CN208633258U - A prefabricated diverter well - Google Patents
A prefabricated diverter well Download PDFInfo
- Publication number
- CN208633258U CN208633258U CN201820877980.7U CN201820877980U CN208633258U CN 208633258 U CN208633258 U CN 208633258U CN 201820877980 U CN201820877980 U CN 201820877980U CN 208633258 U CN208633258 U CN 208633258U
- Authority
- CN
- China
- Prior art keywords
- prefabricated
- outlet pipe
- well body
- lifting gate
- well
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Sewage (AREA)
Abstract
The utility model discloses a kind of prefabricated shunting well, including well body, and water inlet pipe, the first outlet pipe and the second outlet pipe are provided in well body;Liquid level sensor, monitoring device, the first sealing lifting gate for being opened and closed the first water pipe and the second sealing lifting gate for being opened and closed the second outlet pipe are provided in well body;Automatic control device is provided with outside well body, liquid level sensor, monitoring device, the first sealing lifting gate and the second sealing lifting gate are connect with automatic control device respectively.The utility model can realize that rainwater shunting is handled, and water storage when raining by the water stored " release " and is used when needing;Prefabricated shunting well can shorten the engineering construction duration, use manpower and material resources sparingly;It promotes urban ecological system function and reduces the generation of Urban Flood Waterlogging;When shunting well is passed into disuse, prefabricated Vatch basin can integrally be dug out and hang away recycling, not generate a large amount of building wastes.
Description
Technical field
The utility model belongs to drainage system technical field, and in particular to a kind of prefabricated shunting well.
Background technique
The recycling of rainwater is conducive to improve the consciousness that people treasure water resource, save water resource, there is huge society
Meeting benefit, existing shunting well are reinforced concrete structure, and for reinforced concrete structure shunting well from construction is designed into, entire engineering is all
Phase is long, at high cost, if you need to remove, essentially building waste, and not recoverable;Therefore, it is necessary to one kind can rationally adjust respectively
Pipeline water level is realized and is precisely shunted, and can shorten the prefabricated shunting well of duration of a project.
Utility model content
Goal of the invention: in view of the deficienciess of the prior art, the purpose of the utility model is to provide a kind of prefabricated shunting wells.
Technical solution: in order to achieve the above-mentioned object of the invention, the technical solution adopted in the utility model is as follows:
A kind of prefabricated shunting well, including well body are provided with water inlet pipe, the first outlet pipe and the second water outlet in the well body
Pipe, the water inlet pipe are connected with municipal storm sewer, and first outlet pipe is connected with natural water, second outlet pipe and
Reservoir is connected;Liquid level sensor, monitoring device, the first sealing lifting lock for being opened and closed the first water pipe are provided in the well body
Second sealing lifting gate of the second outlet pipe of door and opening and closing;Automatic control device, the liquid are provided with outside the well body
Level sensor, monitoring device, the first sealing lifting gate and the second sealing lifting gate are connect with automatic control device respectively.
Preferably, the water inlet pipe, the first outlet pipe and the second outlet pipe are separately positioned on the lower sidewall of well body, institute
It states water inlet pipe and the first outlet pipe to be arranged on the opposite side wall of well body, second outlet pipe goes out perpendicular to water inlet pipe with first
Water pipe setting.
Preferably, the water inlet pipe and the first outlet pipe are concentric.
Preferably, being provided with guardrail in the well body internal upper part.
Preferably, being provided with maintenance channel below the guardrail, and the maintenance channel is located at the first sealing lifting
Above gate and the second sealing lifting gate.
Preferably, the monitoring device is the camera for being mounted on top in well body, there are two the camera installations,
It is located in the opposite two side walls of well body.
Preferably, the automatic control device is single-chip microcontroller or PLC control cabinet, the automatic control device is adopted
Collect and judge the liquid level information of liquid level sensor, the first sealing lifting gate and second is controlled with this and seals opening for lifting gate
It closes.
Preferably, the well body is round or rectangular.
The utility model has the advantages that compared with prior art, the utility model has the advantage that
The utility model can realize that rainwater shunting is handled, and water storage when raining by the water stored " release " and is subject to when needing
It utilizes;The engineering construction duration can be shortened by installing prefabricated shunting well, be used manpower and material resources sparingly;Course of work moderate rain moisture stream process,
Water storage when raining by the water stored " release " and is used when needing;It promotes urban ecological system function and reduces city flood
The generation of damage caused by waterlogging evil;When such as the shunting well is passed into disuse, prefabricated Vatch basin can integrally be dug out and hang away recycling, do not generated big
Measure building waste.
Detailed description of the invention
Fig. 1 is prefabricated shunting well vertical cross-section figure;
Fig. 2 is prefabricated shunting well view in transverse section.
Specific embodiment
Combined with specific embodiments below, the present invention is furture elucidated, and embodiment is under the premise of the technical scheme of the present invention
Implemented, it should be understood that these examples are only for illustrating the present invention and are not intended to limit the scope of the present invention.
As illustrated in fig. 1 and 2, the prefabricated shunting well of the application mainly includes well body 1, guardrail 2, maintenance channel 3, water inlet pipe
4, monitoring device 5, liquid level sensor 6, the first outlet pipe 7, first seal lifting gate 8, the second outlet pipe 9, automation control
Device 10 and the second sealing lifting gate 11.Water inlet pipe 4, the first outlet pipe 7 and the second outlet pipe 9, water inlet are set in well body 1
Pipe 4 is connected with municipal storm sewer, and the first outlet pipe 7 is connected with natural water, and the second outlet pipe 9 is connected with reservoir;In well
Liquid level sensor 6, monitoring device 5, the first sealing lifting gate 8 for being opened and closed the first water pipe 7 and opening and closing second is provided in body 1 to go out
Second sealing lifting gate 11 of water pipe 9;Automatic control device 10, liquid level sensor 6, monitoring dress are provided with outside well body 1
It sets the 5, first sealing lifting gate 8 and the second sealing lifting gate 11 is connect with automatic control device 10 respectively.
Well body 1 is circle or rectangular, and as preferred embodiment, the diagram well body 1 of the present embodiment is circle, circular
The production and processing of well body 1 is convenient, and when installation occupies little space.Water inlet pipe 4, the first outlet pipe 7 and the second outlet pipe 9 are separately positioned on
The lower sidewall of well body 1, water inlet pipe 4 and the first outlet pipe 7 are arranged on the opposite side wall of well body 1, the second outlet pipe 9 perpendicular to
Water inlet pipe 4 and the first outlet pipe 7 are arranged, it is preferred that and water inlet pipe 4 and the first outlet pipe 7 are concentric, when big convenient for rainfall, rainwater
Natural water is quickly discharged by the first outlet pipe 7.
1 internal upper part of well body is provided with guardrail 2.It is provided with maintenance channel 3 below guardrail 2, and maintenance channel 3 is located at the
11 top of one sealing lifting gate 8 and the second sealing lifting gate.Guardrail 2 can bear the total amount for the personnel of applying, and prevent from falling into well,
It is additionally provided with the ladder for leading to shaft bottom on guardrail 2, the weight of service personnel can be born.Access path 3 is convenient for staff couple
It seals lifting gate and water pipe carries out maintenance and inspection.
Monitoring device 5 is the camera for being mounted on top in well body 1, and there are two camera installations, is located at 1 phase of well body
Pair two side walls on.Automatic control device 10 is single-chip microcontroller or PLC control cabinet, and automatic control device 10 acquires and sentences
The liquid level information of disconnected liquid level sensor 6 controls the opening and closing of the first sealing lifting gate 8 and the second sealing lifting gate 11 with this.
The working principle and process of the utility model:
1, when dry season, the second sealing lifting gate 11 can be according to the sensing data of liquid level sensor 6, and it is determined whether to enable release
The water for putting storage pond enters well body 1, and the first sealing lifting gate 8 is opened, and water of regulating and storing enters natural water, it is ensured that urban river
There is water in dry season;
2, when raining, the first sealing lifting gate 8, which is in, rises closed state, after rainwater enters well body 1 by water inlet pipe 4,
Second sealing lifting gate 11 is opened, and rainwater is entered by the second outlet pipe 9 preferentially enters storage pond;When storage pond reaches maximum hold
When amount, the second sealing lifting gate 11 is closed, and the first sealing lifting gate 8 is opened, and rainwater enters Natural Water by the first outlet pipe 7
Body.Above-mentioned action process and data acquisition are completed by monitoring device 5 and automatic control device 10.
The prefabricated shunting well and auxiliary device instrument and automated system of the utility model all complete in factory, apply
Work scene need to only dig the hole of certain depth, be not necessarily to a large amount of reinforcing bars and concreting;Prefabricated shunting well is to construction site by crane
It hangs in hole, and connects drainage pipeline, fixed rear perimeter edge landfill is adjustable, and sealing lifting gate can basis in prefabricated shunting well
Its two sides SEA LEVEL VARIATION and change gatage automatically, with ensure rainwater flow to.
The utility model can realize that rainwater shunting is handled, and water storage when raining by the water stored " release " and is subject to when needing
It utilizes;The engineering construction duration can be shortened by installing prefabricated shunting well, be used manpower and material resources sparingly;Course of work moderate rain moisture stream process,
Water storage when raining by the water stored " release " and is used when needing;It promotes urban ecological system function and reduces city flood
The generation of damage caused by waterlogging evil;When such as the shunting well is passed into disuse, prefabricated Vatch basin can integrally be dug out and hang away recycling, do not generated big
Measure building waste.
The above is only the preferred embodiment of the utility model, it is noted that for the common skill of the art
For art personnel, without departing from the principle of this utility model, several improvements and modifications can also be made, these improve and
Retouching also should be regarded as the protection scope of the utility model.
Claims (8)
1. a kind of prefabricated shunting well, it is characterised in that: including well body, water inlet pipe, the first outlet pipe are provided in the well body
With the second outlet pipe, the water inlet pipe is connected with municipal storm sewer, and first outlet pipe is connected with natural water, and described the
Two outlet pipes are connected with reservoir;Be provided in the well body liquid level sensor, monitoring device, be opened and closed the first water pipe first
It seals lifting gate and is opened and closed the second sealing lifting gate of the second outlet pipe;Automation control dress is provided with outside the well body
Set, the liquid level sensor, monitoring device, first sealing lifting gate and second sealing lifting gate respectively with automation control
Device connection.
2. prefabricated shunting well according to claim 1, it is characterised in that: the water inlet pipe, the first outlet pipe and second go out
Water pipe is separately positioned on the lower sidewall of well body, and the water inlet pipe and the first outlet pipe are arranged on the opposite side wall of well body, institute
The second outlet pipe is stated to be arranged perpendicular to water inlet pipe and the first outlet pipe.
3. prefabricated shunting well according to claim 2, it is characterised in that: the water inlet pipe and the first outlet pipe are concentric.
4. prefabricated shunting well according to claim 1, it is characterised in that: the well body internal upper part is provided with guardrail.
5. prefabricated shunting well according to claim 4, it is characterised in that: it is provided with maintenance channel below the guardrail,
And the maintenance channel is located above the first sealing lifting gate and the second sealing lifting gate.
6. prefabricated shunting well according to claim 1, it is characterised in that: the monitoring device is to be mounted on top in well body
Camera, there are two camera installations, is located in the opposite two side walls of well body.
7. prefabricated shunting well according to claim 1, it is characterised in that: the automatic control device be single-chip microcontroller or
PLC control cabinet, the automatic control device acquire and judge the liquid level information of liquid level sensor, control the first sealing liter with this
The opening and closing of gate and the second sealing lifting gate is dropped.
8. prefabricated shunting well according to claim 1, it is characterised in that: the well body is round or rectangular.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201820877980.7U CN208633258U (en) | 2018-06-07 | 2018-06-07 | A prefabricated diverter well |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201820877980.7U CN208633258U (en) | 2018-06-07 | 2018-06-07 | A prefabricated diverter well |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN208633258U true CN208633258U (en) | 2019-03-22 |
Family
ID=65734546
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201820877980.7U Expired - Fee Related CN208633258U (en) | 2018-06-07 | 2018-06-07 | A prefabricated diverter well |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN208633258U (en) |
-
2018
- 2018-06-07 CN CN201820877980.7U patent/CN208633258U/en not_active Expired - Fee Related
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN207392409U (en) | A kind of Mobyneb Vatch basin system | |
| CN106836438A (en) | Step for municipal Storm Sewer Network blocks water with water system of regulating and storing | |
| CN105464202A (en) | Rainwater discarding well with adjustable closure flap valve | |
| CN104790516B (en) | A kind of rainwater regulating pondage system | |
| CN203173911U (en) | Precipitation device | |
| CN208633259U (en) | A prefabricated interception well | |
| CN206328765U (en) | A kind of water drainage of deep foundation pit structure | |
| CN108625453A (en) | Skyscraper sponge City complex system | |
| CN208633258U (en) | A prefabricated diverter well | |
| CN201284492Y (en) | Simple and practical overhead road rainwater utilization system | |
| CN215290545U (en) | Automatic control type sewage vatch basin | |
| CN207062994U (en) | A kind of Urban Storm Flood joint utilizes system | |
| CN202157297U (en) | Gate control type urban rain and flood regulation, control and utilization system | |
| CN110578367A (en) | Prefabricated vatch basin | |
| CN106988400A (en) | It is a kind of keep off it is damp, anti-blocking, maintenance it is convenient, can sand washing desilting hondo formula closure works system and method | |
| CN111236391A (en) | Intelligent sewage intercepting inspection well | |
| CN106917473B (en) | A kind of rainwater recycle method of photovoltaic greening composite roof | |
| CN206273911U (en) | The clean storage in rain water on roof source based on sponge the idea of the city oozes device | |
| CN206189551U (en) | Enclose eaves formula rainwater regulation collecting system suitable for reform transform old district | |
| CN116335250A (en) | Rainwater and sewage separation device | |
| CN201713858U (en) | Rainwater collecting, processing and lifting device | |
| CN211922820U (en) | Drainage and seepage structure and rainwater collection and utilization system of sponge city | |
| CN203856047U (en) | Automatic unpowered house storm sewage separation device | |
| CN110578366A (en) | Prefabricated split-flow well | |
| CN220978289U (en) | A multifunctional integrated interception well |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20190322 |
|
| CF01 | Termination of patent right due to non-payment of annual fee |