CN209067240U - A kind of full section of tunnel construction integer support steel arch-shelf terminal pad - Google Patents

A kind of full section of tunnel construction integer support steel arch-shelf terminal pad Download PDF

Info

Publication number
CN209067240U
CN209067240U CN201821745641.XU CN201821745641U CN209067240U CN 209067240 U CN209067240 U CN 209067240U CN 201821745641 U CN201821745641 U CN 201821745641U CN 209067240 U CN209067240 U CN 209067240U
Authority
CN
China
Prior art keywords
anchor pole
flange disk
terminal pad
guide sleeve
steel arch
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821745641.XU
Other languages
Chinese (zh)
Inventor
崔海强
谢强
仇瑞红
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hebei Chuangheng Intelligent Equipment Technology Co Ltd
Original Assignee
Hebei Chuangheng Intelligent Equipment Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hebei Chuangheng Intelligent Equipment Technology Co Ltd filed Critical Hebei Chuangheng Intelligent Equipment Technology Co Ltd
Priority to CN201821745641.XU priority Critical patent/CN209067240U/en
Application granted granted Critical
Publication of CN209067240U publication Critical patent/CN209067240U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model belongs to terminal pad technical field, discloses a kind of full section of tunnel construction integer support steel arch-shelf terminal pad.It is mainly characterized in that including first flange disk and second flange disk, anchor pole locating rack has been provided on the first flange disk or second flange disk, it is provided with anchor pole guide sleeve on the anchor pole locating rack, is provided with connection bolt in the connecting hole on the first flange disk and second flange disk.Anchor pole is squeezed into along anchor pole guide sleeve direction, anchor pole is directly connected and fixed with anchor pole guide sleeve, and anchor pole direction of insertion is consistent with anchor pole guide sleeve direction, it does not need separately to weld, construction is simple, bonding strength is big, and anchor pole is not easy to deviate from, and anchor pole direction of insertion is the best anchoring direction of design;Different for the anchor pole guide sleeve direction in the terminal pad of different location, anchor pole guide sleeve sets different directions according to the location of terminal pad.

Description

A kind of full section of tunnel construction integer support steel arch-shelf terminal pad
Technical field
The utility model belongs to tunnel support steel arch-shelf technical field more particularly to a kind of whole branch of full section of tunnel construction Protect steel arch-shelf terminal pad.
Background technique
For country's Tunnel Engineering frequently with composite lining structure, tunnel steel arch frame is the composition portion of Tunnel at present Point, main function is resistant to the initial stage convergent deformation that country rock is generated due to excavation disturbance.Steel arch-shelf is fragmented under normal conditions It is transported to construction site, the face after excavating manually is attached it to by worker.During installation, first that steel arch support is good, Tunnel inner wall squeezes into anchor pole, and anchor pole and steel arch-shelf are welded together, and the above method has the following deficiencies: first, due to will Anchor pole welds together with steel arch-shelf, and the tunnel of cutting is limited to by electric power etc., and welding difficulty is big, and since face is easy Existing falling rocks etc., increases accident rate;Second, welding quality is low due to being limited by welding position, it is easy to snap, causes Steel arch-shelf bending;Third, the best Impact direction due to anchor pole present position is different, anchor pole is inserted into the direct shadow of angle of tunnel wall Ring anchor rod strength;For existing method it is difficult to ensure that anchor pole is on best Impact direction, anchoring strength is low.
Utility model content
It is complete that the technical problems to be solved in the utility model is just to provide a kind of tunnel that a kind of anchoring strength is big, easy for construction Section construction integer support steel arch-shelf terminal pad.
To solve the above problems, the technical solution adopted in the utility model are as follows: including first flange disk and second flange disk, It has been provided with anchor pole locating rack on the first flange disk or second flange disk, has been provided with anchor pole on the anchor pole locating rack Guide sleeve is provided with connection bolt in the connecting hole on the first flange disk and second flange disk.
Its additional technical feature are as follows:
The first flange disk and second flange disk side are flexibly connected by bindiny mechanism;
The bindiny mechanism is the hinge shaft connecting with the first flange disk and second flange disk.
A kind of full section of tunnel construction integer support steel arch-shelf terminal pad and the prior art provided by the utility model It compares, has the advantage that first, due to including first flange disk and second flange disk, in the first flange disk or second It has been provided with anchor pole locating rack on ring flange, has been provided with anchor pole guide sleeve on the anchor pole locating rack, in first method Be provided with connection bolt in connecting hole on blue disk and second flange disk, first flange disk and second flange disk respectively with need to connect The two segmentation steel arch-shelfs up and down connect are fixed together, and the connecting hole of first flange disk and second flange disk is aligned, and are led to It crosses connection bolt first flange disk and second flange disk link together, squeezes into anchor pole, anchor pole along anchor pole guide sleeve direction It is directly connected and fixed with anchor pole guide sleeve, and anchor pole direction of insertion is consistent with anchor pole guide sleeve direction, does not need It separately welds, construction is simple, bonding strength is big, and anchor pole is not easy to deviate from, and anchor pole direction of insertion is the best anchoring of design Direction;Different for the anchor pole guide sleeve direction in the terminal pad of different location, anchor pole guide sleeve is according to locating for terminal pad Position set different directions;Second, since the first flange disk and second flange disk side are connected by bindiny mechanism's activity Connect, in steel arch-shelf production process, by need with the terminal pad connect steel arch-shelf both ends respectively with first flange disk and second Ring flange welds together, and first flange disk and second flange disk are flexibly connected by bindiny mechanism, when completing the process, will lead to The steel arch-shelf for crossing terminal pad connection folds, and is fixed by holding clamp or rope, will when transporting supporting position Holding clamp or rope are opened, and with the mechanical picking-up in the middle part of upper arch is lifted, middle arch rack and lower arch are under self gravitation effect It is sagging, at this point, under the limit of bindiny mechanism, the connecting hole automatic aligning of first flange disk and second flange disk, so that connection Bolt can be readily intercalated into, and will connect the nut tightening on bolt, shorten staff in the operating time of supporting position, Reduce because of falling rocks or the incidence to cause the accident of collapsing, and improve installation effectiveness, reduces labor intensity;Third, by In the bindiny mechanism be the hinge shaft being connect with the first flange disk and second flange disk, first flange disk and second flange disk Hinge shape is formed with hinge shaft, the connecting hole on such first flange disk and second flange disk is not easy to deviate, and installation speed is fast.
Detailed description of the invention
Fig. 1 is a kind of structural schematic diagram of full section of tunnel construction integer support steel arch-shelf terminal pad of the utility model;
Fig. 2 is a kind of installation diagram of full section of tunnel construction integer support steel arch-shelf terminal pad;
Fig. 3 is a kind of full section of tunnel construction integer support steel arch-shelf that first flange disk is connected with second flange disk activity With terminal pad structural schematic diagram.
Specific embodiment
With reference to the accompanying drawings and detailed description to a kind of full section of tunnel of the utility model construction integer support steel arch It the structure of frame terminal pad and is described in further details using principle.
As depicted in figs. 1 and 2, a kind of knot of full section of tunnel construction integer support steel arch-shelf terminal pad of the utility model Structure schematic diagram, a kind of full section of tunnel construction integer support steel arch-shelf terminal pad of the utility model includes 1 He of first flange disk Second flange disk 2 has been provided with anchor pole locating rack 3 on first flange disk 1, and anchor pole guiding is provided on anchor pole locating rack 3 Casing 4, certainly, anchor pole locating rack 3 also can be set on second flange disk 2, on first flange disk 1 and second flange disk 2 Connecting hole 5 in be provided with connection bolt 6.Connected respectively with needs two points up and down of first flange disk 1 and second flange disk 2 Section steel arch-shelf is fixed together, and the connecting hole 5 of first flange disk 1 and second flange disk 2 is aligned, by connecting bolt 6 First flange disk and second flange disk are linked together, squeeze into anchor pole along 4 direction of anchor pole guide sleeve, anchor pole is directly and anchor pole Guide sleeve 4 is connected and fixed, and anchor pole direction of insertion is consistent with 4 direction of anchor pole guide sleeve, does not need separately to weld, Construction is simple, bonding strength is big, and anchor pole is not easy to deviate from, and anchor pole direction of insertion is the best anchoring direction of design;For Anchor pole guide sleeve direction in the terminal pad of different location is different, and anchor pole guide sleeve is set according to the location of terminal pad Different directions.
As shown in figure 3, the side of first flange disk 1 and second flange disk 2 is flexibly connected by bindiny mechanism 7, in steel arch In frame production process, the steel arch-shelf both ends connected with the terminal pad will be needed to weld respectively with first flange disk and second flange disk Together, first flange disk 1 and second flange disk 2 are flexibly connected by bindiny mechanism 7, when completing the process, will pass through the company The steel arch-shelf for connecing disk connection folds, and is fixed by holding clamp or rope, when transporting supporting position, by fixing card Tool or rope are opened, and with the mechanical picking-up in the middle part of upper arch is lifted, middle arch rack and lower arch are sagging under self gravitation effect, this When, under the limit of bindiny mechanism, 5 automatic aligning of connecting hole of first flange disk 1 and second flange disk 2, so that connection bolt 6 It can be readily intercalated into, the nut tightening on bolt 6 will be connected, shorten staff in the operating time of supporting position, subtract Lack because of falling rocks or the incidence to cause the accident of collapsing, and improved installation effectiveness, has reduced labor intensity.
Bindiny mechanism 7 is the hinge shaft 8 connecting with first flange disk 1 and second flange disk 2, first flange disk 1 and the second method Blue disk 2 and hinge shaft 8 form hinge shape, and the connecting hole on such first flange disk and second flange disk is not easy to deviate, installation speed Degree is fast.
The protection scope of the utility model is not limited solely to above-described embodiment, as long as structure and a kind of tunnel of the utility model The method structure that road tunneling boring construction integer support steel arch-shelf terminal pad and the oblique wire bond of partition connect is identical, and it is practical new just to fall in this The range of type protection.

Claims (1)

  1. The integer support steel arch-shelf terminal pad 1. a kind of full section of tunnel is constructed, it is characterised in that: including first flange disk and the Two ring flanges have been provided with anchor pole locating rack on the first flange disk or second flange disk, on the anchor pole locating rack It is provided with anchor pole guide sleeve, is provided with connection bolt in the connecting hole on the first flange disk and second flange disk;Institute First flange disk and second flange disk side is stated to be flexibly connected by bindiny mechanism;The bindiny mechanism be and the first flange The hinge shaft that disk is connected with second flange disk.
CN201821745641.XU 2018-10-26 2018-10-26 A kind of full section of tunnel construction integer support steel arch-shelf terminal pad Active CN209067240U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821745641.XU CN209067240U (en) 2018-10-26 2018-10-26 A kind of full section of tunnel construction integer support steel arch-shelf terminal pad

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821745641.XU CN209067240U (en) 2018-10-26 2018-10-26 A kind of full section of tunnel construction integer support steel arch-shelf terminal pad

Publications (1)

Publication Number Publication Date
CN209067240U true CN209067240U (en) 2019-07-05

Family

ID=67096273

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821745641.XU Active CN209067240U (en) 2018-10-26 2018-10-26 A kind of full section of tunnel construction integer support steel arch-shelf terminal pad

Country Status (1)

Country Link
CN (1) CN209067240U (en)

Similar Documents

Publication Publication Date Title
CN104989873B (en) Penstock oblique-pulling inversion assembling method
CN102926466A (en) Method for enhancing warp angle of ring mouth flitch of steel pipe node
CN209067240U (en) A kind of full section of tunnel construction integer support steel arch-shelf terminal pad
CN104563578A (en) Combined framework pillar for 500kV transformer substation and mounting method of combined framework pillar
CN208966352U (en) A kind of supporting construction in weak rocks matter region tunnel
CN209067239U (en) Full section of tunnel construction integer support steel arch-shelf terminal pad
CN103557007B (en) Cross the construction method of geological anomaly zone soft-rock tunnel smashed to pieces
CN214464174U (en) Novel chute with double slag outlets
CN103244158B (en) Strengthening structure for integrated bolting with bar and wire mesh
CN207920616U (en) A kind of suspension device for taking out tunnel speedy drivage the bottom of for
CN209129633U (en) Full section of tunnel construction integer support steel arch-shelf
CN208982068U (en) The full section of tunnel construction integer support steel arch-shelf fixed device of jacking
CN204646267U (en) A kind of corrugated steel Tunnel structure
CN204386242U (en) For the combined type truss column of 500kV transformer station
CN204113319U (en) A kind of folding telescopic alley hydraulic support
CN208587175U (en) A kind of prestressed structure of prestressed anchor
CN208137970U (en) Longitudinally connected attachment device between a kind of grillage for Tunnel Engineering
CN207795306U (en) A kind of neighbouring goaf gas concentration bound polyamine device of high methane comprehensive coal face upper corner
CN110454202A (en) Stubborn fixing bolt formula attachment device and installation method suitable for tunnel steel arch frame segment
CN107605051A (en) Assembled beam-column attachment means and assembled architecture framework
CN206753622U (en) A kind of bar-mat reinforcement for coal mine roadway bolt-mesh-spurting supporting
CN109184752A (en) A kind of coal mine supporting construction and its method for protecting support for passing through old kiln goaf
CN103924684B (en) Soap-free emulsion polymeization prestress connects beams of concrete square steel tube concrete column reinforcing joint
CN208647961U (en) A kind of current device of belt conveyer
CN214638820U (en) Shield constructs flexible pull throughs of synchronous slip casting pipe

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant