CN209169695U - A kind of middle-placed switch cabinet installation system - Google Patents

A kind of middle-placed switch cabinet installation system Download PDF

Info

Publication number
CN209169695U
CN209169695U CN201920005166.0U CN201920005166U CN209169695U CN 209169695 U CN209169695 U CN 209169695U CN 201920005166 U CN201920005166 U CN 201920005166U CN 209169695 U CN209169695 U CN 209169695U
Authority
CN
China
Prior art keywords
switch cabinet
placed switch
guide rail
installation system
placement rack
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201920005166.0U
Other languages
Chinese (zh)
Inventor
王新平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xinjiang Bayi Iron and Steel Co Ltd
Original Assignee
Xinjiang Bayi Iron and Steel Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xinjiang Bayi Iron and Steel Co Ltd filed Critical Xinjiang Bayi Iron and Steel Co Ltd
Priority to CN201920005166.0U priority Critical patent/CN209169695U/en
Application granted granted Critical
Publication of CN209169695U publication Critical patent/CN209169695U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Patch Boards (AREA)

Abstract

The utility model discloses a kind of middle-placed switch cabinet installation systems, belong to power distribution cabinet manufacturing technology field, aiming at the problem that installation of existing middle-placed switch cabinet is unfavorable for continuous productive process and low efficiency, the utility model passes through following proposal: including truss guide rail, the middle-placed switch cabinet placement rack for being arranged in truss guide rail lower part and the installment work platform that middle-placed switch cabinet placement rack side is set, wherein installment work platform includes hoistable platform and the Tool Cabinet that is arranged on hoistable platform, truss guide rail includes two guide rail brackets fixed on the ground in parallel, guide rail bracket is provided with sliding beam, electric block is movably set on sliding beam;Realize the efficient flowing water installation of middle-placed switch cabinet.

