CN208747528U - A kind of fast hoisting pipe running tool - Google Patents

A kind of fast hoisting pipe running tool Download PDF

Info

Publication number
CN208747528U
CN208747528U CN201821359988.0U CN201821359988U CN208747528U CN 208747528 U CN208747528 U CN 208747528U CN 201821359988 U CN201821359988 U CN 201821359988U CN 208747528 U CN208747528 U CN 208747528U
Authority
CN
China
Prior art keywords
vertical bar
under casing
running tool
pulley
fast hoisting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201821359988.0U
Other languages
Chinese (zh)
Inventor
国立庆
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jinan Erjian Group Engineering Co Ltd
Original Assignee
Jinan Erjian Group Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jinan Erjian Group Engineering Co Ltd filed Critical Jinan Erjian Group Engineering Co Ltd
Priority to CN201821359988.0U priority Critical patent/CN208747528U/en
Application granted granted Critical
Publication of CN208747528U publication Critical patent/CN208747528U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

A kind of fast hoisting pipe running tool, it is related to building machinery field, including under casing, it is equipped with multiple universal wheels on the downside of the under casing, is equipped on the upside of the under casing and puts pipe door, the under casing is equipped with bracket component, the bracket component includes the first vertical bar and the second vertical bar of vertical direction setting, it is equipped with foreboard and oblique rod in the first vertical bar, the second vertical bar upper end, one group of winding elevating mechanism is equipped on the first vertical bar and the second vertical bar, is lifted with steel pipe between two groups of winding elevating mechanisms.The problem of the utility model can solve lifting pipeline high labor cost existing in the prior art, large labor intensity, low efficiency.Pipeline is lifted by two motors, reduces the labor intensity of worker, increases working efficiency, the position of pipeline is adjusted by the universal wheel and motor of lifting device, it is simple and reliable.

Description

A kind of fast hoisting pipe running tool
Technical field
The utility model relates to building machinery field, specifically a kind of fast hoisting pipe running tool.
Background technique
In construction projects, pipeline many places are at the top of floor, and especially in basement and garage, floor layer is tall and big, pipeline More and quality is big.Due to the particularity of construction, it is difficult to be lifted, be mostly used artificial using tools such as ground vehicle vehicle, overhead traveling cranes Cooperation scaffold is lifted, large labor intensity, low efficiency.
Utility model content
Aiming at the problems existing in the prior art, the utility model provides a kind of fast hoisting pipe running tool, can be to avoid The generation of the above problem.
The technical solution adopted by the utility model to solve its technical problems is that:
A kind of fast hoisting pipe running tool, including under casing, the under casing downside are equipped with multiple universal wheels, the under casing upside Equipped with putting pipe door, the under casing is equipped with bracket component, and the bracket component includes the first vertical bar and the of vertical direction setting Two vertical bars are equipped with foreboard and oblique rod in the first vertical bar, the second vertical bar upper end, are all provided on the first vertical bar and the second vertical bar There is one group of winding elevating mechanism, is lifted with steel pipe between two groups of winding elevating mechanisms.
Further, the under casing is equipped with rotary electric machine, and the output shaft of the rotary electric machine is connected with rolling wheel, the volume It is wound with wirerope on wheel, first pulley is equipped on the second vertical bar, second pulley, the wirerope-winding are equipped on foreboard It is connected on steel pipe after first pulley, second pulley.
Further, the under casing is equipped with rotary electric machine, and the output shaft of the rotary electric machine is connected with rolling wheel, the volume It is wound with wirerope on wheel, first pulley is equipped on the first vertical bar, second pulley, the wirerope-winding are equipped on foreboard It is connected on steel pipe after first pulley, second pulley.
Wherein, rotary electric machine, rolling wheel, wirerope, first pulley, second pulley are two sets, are separately mounted to the first vertical bar On the second vertical bar.
Further, it is equipped with front tray on front side of the under casing, outlet spout is equipped under casing.
Further, it is equipped with first axle on the upside of the outlet spout, is rotatably connected to oscillating deck, oscillating deck in the first axle It is connected with reel by a bracing wire, the reel is mounted on fixed frame, and the fixed frame is mounted under casing.
Further, first vertical bar is connected with bearing diagonal, and the bearing diagonal is connected on rear side of under casing, the first vertical bar, Bearing diagonal, under casing form a triangle firm organization.
Further, to be additionally provided with one between first vertical bar and bearing diagonal horizontally-supported.
Further, the second vertical bar is connected with bearing diagonal, and the bearing diagonal is connected on rear side of under casing, the second vertical bar, tiltedly branch Support, under casing form a triangle firm organization.
Further, to be additionally provided with one between second vertical bar and bearing diagonal horizontally-supported.
Further, the second axis is installed on the oblique rod, is hinged with slide plate on second axis, it is hinged on foreboard There is an air-leg, the telescopic rod of the air-leg is hinged on slide plate, and driving motor, the driving electricity are equipped on oblique rod Machine is connected with cam.
The beneficial effects of the utility model are:
The utility model can solve lifting pipeline high labor cost existing in the prior art, large labor intensity, low efficiency The problem of.Pipeline is lifted by two motors, reduces the labor intensity of worker, increases working efficiency, passes through lifting device Universal wheel and motor adjust the position of pipeline, simple and reliable.
Detailed description of the invention
Fig. 1 is the three dimensional structure diagram of the utility model;
Fig. 2 is the cross-sectional view of the utility model;
Fig. 3 is the partial enlarged view in Fig. 1 at A;
Fig. 4 is the partial enlarged view in Fig. 2 at B;
Fig. 5 is the structural schematic diagram that the utility model is added with slide assemblies;
Fig. 6 is the partial enlarged view in Fig. 5 at C.
In figure: 100 steel pipes, 11 under casings, 12 front tray, 13 put pipe door, 14 universal wheels,
21 first vertical bars, 22 second vertical bars, 23 bearing diagonals, 24 is horizontally-supported, 25 foreboards, 26 oblique rods,
31 rotary electric machines, 32 rolling wheels, 33 wirerope, 34 first pulleys, 35 second pulleys,
41 first axles, 42 oscillating decks, 43 bracing wires, 44 fixed frames, 45 reels,
51 second axis, 52 slide plates, 53 air-legs, 54 driving motors, 55 cams.
Specific embodiment
