CN209052956U - A kind of overpass structure being layered vertically - Google Patents
A kind of overpass structure being layered vertically Download PDFInfo
- Publication number
- CN209052956U CN209052956U CN201821141356.7U CN201821141356U CN209052956U CN 209052956 U CN209052956 U CN 209052956U CN 201821141356 U CN201821141356 U CN 201821141356U CN 209052956 U CN209052956 U CN 209052956U
- Authority
- CN
- China
- Prior art keywords
- bridge
- ramp bridge
- exit
- ramp
- lane
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Road Paving Structures (AREA)
Abstract
本实用新型公开了一种竖直分层的立交结构,包括横向道路、隆起的第一匝道桥和隆起的第二匝道桥,横向道路包括上车行道和下车行道。第一匝道桥和第二匝道桥均为单向车道,第一匝道桥在下车行道的部分车道上形成第一入口和第一出口,第二匝道桥在上车行道的部分车道上形成第二入口和第二出口,两条匝道桥的平面投影至少部分重合。当横向道路上存在立交结构设置在两个交叉口之间,在进出口的布置上进行优化,可以避免十字路口交通冲突和地面交通在进出口处的压力。这种竖直分层的立交结构,缓解了城市交通压力,降低匝道桥对大面积净空的要求,拉开了匝道桥结构与周围建筑的距离避免噪音和震动的影响。此实用新型用于道路改造领域。
The utility model discloses a vertical layered interchange structure, which comprises a lateral road, a raised first ramp bridge and a raised second ramp bridge. The lateral road includes an upper lane and a lower lane. Both the first ramp bridge and the second ramp bridge are one-way lanes. The first ramp bridge forms the first entrance and the first exit on part of the lane of the exit lane, and the second ramp bridge forms on part of the lane on the driveway. For the second entrance and the second exit, the plane projections of the two ramp bridges at least partially overlap. When there is an interchange structure on a lateral road between two intersections, optimizing the layout of the entrance and exit can avoid traffic conflicts at the intersection and the pressure of ground traffic at the entrance and exit. This vertical layered interchange structure relieves the urban traffic pressure, reduces the requirement of the ramp bridge for a large area of clearance, and widens the distance between the ramp bridge structure and the surrounding buildings to avoid the influence of noise and vibration. The utility model is used in the field of road reconstruction.
Description
技术领域technical field
本实用新型涉及道路改造领域,特别是涉及一种竖直分层的立交结构。The utility model relates to the field of road reconstruction, in particular to a vertical layered interchange structure.
背景技术Background technique
当前,城市道路建设的用地比较紧张,特别是在市中心区道路建设用地受到很大的限制。同时在现有城市已有设施基础上进行的改造项目更加面临着重重困难,甚至有的改造项目是在规划路网之外的新增项目,而城市中却难以提供大范围的净空或者地面需求。随着城市的发展和交通的运行愈加繁重,当一些道路的交通量达到一定的规模时,需要将部分车流从现有道路中抽离出来,提高交通运行的效率,也可以缓解现有道路的拥堵程度。常规的处理方式是新增桥梁,包括实现各转向功能的匝道,同时桥下布置地面道路,保持现状道路的功能。At present, the land for urban road construction is relatively tight, especially in the downtown area, the land for road construction is greatly restricted. At the same time, the renovation projects based on the existing facilities in the existing cities face more difficulties. Some renovation projects are even new projects outside the planned road network, but it is difficult to provide a large-scale headroom or ground demand in the city. . With the development of the city and the more and more heavy traffic operation, when the traffic volume of some roads reaches a certain scale, it is necessary to extract part of the traffic flow from the existing roads to improve the efficiency of traffic operation, and it can also alleviate the existing roads. level of congestion. The conventional treatment method is to add new bridges, including ramps to realize various steering functions, and at the same time, ground roads are arranged under the bridges to maintain the functions of the existing roads.
