CN208668458U - A sponge pavement-underground integrated pipe gallery system - Google Patents

A sponge pavement-underground integrated pipe gallery system Download PDF

Info

Publication number
CN208668458U
CN208668458U CN201821057768.2U CN201821057768U CN208668458U CN 208668458 U CN208668458 U CN 208668458U CN 201821057768 U CN201821057768 U CN 201821057768U CN 208668458 U CN208668458 U CN 208668458U
Authority
CN
China
Prior art keywords
sponge
pipe gallery
road surface
road
pavement
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201821057768.2U
Other languages
Chinese (zh)
Inventor
黄志强
施维
马晨峰
王瑜婷
王晏灵
李庞举
徐庆军
綦得强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenyang University of Technology
Original Assignee
Shenyang University of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenyang University of Technology filed Critical Shenyang University of Technology
Priority to CN201821057768.2U priority Critical patent/CN208668458U/en
Application granted granted Critical
Publication of CN208668458U publication Critical patent/CN208668458U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A30/00Adapting or protecting infrastructure or their operation
    • Y02A30/60Planning or developing urban green infrastructure

Landscapes

  • Road Paving Structures (AREA)
  • Sewage (AREA)

Abstract

A kind of sponge road surface-underground pipe gallery system, the system includes sponge road surface and underground pipe gallery two parts, sponge road surface, underground pipe gallery and tunnel synthesis are integrated using combination, by the way of earth's surface is combined using sponge road surface and rigid pavement, only implement sponge road in pavement side to handle, motor vehicle lane is rigid pavement, and road surface is made to form certain slope, i.e. both pavement and motor vehicle lane intersection is lower than road surface level;Above and below ground resource is effectively combined by this system, on the one hand the reasonable efficient utilization of natural resources is realized substantially, alleviates the problems such as traffic burden and tropical island effect in city, on the other hand, due to the integrated multifunction of system, it is comprehensive relatively strong, greatly save economic cost.

Description

A kind of sponge road surface-underground pipe gallery system
Technical field
The utility model relates to sponge road surface-underground pipe gallery system, be primarily adapted for use in city that there are waterlogging is existing In city construction engineering as the problems such as, surface gathered water problem is severe, rain-flood resources cannot efficiently use and traffic jam.
Background technique
In urban road construction, processing rain proluvial water problems becomes the most important thing.Existing road surface drainage technology is divided into Road surface top drainage and road surface internal drainage.Road surface top drainage includes road surface drainage and median strip draining.Inside road surface Draining refers to exclusion or drainage by being seeped into inside pavement structure under crack, seam or surface layer gap, or by underground water and road The backwater of road two sides invades the moisture inside pavement structure.A kind of rainwater to drop to road surface of specific drainage procedure passes through road surface cross It is discharged to the gradient to the two sides on road, another kind is to block water band in the setting of road shoulder outer ledge, and pavement surface water is collected in and blocks water In the shallow triangle cross-section of river that band is formed with road shoulder paving, the discharge opening and chute that are then arranged across a certain distance by phase It concentrates and excludes outside embankment slope foot.And the problems such as facing the water supply and sewage work pipeline aging of old town, since underground utilities are handed in length and breadth It is wrong, it is difficult to carry out centralized management and simple dismantling merges, inconvenient, construction effect is low.In face of extreme weather both precipitation Weather leads to serious ponding problem since drainability is insufficient, keeps a series of situations such as congestion in road, urban waterlogging frequent Occur.
Currently, the more mature construction method of road surface drainage is to be laid with sponge road surface, i.e. construction sponge city.This construction party Though case can regard the concrete practice of Urban Storm Flood management philosophy as, construction sponge city has chronicity, complexity and larger Fund cost the features such as, in addition, the construction in sponge city be in city prevailing roadway build on the basis of carry out, be To the necessary change that original road surface drainage device carries out, and non-fully it is transformed.Therefore, the urban construction speed in face of constantly accelerating And ever-expanding city area, original supply and drain water system are not enough to solve the practical problem of " row-storage ", and underground utilities It is intricate, it is unfavorable for rebuilding and safeguards, for sponge city, the storage of rain-flood resources, using as the most important thing, but In process of construction, a large amount of fund is needed to support, and the existing obvious output in sponge city for completing transformation is insufficient, and cannot be complete Benign water circulation theory is realized entirely.
Pipe gallery is important infrastructure, and for sponge city, construction underground pipe gallery is extremely must It wants, and encounters many difficulties in work progress, such as not yet carry out Coordination Treatment between the two, supported without enough funds Deng.
Summary of the invention
Purpose of utility model:
The utility model provides a kind of sponge road surface-underground pipe gallery system and construction technology, and the purpose is to solve road Area water and urban waterlogging, rain-flood resources cannot efficiently use and the problem of road traffic congestions.
Technical solution:
A kind of sponge road surface-underground pipe gallery system, it is characterised in that: the system includes that sponge road surface and underground are comprehensive Sponge road surface, underground pipe gallery and tunnel synthesis are integrated by piping lane two parts using combination, because of sponge road high water-permeability and Its high bearing capacity, therefore by the way of earth's surface is combined using sponge road surface and rigid pavement, to reach economy to greatest extent Effect is only implemented sponge road (1) in pavement side and is handled, and motor vehicle lane (2) are rigid pavement, and form road surface centainly Both the gradient, i.e. pavement and motor vehicle lane intersection are slightly below road surface level, collect convenient for ponding and are rationally discharged;
Underground pipe gallery system is divided into two sides totally three parts, side corresponds to sponge road (1) as draining storehouse (3) to arrange Except the ponding that sponge road is stored, this is first part, and the other side is divide into upper part and lower part, and top is allocated as being used for for second part Municipal administration, electric power, communication, the various utility line storehouses (4) of combustion gas, lower part is allocated as being used to be open to traffic for tunnel highway (5), and strictly screens With high-intensitive, corrosion resistant pipeline material, so that space utilization maximizes.
It is also arranged the V-type slope (7) with high-intensitive and corrosion resistance characteristic in piping lane bottom part down, it is V-type slope (7) and total Drainage duct connection;It comes together in total drainage duct convenient for the ponding in the ponding and tunnel drainage ditch in draining storehouse, quickly has The drainage of effect.V-type slope (7) is connected to the gutter (6) of draining storehouse (3) and tunnel highway (5).
Highway (5) two sides in tunnel dispose gutter (6), and come together in always with the ponding in the draining storehouse of the underground pipe gallery other side In drainage duct, and then the devices such as precipitating filtering, reservoir are introduced, supplies water in municipal industry.
A kind of construction technology of sponge road surface-underground pipe gallery system as described above, it is characterised in that: the technique packet Include following steps: (1) road surface part sponge road is constructed;(2) sponge road surface and underground pipe gallery coordinate connection construction;(3) underground is comprehensive Close the distribution of piping lane system pattern;(4) tunnel and tunnel drainage construction;(5) sponge road surface-underground pipe gallery drainage construction.
The construction of road surface part sponge road is that pavement is handled using sponge road, and motor vehicle lane is then conventional rigid road surface, Form of construction work is identical as conventional pav, and intersection has a certain slope, i.e. slightly below motor vehicle lane, and ponding is enable preferably to converge It combines at sponge road, convenient for discharge.Sponge road is sandstone layer under water-permeable pavement, lacunose structure makes road according to its characteristic It permeates the ground under the water energy in face is rapid, is stored in the water storage ditch of lower section because of sponge road higher cost, at local sponge road The reason combining road gradient can also save substantial contribution while solving the problems, such as ponding.
It is drainage duct by being evenly arranged that sponge road surface and underground pipe gallery, which are integrally formed, is coupled with sponge road Water storage ditch (8) is connected to the draining storehouse of tunnel side in turn below face;It is i.e. logical by ponding of the sponge road infiltration in water storage ditch It crosses drainage duct to be introduced into tunnel, and then implements the processing and utilization to ponding.
Underground pipe gallery is comprehensive the most prominent in the entire system, and the pattern of underground pipe gallery is divided into three parts, and side is row For the storage and precipitating of sponge surface gathered water, the other side is divide into upper part and lower part sump again.Wherein top is given as Municipal Draining, electric power,
Tunnel both sides of highway designs gutter, to solve the problems, such as tunnel ponding
Underground pipe gallery drainage construction will drain the public class transportation route such as product combustion gas in storehouse, and lower section is as subterranean tunnel Highway alleviates the crowded status of traffic above-ground for being open to traffic.The underground pipe gallery of one entirety is divided into different three of functionality again A small entirety realizes space utilization maximization and fund using rationalization as far as possible.Water and tunnel ponding are aggregated into always In discharge pipe line, the total drainage system of sponge road surface-underground pipe gallery synthesis is located on the downside of piping lane, and placement has high-intensitive corrosion resistant The V-type slope of corrosion material effectively collects water resource, subsequent to be introduced into reservoir by processing such as precipitating filterings, for supplying To municipal industry, rain proluvial water resource secondary use is completed.
Advantageous effect:
A kind of sponge road surface-underground pipe gallery system and construction technology, this system effectively tie above and below ground resource Altogether, the reasonable efficient traffic burden and tropical island effect for utilizing, alleviating city of natural resources is on the one hand realized substantially The problems such as, it is on the other hand, comprehensive relatively strong due to the integrated multifunction of system, greatly save economic cost.
Detailed description of the invention
Fig. 1 is sponge road surface-underground pipe gallery integrated system effect picture;
Fig. 2 is underground pipe gallery integrated system effect picture;
Fig. 3 is sponge road surface effect picture;
Fig. 4 is sponge road surface-underground pipe gallery integrated system effect picture.
Specific embodiment:
A kind of sponge road surface-underground pipe gallery system, the system include sponge road surface and underground pipe gallery two parts, Sponge road surface, underground pipe gallery and tunnel synthesis are integrated using combination, because of sponge road high water-permeability and its high-mechanic energy Power, therefore by the way of earth's surface is combined using sponge road surface and rigid pavement, to reach economy effect to greatest extent, only in people Sponge road (1) processing is implemented in trade side, and motor vehicle lane (2) are rigid pavement, and road surface is made to form certain slope, i.e. people's row Both road and motor vehicle lane intersection are slightly below road surface level, collect convenient for ponding and are rationally discharged;
Underground pipe gallery system is divided into two sides totally three parts, side corresponds to sponge road (1) as draining storehouse (3) to arrange Except the ponding that sponge road is stored, this is first part, and the other side is divide into upper part and lower part, and top is allocated as being used for for second part Municipal administration, electric power, communication, the various utility line storehouses (4) of combustion gas, lower part is allocated as being used to be open to traffic for tunnel highway (5), and strictly screens With high-intensitive, corrosion resistant pipeline material, so that space utilization maximizes.
It is also arranged the V-type slope (7) with high-intensitive and corrosion resistance characteristic in piping lane bottom part down, it is V-type slope (7) and total Drainage duct connection;It comes together in total drainage duct convenient for the ponding in the ponding and tunnel drainage ditch in draining storehouse, quickly has The drainage of effect.V-type slope (7) is connected to the gutter (6) of draining storehouse (3) and tunnel highway (5).
Highway (5) two sides in tunnel dispose gutter (6), and come together in always with the ponding in the draining storehouse of the underground pipe gallery other side In drainage duct, and then the devices such as precipitating filtering, reservoir are introduced, supplies water in municipal industry.
