CN209066486U - A kind of piping lane inside branch pier structure - Google Patents

A kind of piping lane inside branch pier structure Download PDF

Info

Publication number
CN209066486U
CN209066486U CN201821421196.1U CN201821421196U CN209066486U CN 209066486 U CN209066486 U CN 209066486U CN 201821421196 U CN201821421196 U CN 201821421196U CN 209066486 U CN209066486 U CN 209066486U
Authority
CN
China
Prior art keywords
buttress
piping lane
steel bar
pipe steel
pier structure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821421196.1U
Other languages
Chinese (zh)
Inventor
贾登忠
赵志江
李文辉
梁权威
罗元勋
李瑞基
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Jian Jian Industrial Group Co Ltd
Zhongsheng Donghao (guangzhou) Construction Co Ltd
Original Assignee
Guangdong Jian Jian Industrial Group Co Ltd
Zhongsheng Donghao (guangzhou) Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Jian Jian Industrial Group Co Ltd, Zhongsheng Donghao (guangzhou) Construction Co Ltd filed Critical Guangdong Jian Jian Industrial Group Co Ltd
Priority to CN201821421196.1U priority Critical patent/CN209066486U/en
Application granted granted Critical
Publication of CN209066486U publication Critical patent/CN209066486U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses branch pier structures inside a kind of piping lane, comprising: buttress main body determines pipe steel bar and positioning element composition;The buttress body contours are in the shape of an " I ", it is divided into buttress top, in the middle part of buttress and buttress bottom end, described to determine pipe steel bar both ends and be fixedly connected on the buttress top, the positioning element includes two bolts, described bolt one end is connected to the buttress bottom end, and the other end is connected to piping lane bottom plate.The buttress structure positioning is stablized, and is not susceptible to move, significantly enhances the safety of piping lane internal pipeline, for being equipped with antirattle spring and elastic rubber pad on the branch pier structure, so that entire buttress is more stable for the support effect of pipeline.The branch pier structure can be prefabricated outside piping lane, directly moves inside piping lane when to be used, avoids and makes the increase of material caused by buttress at the construction field (site), while cuing down expenses, significantly improves construction efficiency.

Description

A kind of piping lane inside branch pier structure
Technical field
The utility model relates to branch pier structures inside building structure field more particularly to a kind of piping lane.
Background technique
Piping lane refers to that a municipal administration is built below urban road shares tunnel, and electric power, communication, water supply, combustion gas etc. is more Kind municipal pipeline concentrates on one, carries out " unified planning, unified construction, unified management ", to accomplish the synthesis benefit of the underground space With shared with resource.
Traditional pipe gallery construction, buttress generally use cast in situs, need to carry out steel bar meter at the construction field (site) to tie up The processes such as bundle, formwork, concrete casting, maintenance, demoulding, not only working procedure is complicated for the method, long construction period, while also depositing The problems such as needing biggish raw material storage and processing factory site.Further, since section of tubing needs to be laid out in advance, and therefore, pipe Road and buttress are separately constructed is unable to satisfy the demand of part piping lane inside some piping lanes.
Utility model content
In order to overcome the above technical defects, the utility model provides a kind of piping lane inside branch pier structure, can be prefabricated in advance Branch pier structure inside good piping lane reduces construction period, and design structure is simple, saves significantly on buttress raw material.
To solve the above-mentioned problems, the utility model is achieved by following technical scheme: a kind of piping lane inside buttress Structure, comprising: buttress main body determines pipe steel bar and positioning element composition;The buttress body contours are in the shape of an " I ", are divided into buttress Top, in the middle part of buttress and buttress bottom end, it is described to determine pipe steel bar both ends and be fixedly connected on the buttress top, the positioning element packet Two bolts are included, described bolt one end is connected to the buttress bottom end, and the other end is connected to piping lane bottom plate.
Further, described to determine pipe steel bar in inverted " u " font, it is described to determine pipe steel bar both ends and be provided with screw thread, the buttress There are two through holes for top setting, described to determine pipe steel bar both ends across the through hole and fixed by the first nut.
Further, described to determine pipe steel bar both ends and also set up there are two antirattle spring, two ends for determining pipe steel bar Be each passed through the antirattle spring, the lower surface of the antirattle spring end thereof contacts and the buttress top, another end in contact with First nut.
Further, hole for hoist is provided in the middle part of the buttress, the hole for hoist passes through the interposition in the middle part of the buttress It sets.
Further, the elastic gum that material is haloflex is provided between the buttress bottom end and the piping lane bottom plate It pads, setting passes through the elastic rubber pad and be fixed in the positioning hole there are two hole, the bolt is positioned on the piping lane bottom plate.
Further, buttress top setting is fluted, the groove and described determine to be formed that determine pipe empty between pipe steel bar Between, the pipeline inside piping lane determines tube space by described.
Further, one end of the bolt is provided with the second nut, and second nut passes through the bolt and and institute State the surface contact of buttress bottom end.
Further, the buttress main body is reinforced concrete structure.
Compared with prior art, the utility model has the beneficial effects that
The utility model discloses branch pier structures inside a kind of piping lane, easily will be inside piping lane using the branch pier structure Pipeline is placed in the buttress superstructure, and the buttress structure positioning is stablized, and is not susceptible to move, significantly enhances piping lane The safety of internal pipeline, for being equipped with antirattle spring and elastic rubber pad on the branch pier structure so that entire buttress for The support effect of pipeline is more stable.The branch pier structure can be prefabricated outside piping lane, and pipe is directly moved when to be used Inside corridor, avoids and make the increase of material caused by buttress at the construction field (site), while cuing down expenses, significantly improve construction Efficiency.
Detailed description of the invention
Specific embodiment of the present utility model is described in further detail with reference to the accompanying drawing, in which:
Fig. 1 is a kind of structural schematic diagram of branch pier structure inside piping lane disclosed in the utility model embodiment.
In figure:
1- pipeline;2- determines pipe steel bar;3- buttress top;In the middle part of 4- buttress;5- bolt;6- elastic rubber pad;7- buttress bottom end; 8- piping lane bottom plate;9- hole for hoist;10- antirattle spring;The first nut of 11-;The second nut of 12-.
Specific embodiment
It is illustrated below in conjunction with preferred embodiment of the attached drawing to the utility model, it should be understood that described herein excellent It selects embodiment to be only used for describing and explaining the present invention, is not used to limit the utility model.
As shown in Figure 1, the utility model discloses branch pier structures inside a kind of piping lane, comprising: buttress main body determines pipe steel bar 2 and positioning element composition;The buttress body contours are in the shape of an " I ", are divided into buttress top 3, buttress middle part 4 and buttress bottom end 7, further, the buttress main body is reinforced concrete structure, determines 2 both ends of pipe steel bar and is fixedly connected on buttress top 3, described Positioning element includes two bolts 5, and 5 one end of bolt is connected to buttress bottom end 7, and the other end is connected to piping lane bottom plate 8.
Preferably, pipe steel bar 2 is determined in inverted " u " font, is determined 2 both ends of pipe steel bar and is provided with screw thread, buttress top 3 is provided with two It is across the through hole and fixed by the first nut 11 to determine 2 both ends of pipe steel bar for a through hole.Further, buttress top 3 is set It is equipped with groove, the groove and determines to be formed between pipe steel bar 2 and determine tube space, the pipeline 1 inside piping lane, which passes through, described determines tube space. In specific work progress, needing to arrange that pipeline 1 when on branch pier structure, directly moves branch pier structure to piping lane It is fixed, and 1 frame of pipeline is determined into tube space in branch pier structure.
Preferably, determine 2 both ends of pipe steel bar to also set up there are two antirattle spring 10, two ends for determining pipe steel bar 2 are worn respectively Cross antirattle spring 10, the lower surface of antirattle spring 10 end thereof contacts and buttress top 3, another end in contact and the first nut 11.? In the range of the sedimentation that piping lane allows, when determining the rigidity of pipe steel bar 2 and the welding offer of bolt 5, damping spring be can provide suitably Flexibility, make pipeline 1 do not occur drawing crack destruction.
Preferably, the elastic rubber pad 6 that material is haloflex, piping lane are provided between buttress bottom end 7 and piping lane bottom plate 8 Setting passes through elastic rubber pad 6 and is fixed in the positioning hole there are two hole, bolt 5 is positioned on bottom plate 8.It can using elastic rubber pad 6 To play grade during installation, certain flexibility is provided in use process prevents the unexpected drawing crack of pipeline 1 from destroying.
Preferably, buttress middle part 4 is provided with hole for hoist 9, and hole for hoist 9 passes through in the middle part of buttress 4 middle position.By buttress Structure is hung in from piping lane hoisting port when being installed inside piping lane, and hole for hoist 9 is arranged in the position of centre of gravity of branch pier structure, both can be with It realizes safty hoisting, branch pier structure can also be efficiently overturn when having demand.
Preferably, one end of bolt 5 is provided with the second nut 12, and the second nut 12 passes through bolt 5 and the buttress bottom end 7 and Surface contact.The fixation that branch pier structure is carried out by bolt 5 and the second nut 12, so that the installation of branch pier structure is more stable.
The other structures of branch pier structure are referring to the prior art inside piping lane described in the present embodiment, and details are not described herein.
The above descriptions are merely preferred embodiments of the present invention, not makees in any form to the utility model Limitation, therefore it is all without departing from the content of the technical scheme of the utility model, implement according to the technical essence of the utility model to above Any modification, equivalent variations and modification, are still within the scope of the technical solutions of the present invention made by example.