通过桥梁对交通进行合理的分流,很大程度上可以缓解交通压力,也可以避免单一事故造成的巨大拥堵。大多数情况下是在同一桥梁实现交通往返,或者往返两条道路分开但位于同一高度平面上,道路横断面的总宽度比较宽。较宽的横断面增加了征拆的难度,同时桥梁与两侧的建筑物距离更加贴近,影响较大。特别当桥下净空不高时,较宽的桥梁对于桥下的交通和行人会造成压抑的感觉,这种压抑包括空间、光线等。而抬高桥梁无疑会增加工程造价,桥梁的规模也会变大加重对周边的影响。对于桥梁沿已有道路的改造,往返交通均位于同一高度的平面内,不能很好地满足城市交通改造的需求。Reasonable diversion of traffic through bridges can relieve traffic pressure to a large extent, and can also avoid huge congestion caused by a single accident. In most cases, the traffic round-trip is realized on the same bridge, or the round-trip two roads are separated but located on the same height plane, and the total width of the road cross section is relatively wide. The wider cross-section increases the difficulty of expropriation and demolition, and at the same time, the distance between the bridge and the buildings on both sides is closer, which has a greater impact. Especially when the clearance under the bridge is not high, the wider bridge will cause a feeling of depression for the traffic and pedestrians under the bridge, such depression includes space, light and so on. Elevating the bridge will undoubtedly increase the project cost, and the scale of the bridge will also increase and increase the impact on the surrounding area. For the reconstruction of bridges along the existing roads, the round-trip traffic is located in the same height plane, which cannot well meet the needs of urban traffic reconstruction.
实用新型内容Utility model content
本实用新型的目的在于提供一种平面占地少、征拆方便的竖直分层立交结构。The purpose of the utility model is to provide a vertical layered interchange structure with less plane occupation and convenient expropriation and dismantling.
本实用新型所采取的技术方案是:一种竖直分层的立交结构,包括横向道路、隆起的第一匝道桥和隆起的第二匝道桥,第一匝道桥和第二匝道桥均位于横向道路上,横向道路包括上车行道和下车行道,第一匝道桥和第二匝道桥均为单向车道,第一匝道桥在下车行道上形成第一入口和第一出口,第二匝道桥在上车行道上形成第二入口和第二出口,第一入口和第一出口只占用下车行道的部分车道,第二入口和第二出口只占用上车行道的部分车道,第一匝道桥和第二匝道桥的平面投影至少部分重合。The technical scheme adopted by the utility model is: a vertical layered interchange structure, comprising a transverse road, a raised first ramp bridge and a raised second ramp bridge, and the first ramp bridge and the second ramp bridge are both located in the horizontal direction. On the road, the lateral road includes the on-board lane and the off-road lane. The first ramp bridge and the second ramp bridge are both one-way lanes. The first ramp bridge forms the first entrance and the first exit on the off-road The ramp bridge forms a second entrance and a second exit on the upper lane. The first entrance and the first exit only occupy part of the lane of the lower lane, and the second entrance and the second exit only occupy part of the lane of the upper lane. Planar projections of the first ramp bridge and the second ramp bridge at least partially coincide.
作为上述方案的改进,横向道路上分别设有第一纵道和第二纵道,第一纵道和第二纵道分别与横向道路相交形成第一交叉口和第二交叉口,第一入口、第一出口、第二入口和第二出口均位于第一交叉口和第二交叉口之间。As an improvement of the above scheme, a first longitudinal road and a second longitudinal road are respectively provided on the transverse road, and the first longitudinal road and the second longitudinal road intersect with the transverse road respectively to form a first intersection and a second intersection. , the first outlet, the second inlet and the second outlet are all located between the first intersection and the second intersection.
作为上述方案的改进,第一入口相比第二出口更靠近第一交叉口,第二入口相比第一出口更靠近第二交叉口。As an improvement of the above solution, the first inlet is closer to the first intersection than the second outlet, and the second inlet is closer to the second intersection than the first outlet.
作为上述方案的改进,第一匝道桥在第一入口到第一出口之间部分为第一桥身,第二匝道桥在第二入口到第二出口之间部分为第二桥身,第一桥身至少有一部分位于第二桥身的上方。As an improvement of the above solution, the part of the first ramp bridge between the first entrance and the first exit is the first bridge body, the part of the second ramp bridge between the second entrance and the second exit is the second bridge body, and the first At least a part of the bridge body is located above the second bridge body.
作为上述方案的改进,第一桥身和第二桥身的延伸方向均与横向道路相同。As an improvement of the above solution, the extension directions of the first bridge body and the second bridge body are the same as the transverse road.
作为上述方案的改进,该竖直分层的立交结构包括若干旁通匝道,各旁通匝道由横向道路连接第一匝道桥或第二匝道桥。As an improvement of the above solution, the vertical layered interchange structure includes several bypass ramps, and each bypass ramp is connected to the first ramp bridge or the second ramp bridge by a transverse road.
作为上述方案的改进,第一匝道桥和第二匝道桥两侧均设有隔音墙。As an improvement of the above solution, soundproof walls are provided on both sides of the first ramp bridge and the second ramp bridge.
作为上述方案的改进,第一匝道桥的桥底设有照明灯具。As an improvement of the above solution, lighting lamps are provided at the bottom of the first ramp bridge.
作为上述方案的改进,第一匝道桥和第二匝道桥的两侧设有防撞墙,防撞墙上设有照明灯具。As an improvement of the above-mentioned solution, anti-collision walls are provided on both sides of the first ramp bridge and the second ramp bridge, and lighting lamps are provided on the anti-collision walls.
本实用新型的有益效果:这种竖直分层的立交结构,主要是将位于同一平面上包括往返车道的匝道桥拆分为竖直方向上的两条单向匝道桥,在实现大程度地缓解城市交通压力的同时,降低匝道桥对大面积净空或者地层的要求,拉开了匝道桥结构与周围建筑的距离避免噪音和震动的影响,降低了施工难度并提高了城市道路施工改造的可行性;还可以大面积降低上层桥梁的投影面积,保证了底层路面的采光,减少路人车辆的心理压迫;特别地位于两个十字交叉口之间的竖直分层的立交结构在进出口的布置上进行优化,避免十字路口交通冲突缓解地面交通在进出口处的压力。The beneficial effects of the present utility model: the vertical layered interchange structure mainly splits the ramp bridge including the round-trip lane on the same plane into two one-way ramp bridges in the vertical direction, which can achieve maximum While alleviating the urban traffic pressure, it also reduces the requirements of the ramp bridge for large area clearance or strata, widens the distance between the ramp bridge structure and the surrounding buildings to avoid the influence of noise and vibration, reduces the construction difficulty and improves the feasibility of urban road construction and renovation. It can also reduce the projected area of the upper bridge in a large area, ensuring the lighting of the ground floor and reducing the psychological pressure of passers-by and vehicles; especially the arrangement of the vertical layered interchange structure between the two intersections at the entrance and exit Optimized to avoid traffic conflicts at intersections and relieve the pressure of ground traffic at the entrance and exit.
附图说明Description of drawings
下面结合附图对本实用新型作进一步说明:Below in conjunction with accompanying drawing, the utility model is further described:
图1是竖直分层的立交结构的立体图;1 is a perspective view of a vertically layered interchange structure;
图2是竖直分层的立交结构的平面图。Figure 2 is a plan view of a vertically layered interchange structure.
具体实施方式Detailed ways
参照图1和图2,本实用新型为一种竖直分层的立交结构,包括横向道路1、隆起的第一匝道桥2和隆起的第二匝道桥3。为方便描述并不代表其实际方向,横向道路1由图2所示分为上车行道11和下车行道12。上车行道11和下车行道12均不代表行车方向,只是为了方便描述,代称其同一道路上同一方向的一系列车道。第一匝道桥2和第二匝道桥3分别为隆起的立交桥结构,都位于横向道路1上,并且都是单向车道。第一匝道桥2对下车行道12进行分流,并在下车行道12上形成第一入口21和第一出口22。第二匝道桥3对上车行道11进行分流,并在上车行道11上形成第二入口31和第二出口32。第一入口21和第一出口22都只占用下车行道12的部分车道,第二入口31和第二出口32都只占用上车行道11的部分车道,其余未占用的车道继续发挥原有的作用。第一匝道桥2和第二匝道桥3的平面投影至少部分重合,可以是第一匝道桥2部分桥身位于第二匝道桥3的竖直上方,也可以是第二匝道桥3的部分桥身位于第一匝道桥2的竖直上方。Referring to FIGS. 1 and 2 , the present invention is a vertical layered interchange structure, comprising a lateral road 1 , a raised first ramp bridge 2 and a raised second ramp bridge 3 . For convenience of description and not representing its actual direction, the lateral road 1 is divided into an upper lane 11 and a lower lane 12 as shown in FIG. 2 . The on-vehicle lane 11 and the off-vehicle lane 12 do not represent the driving direction, but for the convenience of description, they are referred to as a series of lanes in the same direction on the same road. The first ramp bridge 2 and the second ramp bridge 3 are respectively raised overpass structures, both are located on the lateral road 1, and both are one-way lanes. The first ramp bridge 2 divides the off-road 12 , and forms a first entrance 21 and a first exit 22 on the off-road 12 . The second ramp bridge 3 divides the upper lane 11 , and forms a second entrance 31 and a second outlet 32 on the upper lane 11 . Both the first entrance 21 and the first exit 22 only occupy part of the lanes of the lower lane 12, the second entrance 31 and the second exit 32 only occupy part of the lanes of the upper lane 11, and the remaining unoccupied lanes continue to play their original roles. some effect. The plane projections of the first ramp bridge 2 and the second ramp bridge 3 at least partially overlap, and it can be that part of the bridge body of the first ramp bridge 2 is located vertically above the second ramp bridge 3, or it can be part of the bridge of the second ramp bridge 3 The body is located vertically above the first ramp bridge 2 .
作为优选的实施方式,第一匝道桥2在第一入口21到第一出口22之间部分为第一桥身,第二匝道桥3在第二入口31到第二出口32之间部分为第二桥身,第一桥身部分位于第二桥身的竖直上方,由此连同横向道路1一起形成三层立交结构。横向道路1位于最底层,第二匝道桥3位于中间层,第一匝道桥2位于最顶层上。第一匝道桥2上方、第一匝道桥2和第二匝道桥3之间、第二匝道桥3和其下方横向道路1之间都满足行车的净空要求。车辆从立交结构外的下车行道12上未被第一入口21和第一出口22覆盖的车道进出立交结构范围内的下车行道12。车辆从立交结构外的上车行道11上未被第二入口31和第二出口32覆盖的车道进出立交结构范围内的上车行道11。As a preferred embodiment, the part of the first ramp bridge 2 between the first entrance 21 and the first exit 22 is the first bridge body, and the part of the second ramp bridge 3 between the second entrance 31 and the second exit 32 is the first bridge body. The second bridge body, the first bridge body is located vertically above the second bridge body, thereby forming a three-story interchange structure together with the lateral road 1 . The transverse road 1 is located on the bottommost floor, the second ramp bridge 3 is located on the middle level, and the first ramp bridge 2 is located on the topmost level. Above the first ramp bridge 2 , between the first ramp bridge 2 and the second ramp bridge 3 , and between the second ramp bridge 3 and the lateral road 1 below it all meet the clearance requirements for driving. Vehicles enter and exit the get-off lane 12 within the interchange structure from the lane not covered by the first entrance 21 and the first exit 22 on the get-off lane 12 outside the interchange structure. Vehicles enter and exit the pick-up lane 11 within the interchange structure from the lane on the pick-up lane 11 outside the interchange structure that is not covered by the second entrance 31 and the second exit 32 .
在本实施例中,横向道路1上分别设有第一纵道4和第二纵道5,第一纵道4和第二纵道5都是双向车道。第一纵道4位于图2所示的左侧,第二纵道5位于图2所示的右侧,左右侧的定义只是方便表达描述并不代表具体方向。第一纵道4和第二纵道5分别与横向道路1相交形成第一交叉口和第二交叉口,第一交叉口和第二交叉口之间的距离较大。横向道路1位于第一交叉口和第二交叉口之间的路段具有比较大的交通压力,横向道路1无法再向外拓展,并且普通匝道桥建设上受已有建筑设施的影响大。在本实施例中,横向道路1的上车行道11和下车行道12均包括两条车道,排列顺序由上到下。第一纵道4和第二纵道5均包括四条车道,排列顺序由左到右。In this embodiment, the lateral road 1 is provided with a first longitudinal track 4 and a second longitudinal track 5 respectively, and both the first longitudinal track 4 and the second longitudinal track 5 are two-way lanes. The first longitudinal track 4 is located on the left side as shown in FIG. 2 , and the second longitudinal track 5 is located on the right side as shown in FIG. 2 . The definitions of the left and right sides are only for convenience of expression and description, and do not represent specific directions. The first longitudinal road 4 and the second longitudinal road 5 respectively intersect the transverse road 1 to form a first intersection and a second intersection, and the distance between the first intersection and the second intersection is relatively large. The section of the lateral road 1 between the first intersection and the second intersection has relatively large traffic pressure, and the lateral road 1 cannot be expanded outward, and the construction of the ordinary ramp bridge is greatly affected by the existing construction facilities. In this embodiment, the upper lanes 11 and the lower lanes 12 of the lateral road 1 both include two lanes, arranged in order from top to bottom. The first longitudinal lane 4 and the second longitudinal lane 5 each include four lanes, arranged in order from left to right.
横向道路1在位于第一交叉口和第二交叉口之间的路段上设置第一匝道桥2和第二匝道桥3,第一匝道桥2和第二匝道桥3都是隆起的立交桥结构。第一匝道桥2用于缓解下车行道12的交通压力,第二匝道桥3用于缓解上车行道11的交通压力。第一入口21、第一出口22、第二入口31和第二出口32均位于第一交叉口和第二交叉口之间,第一入口21和第一出口22均位于下车行道12的第二条车道上,第二入口31和第二出口32均位于上车行道11的第一条车道上。The lateral road 1 is provided with a first ramp bridge 2 and a second ramp bridge 3 on the road section between the first intersection and the second intersection. Both the first ramp bridge 2 and the second ramp bridge 3 are raised overpass structures. The first ramp bridge 2 is used to relieve the traffic pressure on the off-road 12 , and the second ramp bridge 3 is used to relieve the traffic pressure on the on-road 11 . The first entrance 21 , the first exit 22 , the second entrance 31 and the second exit 32 are all located between the first intersection and the second intersection, and the first entrance 21 and the first exit 22 are all located at the edge of the lower lane 12 . On the second lane, both the second entrance 31 and the second exit 32 are located on the first lane of the upper carriageway 11 .
第一桥身和第二桥身的延伸方向与横向道路1相同,第一桥身和第二桥身都有部分桥身的平面投影位于横向道路1的中间。第一匝道桥2和第二匝道桥3的坡度基本相同,但是第一匝道桥2在与第二匝道桥3在平面投影相交处的部分的高度高于第二匝道桥3,并且高出部分足够提供第二匝道桥3的行车净空。第一匝道桥2的平面投影上看,第一入口21由下车行道12拐向横向道路1中间形成第一桥身,再由横向道路1中间拐回下车行道12上。第二匝道桥3的平面投影上看,第二入口31由上车行道11拐向横向道路1中间形成第一桥身,再由横向道路1中间拐回上车行道11上。The extension direction of the first bridge body and the second bridge body is the same as that of the transverse road 1 , and the plane projections of part of the first bridge body and the second bridge body are located in the middle of the transverse road 1 . The slopes of the first ramp bridge 2 and the second ramp bridge 3 are substantially the same, but the height of the first ramp bridge 2 at the intersection with the second ramp bridge 3 in the plane projection is higher than that of the second ramp bridge 3, and the height is higher than that of the second ramp bridge 3. It is sufficient to provide the traffic clearance of the second ramp bridge 3 . Viewed from the plane projection of the first ramp bridge 2 , the first entrance 21 turns from the alighting lane 12 to the middle of the lateral road 1 to form a first bridge body, and then turns from the middle of the lateral road 1 back to the alighting lane 12 . Viewed from the plane projection of the second ramp bridge 3 , the second entrance 31 turns from the upper lane 11 to the middle of the lateral road 1 to form the first bridge body, and then turns from the middle of the lateral road 1 back to the upper lane 11 .
横向道路1在第一交叉口和第二交叉口之间的路段,下车行道12的车辆由图2所示左侧驶向右侧。下车行道12中的车辆进入下车行道12的第二条车道由第一入口21进入第一匝道桥2中,顺延第一匝道桥2驶向第一出口22。下车行道12中的车辆进入下车行道12的第一条车道驶入位于立交结构下方的横向道路1路段,在当驶过第一入口21后可以选择进入下车行道12的第二条车道,在靠近第一出口22出驶向下车行道12的第一条车道驶出立交结构路段。第一交叉口和第二交叉口之间的横向道路1路段,上车行道11的车辆由图2所示右侧驶向左侧。上车行道11中的车辆进入上车行道11的第一条车道由第二入口31进入第二匝道桥3中,顺延第二匝道桥3驶向第二出口32。上车行道11中的车辆进入上车行道11的第二条车道驶入位于立交结构下方的横向道路1路段,在当驶过第二入口31后可以选择进入上车行道11的第一条车道,在靠近第二出口32出驶向上车行道11的第二条车道驶出立交结构路段。On the section of the lateral road 1 between the first intersection and the second intersection, the vehicles on the off-road 12 drive from the left to the right as shown in FIG. 2 . Vehicles in the get-off lane 12 enter the second lane of the get-off lane 12 , enter the first ramp bridge 2 through the first entrance 21 , and proceed to the first exit 22 along the first ramp bridge 2 . Vehicles in the alighting lane 12 enter the first lane of the alighting lane 12 and enter the section of the lateral road 1 located under the interchange structure. There are two lanes, and the first lane near the first exit 22 to the down lane 12 exits the interchange structure section. In the section of the lateral road 1 between the first intersection and the second intersection, vehicles on the roadway 11 drive from the right side to the left side as shown in FIG. 2 . Vehicles in the upper lane 11 enter the first lane of the upper lane 11 and enter the second ramp bridge 3 through the second entrance 31 , and proceed along the second ramp bridge 3 to the second exit 32 . The vehicle in the upper lane 11 enters the second lane of the upper lane 11 and enters the section of the lateral road 1 located under the interchange structure, and can choose to enter the first lane of the upper lane 11 after passing the second entrance 31. One lane, and the second lane, which is close to the second exit 32, goes to the upper carriageway 11 and exits the interchange structure section.
在该立交结构中,第一出口22或第二出口32是分别驶向第二交叉口和第一交叉口,应适当增大第一出口22与第二交叉口的距离和第二出口32与第一交叉口的距离。因为很多时候交叉口处设有灯控或者匝道,车速较为缓慢或者需要排队等候。而车辆在驶出第一出口22或第二出口32的时候通常会是下坡状态,容易使车辆车速会较快。如果第一出口22或第二出口32与第二交叉口和第一交叉口距离较近的话容易产生交通冲突发生意外,或者车辆排队排到第一匝道桥2或第二匝道桥3在第一出口22或第二出口32处的斜坡上,这样会有较大的交通隐患。而为了尽快更好地缓解横向道路1上的交通压力,第一入口21和第二入口31会在满足交通规范的同时尽可能分别靠近第二交叉口和第一交叉口。In this interchange structure, the first exit 22 or the second exit 32 is directed to the second intersection and the first intersection, respectively, and the distance between the first exit 22 and the second intersection and the distance between the first exit 22 and the second intersection and the distance between the second exit 32 and the second intersection should be appropriately increased. The distance to the first intersection. Because many times there are light controls or ramps at the intersection, the speed of the vehicle is relatively slow or there is a need to wait in line. However, when the vehicle exits the first exit 22 or the second exit 32, it is usually in a downhill state, which tends to make the vehicle speed faster. If the first exit 22 or the second exit 32 is close to the second intersection and the first intersection, traffic conflicts are likely to cause accidents, or vehicles queue up to the first ramp bridge 2 or the second ramp bridge 3 at the first On the slope at the exit 22 or the second exit 32, there will be a greater traffic hazard. In order to better relieve the traffic pressure on the lateral road 1 as soon as possible, the first entrance 21 and the second entrance 31 will be as close as possible to the second intersection and the first intersection, respectively, while satisfying the traffic regulations.
对于在同一平面设置往返的车道的匝道桥来说,往返方向的入口和出口总是位于同一纵向位置上的,就会难以避免地产生进出口的布置矛盾。并且位于同一纵向上的往返方向的入口和出口会压缩进入横向道路1在立交结构下的路段,形成交通瓶颈。而在竖直分层的立交结构中,单条往返方向的匝道分为第一匝道桥2和第二匝道桥3的立交结构,第一匝道桥2和第二匝道桥3将尽量设置为竖直上下层结构,但是第一入口21、第一出口22、第二入口31和第二出口32相互之间相互错开的不会有位置的必要关联。在本实施例中在横向道路1上从左到右依次为第一入口21、第二出口32、第一出口22和第二入口31,这样在大程度上满足了交通要求。第一入口21占用下车行道12的第二条车道,特别地可以适当拓展道路或者缩窄已有车道,将横向道路1在第一入口21的纵向上由上车行道11的两条车道和下车行道12的两条车道变成上车行道11的两条车道和下车行道12的三条车道。这时候第一入口21占用下车行道12的一条车道,其余不占用的上车行道11的两条车道和下车行道12的两条车道可正常通车。在第一出口22、第二入口31、第二出口32处可以采取同样的设置。For a ramp bridge with a round-trip lane set on the same plane, the entrance and exit in the round-trip direction are always located at the same longitudinal position, which will inevitably lead to a contradiction in the arrangement of the entrance and exit. And the entrance and exit of the round-trip direction located in the same longitudinal direction will be compressed into the section of the lateral road 1 under the interchange structure, forming a traffic bottleneck. In the vertical layered interchange structure, a single round-trip ramp is divided into a first ramp bridge 2 and a second ramp bridge 3. The first ramp bridge 2 and the second ramp bridge 3 will be set as vertical as possible. The upper and lower layers are structured, but the first inlet 21 , the first outlet 22 , the second inlet 31 and the second outlet 32 are staggered from each other and do not have a necessary relationship of positions. In this embodiment, from left to right on the lateral road 1 are the first entrance 21 , the second exit 32 , the first exit 22 and the second entrance 31 , which satisfies the traffic requirements to a large extent. The first entrance 21 occupies the second lane of the lower lane 12 , in particular, the road can be appropriately expanded or the existing lane can be narrowed, and the transverse road 1 can be divided into two lanes of the upper lane 11 in the longitudinal direction of the first entrance 21 . The two lanes of the lane and the alighting lane 12 become two lanes of the upper lane 11 and three lanes of the falling lane 12 . At this time, the first entrance 21 occupies one lane of the lower lane 12 , and the remaining two lanes of the upper lane 11 and the two lanes of the lower lane 12 that are not occupied can be open to traffic normally. The same arrangement can be adopted at the first outlet 22 , the second inlet 31 , the second outlet 32 .