A kind of construction technology of sponge road surface-underground pipe gallery system as described above, the technique the following steps are included: (1) road surface part sponge road is constructed;(2) sponge road surface and underground pipe gallery coordinate connection construction;(3) underground pipe gallery system lattice Score of the game cloth;(4) tunnel and tunnel drainage construction;(5) sponge road surface-underground pipe gallery drainage construction.
The construction of road surface part sponge road is that pavement is handled using sponge road, and motor vehicle lane is then conventional rigid road surface, Form of construction work is identical as conventional pav, and intersection has a certain slope, i.e. slightly below motor vehicle lane, and ponding is enable preferably to converge It combines at sponge road, convenient for discharge.Sponge road is sandstone layer under water-permeable pavement, lacunose structure makes road according to its characteristic It permeates the ground under the water energy in face is rapid, is stored in the water storage ditch of lower section because of sponge road higher cost, at local sponge road The reason combining road gradient can also save substantial contribution while solving the problems, such as ponding.
It is drainage duct by being evenly arranged that sponge road surface and underground pipe gallery, which are integrally formed, is coupled with sponge road Water storage ditch (8) is connected to the draining storehouse of tunnel side in turn below face;It is i.e. logical by ponding of the sponge road infiltration in water storage ditch It crosses drainage duct to be introduced into tunnel, and then implements the processing and utilization to ponding.
Underground pipe gallery is comprehensive the most prominent in the entire system, and the pattern of underground pipe gallery is divided into three parts, and side is row For the storage and precipitating of sponge surface gathered water, the other side is divide into upper part and lower part sump again.Wherein top is given as Municipal Draining, electric power, tunnel both sides of highway design gutter, to solve the problems, such as tunnel ponding.
Underground pipe gallery drainage construction will drain the public class transportation route such as product combustion gas in storehouse, and lower section is as subterranean tunnel Highway alleviates the crowded status of traffic above-ground for being open to traffic.The underground pipe gallery of one entirety is divided into different three of functionality again A small entirety realizes space utilization maximization and fund using rationalization as far as possible.Water and tunnel ponding are aggregated into always In discharge pipe line, the total drainage system of sponge road surface-underground pipe gallery synthesis is located on the downside of piping lane, and placement has high-intensitive corrosion resistant The V-type slope of corrosion material effectively collects water resource, subsequent to be introduced into reservoir by processing such as precipitating filterings, for supplying To municipal industry, rain proluvial water resource secondary use is completed.
In conclusion sponge road surface-underground pipe gallery integrated system is by sponge road surface, underground pipe gallery and three, tunnel engineering knot It is combined into an entirety, when rain flood comes temporarily, ponding is through spy under sponge road surface by coming together in sponge road with acclive road The sandstone layer very handled, using its water penetration, lacunose structure, ponding rapidly permeates into underground, is cached in the water storage ditch of lower section In, then introduced in draining storehouse and precipitated by the drainage pipeline of connection water storage ditch and piping lane, through the existing purification such as filtering, rainwater treatment It is stored in reservoir after device, is taken to industries such as municipal administrations, ground is drained by pumping plant, implement the moisturizings such as green area irrigation and supply It gives.The combination of sponge road surface and underground pipe gallery makes entire drainage system have integrality, and integrated function is strong, reduces engineering Cost.
After surface gathered water flows into the draining storehouse in piping lane, as the total drainage system of piping lane continues to be discharged.Except draining storehouse side Outside, the other side in entire underground pipe gallery space includes Common Ducts and tunnel highway again.Municipal plumbing, electric power, combustion gas Equal transportation routes concentrate on the top of piping lane, and lower section, for being open to traffic, mitigates traffic above-ground burden, realize sky as tunnel highway Between using maximize, it is practical.
When there is ponding in tunnel in piping lane, to reach drainage effect to greatest extent, tunnel road surface takes two sides when constructing It is made certain to descending slope, ponding enters in the gutter of its both sides of the road through road surface slope current.
The water resource in ponding and draining storehouse in gutter is finally compiled in main sewer road, for the ease of collecting, in pipe V-type slope made by high-intensitive and corrosion resistant material is taken below corridor, and water resource is effectively collected and is drained in total draining In conduit, and then each purification device is imported, completes " row-storage-secondary use " benign water circulation.
The utility model after continuing to optimize construction technology, form collection sponge road surface, underground pipe gallery, tunnel highway be one The integrated system of body, efficiently solves the problems, such as " draining-storage-secondary use " of surface gathered water, while also subtracting for road traffic Light burden, it is ensured that space utilization maximizes and economic and practical rationalization.

Claims (3)

1.一种海绵路面-地下综合管廊系统,其特征在于:该系统包括海绵路面和地下综合管廊两部分,采用组合方式将海绵路面、地下管廊及隧道综合为一体,将地表采用海绵路面和刚性路面结合的方式,仅在人行道一侧实施海绵路(1)处理,机动车车道(2)为刚性路面,并使路面形成一定坡度,即人行道与机动车车道二者交界处低于道路水平面;1. a sponge pavement-underground integrated pipe gallery system, is characterized in that: this system comprises two parts of sponge pavement and underground integrated pipe gallery, adopts combined mode to integrate sponge pavement, underground pipe gallery and tunnel into one, and the surface adopts sponge. In the way of combining the road surface and the rigid road surface, the sponge road (1) treatment is only carried out on one side of the sidewalk, and the motor vehicle lane (2) is a rigid road surface, and the road surface forms a certain slope, that is, the junction of the sidewalk and the motor vehicle lane is lower than the road surface. road level; 将地下管廊系统分为两侧共三个部分,一侧对应海绵路(1)作为排水仓(3)用以排除海绵路所存储的积水,此为第一部分,另一侧分为上下两部分,上部分作为第二部分用于市政、电力、通讯、燃气各种公用管线仓(4),下部分作为隧道公路(5)用来通车。The underground pipe gallery system is divided into three parts on both sides. One side corresponds to the sponge road (1) as a drainage bin (3) to remove the accumulated water stored in the sponge road. This is the first part, and the other side is divided into upper and lower parts. Two parts, the upper part is used as the second part for various public pipeline warehouses (4) for municipal, electric power, communication, and gas, and the lower part is used as a tunnel road (5) to open to traffic. 2.根据权利要求1所述的一种海绵路面-地下综合管廊系统,其特征在于:在管廊底部下方还安置具有高强度且耐腐蚀特性的V型斜坡(7),V型斜坡(7)与总排水导管连通; V型斜坡(7)与排水仓(3)及隧道公路(5)的排水沟(6)连通。2. A sponge pavement-underground integrated pipe gallery system according to claim 1, characterized in that: a V-shaped slope (7) with high strength and corrosion resistance is also arranged below the bottom of the pipe gallery, and the V-shaped slope ( 7) Connect with the main drainage conduit; V-shaped slope (7) communicates with the drainage bin (3) and the drainage ditch (6) of the tunnel road (5). 3.根据权利要求1所述的一种海绵路面-地下综合管廊系统,其特征在于:隧道公路(5)两侧安置排水沟(6)。3. The sponge pavement-underground integrated pipe gallery system according to claim 1, characterized in that: drainage ditches (6) are arranged on both sides of the tunnel road (5).
CN201821057768.2U 2018-07-05 2018-07-05 A sponge pavement-underground integrated pipe gallery system Expired - Fee Related CN208668458U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821057768.2U CN208668458U (en) 2018-07-05 2018-07-05 A sponge pavement-underground integrated pipe gallery system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821057768.2U CN208668458U (en) 2018-07-05 2018-07-05 A sponge pavement-underground integrated pipe gallery system

Publications (1)

Publication Number Publication Date
CN208668458U true CN208668458U (en) 2019-03-29

Family

ID=65827403

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821057768.2U Expired - Fee Related CN208668458U (en) 2018-07-05 2018-07-05 A sponge pavement-underground integrated pipe gallery system

Country Status (1)

Country Link
CN (1) CN208668458U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109024673A (en) * 2018-07-05 2018-12-18 沈阳工业大学 A kind of sponge road surface-underground pipe gallery system and construction technology

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109024673A (en) * 2018-07-05 2018-12-18 沈阳工业大学 A kind of sponge road surface-underground pipe gallery system and construction technology
CN109024673B (en) * 2018-07-05 2024-10-29 沈阳工业大学 Sponge pavement-underground comprehensive pipe gallery system and construction process

Similar Documents

Publication Publication Date Title
CN206616423U (en) Concave herbaceous field system based on sponge city
CN209779370U (en) Urban road rainwater is collected and is utilized and discharge system
CN102936911B (en) Podium building rainwater collecting and utilizing system
CN106835890A (en) Concave herbaceous field system and construction method based on sponge city
CN106245487B (en) The construction method of the urban road sponge engineering system of combining road maintenance
CN205134481U (en) Highway superelevation excavation highway section hydrocone type drainage system
CN104234078A (en) Multifunctional tunnel type city rainfall flood comprehensive utilization system
CN106638219A (en) Ramped urban road of sponge city
CN106013400A (en) A sidewalk comprehensive pipe network and storage and drainage system
CN106087648B (en) A kind of special Quick drainage of urban road and irrigation system
CN109024673B (en) Sponge pavement-underground comprehensive pipe gallery system and construction process
CN208668458U (en) A sponge pavement-underground integrated pipe gallery system
CN106245736A (en) A kind of double water source tree pond rainwater utilization system
CN207143648U (en) A kind of ubbase drain system of embedding careless brick surface layer
CN209243482U (en) A kind of town road for receiving water function with face formula
CN217052889U (en) Structure of combined sponge city system for sidewalk and green belt
CN105839771B (en) One kind is dammed type rain perforaled strainer
CN206157878U (en) Biological stagnant water pond system in sponge city
CN211498349U (en) A drainage structures for dividing area in road
CN211312064U (en) A self-adjusting road water guiding structure
CN209723194U (en) highway drainage system
CN208649829U (en) A kind of level land grass planting ditch
CN206616658U (en) Filter closure works system in a kind of Mountainous City
CN201924399U (en) Round surface early-stage rainwater treatment system
CN106868982A (en) Drainage type water-permeable brick

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190329