CN208797877U - A kind of angle is speeded fixture - Google Patents

A kind of angle is speeded fixture Download PDF

Info

Publication number
CN208797877U
CN208797877U CN201821670849.XU CN201821670849U CN208797877U CN 208797877 U CN208797877 U CN 208797877U CN 201821670849 U CN201821670849 U CN 201821670849U CN 208797877 U CN208797877 U CN 208797877U
Authority
CN
China
Prior art keywords
clamping plate
plate
fixture
clamping
sides
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201821670849.XU
Other languages
Chinese (zh)
Inventor
陈奇明
李勇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xiamen Tongshengda Industry And Trade Co Ltd
Original Assignee
Xiamen Tongshengda Industry And Trade Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xiamen Tongshengda Industry And Trade Co Ltd filed Critical Xiamen Tongshengda Industry And Trade Co Ltd
Priority to CN201821670849.XU priority Critical patent/CN208797877U/en
Application granted granted Critical
Publication of CN208797877U publication Critical patent/CN208797877U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B10/00Integration of renewable energy sources in buildings
    • Y02B10/10Photovoltaic [PV]
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/50Photovoltaic [PV] energy

Landscapes

  • Roof Covering Using Slabs Or Stiff Sheets (AREA)

Abstract

It speeds fixture the utility model discloses a kind of angle, it is related to a kind of color steel roof board clamp, its drip irrigation device includes the main pressing plate that top is connect with photovoltaic module, it is symmetricly set on the first clamping plate and second clamping plate and for by the first clamping plate of the main pressing plate lower part two sides, the bolt assembly that second clamping plate and the main pressing plate are fixed, the lower end surface of the main pressing plate has extended downwardly connecting plate, the top of the first clamping plate and second clamping plate fits in the outer wall two sides of the connecting plate respectively, the outer wall two sides of the connecting plate are symmetrically arranged with outwardly extending positioning protrusion, the locating slot mutually chimeric with the positioning protrusion is provided in the first clamping plate and second clamping plate, the clamping part of one clamping color steel tile roof wave crest is formed at the lower part of the first clamping plate and second clamping plate, the utility model, which has, facilitates operator's installs fixture, Improve the effect of construction efficiency.

Description

A kind of angle is speeded fixture
Technical field
The utility model relates to a kind of color steel roof board clamps, and more specifically it is related to a kind of angle and speeds fixture.
Background technique
Photovoltaic module is the core in solar power system, and effect is that the radiation energy of the sun is converted to electricity Energy.In practical applications, photovoltaic module is fixed on roof made of color steel tile, and wherein color steel tile is speeded the making of type watt with angle again With the most extensively, in order to realize that angle is speeded being reliably connected of type color steel tile roof and photovoltaic module, angle speed type color steel tile roof with The angle for both connecting is typically provided between photovoltaic module to speed fixture.
Currently, the Chinese patent that notification number is CN203514654U discloses a kind of roof panel fixture, including what is be oppositely arranged First side plate and the second side plate, the lower section of both side plate are equipped with bottom and support lower margin, and outer-hexagonal bolt passes through first through hole and second Through-hole clamps the stupefied portion of roof boarding, and two lateral convex ribs are equipped with above the outer wall of second side plate, so that convex ribs slot is constituted, it should The longitudinal width of convex ribs slot and the bolt head of outer-hexagonal bolt match.
It is similar to a kind of above-mentioned roof panel fixture in the prior art, passes through protrusion between the first side plate and the second side plate With being mutually twisted for stopper protrusion, preliminary connection is realized.But protrusion is contacted between stopper protrusion for line, is tightening bolt During, in fact it could happen that protrusion is detached from the case where stopper protrusion, causes operation more inconvenient, seriously affects construction efficiency, because And the space that could be improved.
Utility model content
In view of the deficienciess of the prior art, speeding fixture the purpose of this utility model is to provide a kind of angle, advantage exists In facilitating operator's installs fixture, construction efficiency is improved.
To achieve the above object, the utility model provides following technical solution: a kind of angle is speeded fixture, including top and light Lie prostrate main pressing plate, the first clamping plate for being symmetricly set on the main pressing plate lower part two sides and the second clamping plate of component connection and for inciting somebody to action The bolt assembly that the first clamping plate, second clamping plate and the main pressing plate are fixed, the lower end surface of the main pressing plate has extended downwardly The top of connecting plate, the first clamping plate and second clamping plate fits in the outer wall two sides of the connecting plate, the connecting plate respectively Outer wall two sides be symmetrically arranged with outwardly extending positioning protrusion, be provided in the first clamping plate and second clamping plate with it is described fixed The folder of one clamping color steel tile roof wave crest is formed at the lower part of the locating slot that position protrusion is mutually fitted into, the first clamping plate and second clamping plate Hold portion.
By using above-mentioned technical proposal, in installs fixture, first the top of first clamping plate and second clamping plate is fitted in The outer wall two sides of connecting plate, and make to realize the preliminary connection of first clamping plate and second clamping plate, so in positioning protrusion insertion locating slot The clamping section that the lower part of first clamping plate and second clamping plate is formed is clamped in the wave crest two sides on color steel tile roof afterwards, finally by spiral shell Bolt assembly fixes first clamping plate, second clamping plate and connecting plate, and the installation of fixture can be realized.
To sum up, the mounting means between original first clamping plate and second clamping plate is converted to first clamping plate and company by above structure Mounting means between fishplate bar, second clamping plate and connecting plate, and contacted relative to line between original first clamping plate and second clamping plate Mounting means, by the way that first clamping plate and second clamping plate to be fitted in the outer wall two sides of connecting plate, and keep positioning protrusion insertion fixed In the slot of position, it can be ensured that the stability of first clamping plate and second clamping plate when installing bolt assembly facilitates operator's installation folder Tool improves construction efficiency.
The utility model is further arranged to: it is symmetrically arranged that the both sides of the edge of the connecting plate length direction form two column The both sides of the edge of first broached-tooth design, the first clamping plate and second clamping plate form the be mutually engaged with first broached-tooth design Two broached-tooth designs.
By using above-mentioned technical proposal, under the mating reaction of the first broached-tooth design and the second broached-tooth design, Neng Goujin One step avoids generating the offset on vertical direction between first clamping plate and connecting plate or second clamping plate and connecting plate, improves the first folder Stability when plate and fixed second clamping plate.
The utility model is further arranged to: the tooth socket of first broached-tooth design and the second broached-tooth design is arc Slot.
By using above-mentioned technical proposal, arc groove design can reduce the first broached-tooth design and the second broached-tooth design phase The abrasion mutually generated when occlusion, and then extend the service life of first clamping plate and second clamping plate.
The utility model is further arranged to: the middle position of the main pressing plate is arranged at intervals with several first mounting holes.
By using above-mentioned technical proposal, the setting of the first mounting hole can be convenient for the connection of main pressing plate and photovoltaic module, And the first mounting hole is arranged in the middle position of main pressing plate, the stress of main pressing plate two sides can be made to keep balance, extend main pressure The service life of plate.
The utility model is further arranged to: if being symmetrically arranged on the main pressing plate in the two sides of first mounting hole Dry second mounting hole.
It may cause photovoltaic module due to the error of photovoltaic module itself size by using above-mentioned technical proposal and pacifying Deviate the middle position of main pressing plate when dress, thus can realize the installation of main pressing plate and photovoltaic module by the second mounting hole, To adapt to different operating conditions.
The utility model is further arranged to: the main pressing plate lower end surface is provided with loss of weight in the two sides of the connecting plate Slot.
By using above-mentioned technical proposal, the design of weight loss groove can reduce the dosage of material, save production cost.
The utility model is further arranged to: the lower edge of the first clamping plate and second clamping plate be provided with extend outwardly and It is parallel to the support edge of color steel roofing.
By using above-mentioned technical proposal, the design on edge is supported, increases the contact area of the fixture and color steel roofing, The fixture is dispersed to the pressure of color steel roofing, has avoided color steel roofing and wear.
The utility model is further arranged to: the lower end surface on the support edge is provided with wavy shaped configuration.
By using above-mentioned technical proposal, the design of wavy shaped configuration increases first clamping plate and second clamping plate to color steel The frictional resistance of tile roofing, so that the wind loading rating of the fixture enhances.
In conclusion the utility model has the advantage that
1, by the way that first clamping plate and second clamping plate to be fitted in the outer wall two sides of connecting plate, and make positioning protrusion insertion positioning In slot, first clamping plate and second clamping plate can be made more stable in the installation process of bolt assembly, operator is facilitated to install Fixture improves construction efficiency;
2, by the cooperation of the first broached-tooth design and the second broached-tooth design, first clamping plate and connecting plate can be further avoided Or the offset between second clamping plate and connecting plate on generation vertical direction, improve stabilization when first clamping plate and fixed second clamping plate Property;
3, by supporting the design on edge, the contact area of the fixture and color steel roofing is increased, the fixture pair has been dispersed The pressure of color steel roofing avoids color steel roofing and wears.
Detailed description of the invention
Fig. 1 is the assembly structure diagram of the present embodiment;
Fig. 2 is the configuration schematic diagram of the present embodiment.
Description of symbols: 1, main pressing plate;2, first clamping plate;3, second clamping plate;4, bolt assembly;5, clamping part;6, even Fishplate bar;7, connecting hole;8, weight loss groove;9, the first mounting hole;10, the second mounting hole;11, positioning protrusion;12, locating slot;13, One broached-tooth design;14, the second broached-tooth design;15, arc groove;16, edge is supported;17, wavy shaped configuration.
Specific embodiment
The utility model is described in further detail below in conjunction with attached drawing.
A kind of angle is speeded fixture, as shown in Figure 1, include top connect with photovoltaic module main pressing plate 1, be symmetricly set on main pressure The first clamping plate 2 and second clamping plate 3 of 1 lower part two sides of plate and for that first clamping plate 2, second clamping plate 3 and main pressing plate 1 is fixed The clamping part 5 of one clamping color steel tile roof wave crest is formed at the lower part of bolt assembly 4, first clamping plate 2 and second clamping plate 3.
Specifically, as shown in Fig. 2, the lower end surface of main pressing plate 1 has extended downwardly connecting plate 6, first clamping plate 2 and second clamping plate 3 top is fitted in the outer wall two sides of connecting plate 6 respectively.Wherein, coaxial in first clamping plate 2, connecting plate 6 and second clamping plate 3 It is provided with connecting hole, bolt assembly 4 is passed through into connecting hole, can be realized between first clamping plate 2, connecting plate 6 and second clamping plate 3 Connection.In addition, production cost is saved in order to reduce the dosage of material, the lower end surface and position of main pressing plate 1 in the present embodiment The two sides of connecting plate 6 are provided with weight loss groove 8.
As shown in Fig. 2, the middle position of main pressing plate 1 is arranged at intervals with several first mounting holes 9, pass through the first mounting hole 9 The first mounting hole 9 can be arranged in the middle position of main pressing plate 1 convenient for the connection of main pressing plate 1 and photovoltaic module, can made The stress of main 1 two sides of pressing plate keeps balance, to extend the service life of main pressing plate 1.
Further, due to the error of photovoltaic module size itself, it may cause photovoltaic module deviation when installation The middle position of main pressing plate 1, therefore several second peaces are symmetrically arranged on main pressing plate 1 and positioned at the two sides of the first mounting hole 9 Fill hole 10.
As shown in Fig. 2, the outer wall two sides of connecting plate 6 are symmetrically arranged with outwardly extending positioning protrusion 11,2 He of first clamping plate The locating slot 12 mutually chimeric with positioning protrusion 11 is provided in second clamping plate 3, by the cooperation of positioning protrusion 11 and locating slot 12, It can be realized the precise positioning between first clamping plate 2, second clamping plate 3 and connecting plate 6, so that first clamping plate 2 and second clamping plate 3 exist It is more stable in the installation process of bolt assembly 4.
As shown in Fig. 2, the both sides of the edge of 6 length direction of connecting plate form two symmetrically arranged first broached-tooth designs 13 of column, The both sides of the edge of first clamping plate 2 and second clamping plate 3 form the second broached-tooth design 14 being engaged with 13 phase of the first broached-tooth design, pass through The cooperation of first broached-tooth design 13 and the second broached-tooth design 14 can further avoid first clamping plate 2 and connecting plate 6 or the second folder The offset on vertical direction is generated between plate 3 and connecting plate 6, effectively improves stabilization when first clamping plate 2 and fixed second clamping plate 3 Property.
Further, the mill in order to reduce the first broached-tooth design 13 and when the second broached-tooth design 14 is mutually twisted generates It damages, the tooth socket of the first broached-tooth design 13 and the second broached-tooth design 14 is arc groove 15 in the present embodiment.
As shown in Fig. 2, the lower edge of first clamping plate 2 and second clamping plate 3, which extends outwardly, is parallel to the branch of color steel roofing Along 16, support is provided with wavy shaped configuration 17 along 16 lower end surface for support, can increase the fixture and color steel tile along 16 by supporting The contact area of roofing disperses the fixture to the pressure of color steel roofing, color steel roofing is avoided to wear;And pass through wave Shape structure 17 is capable of increasing first clamping plate 2 and second clamping plate 3 to the frictional resistance of color steel roofing, enables the wind resistance of the fixture Power enhancing.
Working principle: in installs fixture, the top of first clamping plate 2 and second clamping plate 3 is first fitted in the outer of connecting plate 6 Wall two sides, and make positioning protrusion 11 be embedded in locating slot 12 in, the first broached-tooth design 13 be engaged with 14 phase of the second broached-tooth design, realization The preliminary connection of first clamping plate 2 and second clamping plate 3, the clamping section for then forming the lower part of first clamping plate 2 and second clamping plate 3 press from both sides Tightly in the wave crest two sides on color steel tile roof, finally by bolt assembly 4 pass through mounting hole 7 by first clamping plate 2, second clamping plate 3 with Connecting plate 6 is fixed, and the installation of fixture can be realized.
To sum up, the mounting means contacted relative to line between original first clamping plate 2 and second clamping plate 3, by being pressed from both sides first Plate 2 and second clamping plate 3 are fitted in the outer wall two sides of connecting plate 6, and are embedded in positioning protrusion 11 in locating slot 12, the first sawtooth knot Structure 13 is engaged with 14 phase of the second broached-tooth design, it can be ensured that first clamping plate 2 and second clamping plate 3 are steady when installing bolt assembly 4 It is qualitative, in order to operator's installs fixture, improve construction efficiency.
The above is only the preferred embodiment of the present invention, is not intended to limit the utility model, all practical at this Within novel design concept, any modification, equivalent replacement, improvement and so on should be included in the protection of the utility model Within the scope of.

