CN209082320U - A kind of water conservancy road and bridge construction grouting equipment of more casting heads - Google Patents
A kind of water conservancy road and bridge construction grouting equipment of more casting heads Download PDFInfo
- Publication number
- CN209082320U CN209082320U CN201821871443.8U CN201821871443U CN209082320U CN 209082320 U CN209082320 U CN 209082320U CN 201821871443 U CN201821871443 U CN 201821871443U CN 209082320 U CN209082320 U CN 209082320U
- Authority
- CN
- China
- Prior art keywords
- chamber
- fixedly installed
- equipment
- equipment body
- casting
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Abstract
The utility model discloses a kind of water conservancy road and bridge construction grouting equipments of more casting heads, including plant bottom case and equipment body, the plant bottom case is located at the lower end outer surface of equipment body, the lower end outer surface of the plant bottom case is movably installed with universal wheel, the leading exterior surface side of the equipment body is fixedly installed with control panel, the upper end outer surface of the equipment body is fixedly installed with water tank and first chamber, and water tank is located at the side of first chamber.The utility model makes the present apparatus in use by being provided with a series of structure, it can reduce the labor intensity of staff, improve slip casting efficiency, it is also convenient to prevent use for a long time from Hydralock equipment inconvenience being caused to continue to construct to cleaning inside its equipment, and the mud stroke sprayed is farther, mud and road surface contact strength after injection is higher, structure is simple, and slip casting effect is more excellent, optimizes use process.
Description
Technical field
The utility model relates to a kind of grouting equipment technical field, the water conservancy road and bridge construction of specially a kind of more casting heads is used
Grouting equipment.
Background technique
Usually using being filled at the hollows such as grouting equipment road pavement during water conservancy road and bridge construction, which mainly makees
Passed through stirring raw material and be delivered to casting head and slip casting with being, but existing water conservancy road and bridge construction grouting equipment, structure
Simply, slip casting effect is not excellent enough, and single casting head slip casting efficiency is lower, while equipment inside is cleaned in inconvenience, long
Phase previous use, will cause Hydralock equipment, inconvenience continues to construct.
Utility model content
The purpose of this utility model is to provide a kind of water conservancy road and bridge construction grouting equipments of more casting heads, on solving
State the problem of proposing in background technique.
To achieve the above object, the utility model provides the following technical solutions: a kind of water conservancy road and bridge construction of more casting heads
With grouting equipment, including plant bottom case and equipment body, the plant bottom case is located at the lower end outer surface of equipment body, described to set
The lower end outer surface of standby pedestal is movably installed with universal wheel, and the leading exterior surface side of the equipment body is fixedly installed with control
Panel, the upper end outer surface of the equipment body is fixedly installed with water tank and first chamber, and water tank is located at the one of first chamber
Side, the inside of the water tank are fixedly installed with water pump, stirring motor are fixedly installed with above the first chamber, and stir electricity
One end of machine is movably installed with agitating paddle, and the inside of the equipment body is fixedly installed with feeding motor and second chamber, and send
Material motor is located at the side of second chamber.
By using above-mentioned technical proposal, the labor intensity of staff can reduce, improve slip casting efficiency, also convenient pair
It is cleaned inside its equipment, prevents use for a long time, cause Hydralock equipment, inconvenience continues to construct, and sprays
Mud stroke it is farther, the mud and road surface contact strength after injection are higher, and structure is simple, and slip casting effect is more excellent.
Preferably, a side external surface of the water tank is fixedly installed with sparge pipe, and the upper end outer surface of sparge pipe is close
The position of water tank is movably installed with valve.
By using above-mentioned technical proposal, by starting the power supply of water pump, and valve is opened, the clear water inside water tank
By water spray pipe inspection to first chamber and second chamber, and conveniently its inside is cleaned, prevents use for a long time,
Hydralock equipment is caused, inconvenience continues to construct.
Preferably, the position between the first chamber and second chamber is provided with opening, the inside of the second chamber
It is movably installed with conveying axis, and a side external surface of conveying axis is movably installed with delivery pipe, the delivery pipe is far from conveying axis
Side is fixedly installed with casting head.
By using above-mentioned technical proposal, start the power supply of feeding motor, conveying axis is by the mud in second chamber through defeated
It send pipe to send to casting head, and then mortar depositing construction is carried out to road and bridge by casting head.
Preferably, the quantity of the conveying axis, delivery pipe and casting head is three, and it is in be placed in parallel.
By using above-mentioned technical proposal, multiple casting heads, which are arranged, road pavement to carry out while infuse according to actual needs
Slurry reduces the labor intensity of staff, improves slip casting efficiency.
Preferably, the position between the delivery pipe and casting head is fixedly installed with adjustment seat, and outside the side of adjustment seat
Surface is fixedly installed with fixed block close to the position of lower end, and the fixed block is arc-shaped, and the inside of the adjustment seat is fixedly mounted
There is first baffle, and the outer surface of first baffle is movably installed with bearing, the inside of the bearing, which is run through, to be had second baffle and hold
, and handle is applied in the inside of second baffle.
By using above-mentioned technical proposal, handle rotation second baffle is held, makes what it formed between first baffle to open
Mouth becomes smaller, so that the mud stroke for the lesser casting head injection that is open is farther, the mud after injection under same discharge pressure
Slurry is higher with road surface contact strength, and structure is simple, and slip casting effect is more excellent, and wherein second baffle can rotate mainly bearing
Rotation driven, first baffle is fan-shaped with second baffle, quantity is two, it can be changed after interlocking in the two
Between be formed by openings of sizes.
Preferably, the back end outer surface side of the equipment body is provided with power interface, the output end of power interface with
The input terminal of feeding motor, stirring motor and water pump is electrically connected.
By using above-mentioned technical proposal, water pump can be conveyed inside clear water to equipment, and stirring motor is used as to raw material
The power resources for the agitating paddle processed, power resources of the feeding motor as conveying axis.
In conclusion the utility model has the following beneficial effects:
1, by starting the power supply of feeding motor, conveying axis send the mud in second chamber to casting head through delivery pipe,
And then mortar depositing construction is carried out to road and bridge by casting head, second baffle is rotated by holding handle at this time, makes itself and first baffle
Between the opening that is formed become smaller so that the mud stroke for the lesser casting head injection that is open is more under same discharge pressure
Far, the mud after injection and road surface contact strength are higher, and structure is simple, and slip casting effect is more excellent, and wherein second baffle can
Rotation is mainly what the rotation of bearing was driven, and first baffle is fan-shaped with second baffle, and quantity is two, and the two is handed over
It can be changed after mistake and be formed by openings of sizes between it;
2, road pavement slip casting simultaneously can be carried out according to actual needs by multiple casting heads of setting, reduces staff
Labor intensity, improve slip casting efficiency, while by the power supply of starting water pump, and opening valve, the clear water inside water tank
By water spray pipe inspection to first chamber and second chamber, and conveniently its inside is cleaned, prevents use for a long time
Hydralock equipment inconvenience is caused to continue to construct.
Detailed description of the invention
Fig. 1 is the overall structure diagram of the utility model;
Fig. 2 is that the conveying axis of the utility model combines view with delivery pipe;
Fig. 3 is the adjustment seat enlarged view of the utility model.
In figure: 1, plant bottom case;2, equipment body;21, control panel;22, feeding motor;23, conveying axis;24, it conveys
Pipe;25, casting head;3, first chamber;31, agitating paddle;32, stirring motor;4, water tank;41, water pump;42, valve;43, it sprays water
Pipe;5, second chamber;6, universal wheel;7, adjustment seat;71, fixed block;72, handle;73, first baffle;74, second baffle;75,
Bearing.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model
Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole
Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work
Every other embodiment obtained, fall within the protection scope of the utility model.
In the description of the present invention, it should be noted that term " on ", "lower", "inner", "outside" " front end ", " after
The orientation or positional relationship of the instructions such as end ", " both ends ", " one end ", " other end " is that orientation based on the figure or position are closed
System, is merely for convenience of describing the present invention and simplifying the description, rather than the device or element of indication or suggestion meaning are necessary
It with specific orientation, is constructed and operated in a specific orientation, therefore should not be understood as limiting the present invention.In addition,
Term " first ", " second " are used for descriptive purposes only and cannot be understood as indicating or suggesting relative importance.
In the description of the present invention, it should be noted that unless otherwise clearly defined and limited, term " is pacified
Dress ", " being provided with ", " connection " etc., shall be understood in a broad sense, such as " connection ", may be a fixed connection, be also possible to detachably connect
It connects, or is integrally connected;It can be mechanical connection, be also possible to be electrically connected;It can be directly connected, intermediate matchmaker can also be passed through
Jie is indirectly connected, and can be the connection inside two elements.It for the ordinary skill in the art, can be with concrete condition
Understand the concrete meaning of above-mentioned term in the present invention.
Fig. 1-3 is please referred to, a kind of embodiment provided by the utility model: a kind of water conservancy road and bridge construction note of more casting heads
Equipment is starched, including plant bottom case 1 and equipment body 2, plant bottom case 1 are located at the lower end outer surface of equipment body 2, equipment body 2
Upper end outer surface water tank 4 and first chamber 3 is fixedly mounted, and water tank 4 is located at the side of first chamber 3, and the inside of water tank 4 is consolidated
Dingan County's holding water pump 41 by starting the power supply of water pump 41, and opens valve 42, and the clear water inside water tank 4 can pass through sparge pipe
43 spray to first chamber 3 and second chamber 5, and conveniently clean to its inside, prevent use for a long time from causing mud
Slurry disabling facility inconvenience continues to construct, and stirring motor 32 is fixedly mounted in the top of first chamber 3, and one end of stirring motor 32 is living
Dynamic installation agitating paddle 31, feeding motor 22 and second chamber 5 is fixedly mounted in the inside of equipment body 2, and feeding motor 22 is located at
Universal wheel 6, the leading exterior surface one of equipment body 2 are installed in the lower end outer surface activity of the side of second chamber 5, plant bottom case 1
Control panel 21 is fixedly mounted in side.
Further, a side external surface of water tank 4 is fixedly installed with sparge pipe 43, and the upper end outer surface of sparge pipe 43 is close
The position of water tank 4 is movably installed with valve 42, by starting the power supply of water pump 41, and opens valve 42, the clear water inside water tank 4
Can be sprayed by sparge pipe 43 to first chamber 3 and second chamber 5, and conveniently its inside is cleaned, prevent for a long time with
Past use causes Hydralock equipment inconvenience to continue to construct.
Further, the position between first chamber 3 and second chamber 5 is provided with opening, the internal activity peace of second chamber 5
A side external surface equipped with conveying axis 23, and conveying axis 23 is movably installed with delivery pipe 24, and delivery pipe 24 is far from conveying axis 23
Side is fixedly installed with casting head 25, starts the power supply of feeding motor 22, conveying axis 23 is by the mud in second chamber 5 through conveying
Pipe 24 is sent to casting head 25, and then carries out mortar depositing construction to road and bridge by casting head 25.
Further, conveying axis 23, delivery pipe 24 and casting head 25 quantity be three, and its be in be placed in parallel, if
Setting multiple casting heads 25 road pavement can carry out slip casting simultaneously according to actual needs, reduce the labor intensity of staff, improve
Slip casting efficiency.
Further, the position between delivery pipe 24 and casting head 25 is fixedly installed with adjustment seat 7, and the side of adjustment seat 7
Outer surface is fixedly installed with fixed block 71 close to the position of lower end, and fixed block 71 is arc-shaped, and the inside of adjustment seat 7 is fixedly installed with
First baffle 73, and the outer surface of first baffle 73 is movably installed with bearing 75, the inside of bearing 75, which is run through, second baffle 74
With handle 72, and handle 72 is applied in the inside of second baffle 74, holds handle 72 and rotates second baffle 74, makes itself and first gear
The opening formed between plate 73 becomes smaller, so that under same discharge pressure, the mud for the lesser injection of casting head 25 that is open
Stroke is farther, and the mud after injection and road surface contact strength are higher, and structure is simple, and slip casting effect is more excellent, wherein second gear
What the rotation that plate 74 can rotate mainly bearing 75 was driven, first baffle 73 is fan-shaped with second baffle 74, quantity
It is two, the two can be changed after interlocking and be formed by openings of sizes between it.
Further, the back end outer surface side of equipment body 2 is provided with power interface, the output end of power interface and feeding
The input terminal of motor 22, stirring motor 32 and water pump 41 is electrically connected, and water pump 41 can convey inside clear water to equipment, stirring electricity
Power resources of the machine 32 as the agitating paddle 31 processed to raw material, feeding motor 22 are come as the power of conveying axis 23
Source.
It should be noted that the utility model is a kind of water conservancy road and bridge construction grouting equipment of more casting heads, in use,
Firstly, putting raw materials into second chamber 5, and the stirring motor 32 of model YE2-280M-4 is connected, stirring motor 32 drives
Agitating paddle 31 is stirred processing to raw material and flows into second chamber 5, then connects the feeding electricity of model YE2-355M-4
The power supply of machine 22, feeding motor 22 drives the rotation of conveying axis 23 at this time, can be by the mud in second chamber 5 through delivery pipe
24 send to casting head 25, and then by casting head 25, carry out mortar depositing construction to road and bridge, at this time by holding the rotation of handle 72 second
Baffle 74, the opening for forming it between first baffle 73 become smaller, so that being open lesser under same discharge pressure
The mud stroke that casting head 25 sprays is farther, and the mud and road surface contact strength after injection are higher, and structure is simple, and slip casting effect is more
Add it is excellent, what the rotation that wherein second baffle 74 can rotate mainly bearing 75 was driven, first baffle 73 and second baffle
74 is fan-shaped, and quantity is two, and the two can be changed after interlocking and be formed by openings of sizes between it, and by setting
The multiple casting heads 25 set road pavement can carry out slip casting simultaneously according to actual needs, reduce the labor intensity of staff, mention
High slip casting efficiency finally by the power supply of the water pump 41 of starting model LP544, and opens valve 42, the clear water inside water tank 4
Can be sprayed by sparge pipe 43 to first chamber 3 and second chamber 5, and conveniently its inside is cleaned, prevent for a long time with
Past use causes Hydralock equipment inconvenience to continue to construct, and effectively increases the functionality of its own, more practical.
It is obvious to a person skilled in the art that the present invention is not limited to the details of the above exemplary embodiments, and
And without departing substantially from the spirit or essential attributes of the utility model, it can realize that this is practical new in other specific forms
Type.Therefore, in all respects, the present embodiments are to be considered as illustrative and not restrictive, this is practical new
The range of type is indicated by the appended claims rather than the foregoing description, it is intended that containing for the equivalent requirements of the claims will be fallen in
All changes in justice and range are embraced therein.It should not treat any reference in the claims as limiting
Related claim.
Claims (6)
1. a kind of water conservancy road and bridge construction grouting equipment of more casting heads, including plant bottom case (1) and equipment body (2), special
Sign is: the plant bottom case (1) is located at the lower end outer surface of equipment body (2), the lower end outer surface of the plant bottom case (1)
It is movably installed with universal wheel (6), the leading exterior surface side of the equipment body (2) is fixedly installed with control panel (21), institute
The upper end outer surface for stating equipment body (2) is fixedly installed with water tank (4) and first chamber (3), and water tank (4) is located at first chamber
(3) inside of side, the water tank (4) is fixedly installed with water pump (41), is fixedly installed with above the first chamber (3)
Stirring motor (32), and one end of stirring motor (32) is movably installed with agitating paddle (31), the inside of the equipment body (2) is solid
Dingan County is equipped with feeding motor (22) and second chamber (5), and feeding motor (22) is located at the side of second chamber (5).
2. a kind of water conservancy road and bridge construction grouting equipment of more casting heads according to claim 1, it is characterised in that: described
One side external surface of water tank (4) is fixedly installed with sparge pipe (43), and the upper end outer surface of sparge pipe (43) is close to water tank (4)
Position is movably installed with valve (42).
3. a kind of water conservancy road and bridge construction grouting equipment of more casting heads according to claim 1, it is characterised in that: described
Position between first chamber (3) and second chamber (5) is provided with opening, and the internal activity of the second chamber (5) is equipped with
Conveying axis (23), and a side external surface of conveying axis (23) is movably installed with delivery pipe (24), the delivery pipe (24) is far from defeated
The side of axis (23) is sent to be fixedly installed with casting head (25).
4. a kind of water conservancy road and bridge construction grouting equipment of more casting heads according to claim 3, it is characterised in that: described
The quantity of conveying axis (23), delivery pipe (24) and casting head (25) is three, and it is in be placed in parallel.
5. a kind of water conservancy road and bridge construction grouting equipment of more casting heads according to claim 3, it is characterised in that: described
Position between delivery pipe (24) and casting head (25) is fixedly installed with adjustment seat (7), and a side external surface of adjustment seat (7) leans on
The position of nearly lower end is fixedly installed with fixed block (71), and the fixed block (71) is arc-shaped, and the inside of the adjustment seat (7) is fixed
Be equipped with first baffle (73), and the outer surface of first baffle (73) is movably installed with bearing (75), the bearing (75) it is interior
Portion, which is run through, second baffle (74) and handle (72), and handle (72) is applied in the inside of second baffle (74).
6. a kind of water conservancy road and bridge construction grouting equipment of more casting heads according to claim 1, it is characterised in that: described
The back end outer surface side of equipment body (2) is provided with power interface, the output end of power interface and feeding motor (22), stirring
The input terminal of motor (32) and water pump (41) is electrically connected.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821871443.8U CN209082320U (en) | 2018-11-14 | 2018-11-14 | A kind of water conservancy road and bridge construction grouting equipment of more casting heads |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821871443.8U CN209082320U (en) | 2018-11-14 | 2018-11-14 | A kind of water conservancy road and bridge construction grouting equipment of more casting heads |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209082320U true CN209082320U (en) | 2019-07-09 |
Family
ID=67123940
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821871443.8U Expired - Fee Related CN209082320U (en) | 2018-11-14 | 2018-11-14 | A kind of water conservancy road and bridge construction grouting equipment of more casting heads |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209082320U (en) |
-
2018
- 2018-11-14 CN CN201821871443.8U patent/CN209082320U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
WO2018152747A1 (en) | Easy-to-clean lithium battery electrode slurry stirring and mixing tank | |
CN212331429U (en) | Aerated concrete slurrying mixer | |
CN108915293A (en) | A kind of multifunctional building driven high voltage grouter | |
CN209082320U (en) | A kind of water conservancy road and bridge construction grouting equipment of more casting heads | |
CN212193687U (en) | Cement rapid mixing device for construction | |
CN206391982U (en) | Gas mixing stirring-type mixing device | |
CN207951267U (en) | A kind of hand operated mixing device of health products | |
CN110757648A (en) | Raw material stirring device for cement pipe production | |
CN206838005U (en) | A kind of binding agent mixer with cleaning function | |
CN109275651A (en) | A kind of municipal administration gardens insecticide mixing flusher | |
CN210161409U (en) | Concrete mixing plant is with wiper mechanism's concrete mixing device | |
CN205704728U (en) | One can automatic watering concrete mixer | |
CN205704714U (en) | Perlite blender | |
CN214052982U (en) | Sediment system is washd in settling cask medium mediation | |
CN209381111U (en) | A kind of cement suitable for dyke seepage control, which pours, uses agitating device | |
CN209093179U (en) | A kind of processing emulsifiable paste emulsion tank | |
CN208340168U (en) | A kind of ultrasonic extraction tank being convenient to clean | |
CN208265900U (en) | A kind of sanitary sewage Automatic Dosing chlorination equipment | |
CN207591692U (en) | A kind of beverage agitating apparatus | |
CN218872623U (en) | Medicine device is spouted that self-cleaning filter equipment used | |
CN202130756U (en) | Medicine storage device with agitating device | |
CN211891390U (en) | Lime cement production mixer | |
CN210645709U (en) | Cement mixer dust collector | |
CN110496549A (en) | A kind of construction paint mixing device and its working method | |
CN219817465U (en) | Repairing liquid spraying device for soil repairing |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20190709 Termination date: 20191114 |
|
CF01 | Termination of patent right due to non-payment of annual fee |