当第一交叉口和第二交叉口的距离比较远时,为了提高交通的便捷度,提升其交通服务功能,可以设置若干旁通匝道,各旁通匝道由横向道路1连接到第一匝道桥2或第二匝道桥3。横向道路1的车辆可以通过旁通匝道进入第一匝道桥2或者第二匝道桥3中,或第一匝道桥2或者第二匝道桥3中的车辆可以通过旁通匝道回到横向道路1上。这种竖直分层的立交结构更加远离了两侧的建筑楼层,对于敏感的路段比如学校、医院等可以在第一匝道桥2和第二匝道桥3两侧可以设置完全封闭式的隔音措施,如混凝土结构或者钢结构隔音墙。同时,可以在第一匝道桥2底部设有照明灯具,如高压钠灯或新型节能光源。或可在第一匝道桥2和第二匝道桥3的两侧设有防撞墙,在防撞墙上设有照明灯具。可由采光更好的第一匝道桥2上设太阳能采光连接到第一匝道桥2底部或防撞墙上的照明灯具用于照明。When the distance between the first intersection and the second intersection is relatively long, in order to improve the convenience of traffic and improve its traffic service function, several bypass ramps can be set up, and each bypass ramp is connected by the transverse road 1 to the first ramp bridge 2 or the second ramp bridge 3. Vehicles on the cross road 1 can enter the first ramp bridge 2 or the second ramp bridge 3 through the bypass ramp, or vehicles in the first ramp bridge 2 or the second ramp bridge 3 can return to the cross road 1 through the bypass ramp . This vertical layered interchange structure is farther away from the building floors on both sides. For sensitive road sections such as schools, hospitals, etc., completely enclosed sound insulation measures can be provided on both sides of the first ramp bridge 2 and the second ramp bridge 3 , such as concrete structure or steel structure sound insulation wall. At the same time, lighting fixtures, such as high pressure sodium lamps or new energy-saving light sources, may be provided at the bottom of the first ramp bridge 2 . Alternatively, anti-collision walls may be provided on both sides of the first ramp bridge 2 and the second ramp bridge 3, and lighting fixtures may be provided on the anti-collision walls. The lighting fixtures connected to the bottom of the first ramp bridge 2 or the anti-collision wall can be provided on the first ramp bridge 2 with better lighting for lighting.
在进行道路改造时,根据实际需要对匝道桥进行设计规划。改造过程中先实施新建匝道桥的施工便道、交通疏解和围蔽,对匝道桥的主体结构、附属设施进行施工,完成后拆除新建匝道桥的施工便道和围蔽。然后对地面道路进行修复,开放交通。When carrying out road reconstruction, design and plan the ramp bridge according to actual needs. During the reconstruction process, the construction access road, traffic relief and enclosure of the newly built ramp bridge will be implemented first, and the main structure and ancillary facilities of the ramp bridge will be constructed. After completion, the construction access road and enclosure of the newly built ramp bridge will be demolished. Surface roads are then repaired and open to traffic.
在城里道路建设或改造中,城市内部的河涌同样是需要考虑的重点因素。特别是在城市建成区内,沿河涌布置道路线位的优势在于征拆相对容易。但是以地面道路形式会大面积覆盖河涌,这样对于河涌的维护是不利的。沿河涌走向布置的道路以桥梁的形式进行,但目前依旧是往返车道位于同一平面道路上的桥梁形式,依旧是会大面积覆盖河涌,难以满足明渠的要求。这种竖直分层的立交结构同样可以很好的解决上述问题,并下层桥梁不需要满足行车的净空要求,只需要满足河涌治理的高度要求。In the construction or renovation of urban roads, the river flow in the city is also a key factor to be considered. Especially in urban built-up areas, the advantage of arranging road alignment along the river is that it is relatively easy to expropriate and demolish. However, the ground road will cover a large area of the river, which is unfavorable for the maintenance of the river. The roads arranged along the river flow are in the form of bridges, but at present it is still in the form of bridges where the round-trip lanes are located on the same plane road, which still covers a large area of the river flow, which is difficult to meet the requirements of open channels. This vertical layered interchange structure can also solve the above problems very well, and the lower bridge does not need to meet the clearance requirements for traffic, but only needs to meet the height requirements for river flow management.