Claims (8)

  1. The fixture 1. a kind of angle is speeded, it is characterised in that: the main pressing plate (1) that connect including top with photovoltaic module is symmetricly set on institute State main pressing plate (1) lower part two sides first clamping plate (2) and second clamping plate (3) and for by the first clamping plate (2), second folder The bolt assembly (4) that plate (3) and the main pressing plate (1) are fixed, the lower end surface of the main pressing plate (1) has extended downwardly connecting plate (6), the top of the first clamping plate (2) and second clamping plate (3) fits in the outer wall two sides of the connecting plate (6) respectively, described The outer wall two sides of connecting plate (6) are symmetrically arranged with outwardly extending positioning protrusion (11), the first clamping plate (2) and second clamping plate (3) locating slot (12) mutually chimeric with the positioning protrusion (11), the first clamping plate (2) and second clamping plate (3) are provided on Lower part formed one clamping color steel tile roof wave crest clamping part (5).
  2. The fixture 2. a kind of angle according to claim 1 is speeded, it is characterised in that: the two sides of connecting plate (6) length direction Edge forms two symmetrically arranged first broached-tooth designs (13) of column, the both sides of the edge of the first clamping plate (2) and second clamping plate (3) Form the second broached-tooth design (14) being mutually engaged with first broached-tooth design (13).
  3. The fixture 3. a kind of angle according to claim 2 is speeded, it is characterised in that: first broached-tooth design (13) and the second saw The tooth socket of toothing (14) is arc groove (15).
  4. The fixture 4. a kind of angle according to claim 1 is speeded, it is characterised in that: the middle position interval of the main pressing plate (1) It is provided with several first mounting holes (9).
  5. The fixture 5. a kind of angle according to claim 4 is speeded, it is characterised in that: in first peace on the main pressing plate (1) The two sides of dress hole (9) are symmetrically arranged with several second mounting holes (10).
  6. The fixture 6. a kind of angle according to claim 1 is speeded, it is characterised in that: main pressing plate (1) lower end surface is in the company The two sides of fishplate bar (6) are provided with weight loss groove (8).
  7. The fixture 7. a kind of angle according to claim 1 is speeded, it is characterised in that: the first clamping plate (2) and second clamping plate (3) Lower edge be provided with and extend outwardly and be parallel to the support of color steel roofing along (16).
  8. The fixture 8. a kind of angle according to claim 7 is speeded, it is characterised in that: the support is provided with along the lower end surface of (16) Wavy shaped configuration (17).
CN201821670849.XU 2018-10-15 2018-10-15 A kind of angle is speeded fixture Expired - Fee Related CN208797877U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821670849.XU CN208797877U (en) 2018-10-15 2018-10-15 A kind of angle is speeded fixture

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821670849.XU CN208797877U (en) 2018-10-15 2018-10-15 A kind of angle is speeded fixture

Publications (1)

Publication Number Publication Date
CN208797877U true CN208797877U (en) 2019-04-26

Family

ID=66211963

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821670849.XU Expired - Fee Related CN208797877U (en) 2018-10-15 2018-10-15 A kind of angle is speeded fixture

Country Status (1)

Country Link
CN (1) CN208797877U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111641373A (en) * 2020-07-03 2020-09-08 江西晶科光伏材料有限公司 Briquetting and adopt photovoltaic module's of this briquetting mounting structure
CN112202392A (en) * 2020-10-30 2021-01-08 无锡尚德益家新能源有限公司 A photovoltaic quick installation angle clamp

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111641373A (en) * 2020-07-03 2020-09-08 江西晶科光伏材料有限公司 Briquetting and adopt photovoltaic module's of this briquetting mounting structure
CN112202392A (en) * 2020-10-30 2021-01-08 无锡尚德益家新能源有限公司 A photovoltaic quick installation angle clamp

Similar Documents

Publication Publication Date Title
AU2020101925A4 (en) Mounting bracket for photovoltaic module and photovoltaic system
CN201936895U (en) Installing bracket for solar cell panel
CN208797877U (en) A kind of angle is speeded fixture
CN203872118U (en) Circular clamp
CN217883284U (en) Photovoltaic module mounting structure
CN208539832U (en) A kind of solar photovoltaic bracket
CN212413089U (en) Special fixture assembly for guide-rail-free flexible roof photovoltaic support
CN215978087U (en) Color steel tile for installing photovoltaic module and color steel tile photovoltaic system
CN208955961U (en) A kind of photovoltaic bracket for color steel tile roof
CN217268421U (en) BIPV photovoltaic roofing connected node and photovoltaic building
CN220705258U (en) Reinforcing structure of color steel tile roof
CN202957267U (en) Mounting structure of photovoltaic bracket guide rail
CN212463111U (en) Connecting structure of purline and main shaft
CN214591251U (en) Quick installing support aluminum profile struction of photovoltaic module
CN211481221U (en) Photovoltaic module installation assembly
CN209330005U (en) A kind of guide rail link block for solar energy
CN203504490U (en) Pressing block for solar module assembly with frame
CN207354146U (en) A kind of photovoltaic bracket support beam structure
CN208329413U (en) Photovoltaic bracket and colored steel roof connection structure
CN208955953U (en) Photovoltaic fixture block quick fixation structure
CN217759666U (en) A BIPV photovoltaic roof waterproof structure
CN221575256U (en) Photovoltaic module fixture and photovoltaic system
CN221688552U (en) Support base of photovoltaic module and photovoltaic system
CN216016812U (en) Photovoltaic board coupling mechanism of quick installation
CN222107828U (en) Photovoltaic module fixture and photovoltaic system

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190426

Termination date: 20201015