As shown in Figures 1 to 6, a kind of fast hoisting pipe running tool, including under casing 11, the under casing are hollow body, It can be placed with steel pipe under casing, used as counterweight.
Multiple universal wheels 14 are equipped on the downside of the under casing.Universal wheel is the prior art, and universal wheel is exactly so-called movable leg The structure of wheel, its structure tolerable injury level 360 degree rotation, such as trolley is two, front fast pulley, and back is helped close to promotion Hand is two movable universal wheels.
It is equipped on the upside of the under casing and puts pipe door 13, can be used for placing steel tubes 100.
The optimization design of scheme is equipped with front tray 12 as shown in Figures 2 and 4 on front side of the under casing, be equipped under casing The design of nozzle 15, the outlet spout may make front tray to be connected under casing, and steel pipe is facilitated to enter under casing by outlet spout Front tray.
It is equipped with first axle 41 on the upside of outlet spout, oscillating deck 42 is rotatably connected in the first axle, oscillating deck passes through one Bracing wire 43 is connected with reel 45, and the reel is mounted on fixed frame 44, and the fixed frame is mounted under casing.Pass through pendulum Under casing is divided into two sides up and down, the angle on upper layer is adjusted by bracing wire by the design of movable plate.If necessary to upper layer lifting steel pipes, Only reel is needed to rotate, so that oscillating deck is diagonally downward, then upper layer steel pipe is fallen into lower layer, and nozzle enters forestock from Disk.
The under casing is equipped with bracket component 2.Winding elevating mechanism is provided on the bracket component.
The bracket component includes the first vertical bar 21 and the second vertical bar 22 of vertical direction setting, first vertical bar and the Two vertical bars are on front side of under casing.
In order to enhance the stability of entire bracket, first vertical bar is connected with bearing diagonal 23, and the bearing diagonal is connected to On rear side of under casing.First vertical bar, bearing diagonal, under casing form a triangle firm organization.
Scheme optimization design, is additionally provided with one horizontally-supported 24 between first vertical bar and bearing diagonal.
Similarly, the second vertical bar is also designed in this way.Second vertical bar is connected with bearing diagonal 23, after the bearing diagonal is connected under casing Side.Second vertical bar, bearing diagonal, under casing form a triangle firm organization.
Scheme optimization design, is additionally provided with one horizontally-supported 24 between second vertical bar and bearing diagonal.
Foreboard 25 and oblique rod 26 are equipped in the first vertical bar, the second vertical bar upper end.The foreboard, oblique rod, first Vertical bar forms a three-legged structure.Similarly, the foreboard, oblique rod, the second vertical bar form a three-legged structure.
One group of winding elevating mechanism is equipped on the first vertical bar and the second vertical bar.It is lifted between two groups of winding elevating mechanisms There is steel pipe 100.
Now analyzed by taking the second vertical bar as an example.
The under casing is equipped with rotary electric machine 31, and the output shaft of the rotary electric machine is connected with rolling wheel 32, on the rolling wheel It is wound with wirerope 33.
It is equipped with first pulley 34 on the second vertical bar, second pulley 35, the wirerope-winding first are equipped on foreboard It is connected to after pulley, second pulley on steel pipe 100.
The lifting that steel pipe can be driven by the rotation of rotary electric machine in this way, the shifting of whole device can be realized using universal wheel It is dynamic.Utilize the design of under casing, it is ensured that certain counterweight avoids overthrow accident.
Scheme optimization design, as shown in Figure 6.Second axis 51 is installed on oblique rod 26, is hinged on second axis Slide plate 52, is hinged with an air-leg 53 on foreboard, and the telescopic rod of the air-leg is hinged on slide plate.It is installed on oblique rod There is driving motor 54, the driving motor is connected with cam 55.
Driving motor band moving cam rotates, and may make slide plate to deflect, angular deflection makes air-leg to certain angle Movement, slide plate is released, so that slide plate is overlapped on scaffold, steel pipe can be moved on scaffold along slide plate slides, be avoided Occur dangerous.
Wherein, air-leg is the prior art, the working principle of air-leg: fills high pressure gas, moving piston in iron pipe On have through-hole, if Pneumatic power support lever advocate iron pipe and external atmosphere pressure acts on pressure difference in cross section of the piston rod, gas Support rod is moved using high-pressure inert gas as power, support force is stable in entire impulse stroke, and has buffer gear, is kept away Exempt to impact in place, such as what is applied on air pressure high case bed is exactly air-leg.
Except for the technical features described in the specification, it all is technically known to those skilled in the art.

Claims (8)

1. a kind of fast hoisting pipe running tool, including under casing, the under casing downside is equipped with multiple universal wheels, sets on the upside of the under casing Put pipe door, which is characterized in that the under casing is equipped with bracket component, and the bracket component includes the first of vertical direction setting Vertical bar and the second vertical bar are equipped with foreboard and oblique rod in the first vertical bar, the second vertical bar upper end, perpendicular in the first vertical bar and second It is equipped with one group of winding elevating mechanism on bar, is lifted with steel pipe between two groups of winding elevating mechanisms.
2. fast hoisting pipe running tool according to claim 1, which is characterized in that the under casing is equipped with rotary electric machine, The output shaft of the rotary electric machine is connected with rolling wheel, is wound with wirerope on the rolling wheel, and it is sliding that first is equipped on the second vertical bar Wheel is equipped with second pulley on foreboard, is connected on steel pipe after the wirerope-winding first pulley, second pulley.
3. fast hoisting pipe running tool according to claim 1, which is characterized in that the under casing is equipped with rotary electric machine, The output shaft of the rotary electric machine is connected with rolling wheel, is wound with wirerope on the rolling wheel, and it is sliding that first is equipped on the first vertical bar Wheel is equipped with second pulley on foreboard, is connected on steel pipe after the wirerope-winding first pulley, second pulley.
4. fast hoisting pipe running tool according to claim 1, which is characterized in that front tray is equipped on front side of the under casing, Outlet spout is equipped under casing.
5. fast hoisting pipe running tool according to claim 4, which is characterized in that be equipped with first on the upside of the outlet spout Axis is rotatably connected to oscillating deck in the first axle, and oscillating deck is connected with reel by a bracing wire, and the reel is mounted on On fixed frame, the fixed frame is mounted under casing.
6. fast hoisting pipe running tool according to claim 1, which is characterized in that first vertical bar is connected with oblique branch Support, the bearing diagonal are connected on rear side of under casing, and the first vertical bar, bearing diagonal, under casing form a triangle firm organization.
7. fast hoisting pipe running tool according to claim 6, which is characterized in that between first vertical bar and bearing diagonal It is horizontally-supported to be additionally provided with one.
8. fast hoisting pipe running tool according to claim 1, which is characterized in that be equipped with second on the oblique rod Axis is hinged with slide plate on second axis, an air-leg is hinged on foreboard, the telescopic rod of the air-leg is hinged on slide plate On, driving motor is installed on oblique rod, the driving motor is connected with cam.
CN201821359988.0U 2018-08-22 2018-08-22 A kind of fast hoisting pipe running tool Expired - Fee Related CN208747528U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821359988.0U CN208747528U (en) 2018-08-22 2018-08-22 A kind of fast hoisting pipe running tool

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821359988.0U CN208747528U (en) 2018-08-22 2018-08-22 A kind of fast hoisting pipe running tool

Publications (1)

Publication Number Publication Date
CN208747528U true CN208747528U (en) 2019-04-16

Family

ID=66080920

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821359988.0U Expired - Fee Related CN208747528U (en) 2018-08-22 2018-08-22 A kind of fast hoisting pipe running tool

Country Status (1)

Country Link
CN (1) CN208747528U (en)

Similar Documents

Publication Publication Date Title
CN106946161A (en) It is a kind of flexibly to stablize the crane that safety carries auto parts and components
CN204265290U (en) Rail type material hanging apparatus
CN206014349U (en) A kind of rollover stand
CN109083486B (en) Multisection cement pole automatic assembly installation device
CN208747528U (en) A kind of fast hoisting pipe running tool
CN109335159A (en) A kind of vertical ring wrapping machine
CN213011692U (en) Stable telescopic cantilever crane
CN203214074U (en) Material hoisting device for tunnel borer
CN107386138B (en) Totally-enclosed sound insulation screen construction vehicle and totally-enclosed sound insulation screen installation method
CN109850028B (en) Wind power tower maintenance robot
CN113910421B (en) Mold closing system
CN215858940U (en) Novel detachable combined type steel structure aerial work moving operation platform
CN207418183U (en) A kind of rolling bed elevator
CN209721390U (en) A kind of cut deal rollgang transmission system more changing device
CN210176031U (en) Ceramic tile stacker
CN209259612U (en) A kind of feeding device for construction
CN108792940B (en) Lifting device for disassembling and assembling rotary drum equipment
CN112607619A (en) Mechanical lifting type engineering machinery transfer device
CN110757121B (en) Installation line suitable for installation of large glass
CN219211373U (en) Gantry type barrel moving device
CN218879249U (en) Multifunctional height-adjustable portal frame for electric power construction
CN204802486U (en) Rotation type storage lifting machine
CN103921917A (en) Manned submersible pressure load block mobile device
CN217023486U (en) Protection device is used in a tower section of thick bamboo transportation
CN214828514U (en) Double-beam portal crane with adjustable cart running direction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190416