Description

A kind of middle-placed switch cabinet installation system
Technical field
The utility model belongs to power distribution cabinet manufacturing technology field, and in particular to a kind of middle-placed switch cabinet installation system.
Background technique
Middle-placed switch cabinet, full name are metal armouring middle disposed withdrawn type switchgear.Belong to high voltage distribution installation, maximum operating voltage 3.6/7.2/12kV is the indoor complete distribution of three-phase alternating current 50Hz sectionalized single busbar connection system or double-bus segmented system Device.For receiving and the network power with 3.6-12kV, and control protection, monitoring and measuring are carried out to power circuit.In set Formula switchgear is mainly used for power plant, the power transmission of medium and small generator, electric system secondary substation by electricity, power transmission, industrial and mineral The distribution of enterprises and institutions and the starting of Large-scale High-Pressure motor etc..
Middle-placed switch cabinet is compared to common electrical distribution cabinet, due to being divided into the part of multiple autonomous closures, electrical equipment, route Installation is more complicated, is to be installed by hand using artificial stand in the prior art, is unfavorable for integrated mill's continuous productive process, especially It is the biggish middle-placed switch cabinet of some volumes, when installing, lower needs worker to bend over to squat down, and eminence is needed by ladder, on tiptoe object It assists to complete installation, inefficiency.
Summary of the invention
The technical problem to be solved by the utility model is to provide a kind of middle-placed switch cabinet installation systems, realize middle-placed switch cabinet flowing water Installation, efficiently installation.
Technical solution adopted in the utility model is:
A kind of middle-placed switch cabinet installation system, which is characterized in that including truss guide rail, be arranged in the middle-placed switch cabinet of truss guide rail lower part Placement rack and the installment work platform that middle-placed switch cabinet placement rack side is arranged, wherein installment work platform includes that hoistable platform and setting exist Tool Cabinet on hoistable platform, truss guide rail include two guide rail brackets fixed on the ground in parallel, and guide rail bracket is provided with cunning Crossbeam is moved, is movably set with electric block on sliding beam.
Further, the middle-placed switch cabinet placement rack includes mounting seat and the rotation being arranged in mounting seat circle Disk.
Further, the quantity of the rotating circular disc and the quantity of installment work platform are consistent.
Further, long pore structure is provided in the rotating circular disc.
Further, the long hole that the middle-placed switch cabinet placement rack includes mounting seat and is arranged in mounting seat.
Further, the hoistable platform includes chassis and platen, two first elevating lever one end and chassis top surface Hingedly, the other end is mutually resisted by roller with platen lower surface;Two second elevating lever one end and platen lower surface are hinged, another End is mutually resisted by roller with chassis top surface;By a long axis arranged crosswise, long axis connects for first elevating lever and the second elevating lever Oil cylinder is connect, oil cylinder is fixed on chassis.
The beneficial effects of the utility model are: the utility model is mainly used for the flowing water installation of middle-placed switch cabinet, led by truss Rail cooperation electric block can facilitate the handling for realizing middle-placed switch cabinet, and middle-placed switch cabinet placement rack facilitates the placement and fixation of middle-placed switch cabinet, pacifies Dress workbench is used for the standing of worker or squats, and by the way that lifting structure is arranged, can facilitate worker that can take comfortable posture Quick centring is set cabinet and is installed.
Detailed description of the invention
Fig. 1 is the perspective view of the utility model;
Fig. 2 is the front view of the utility model;
Fig. 3 is the structural schematic diagram of the utility model hoistable platform;
Fig. 4 is a kind of middle-placed switch cabinet placement rack structural schematic diagram of the utility model;
Fig. 5 is another middle-placed switch cabinet placement rack structural schematic diagram of the utility model.
Fig. 6 is the rotating circular disc structural schematic diagram of the utility model.
In figure: 1. truss guide rails;2. middle-placed switch cabinet placement rack;3. installment work platform;11A, 11B. guide rail bracket;12. sliding is horizontal Beam;13. electric block;21. pedestal;22. rotating circular disc;23. long hole;221. long pore structures;31. hoistable platform;32. tool Cabinet;311. chassis;312. platen;313. first elevating lever, 314. second elevating lever;315. oil cylinder.
Specific embodiment
Embodiment 1
A kind of middle-placed switch cabinet installation system as shown in Figure 1, Figure 2, Figure 3 and Figure 4, including truss guide rail 1, be arranged in truss and lead The middle-placed switch cabinet placement rack 2 of 1 lower part of rail and the installment work platform 3 that 2 side of middle-placed switch cabinet placement rack is set, wherein installment work platform 3 Including hoistable platform 31 and the Tool Cabinet 32 being arranged on hoistable platform 31, truss guide rail 1 fixes on the ground in parallel including two Guide rail bracket 11A, 11B, guide rail bracket 11A, 11B are provided with sliding beam 12, are movably set on sliding beam 12 electronic Cucurbit 13.The hoistable platform 31 includes chassis 311 and platen 312, on two first elevating lever, 313 one end and chassis 311 Surface is hinged, and the other end is mutually resisted by roller with 312 lower surface of platen;Under two second elevating lever, 314 one end and platen 312 Surface is hinged, and the other end is mutually resisted by roller with 311 upper surface of chassis;First elevating lever 313 passes through with the second elevating lever 314 One long axis arranged crosswise, long axis connection oil cylinder 315, oil cylinder 315 are fixed on chassis 311.
The middle-placed switch cabinet placement rack 2 includes mounting seat 21 and the rotating circular disc 22 being arranged in mounting seat 21. Shown in rotating circular disc 22 be fixed in mounting seat 21 by bearing-axle construction, rotating circular disc 22 can rotate, and set in realization Cabinet rotation is rotated without worker along fixed middle-placed switch cabinet surrounding.
The quantity of the rotating circular disc 22 is consistent with the quantity of installment work platform 3, is as shown in Figure 13.
In use, sliding beam 12 passes through motor, idler wheel in guide rail bracket 11A, 11B is upper to be slided, and electric block 13 Top is hung on sliding beam 12 by pulley, and pulley realizes that electric block 13 is laterally moved along sliding beam 12 by motor control Dynamic, electric block 13 can then sling middle-placed switch cabinet and transport between each rotating circular disc 22, be convenient for the handling of assembly line middle-placed switch cabinet;Lifting Platform 31 then jacks up or fall the first elevating lever 313 by oil cylinder 315 and the second elevating lever 314 realizes the rising of platen 312 And decline.
The present embodiment only example one by one, 13 quantity of electric block, 22 quantity of rotating circular disc all in accordance with assembly line length It is short and can be appropriately arranged with.
Embodiment 2
As shown in Figure 1, Figure 2, Fig. 3 and a kind of middle-placed switch cabinet installation system shown in fig. 5, including truss guide rail 1, be arranged in truss and lead The middle-placed switch cabinet placement rack 2 of 1 lower part of rail and the installment work platform 3 that 2 side of middle-placed switch cabinet placement rack is set, wherein installment work platform 3 Including hoistable platform 31 and the Tool Cabinet 32 being arranged on hoistable platform 31, truss guide rail 1 fixes on the ground in parallel including two Guide rail bracket 11A, 11B, guide rail bracket 11A, 11B are provided with sliding beam 12, are movably set on sliding beam 12 electronic Cucurbit 13.The hoistable platform 31 includes chassis 311 and platen 312, on two first elevating lever, 313 one end and chassis 311 Surface is hinged, and the other end is mutually resisted by roller with 312 lower surface of platen;Under two second elevating lever, 314 one end and platen 312 Surface is hinged, and the other end is mutually resisted by roller with 311 upper surface of chassis;First elevating lever 313 passes through with the second elevating lever 314 One long axis arranged crosswise, long axis connection oil cylinder 315, oil cylinder 315 are fixed on chassis 311.
The middle-placed switch cabinet placement rack 2 includes mounting seat 21 and the long hole 23 being arranged in mounting seat 21.This reality It applies in example, 23 fitted bolt of long hole can facilitate the fixation of middle-placed switch cabinet, and during installing middle-placed switch cabinet, middle-placed switch cabinet stress is larger When, if fixed device is not taken to fix, middle-placed switch cabinet displacement setting is easy to cause to topple over.
Embodiment 3
Improvement as embodiment 1 as shown in Figure 6 is provided with the long pore structure being arranged cross in the rotating circular disc 22 221, cooperated by bolt for fixing middle-placed switch cabinet.

Claims (6)

1. a kind of middle-placed switch cabinet installation system, which is characterized in that including truss guide rail (1), be arranged in truss guide rail (1) lower part It sets cabinet placement rack (2) and the installment work platform (3) of middle-placed switch cabinet placement rack (2) side is set, wherein installment work platform (3) includes Hoistable platform (31) and the Tool Cabinet (32) being arranged on hoistable platform (31), truss guide rail (1) are fixed on ground in parallel including two Guide rail bracket (11A, 11B) on face, is provided with sliding beam (12) across guide rail bracket (11A, 11B), living on sliding beam (12) It is dynamic to be provided with electric block (13).
2. a kind of middle-placed switch cabinet installation system as described in claim 1, which is characterized in that middle-placed switch cabinet placement rack (2) packet The rotating circular disc (22) for including mounting seat (21) and being arranged on mounting seat (21).
3. a kind of middle-placed switch cabinet installation system as claimed in claim 2, which is characterized in that the quantity of the rotating circular disc (22) It is consistent with the quantity of installment work platform (3).
4. a kind of middle-placed switch cabinet installation system as claimed in claim 2 or claim 3, which is characterized in that in the rotating circular disc (22) It is provided with long pore structure.
5. a kind of middle-placed switch cabinet installation system as described in claim 1, which is characterized in that middle-placed switch cabinet placement rack (2) packet The long hole (23) for including mounting seat (21) and being arranged on mounting seat (21).
6. a kind of middle-placed switch cabinet installation system as described in claim 1, which is characterized in that the hoistable platform (31) includes bottom Frame (311) and platen (312), two first elevating lever (313) one end and chassis (311) upper surface are hinged, and the other end passes through roller Wheel is mutually resisted with platen (312) lower surface;Two second elevating lever (314) one end and platen (312) lower surface are hinged, the other end It is mutually resisted by roller and chassis (311) upper surface;First elevating lever (313) and the second elevating lever (314) are handed over by a long axis Fork arrangement, long axis connection oil cylinder (315), oil cylinder (315) are fixed on chassis (311).
CN201920005166.0U 2019-01-03 2019-01-03 A kind of middle-placed switch cabinet installation system Expired - Fee Related CN209169695U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920005166.0U CN209169695U (en) 2019-01-03 2019-01-03 A kind of middle-placed switch cabinet installation system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920005166.0U CN209169695U (en) 2019-01-03 2019-01-03 A kind of middle-placed switch cabinet installation system

Publications (1)

Publication Number Publication Date
CN209169695U true CN209169695U (en) 2019-07-26

Family

ID=67328260

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920005166.0U Expired - Fee Related CN209169695U (en) 2019-01-03 2019-01-03 A kind of middle-placed switch cabinet installation system

Country Status (1)

Country Link
CN (1) CN209169695U (en)

Similar Documents

Publication Publication Date Title
CN203850679U (en) Elevating disassembly and assembly platform with limiting support for current transformer in high-voltage switchgear
CN204643719U (en) A kind of jacking system for changing 10kV middle-placed switch cabinet current transformer
CN206004189U (en) A kind of disassemblerassembler for dismounting transformer in middle-placed switch cabinet
CN202772496U (en) Tool adapted to mount and dismount bird repeller in electrified state
CN209169695U (en) A kind of middle-placed switch cabinet installation system
CN212462522U (en) Novel intelligent power distribution terminal cabinet
CN207218094U (en) A kind of Repair of Transformer device
CN208401267U (en) A kind of low-voltage complete switch equipment having line windering function
CN205105145U (en) Distributing type photovoltaic roof electricity generation panel group structure
CN205985993U (en) Change short circuit fixture that 220kV pipe generating line line stretcher pressed from both sides with electricity
CN204897250U (en) Be suitable for small -size tower crane that uses in transformer substation
CN211946182U (en) Maintenance platform for transformer fault maintenance
CN103293452A (en) Withstand voltage testing apparatus for insulated ladders
CN210779766U (en) Maintenance and debugging tool for horizontal outdoor high-voltage alternating-current isolating switch
CN203813334U (en) Right-angle yoke plate clamp for live exchange of 220 kV strain insulator string
CN103350975A (en) Small size simple lifting device
CN203850744U (en) Live working special tool for pluggable cable terminal
CN202729628U (en) Hoisting device
CN211169895U (en) Integrated liftable modular support for sewage treatment
CN203911326U (en) Armored centrally-positioned metal-enclosed switchgear
CN204067965U (en) A kind of transportation trolley
CN205609997U (en) General type dynamic reactive compensation cabinet
CN211688162U (en) Lift truck platform convenient to installation pull-out type frame circuit breaker
CN204538530U (en) A kind of operating platform for high voltage side of transformer dress hanging earthing conductor
CN219760352U (en) Switch cabinet convenient for part installation

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190726

Termination date: 20200103

CF01 Termination of patent right due to non-payment of annual fee