当然,本设计创造并不局限于上述实施方式,上述各实施例不同特征的组合,也可以达到良好的效果。熟悉本领域的技术人员在不违背本实用新型精神的前提下还可作出等同变形或替换,这些等同的变型或替换均包含在本申请权利要求所限定的范围内。Of course, the design creation is not limited to the above-mentioned embodiments, and the combination of different features of the above-mentioned embodiments can also achieve good effects. Those skilled in the art can also make equivalent modifications or substitutions without departing from the spirit of the present invention, and these equivalent modifications or substitutions are all included within the scope defined by the claims of the present application.
Claims (9)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201821141356.7U CN209052956U (en) | 2018-07-18 | 2018-07-18 | A kind of overpass structure being layered vertically |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201821141356.7U CN209052956U (en) | 2018-07-18 | 2018-07-18 | A kind of overpass structure being layered vertically |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN209052956U true CN209052956U (en) | 2019-07-02 |
Family
ID=67046670
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201821141356.7U Expired - Fee Related CN209052956U (en) | 2018-07-18 | 2018-07-18 | A kind of overpass structure being layered vertically |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN209052956U (en) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN108755317A (en) * | 2018-07-18 | 2018-11-06 | 广州市市政工程设计研究总院有限公司 | A kind of overpass structure being layered vertically |
| WO2022028300A1 (en) * | 2020-08-03 | 2022-02-10 | 李强 | Urban loop main road interchange |
-
2018
- 2018-07-18 CN CN201821141356.7U patent/CN209052956U/en not_active Expired - Fee Related
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN108755317A (en) * | 2018-07-18 | 2018-11-06 | 广州市市政工程设计研究总院有限公司 | A kind of overpass structure being layered vertically |
| CN108755317B (en) * | 2018-07-18 | 2024-03-19 | 广州市市政工程设计研究总院有限公司 | A vertically layered interchange structure |
| WO2022028300A1 (en) * | 2020-08-03 | 2022-02-10 | 李强 | Urban loop main road interchange |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN100473782C (en) | Non-traffic light non-barrier urban multi-level fast traffic road structure | |
| CN104093907B (en) | A kind of city crossroad structure | |
| WO2008009189A1 (en) | A land saving and energy saving, unblocked ecological urban system with ordered space | |
| WO2005031069A1 (en) | A full interchange urban road system and the traffic method of using it | |
| CN201050023Y (en) | Overhead parking space | |
| CN101210410A (en) | A traffic diversion system at an urban intersection | |
| CN103485250B (en) | A kind of three-dimensional urban road without the need to traffic lights zebra stripes | |
| CN106320116A (en) | Optimization design method of exit ramp of pedestrian-bicycle shared road at the crossings in cities | |
| CN203222713U (en) | Three-dimensional crossed semi-underground overpass | |
| CN105970791A (en) | Land-saving overhead type pedestrian bridge | |
| WO2021036902A1 (en) | Interchange overpass bridge | |
| CN103469707B (en) | A kind of multifunctional city road | |
| CN103334354B (en) | A kind of cross directional barrier-free overpass | |
| CN101050617B (en) | Low span-depth path separate passing through inter change cross junction | |
| CN204509921U (en) | Track, T-shaped road junction is without intersection current traffic system continuously | |
| CN201031505Y (en) | Separation of low-span and high-level aisles to cross the intersection | |
| CN203049395U (en) | Road system for achieving quasi-rail transit | |
| CN204475091U (en) | A kind of cross directional barrier-free overpass | |
| CN202072999U (en) | Integral type steel structure flyover | |
| CN202164518U (en) | Cross directional barrier-free overpass | |
| CN108755317B (en) | A vertically layered interchange structure | |
| CN202755280U (en) | Elevated rapid bus lane system built with society lanes | |
| CN1834352B (en) | An urban system that fully separates people and vehicles | |
| CN203451962U (en) | Intersection fast-slow diverging cross road structure | |
| CN210564546U (en) | Highway double-deck shield tunnel section structure |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20190702 |
|
| CF01 | Termination of patent right due to non-payment of annual fee |