔2,U形吊臂连接板1右侧设置有与U形吊臂连接板1左侧对应的连接插孔2。As shown in Figure 1, at least two connecting jacks 2 are provided on the left side of the U-shaped boom connecting plate 1, and the right side of the U-shaped boom connecting plate 1 is provided with a connection corresponding to the left side of the U-shaped boom connecting plate 1. Jack 2.
如附图1、3所示,可调垂直固定杆组件3括垂直套管31、垂直支杆32和调节螺栓34,垂直支杆32套装在垂直套管31的内侧下部,垂直支杆32底部固定安装有连接螺母33,垂直支杆32右侧由上至下依次设置有至少两个内螺纹孔35,垂直套管31右侧下部由上至下依次设置有至少两个与垂直支杆32对应的内螺纹孔35,垂直套管31右侧的一个内螺纹孔35上安装有调节螺栓34。垂直支杆32底部的连接螺母33,便于通过螺栓将可调垂直固定杆组件3与n形可调连接杆组件4固定连接,这样在吊装导线时,可以提高可调垂直固定杆组件3和与n形可调连接杆组件4的稳固度,增大安全系数;在本实用新型使用过程中,通过由上至下改变调节螺栓34的位置,从而实现快速调整可调垂直固定杆组件3的高度,节约工作时间,同时使其安装也方便省力。As shown in accompanying drawings 1 and 3, the adjustable vertical fixing rod assembly 3 includes a vertical sleeve 31, a vertical strut 32 and an adjustment bolt 34, the vertical strut 32 is set on the inner lower part of the vertical sleeve 31, and the bottom of the vertical strut 32 A connecting nut 33 is fixedly installed, the right side of the vertical pole 32 is provided with at least two internally threaded holes 35 from top to bottom, and the lower part of the right side of the vertical sleeve 31 is provided with at least two vertical poles 32 from top to bottom. Corresponding to the internally threaded hole 35 , an adjusting bolt 34 is installed on an internally threaded hole 35 on the right side of the vertical casing 31 . The connecting nut 33 at the bottom of the vertical pole 32 is convenient to fix the adjustable vertical fixed rod assembly 3 with the n-shaped adjustable connecting rod assembly 4 by bolts, so that when the wire is hoisted, the adjustable vertical fixed rod assembly 3 and the connection with the adjustable vertical fixed rod assembly can be improved. The stability of the n-shaped adjustable connecting rod assembly 4 increases the safety factor; during the use of the utility model, the height of the adjustable vertical fixed rod assembly 3 can be quickly adjusted by changing the position of the adjusting bolt 34 from top to bottom , save working time, and make it convenient and labor-saving to install at the same time.
如附图1、2、3、4所示,n形可调连接杆组件4包括横向固定架41、左纵向连接杆43、右纵向连接杆43、左调节箍44、右调节箍44、连接螺栓5和固定螺栓45,左纵向连接杆43和右纵向连接杆43上部分别设置有螺纹,左调节箍44和右调节箍44中间分别设置有与左纵向连接杆43和右纵向连接杆43上部螺纹配合的螺纹孔,左纵向连接杆43上部与左调节箍44通过固定螺栓45固定安装在横向固定架41左端,右纵向连接杆43上部与右调节箍44通过固定螺栓45固定安装在横向固定架41右端,在横向固定架41中间设置有与垂直支杆32底部连接螺母33内侧螺纹相同的定位孔42,横向固定架41的定位孔42与垂直支杆32底部的连接螺母33通过连接螺栓5固定安装在一起,左纵向连接杆43底部与左卡线箍组件9前上部铰接,右纵向连接杆43底部与右卡线箍组件8前上部铰接,左纵向连接杆43后侧上部和右纵向连接杆43后侧上部分别固定安装有连接架7,连接架7后端均设置有与角度调节螺杆6外侧纵向螺纹配合的螺纹孔,角度调节螺杆6上部与连接架7后端固定安装在一起,角度调节螺杆6底部分别与左卡线箍组件9和右卡线箍组件8的后上部铰接,在横向固定架41左右两端分别设置有外环台46。左纵向连接杆43和右纵向连接杆43通过左调节箍44和右调节箍44分别固定安装在横向固定架41左右两端,在使用本实用新型时,便于根据工作现场使用所需情况快速调节右卡线箍组件8与左卡线箍组件9之间的间距,进而方便调节导线之间的间距;n形可调连接杆组件4后侧加装角度调节螺杆6,并分别与左卡线箍组件9、右卡线箍组件8铰接,方便根据现场引流导线所需的使用情况,快速调节卡线箍组件的倾斜角度,使得引流导线安装更加省力和安全;横向固定架41左右两端分别设置的外环台46,在调节右卡线箍组件8与左卡线箍组件9之间的间距时,左纵向连接杆43和右纵向连接杆43不会脱离横向固定架41,增大工作安全系数。As shown in accompanying drawings 1, 2, 3, and 4, the n-shaped adjustable connecting rod assembly 4 includes a transverse fixing frame 41, a left longitudinal connecting rod 43, a right longitudinal connecting rod 43, a left adjusting hoop 44, a right adjusting hoop 44, a connecting Bolt 5 and fixing bolt 45, left longitudinal connecting rod 43 and right longitudinal connecting rod 43 tops are respectively provided with threads, and left adjusting hoop 44 and right adjusting hoop 44 middle are respectively provided with left longitudinal connecting rod 43 and right longitudinal connecting rod 43 tops. Threaded hole, the left longitudinal connecting rod 43 top and the left adjusting hoop 44 are fixedly installed on the left end of the horizontal fixing frame 41 through the fixing bolt 45, and the right longitudinal connecting rod 43 upper part and the right adjusting hoop 44 are fixed and installed on the horizontal fixing frame 41 through the fixing bolt 45. The right end of frame 41 is provided with the same positioning hole 42 as the inner thread of the connecting nut 33 at the bottom of the vertical support rod 32 in the middle of the horizontal fixing frame 41, and the positioning hole 42 of the horizontal fixing frame 41 and the connecting nut 33 at the bottom of the vertical supporting rod 32 are connected by connecting bolts. 5 are fixedly installed together, the bottom of the left longitudinal connecting rod 43 is hinged with the front upper part of the left clamp assembly 9, the bottom of the right longitudinal connecting rod 43 is hinged with the front upper part of the right clamp assembly 8, the rear upper part of the left longitudinal connecting rod 43 and the right The upper part of the rear side of the longitudinal connecting rod 43 is respectively fixedly equipped with a connecting frame 7, and the rear end of the connecting frame 7 is provided with a threaded hole cooperating with the longitudinal thread on the outside of the angle adjusting screw rod 6, and the upper part of the angle adjusting screw rod 6 and the connecting frame 7 rear end are fixedly installed on the Together, the bottom of the angle adjusting screw 6 is respectively hinged with the rear upper parts of the left clamp assembly 9 and the right clamp assembly 8, and outer ring platforms 46 are respectively arranged at the left and right ends of the transverse fixing frame 41 . The left longitudinal connecting rod 43 and the right longitudinal connecting rod 43 are respectively fixedly installed on the left and right ends of the horizontal fixing frame 41 through the left adjusting hoop 44 and the right adjusting hoop 44. When using the utility model, it is convenient to quickly adjust according to the required situation of the work site. The distance between the right wire clamp assembly 8 and the left wire clamp assembly 9 facilitates the adjustment of the distance between the wires; the rear side of the n-shaped adjustable connecting rod assembly 4 is equipped with an angle adjustment screw 6, and is connected with the left wire clamp respectively. The hoop assembly 9 and the right wire hoop assembly 8 are hinged, which is convenient for quickly adjusting the inclination angle of the wire hoop assembly according to the required usage of the on-site drainage wire, so that the installation of the drainage wire is more labor-saving and safe; the left and right ends of the horizontal fixing frame 41 are respectively The outer ring platform 46 provided, when adjusting the distance between the right cable hoop assembly 8 and the left cable hoop assembly 9, the left longitudinal connecting rod 43 and the right longitudinal connecting rod 43 will not break away from the horizontal fixing frame 41, increasing the work Safety factor.
如附图1、2、5所示,右卡线箍组件8包括右夹紧箍81、硅胶垫块84、连接轴83、透气垫网85,硅胶垫块84胶接在右夹紧箍81的内壁上,透气垫网85胶接在硅胶垫块84的内侧,右夹紧箍81中间右侧部位固定安装有连接轴83,右夹紧箍81中间左侧部位设置有固定耳82,固定耳82通过螺栓和螺母固定,右夹紧箍81外侧上后部与角度调节螺杆6底部铰接,左卡线箍组件9包括左夹紧箍81、硅胶垫块84、连接轴83、透气垫网85,硅胶垫块84胶接在左夹紧箍81的内壁上,透气垫网85胶接在硅胶垫块84的内侧,左夹紧箍81中间左侧部位固定安装有连接轴83,左夹紧箍81中间右侧部位设置有固定耳82,固定耳82通过螺栓和螺母固定,左夹紧箍81外侧上后部与角度调节螺杆6底部铰接。在左夹紧箍81的内壁上安装硅胶垫块84胶,并将透气垫网85胶接在硅胶垫块84的内侧,可以实现吊装引流导线时,能够对引流导线起到保护作用,降低对引流导线的损坏,延长引流导线使用周期,节约生产成本;左夹紧箍81和右夹紧箍81中间右侧部位固定安装的连接轴83,方便固定耳82打开后,夹紧箍81能够最大角度展开,有利用引流导线快速装入,同时,固定耳82通过螺栓和螺母固定,在本实用新型使用过程中,拆除固定耳82中的螺栓和螺母后,将所需的引流导线分别夹装在左夹紧箍81和右夹紧箍81内,固定安装好固定耳82的螺栓和螺母即可,其有利于能够实现快速拆装导线的功能,从而能够有效的解决变电站引流导线安装不方便的问题。As shown in accompanying drawings 1, 2, and 5, the right clamping hoop assembly 8 includes a right clamping hoop 81, a silicone spacer 84, a connecting shaft 83, and a breathable cushion net 85, and the silica gel spacer 84 is glued to the right clamping hoop 81. On the inner wall of the inner wall, the breathable cushion net 85 is glued to the inner side of the silica gel cushion block 84, and the middle right part of the right clamping hoop 81 is fixedly equipped with a connecting shaft 83, and the middle left part of the right clamping hoop 81 is provided with a fixed ear 82. The ear 82 is fixed by bolts and nuts, the upper rear part of the outer side of the right clamping hoop 81 is hinged with the bottom of the angle adjustment screw 6, and the left clamping hoop assembly 9 includes a left clamping hoop 81, a silicone spacer 84, a connecting shaft 83, and a breathable gasket 85, the silica gel spacer 84 is glued on the inner wall of the left clamping hoop 81, the breathable cushion net 85 is glued on the inner side of the silica gel spacer 84, and the middle left part of the left clamping hoop 81 is fixedly equipped with a connecting shaft 83, and the left clamping The right part in the middle of the tight hoop 81 is provided with a fixed ear 82, the fixed ear 82 is fixed by a bolt and a nut, and the upper rear part of the left clamp hoop 81 outside is hinged with the bottom of the angle adjustment screw rod 6 . On the inwall of the left clamping hoop 81, install silica gel spacer 84 glue, and the inboard of air-permeable spacer net 85 is glued on silica gel spacer 84, when can realize hoisting drainage wire, can play a protective role to drainage wire, reduce the impact on The damage of the drainage wire prolongs the service life of the drainage wire and saves production costs; the connecting shaft 83 fixedly installed on the right side of the middle of the left clamping hoop 81 and the right clamping hoop 81 facilitates the opening of the fixing ear 82, and the clamping hoop 81 can maximize The angle is expanded, and the drainage wire can be quickly loaded. At the same time, the fixing ear 82 is fixed by bolts and nuts. In the left clamping hoop 81 and the right clamping hoop 81, the bolts and nuts of the fixing ear 82 can be fixedly installed, which is conducive to realizing the function of quickly disassembling and assembling the wires, thereby effectively solving the inconvenient installation of the substation drainage wires The problem.
以上技术特征构成了本实用新型的最佳实施例,其具有较强的适应性和最佳实施效果,可根据实际需要增减非必要的技术特征,来满足不同情况的需求。The above technical features constitute the best embodiment of the utility model, which has strong adaptability and best implementation effect, and non-essential technical features can be increased or decreased according to actual needs to meet the needs of different situations.
Claims (8)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821794366.0U CN209210199U (en) | 2018-11-01 | 2018-11-01 | Double drainage wire lifting tool |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821794366.0U CN209210199U (en) | 2018-11-01 | 2018-11-01 | Double drainage wire lifting tool |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209210199U true CN209210199U (en) | 2019-08-06 |
Family
ID=67457863
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821794366.0U Active CN209210199U (en) | 2018-11-01 | 2018-11-01 | Double drainage wire lifting tool |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209210199U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115871736A (en) * | 2023-02-14 | 2023-03-31 | 武汉钢铁有限公司 | An online reset device and method for bogie bolsters and bolster springs of metallurgical vehicles |
-
2018
- 2018-11-01 CN CN201821794366.0U patent/CN209210199U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115871736A (en) * | 2023-02-14 | 2023-03-31 | 武汉钢铁有限公司 | An online reset device and method for bogie bolsters and bolster springs of metallurgical vehicles |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110581455B (en) | Automatic replacement device for overhead suspension insulator | |
CN207414759U (en) | The strutting assembly of o-ring erecting device | |
CN209210199U (en) | Double drainage wire lifting tool | |
CN206942199U (en) | A kind of support meanss of construction | |
CN209291874U (en) | A kind of distribution cable cover board boom hoisting | |
CN216957646U (en) | Pole-mounted transformer mounting device | |
CN205558786U (en) | Hydraulic pressure lift electric power overhaul ladder | |
CN105552757B (en) | Portable distribution transformer mast-up | |
CN107060370A (en) | A kind of support meanss of construction | |
CN207098462U (en) | Box support frame is connect during a kind of power cable laying construction | |
CN201358310Y (en) | Anode bus switching hoisting appliance expiring work mechanism | |
CN206516986U (en) | A kind of adjustable electric power overhaul frame based on lever principle | |
CN211262660U (en) | A new type of lighting test equipment | |
CN204727536U (en) | A lifting movable support for the transmission shaft of the crane | |
CN210086066U (en) | Bridge expansion joint installation adjustment tool | |
CN205960492U (en) | Change instrument is assisted to perpendicular telescopic isolator static contact | |
CN207847029U (en) | A kind of Novel horse applied on steel construction ceiling framework | |
CN204714417U (en) | A kind of power ramp device | |
CN205472401U (en) | Adjustable overhead earth wire lifting mechanism | |
CN210290345U (en) | Cylinder bearing structure | |
CN214940355U (en) | Secondary pouring structure of bottom hole on auxiliary isolation switch support foundation | |
CN219298831U (en) | Positioning device convenient to adjust and used for installing inclined column steel structure | |
CN217678636U (en) | Prevent throwing net automatic lifting equipment in bridge pier stud construction | |
CN220131776U (en) | Jack auxiliary support structure | |
CN110654991A (en) | Portable Ceiling Mount |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |