CN209067240U - A kind of full section of tunnel construction integer support steel arch-shelf terminal pad - Google Patents
A kind of full section of tunnel construction integer support steel arch-shelf terminal pad Download PDFInfo
- Publication number
- CN209067240U CN209067240U CN201821745641.XU CN201821745641U CN209067240U CN 209067240 U CN209067240 U CN 209067240U CN 201821745641 U CN201821745641 U CN 201821745641U CN 209067240 U CN209067240 U CN 209067240U
- Authority
- CN
- China
- Prior art keywords
- anchor pole
- flange disk
- terminal pad
- guide sleeve
- steel arch
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 29
- 239000010959 steel Substances 0.000 title claims abstract description 29
- 238000010276 construction Methods 0.000 title abstract description 18
- 101700030570 pad-1 Proteins 0.000 claims 1
- 238000003780 insertion Methods 0.000 abstract description 6
- 238000004873 anchoring Methods 0.000 abstract description 5
- 238000009434 installation Methods 0.000 description 6
- 238000010586 diagram Methods 0.000 description 4
- 230000000694 effects Effects 0.000 description 4
- 239000011435 rock Substances 0.000 description 4
- 239000002965 rope Substances 0.000 description 4
- 238000000034 method Methods 0.000 description 3
- 238000003466 welding Methods 0.000 description 3
- 238000004519 manufacturing process Methods 0.000 description 2
- 238000007665 sagging Methods 0.000 description 2
- 238000009412 basement excavation Methods 0.000 description 1
- 238000005452 bending Methods 0.000 description 1
- 239000002131 composite material Substances 0.000 description 1
- 238000005520 cutting process Methods 0.000 description 1
- 239000000203 mixture Substances 0.000 description 1
- 238000005192 partition Methods 0.000 description 1
- 230000011218 segmentation Effects 0.000 description 1
- 230000005641 tunneling Effects 0.000 description 1
Abstract
The utility model belongs to terminal pad technical field, discloses a kind of full section of tunnel construction integer support steel arch-shelf terminal pad.It is mainly characterized in that including first flange disk and second flange disk, anchor pole locating rack has been provided on the first flange disk or second flange disk, it is provided with anchor pole guide sleeve on the anchor pole locating rack, is provided with connection bolt in the connecting hole on the first flange disk and second flange disk.Anchor pole is squeezed into along anchor pole guide sleeve direction, anchor pole is directly connected and fixed with anchor pole guide sleeve, and anchor pole direction of insertion is consistent with anchor pole guide sleeve direction, it does not need separately to weld, construction is simple, bonding strength is big, and anchor pole is not easy to deviate from, and anchor pole direction of insertion is the best anchoring direction of design;Different for the anchor pole guide sleeve direction in the terminal pad of different location, anchor pole guide sleeve sets different directions according to the location of terminal pad.
Description
Technical field
The utility model belongs to tunnel support steel arch-shelf technical field more particularly to a kind of whole branch of full section of tunnel construction
Protect steel arch-shelf terminal pad.
Background technique
For country's Tunnel Engineering frequently with composite lining structure, tunnel steel arch frame is the composition portion of Tunnel at present
Point, main function is resistant to the initial stage convergent deformation that country rock is generated due to excavation disturbance.Steel arch-shelf is fragmented under normal conditions
It is transported to construction site, the face after excavating manually is attached it to by worker.During installation, first that steel arch support is good,
Tunnel inner wall squeezes into anchor pole, and anchor pole and steel arch-shelf are welded together, and the above method has the following deficiencies: first, due to will
Anchor pole welds together with steel arch-shelf, and the tunnel of cutting is limited to by electric power etc., and welding difficulty is big, and since face is easy
Existing falling rocks etc., increases accident rate;Second, welding quality is low due to being limited by welding position, it is easy to snap, causes
Steel arch-shelf bending;Third, the best Impact direction due to anchor pole present position is different, anchor pole is inserted into the direct shadow of angle of tunnel wall
Ring anchor rod strength;For existing method it is difficult to ensure that anchor pole is on best Impact direction, anchoring strength is low.
Utility model content
It is complete that the technical problems to be solved in the utility model is just to provide a kind of tunnel that a kind of anchoring strength is big, easy for construction
Section construction integer support steel arch-shelf terminal pad.
To solve the above problems, the technical solution adopted in the utility model are as follows: including first flange disk and second flange disk,
It has been provided with anchor pole locating rack on the first flange disk or second flange disk, has been provided with anchor pole on the anchor pole locating rack
Guide sleeve is provided with connection bolt in the connecting hole on the first flange disk and second flange disk.
Its additional technical feature are as follows:
The first flange disk and second flange disk side are flexibly connected by bindiny mechanism;
The bindiny mechanism is the hinge shaft connecting with the first flange disk and second flange disk.
A kind of full section of tunnel construction integer support steel arch-shelf terminal pad and the prior art provided by the utility model
It compares, has the advantage that first, due to including first flange disk and second flange disk, in the first flange disk or second
It has been provided with anchor pole locating rack on ring flange, has been provided with anchor pole guide sleeve on the anchor pole locating rack, in first method
Be provided with connection bolt in connecting hole on blue disk and second flange disk, first flange disk and second flange disk respectively with need to connect
The two segmentation steel arch-shelfs up and down connect are fixed together, and the connecting hole of first flange disk and second flange disk is aligned, and are led to
It crosses connection bolt first flange disk and second flange disk link together, squeezes into anchor pole, anchor pole along anchor pole guide sleeve direction
It is directly connected and fixed with anchor pole guide sleeve, and anchor pole direction of insertion is consistent with anchor pole guide sleeve direction, does not need
It separately welds, construction is simple, bonding strength is big, and anchor pole is not easy to deviate from, and anchor pole direction of insertion is the best anchoring of design
Direction;Different for the anchor pole guide sleeve direction in the terminal pad of different location, anchor pole guide sleeve is according to locating for terminal pad
Position set different directions;Second, since the first flange disk and second flange disk side are connected by bindiny mechanism's activity
Connect, in steel arch-shelf production process, by need with the terminal pad connect steel arch-shelf both ends respectively with first flange disk and second
Ring flange welds together, and first flange disk and second flange disk are flexibly connected by bindiny mechanism, when completing the process, will lead to
The steel arch-shelf for crossing terminal pad connection folds, and is fixed by holding clamp or rope, will when transporting supporting position
Holding clamp or rope are opened, and with the mechanical picking-up in the middle part of upper arch is lifted, middle arch rack and lower arch are under self gravitation effect
It is sagging, at this point, under the limit of bindiny mechanism, the connecting hole automatic aligning of first flange disk and second flange disk, so that connection
Bolt can be readily intercalated into, and will connect the nut tightening on bolt, shorten staff in the operating time of supporting position,
Reduce because of falling rocks or the incidence to cause the accident of collapsing, and improve installation effectiveness, reduces labor intensity;Third, by
In the bindiny mechanism be the hinge shaft being connect with the first flange disk and second flange disk, first flange disk and second flange disk
Hinge shape is formed with hinge shaft, the connecting hole on such first flange disk and second flange disk is not easy to deviate, and installation speed is fast.
Detailed description of the invention
Fig. 1 is a kind of structural schematic diagram of full section of tunnel construction integer support steel arch-shelf terminal pad of the utility model;
Fig. 2 is a kind of installation diagram of full section of tunnel construction integer support steel arch-shelf terminal pad;
Fig. 3 is a kind of full section of tunnel construction integer support steel arch-shelf that first flange disk is connected with second flange disk activity
With terminal pad structural schematic diagram.
Specific embodiment
With reference to the accompanying drawings and detailed description to a kind of full section of tunnel of the utility model construction integer support steel arch
It the structure of frame terminal pad and is described in further details using principle.
As depicted in figs. 1 and 2, a kind of knot of full section of tunnel construction integer support steel arch-shelf terminal pad of the utility model
Structure schematic diagram, a kind of full section of tunnel construction integer support steel arch-shelf terminal pad of the utility model includes 1 He of first flange disk
Second flange disk 2 has been provided with anchor pole locating rack 3 on first flange disk 1, and anchor pole guiding is provided on anchor pole locating rack 3
Casing 4, certainly, anchor pole locating rack 3 also can be set on second flange disk 2, on first flange disk 1 and second flange disk 2
Connecting hole 5 in be provided with connection bolt 6.Connected respectively with needs two points up and down of first flange disk 1 and second flange disk 2
Section steel arch-shelf is fixed together, and the connecting hole 5 of first flange disk 1 and second flange disk 2 is aligned, by connecting bolt 6
First flange disk and second flange disk are linked together, squeeze into anchor pole along 4 direction of anchor pole guide sleeve, anchor pole is directly and anchor pole
Guide sleeve 4 is connected and fixed, and anchor pole direction of insertion is consistent with 4 direction of anchor pole guide sleeve, does not need separately to weld,
Construction is simple, bonding strength is big, and anchor pole is not easy to deviate from, and anchor pole direction of insertion is the best anchoring direction of design;For
Anchor pole guide sleeve direction in the terminal pad of different location is different, and anchor pole guide sleeve is set according to the location of terminal pad
Different directions.
As shown in figure 3, the side of first flange disk 1 and second flange disk 2 is flexibly connected by bindiny mechanism 7, in steel arch
In frame production process, the steel arch-shelf both ends connected with the terminal pad will be needed to weld respectively with first flange disk and second flange disk
Together, first flange disk 1 and second flange disk 2 are flexibly connected by bindiny mechanism 7, when completing the process, will pass through the company
The steel arch-shelf for connecing disk connection folds, and is fixed by holding clamp or rope, when transporting supporting position, by fixing card
Tool or rope are opened, and with the mechanical picking-up in the middle part of upper arch is lifted, middle arch rack and lower arch are sagging under self gravitation effect, this
When, under the limit of bindiny mechanism, 5 automatic aligning of connecting hole of first flange disk 1 and second flange disk 2, so that connection bolt 6
It can be readily intercalated into, the nut tightening on bolt 6 will be connected, shorten staff in the operating time of supporting position, subtract
Lack because of falling rocks or the incidence to cause the accident of collapsing, and improved installation effectiveness, has reduced labor intensity.
Bindiny mechanism 7 is the hinge shaft 8 connecting with first flange disk 1 and second flange disk 2, first flange disk 1 and the second method
Blue disk 2 and hinge shaft 8 form hinge shape, and the connecting hole on such first flange disk and second flange disk is not easy to deviate, installation speed
Degree is fast.
The protection scope of the utility model is not limited solely to above-described embodiment, as long as structure and a kind of tunnel of the utility model
The method structure that road tunneling boring construction integer support steel arch-shelf terminal pad and the oblique wire bond of partition connect is identical, and it is practical new just to fall in this
The range of type protection.
Claims (1)
- The integer support steel arch-shelf terminal pad 1. a kind of full section of tunnel is constructed, it is characterised in that: including first flange disk and the Two ring flanges have been provided with anchor pole locating rack on the first flange disk or second flange disk, on the anchor pole locating rack It is provided with anchor pole guide sleeve, is provided with connection bolt in the connecting hole on the first flange disk and second flange disk;Institute First flange disk and second flange disk side is stated to be flexibly connected by bindiny mechanism;The bindiny mechanism be and the first flange The hinge shaft that disk is connected with second flange disk.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821745641.XU CN209067240U (en) | 2018-10-26 | 2018-10-26 | A kind of full section of tunnel construction integer support steel arch-shelf terminal pad |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821745641.XU CN209067240U (en) | 2018-10-26 | 2018-10-26 | A kind of full section of tunnel construction integer support steel arch-shelf terminal pad |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209067240U true CN209067240U (en) | 2019-07-05 |
Family
ID=67096273
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821745641.XU Active CN209067240U (en) | 2018-10-26 | 2018-10-26 | A kind of full section of tunnel construction integer support steel arch-shelf terminal pad |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209067240U (en) |
-
2018
- 2018-10-26 CN CN201821745641.XU patent/CN209067240U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104989873B (en) | Penstock oblique-pulling inversion assembling method | |
CN102926466A (en) | Method for enhancing warp angle of ring mouth flitch of steel pipe node | |
CN209067240U (en) | A kind of full section of tunnel construction integer support steel arch-shelf terminal pad | |
CN104563578A (en) | Combined framework pillar for 500kV transformer substation and mounting method of combined framework pillar | |
CN208966352U (en) | A kind of supporting construction in weak rocks matter region tunnel | |
CN209067239U (en) | Full section of tunnel construction integer support steel arch-shelf terminal pad | |
CN103557007B (en) | Cross the construction method of geological anomaly zone soft-rock tunnel smashed to pieces | |
CN214464174U (en) | Novel chute with double slag outlets | |
CN103244158B (en) | Strengthening structure for integrated bolting with bar and wire mesh | |
CN207920616U (en) | A kind of suspension device for taking out tunnel speedy drivage the bottom of for | |
CN209129633U (en) | Full section of tunnel construction integer support steel arch-shelf | |
CN208982068U (en) | The full section of tunnel construction integer support steel arch-shelf fixed device of jacking | |
CN204646267U (en) | A kind of corrugated steel Tunnel structure | |
CN204386242U (en) | For the combined type truss column of 500kV transformer station | |
CN204113319U (en) | A kind of folding telescopic alley hydraulic support | |
CN208587175U (en) | A kind of prestressed structure of prestressed anchor | |
CN208137970U (en) | Longitudinally connected attachment device between a kind of grillage for Tunnel Engineering | |
CN207795306U (en) | A kind of neighbouring goaf gas concentration bound polyamine device of high methane comprehensive coal face upper corner | |
CN110454202A (en) | Stubborn fixing bolt formula attachment device and installation method suitable for tunnel steel arch frame segment | |
CN107605051A (en) | Assembled beam-column attachment means and assembled architecture framework | |
CN206753622U (en) | A kind of bar-mat reinforcement for coal mine roadway bolt-mesh-spurting supporting | |
CN109184752A (en) | A kind of coal mine supporting construction and its method for protecting support for passing through old kiln goaf | |
CN103924684B (en) | Soap-free emulsion polymeization prestress connects beams of concrete square steel tube concrete column reinforcing joint | |
CN208647961U (en) | A kind of current device of belt conveyer | |
CN214638820U (en) | Shield constructs flexible pull throughs of synchronous slip casting pipe |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |