CN209082278U - A kind of sponge urban ecology road foundation structure - Google Patents

A kind of sponge urban ecology road foundation structure Download PDF

Info

Publication number
CN209082278U
CN209082278U CN201821556211.3U CN201821556211U CN209082278U CN 209082278 U CN209082278 U CN 209082278U CN 201821556211 U CN201821556211 U CN 201821556211U CN 209082278 U CN209082278 U CN 209082278U
Authority
CN
China
Prior art keywords
road
water
foundation structure
sponge urban
drainage pipeline
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201821556211.3U
Other languages
Chinese (zh)
Inventor
王越
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Pengsheng Construction Co Ltd
Original Assignee
Shenzhen Pengsheng Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Pengsheng Construction Co Ltd filed Critical Shenzhen Pengsheng Construction Co Ltd
Priority to CN201821556211.3U priority Critical patent/CN209082278U/en
Application granted granted Critical
Publication of CN209082278U publication Critical patent/CN209082278U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Road Paving Structures (AREA)

Abstract

The utility model discloses a kind of sponge urban ecology road foundation structures, it is related to a kind of road structure, its drip irrigation device includes the pervious bed from top to bottom set gradually, crosses water-base, the first waterproof layer and roadbed, described cross in water-base is provided with collector pipe, it is vertically arranged with drainage pipeline in both sides of the road, is provided with gathering ground below road and in the roadbed;Several gully-holes are offered on the collector pipe, are connected with drainpipe between the collector pipe and drainage pipeline;Water inlet pipe is connected between the drainage pipeline and gathering ground.The water flow of infiltration can be drained, it is avoided to impact roadbed.

Description

A kind of sponge urban ecology road foundation structure
Technical field
The utility model relates to a kind of road structures, more particularly to a kind of sponge urban ecology road foundation structure.
Background technique
With the fast development of urbanization, with the wide of the large area of the impermeable materials such as stone material, cement, concrete construction The Municipals facility such as field, road, and covering of the vast waterproof pavement of these areas to original naturally permeable underlying surface, lead It causes the rainfall runoff that city underlying surface generates when rainfall to be difficult to lower infiltration, and is advanced by the time to form flood peak, be easy to cause city Ponding effectiveness factors.Road surface ratio shared in the waterproof underlying surface in urban area is higher, the rainfall runoff that surface generates Amount is also larger, and the ponding that road surface generates not only influences traffic, makes troubles to the trip of people, while also increasing urban waterlogging Risk.
Recently as the continuous propulsion of sponge urban construction, many areas start gradually by the impervious blanket of road with Permeable pavement is replaced, but has replaced generally existing two main problem of road of permeable pavement at present, first is that, due to before Road surface under the facilities such as inbuilt line equipment be all to be designed construction according to non-Soaking environment mostly, therefore, replacement is saturating Water penetrates lower infiltration of mating formation rainwater after mating formation is permeated or is stored in road lower structural layer and soil matrix, to inbuilt below road Line equipment etc. affects, or even damage subsurface equipment;Second is that under being permeated after replacement permeable pavement by porous pavement The amount of rainfall come is more, is easy to impregnate the vulnerable area of soil matrix below damage road, and then cause adverse effect to road, now mention For a kind of sponge urban ecology road foundation structure.
Utility model content
In view of the deficienciess of the prior art, the purpose of this utility model is to provide a kind of sponge urban ecology Roads Based structures can drain the water flow of infiltration, it is avoided to impact roadbed.
To achieve the above object, the utility model provides following technical solution:
A kind of sponge urban ecology road foundation structure, including from top to bottom set gradually pervious bed, cross water-base, the One waterproof layer and roadbed are provided with collector pipe in described cross in water-base, are vertically arranged with drainage pipeline in both sides of the road, Gathering ground is provided with below road and in the roadbed;Several gully-holes are offered on the collector pipe, in the collection Drainpipe is connected between water pipe and drainage pipeline;Water inlet pipe is connected between the drainage pipeline and gathering ground.
Water flow is allowed to have road surface to permeate downwards by the pervious bed of setting by using above-mentioned technical proposal, in mistake Water flow is flowed in water-base, and can be discharged by collector pipe, finally has drainage pipeline to be discharged into gathering ground, by setting above It sets, water flow can be drained, avoid influence of the water flow to roadbed, meanwhile, reflux can be recycled.
Preferably, the water-base of crossing is to both sides of the road from tilting among road, and the position for being located at both sides of the road is lower; It is vertically arranged with the second waterproof layer in the both sides of the road, the collector pipe is crossed in water-base positioned at described, and is located at road two Side.
It by using above-mentioned technical proposal, is obliquely installed by the way that water-base will be crossed, water flow can be made to think that both sides of the road are flowed It is dynamic, thus, it is flowed out so that water flow is more preferably convenient by collector pipe.
Preferably, the gathering ground includes the collecting-tank being arranged in the roadbed and is filled in the collecting-tank Supporting member.
By using above-mentioned technical proposal, by the collecting-tank of setting, for being collected to water flow, pass through the branch of setting Support building, for being supported to collecting-tank, so that collecting-tank can carry biggish pressure, preferably avoids road The risk of sinking.
Preferably, the supporting member include several horizontally disposed first orifice plates and be vertically arranged several second Collecting-tank segmentation is in several chambers by orifice plate, first orifice plate and the second orifice plate;On first orifice plate and the second orifice plate It is even to offer through-hole.
By using above-mentioned technical proposal, by the first orifice plate of setting and the second orifice plate to the upright side walls of collecting-tank and Horizontal side wall is supported, at the same time, by opening up through-hole on the first orifice plate and the second orifice plate, meanwhile, the two interval shape At chamber, it is convenient that water flow is collected.
Preferably, described water inlet pipe one end is fixed on the side wall of the drainage pipeline, and water inlet is formed on side wall, Precipitation tank is formed in the drainage pipeline and on the downside of the water inlet.
By using above-mentioned technical proposal, by the precipitation tank of setting, so that water flow can flow into after covering precipitation tank Collecting-tank, it is thus possible to be filtered to the grains of sand in water flow.
Preferably, level is fixedly installed the first filter plate in the drainage pipeline.
The impurity in water flow can be filtered by using above-mentioned technical proposal by the first filter plate of setting.
Preferably, be fixedly installed the second filter plate in the water inlet pipe, the vertical water inlet pipe of second filter plate Axis direction.
By using above-mentioned technical proposal, secondary filter can be carried out to water flow by the second filter plate of setting.
Preferably, the hole of second filter plate is less than the hole of first filter plate.
By using above-mentioned technical proposal, water flow can be filtered by different level.
Preferably, road side is provided with ponding well, discharge tube is connected between the ponding bottom and collecting-tank.
The water in collecting-tank can be discharged by using above-mentioned technical proposal by the ponding well of setting.
In conclusion the utility model has the following beneficial effects:
1, by the pervious bed of setting, water flow is allowed to have road surface to permeate downwards, is flowed crossing water flow in water-base It is dynamic, and can be discharged by collector pipe, finally there is drainage pipeline to be discharged into gathering ground, with the above arrangement, can carry out to water flow Drainage, avoids influence of the water flow to roadbed, meanwhile, reflux can be recycled;
2, it is obliquely installed by the way that water-base will be crossed, water flow can be made to think that both sides of the road are flowed, thus, so that water flow is more preferably It is convenient to be flowed out by collector pipe;
3, the upright side walls and horizontal side wall of collecting-tank are supported by the first orifice plate of setting and the second orifice plate, with This simultaneously, by opening up through-hole on the first orifice plate and the second orifice plate, meanwhile, the two is spaced the chamber to be formed, convenient to water flow It is collected.
Detailed description of the invention
Fig. 1 is a kind of cross-sectional view of sponge urban ecology road foundation structure;
Fig. 2 is a kind of schematic diagram of prominent gully-hole in sponge urban ecology road foundation structure;
Fig. 3 is a kind of schematic diagram of prominent supporting member in sponge urban ecology road foundation structure;
Fig. 4 is a kind of schematic diagram of prominent ponding well in sponge urban ecology road foundation structure.
Appended drawing reference: 1, road;11, pervious bed;12, water-base is crossed;13, the first waterproof layer;14, the second waterproof layer;15, Roadbed;2, collector pipe;21, gully-hole;3, drainage pipeline;31, drainpipe;32, the first filter plate;33, water inlet;34, it precipitates Slot;4, water inlet pipe;41, the second filter plate;5, gathering ground;51, collecting-tank;52, supporting member;521, the first orifice plate;522, Two orifice plates;6, ponding well;61, discharge tube.
Specific embodiment
The utility model is described in further detail below in conjunction with attached drawing, wherein the identical attached drawing of identical components Label indicates.It should be noted that word "front", "rear" used in the following description, "left", "right", "up" and "down", " bottom Face " and " top surface " refer to that the direction in attached drawing, word "inner" and "outside" are referred respectively to towards or away from particular elements geometry The direction at center.
A kind of sponge urban ecology road foundation structure referring to figs. 1 and 2, including is set gradually downwards by road surface Pervious bed 11, the roadbed 15 of crossing water-base 12, the first waterproof layer 13 and lower section sets crossing in water-base 12 at the same time It is equipped with collector pipe 2, is vertically arranged with several drainage pipelines 3 in the two sides of road 1, drainage pipeline 3 and collector pipe 2 pass through drainpipe 31 connections, when raining heavily, rainwater was flowed into water-base 12 by pervious bed 11, and rainwater flows in water-base 12 excessively, was led to Drainpipe 31 is crossed to be discharged into collector pipe 2.
Pervious bed 11 is laid on earth's surface, can be the permeable surface layers such as water-permeable brick, pervious asphalt or pervious concrete.Below Water-base 12 of crossing generally include rigid base, semi-rigid type base, flexbile base three classes, may be selected according to regions resources difference saturating The materials such as water particle material, water-permeable cement concrete, stabilization gravel building, it is desirable that there is the layer enough intensity, water penetration, water to stablize Property, continuous porosity is not less than 10%.The first waterproof layer 13 below can be made of polyethylene waterproof coating, the first waterproof Layer 13 with a thickness of being set as 6-10cm.
It can quickly be flowed out in order to facilitate the water flow crossed in water-base 12, the first waterproof layer 13 is obliquely installed, and is intermediate Higher, 1 two sides of road are lower, so that the lower surface for crossing water-base 12 is inclined to set, enable water flow by crossing water Base 12 flows to 1 two sides of road.
The position in water-base 12 and being located at 1 two sides of road was arranged in collector pipe 2, vertical in the two sides for crossing water-base 12 It is provided with the second waterproof layer 14, several gully-holes 21 are uniformly provided on collector pipe 2, the water crossed in water-base 12 is by catchmenting Hole 21 flows into collector pipe 2, and space is larger in collector pipe 2, and rainwater is enabled to quickly to flow.Drainpipe 31 is in drainage pipeline 3 It can be horizontally disposed with, can also be obliquely installed between collector pipe 2.
Drainage pipeline 3 is vertically arranged, and level is fixedly installed the first filter plate 32 on drainage pipeline 3, passes through the first mistake Filter plate 32 carries out primary filtration to the water being discharged into.Further, in order to sufficiently be utilized to rainwater progress, on the road of road 1 It is embedded with gathering ground 5 in base 15, water flow is collected by gathering ground 5.Between drainage pipeline 3 and gathering ground 5 by into Water pipe 4 connects.
Wherein, water inlet pipe 4 is horizontally disposed, is fixedly installed the second filter plate 41, the second filter plate vertically in water inlet pipe 4 41 perpendicular to water inlet pipe 4 axis direction.Further, in order to keep filter plate preferable to water flow filter effect, the second filter plate 41 hole less than the first filter plate 32 hole, thus, water flow is filtered by different level.
Further, it is formed with water inlet 33 on drainage pipeline 3 and positioned at the position of water inlet 33, in drainage pipeline 3 In and be located at the lower end of water inlet 33 and be formed with precipitation tank 34, after water flow is fallen, particle in water flow in precipitation tank 34 into Row precipitating, then water flow has water inlet 33 to be discharged into gathering ground 5.
In conjunction with shown in Fig. 1 and Fig. 3, gathering ground 5 includes the collecting-tank 51 being embedded in roadbed 15 and is filled in collecting-tank Supporting member 52 in 51 is supported collecting-tank 51 by supporting member 52, prevents road 1 from sinking.
Wherein, supporting member 52 includes several horizontally disposed first orifice plates 521 and several second holes being vertically arranged Plate 522, wherein the first orifice plate 521 and the second orifice plate 522 intersect the segmentation of collecting-tank 51 in several chambers, in the first hole Several through-holes are offered on plate 521 and the second orifice plate 522.The edge of first orifice plate 521 and the second orifice plate 522 is connected to collection respectively On the side wall in pond 51, collecting-tank can be supported by the first orifice plate 521 and the second orifice plate 522 of setting, thus, make Biggish pressure can be born by obtaining collecting-tank 51, and in use, road 1 will not sink.
As shown in figure 4, preferably, being provided with ponding well 6 in the side of road 1, connecting between ponding well 6 and collecting-tank 51 It is connected to discharge tube 61.
This specific embodiment is only the explanation to the utility model, is not limitations of the present invention, ability Field technique personnel can according to need the modification that not creative contribution is made to the present embodiment after reading this specification, but As long as all by the protection of Patent Law in the scope of the claims of the utility model.

Claims (9)

1. a kind of sponge urban ecology road foundation structure, it is characterised in that: the road (1) includes from top to bottom setting gradually Pervious bed (11) crosses water-base (12), the first waterproof layer (13) and roadbed (15),
Described cross in water-base (12) is provided with collector pipe (2), is vertically arranged with drainage pipeline (3) in road (1) two sides, Gathering ground (5) are provided in the roadbed (15);Several gully-holes (21) are offered on the collector pipe (2), are catchmented described Drainpipe (31) are connected between pipe (2) and drainage pipeline (3);Be connected between the drainage pipeline (3) and gathering ground (5) into Water pipe (4).
2. sponge urban ecology road foundation structure according to claim 1, it is characterized in that: it is described cross water-base (12) by Road (1) is intermediate to be tilted to road (1) two sides, and the position for being located at road (1) two sides is lower;Water-base (12) two is crossed described Side is vertically arranged with the second waterproof layer (14), and it is interior that the collector pipe (2) is located at cross water-base (12), and is located at road (1) Two sides.
3. sponge urban ecology road foundation structure according to claim 1, it is characterized in that: the gathering ground (5) include It is arranged in the collecting-tank (51) in the roadbed (15) and the supporting member (52) being filled in the collecting-tank (51).
4. sponge urban ecology road foundation structure according to claim 3, it is characterized in that: the supporting member (52) wraps Several second orifice plates (522) for including several horizontally disposed first orifice plates (521) and being vertically arranged, first orifice plate (521) collecting-tank (51) are divided in several chambers with the second orifice plate (522);First orifice plate (521) and the second orifice plate (522) through-hole is uniformly provided on.
5. sponge urban ecology road foundation structure according to claim 1, it is characterized in that: the water inlet pipe (4) one end Be fixed on the side wall of the drainage pipeline (3), and form water inlet (33) on side wall, in the drainage pipeline (3) and Precipitation tank (34) are formed on the downside of the water inlet (33).
6. sponge urban ecology road foundation structure according to claim 1, it is characterized in that: in the drainage pipeline (3) Level is fixedly installed the first filter plate (32).
7. sponge urban ecology road foundation structure according to claim 6, it is characterized in that: solid in the water inlet pipe (4) Surely it is provided with the second filter plate (41), the axis direction of the vertical water inlet pipe (4) of second filter plate (41).
8. sponge urban ecology road foundation structure according to claim 7, it is characterized in that: second filter plate (41) Hole be less than first filter plate (32) hole.
9. sponge urban ecology road foundation structure according to claim 3, it is characterized in that: road (1) side is provided with Ponding well (6) is connected with discharge tube (61) between ponding well (6) bottom and collecting-tank (51).
CN201821556211.3U 2018-09-21 2018-09-21 A kind of sponge urban ecology road foundation structure Expired - Fee Related CN209082278U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821556211.3U CN209082278U (en) 2018-09-21 2018-09-21 A kind of sponge urban ecology road foundation structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821556211.3U CN209082278U (en) 2018-09-21 2018-09-21 A kind of sponge urban ecology road foundation structure

Publications (1)

Publication Number Publication Date
CN209082278U true CN209082278U (en) 2019-07-09

Family

ID=67117315

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821556211.3U Expired - Fee Related CN209082278U (en) 2018-09-21 2018-09-21 A kind of sponge urban ecology road foundation structure

Country Status (1)

Country Link
CN (1) CN209082278U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115162089A (en) * 2022-07-18 2022-10-11 生态环境部南京环境科学研究所 Permeable pavement ecological water collection system suitable for sponge city footpath based on low-influence development

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115162089A (en) * 2022-07-18 2022-10-11 生态环境部南京环境科学研究所 Permeable pavement ecological water collection system suitable for sponge city footpath based on low-influence development

Similar Documents

Publication Publication Date Title
CN106869237A (en) A kind of gardens rainwater-collecting water storage system and its construction method
CN106638918A (en) Construction method for sponge city rainwater collection system
CN109208426A (en) A kind of municipal road construction structure and its construction method
CN205100360U (en) Urban road rainwater holds stagnant structure
CN112252115A (en) Sponge city road structure that can recycle rainwater
CN209482092U (en) Suitable for the sponge city system of biological stranded belt is arranged outside town road red line
CN213740396U (en) Natural permeable quarry pavement structure in sponge city
CN206571217U (en) Outdoor Parking position system based on sponge the idea of the city
CN207295367U (en) A kind of asphalt highway edge drainage structure
CN106088684B (en) The sunk type square and its construction method that a kind of rainwater-collecting recycles
CN208748463U (en) A kind of town road rainwater infiltration storage row's integral system
CN208105449U (en) A kind of ecostagnation pond
CN107190613A (en) Drainage system is oozed after a kind of first water storage in underground slowly
CN203977495U (en) The anti-rainwater impact system of garden type for residential quarter road
CN207228292U (en) One kind omits water system in printing slowly after first catchmenting
CN211848713U (en) Permeable pavement drainage structure
CN104594155A (en) Permeable pavement laying method
CN210658597U (en) Sponge city view is with green structure of sinking
CN204608544U (en) A kind of water conservation layer of water permeable pavement
CN106758676A (en) A kind of multi-level environment-friendly type road draining and water guiding system
CN217711015U (en) Rainwater garden communication overflow system based on different water level gradients
CN206245174U (en) Road drainage structure
CN209958480U (en) Scenic spot afforestation cistern structure
CN106555430A (en) Heat-extraction system is received in a kind of sponge type rain penetration
CN212865490U (en) Be applied to municipal road's ecological area of being detained

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190709

Termination date: 20200921