Claims (8)

1. branch pier structure inside a kind of piping lane characterized by comprising buttress main body determines pipe steel bar and positioning element composition;Institute It is in the shape of an " I " to state buttress body contours, is divided into buttress top, in the middle part of buttress and buttress bottom end, it is described to determine pipe steel bar both ends and fix It is connected to the buttress top, the positioning element includes two bolts, and described bolt one end is connected to the buttress bottom end, The other end is connected to piping lane bottom plate.
2. branch pier structure inside piping lane according to claim 1, which is characterized in that it is described that determine pipe steel bar be in inverted " u " font, Described to determine pipe steel bar both ends and be provided with screw thread, the buttress top setting is described to determine pipe steel bar both ends and pass through there are two through hole The through hole is simultaneously fixed by the first nut.
3. branch pier structure inside piping lane according to claim 2, which is characterized in that described to determine pipe steel bar both ends and be additionally provided with Two antirattle spring, two ends for determining pipe steel bar are each passed through the antirattle spring, the antirattle spring end thereof contacts With the lower surface on the buttress top, another end in contact and first nut.
4. branch pier structure inside piping lane according to claim 1, which is characterized in that be provided with lifting in the middle part of the buttress Hole, the hole for hoist pass through the middle position in the middle part of the buttress.
5. branch pier structure inside piping lane according to claim 1, which is characterized in that the buttress bottom end and the piping lane bottom The elastic rubber pad that material is haloflex is provided between plate, there are two position hole, the spiral shell for setting on the piping lane bottom plate Bolt passes through the elastic rubber pad and is fixed in the positioning hole.
6. branch pier structure inside piping lane according to claim 1, which is characterized in that the buttress top setting is fluted, The groove and it is described determine to be formed between pipe steel bar determine tube space, the pipeline inside piping lane, which passes through, described determines tube space.
7. branch pier structure inside piping lane according to claim 1, which is characterized in that one end of the bolt is provided with second Nut, second nut pass through the bolt and contact with the surface of the buttress bottom end.
8. branch pier structure inside piping lane according to claim 1, which is characterized in that the buttress main body is armored concrete Structure.
CN201821421196.1U 2018-08-31 2018-08-31 A kind of piping lane inside branch pier structure Active CN209066486U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821421196.1U CN209066486U (en) 2018-08-31 2018-08-31 A kind of piping lane inside branch pier structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821421196.1U CN209066486U (en) 2018-08-31 2018-08-31 A kind of piping lane inside branch pier structure

Publications (1)

Publication Number Publication Date
CN209066486U true CN209066486U (en) 2019-07-05

Family

ID=67091358

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821421196.1U Active CN209066486U (en) 2018-08-31 2018-08-31 A kind of piping lane inside branch pier structure

Country Status (1)

Country Link
CN (1) CN209066486U (en)

Similar Documents

Publication Publication Date Title
CN206376276U (en) A kind of prefabricated pipe gallery
CN208668596U (en) A kind of reinforced concrete girder slab system and prefabricated post assembly node
CN109610509A (en) A kind of the adjustable die system and construction method of pipe gallery automatic control section
CN108687950A (en) A kind of prefabricated trolley of pipe gallery and piping lane method for prefabricating
CN204097864U (en) A kind of bridge prefabrication hollow pier stud delay-pour joint structure
CN109057148A (en) Ultra-high performance concrete is without regular reinforcement Prestressed U type beam and its construction method
CN205662838U (en) Prestressing force joint construction of pier is assembled to prefabricated segment
CN203514309U (en) Steel strand anchorage device base
CN207176482U (en) A kind of municipal bridge-collision-avoidance wall
CN209066486U (en) A kind of piping lane inside branch pier structure
CN203129025U (en) Suspension fixing device for hanging basket
CN103510521A (en) Connecting component
CN203514323U (en) Connection component
CN207419232U (en) A kind of traffic bridge column
CN206385568U (en) A kind of city integrated piping lane hoisting ring device
CN206692230U (en) A kind of skyscraper row is hung
CN215925647U (en) Arch rib buckle cable anchoring beam for tower buckle integration
CN211815522U (en) External prestress steering structure
CN204491947U (en) A kind of laminated floor slab
CN103938877B (en) The installation method of crab-bolt stock
CN207160052U (en) A kind of skewback for connecting arcuate bead steel construction
CN207073118U (en) Dam hangs the concrete prefabricated formwork structure of body by the feet
CN207244453U (en) A kind of suspension bridge light anchorage mast apparatus
CN201128905Y (en) Multi-degree-of-freedom toe board special-shaped slip mould
CN209854649U (en) Bottom adjusting and reinforcing device for vertical steel formwork

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant