CN208619061U - A kind of novel drilling and workover machines workover platform - Google Patents

A kind of novel drilling and workover machines workover platform Download PDF

Info

Publication number
CN208619061U
CN208619061U CN201821147862.7U CN201821147862U CN208619061U CN 208619061 U CN208619061 U CN 208619061U CN 201821147862 U CN201821147862 U CN 201821147862U CN 208619061 U CN208619061 U CN 208619061U
Authority
CN
China
Prior art keywords
workover
platform
station
hound
derrick
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821147862.7U
Other languages
Chinese (zh)
Inventor
杨兴廷
郇海东
刘朋朋
于兴达
康辉
韩猛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Kerui Machinery Manufacturing Co Ltd
Original Assignee
Shandong Kerui Machinery Manufacturing Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Kerui Machinery Manufacturing Co Ltd filed Critical Shandong Kerui Machinery Manufacturing Co Ltd
Priority to CN201821147862.7U priority Critical patent/CN208619061U/en
Application granted granted Critical
Publication of CN208619061U publication Critical patent/CN208619061U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of novel drilling and workover machines workover platforms, including driller's station, standpipe station and main platform, driller's station and standpipe station are set to the left end above derrick, driller's station is fixed on Y bracket, and supported using hound, hound is connect by pin with derrick, and standpipe station is fixed on another Y bracket, and supported using hound, hound is connect by pin with derrick;The main platform is set to the right end above derrick, and main platform side is connect by otic placode with derrick side, and main platform is supported using hound, and hound is connect by pin with derrick.The utility model is simple in structure, easy to disassemble to greatly improve movement efficiency;Main platform, which strengthens platform intensity using integrated design, ensures stability, and newly-increased conductor rope stake function, and personnel is facilitated to operate with.

Description

A kind of novel drilling and workover machines workover platform
Technical field
The utility model relates to drilling and workover machines to assist corollary equipment field, more particularly, to a kind of novel drilling and workover machines well workover Platform.
Background technique
Workover platform (generally referring to workover treatment) refers to a kind of operation of oil drilling and subsequent well maintenance, in order to Ensure the platform for the care and maintenance measure that oil well can smoothly be used, and be taken.
In existing conventional drilling and workover machines workover platform, pillar construction is mostly used to be supported workover platform, it can not To carry out whole Transporting, removal of home movement is inconvenient and construction efficiency is low, and consuming time is long, labor intensity is high and also cost compared with Greatly;Main platform and the platform that floats mostly use pin otic placode to be attached in workover platform, and intensity is not high, is easy to produce security risk;It leads Rope stake is set to ground more, and personnel need to operate on ground, therefore increases human cost.
In view of the above problems, integrating the drilling and repairing well machine maintenance of conductor rope stake function it is necessary to provide can be simple with whole Transporting, structure Well platform.
Summary of the invention
The purpose of the utility model is to overcome disadvantages of the existing technology, provide a kind of convenient disassembly, and movement is portable, Stable structure integrates the drilling and workover machines workover platform of conductor rope stake function.
To achieve the goals above, the technical solution adopted by the utility model to solve its technical problems is that: it is a kind of novel Drilling and workover machines workover platform, including driller's station, standpipe station and main platform, driller's station and standpipe station It is set to the left end above derrick, driller's station is fixed on Y bracket, and is supported using hound, and hound passes through pin It is connect with derrick, standpipe station is fixed on another Y bracket, and is supported using hound, and hound passes through pin and derrick Connection;The main platform is set to the right end above derrick, and main platform side is connect by otic placode with derrick side, and main platform It is supported using hound, hound is connect by pin with derrick.
As optimization, the workover platform periphery is equipped with guardrail, it is ensured that the safety that operator operates on platform, Operator is effectively avoided the safety problems such as to drop.
As optimization, driller's station and standpipe station are equipped with short ladder, effectively operator are helped to carry out Climbing.
As optimization, the main platform is equipped with the long ladder of two sections suit, drawing and pulling type structure, can according to main podium level, into Row practical adjustments, facilitate operator to climb.
As optimization, the main platform is equipped with conductor rope stake, and operator can carry out rope guiding on main platform, Greatly operator is facilitated to operate.
As optimization, the main platform is welded as a whole with the platform that floats, and is not needing pin otic placode to be attached fixation, whole Body enhances platform structure stability.
Compared with prior art the beneficial effects of the utility model are: workover platform is supported using hound, hound is logical It crosses pin to connect with derrick, convenient disassembly, movement is portable.Main platform and the platform that floats are welded as a whole, enhancing platform structure is stablized Property.Conductor rope stake is installed on main platform, allows operator to carry out rope guiding on main platform, facilitates operation.
Detailed description of the invention
The present invention can be better understood by description below.The overall structure and function of this workover platform pass through to attached The description of figure provides.
Fig. 1 is the main view of workover platform overall effect.
Fig. 2 is the left view of workover platform overall effect.
Fig. 3 is the schematic perspective view of workover platform entirety.
Wherein, 1 pin, 2 hounds, 3 otic placodes, 4 derricks, 5 driller's stations, 6 standpipe stations, 7 guardrails, 8 conductor rope stakes, 9 main platforms, 10 long ladders, 11 short ladders.
Specific embodiment
A kind of novel drilling and workover machines workover platform in embodiment as shown in Figure 1 to Figure 3, a kind of novel drilling and workover machines are repaired Well platform, including driller's station 5, standpipe station 6 and main platform 9, driller's station 5 and standpipe station 6 are arranged Left end above derrick 4, driller's station 5 are fixed on Y bracket, and are supported using hound 2, and hound 2 passes through pin 1 Connect with derrick 4, standpipe station 6 is fixed on another Y bracket, and using hound 2 support, hound 2 by pin 1 with Derrick 4 connects;The main platform 9 is set to the right end of 4 top of derrick, and main 9 side of platform is connected by otic placode 3 and 4 side of derrick It connects, and main platform 9 is supported using hound 2, hound 2 is connect by pin 1 with derrick 4.
The workover platform periphery is equipped with guardrail 7, it is ensured that the safety that operator operates on platform effectively avoids Operator such as drops at the safety problems.
Driller's station 5 and standpipe station 6 be equipped with it is short by terraced 11, effectively help operator climb.
The main platform 9 is equipped with the long ladder 10 of two sections suit, drawing and pulling type structure, can be carried out practical according to main 9 height of platform It adjusts, operator is facilitated to climb.
The main platform 9 is equipped with conductor rope stake 8, and operator can carry out rope guiding on main platform, greatly side Just operator operates.
The main platform 9 is welded as a whole with the platform that floats, and is not needing pin otic placode to be attached fixation, is integrally enhancing Platform structure stability.
When the workover platform is installed for the first time, driller's station 5 and standpipe station 6 are set to 4 top of derrick Left end, driller's station 5 are fixed on Y bracket, and are supported using hound 2, and hound 2 is connect by pin 1 with derrick 4, Standpipe station 6 is fixed on another Y bracket, and is supported using hound 2, and hound 2 is connect by pin 1 with derrick 4;Institute The right end that main platform 9 is set to 4 top of derrick is stated, main 9 side of platform is connect by otic placode 3 with 4 side of derrick, and main platform 9 It is supported using hound 2, hound 2 is connect by pin 1 with derrick 4.Operator is by adjusting main 9 side otic placode 3 of platform With the fixation position of derrick 4, main podium level is adjusted.
When the workover platform needs movement, long ladder 10 need to be only removed, workover platform Integral transporting can be realized.
Above-mentioned specific embodiment is only the specific case of the utility model, and the scope of patent protection of the utility model includes But it is not limited to the product form and style of above-mentioned specific embodiment, any one kind for meeting the utility model claims book is new The appropriate changes or modifications that type drilling and workover machines workover platform and any person of an ordinary skill in the technical field do it, all The scope of patent protection of the utility model should be fallen into.

Claims (5)

1. a kind of novel drilling and workover machines workover platform, it is characterised in that: including driller's station, standpipe station and main platform, Driller's station and standpipe station are set to the left end above derrick, and driller's station is fixed on Y bracket, and is used Hound support, hound are connect by pin with derrick, and standpipe station is fixed on another Y bracket, and use hound Support, hound are connect by pin with derrick;The main platform is set to the right end above derrick, and main platform side passes through ear Plate is connect with derrick side, and main platform is supported using hound, and hound is connect by pin with derrick.
2. a kind of novel drilling and workover machines workover platform according to claim 1, it is characterised in that: the installation of workover platform periphery There is guardrail.
3. a kind of novel drilling and workover machines workover platform according to claim 1, it is characterised in that: driller's station Short ladder is equipped with standpipe station.
4. a kind of novel drilling and workover machines workover platform according to claim 1, it is characterised in that: the main platform is equipped with The long ladder of two sections suit, drawing and pulling type structure.
5. a kind of novel drilling and workover machines workover platform according to claim 1, it is characterised in that: set on the main platform There is conductor rope stake.
CN201821147862.7U 2018-07-19 2018-07-19 A kind of novel drilling and workover machines workover platform Active CN208619061U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821147862.7U CN208619061U (en) 2018-07-19 2018-07-19 A kind of novel drilling and workover machines workover platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821147862.7U CN208619061U (en) 2018-07-19 2018-07-19 A kind of novel drilling and workover machines workover platform

Publications (1)

Publication Number Publication Date
CN208619061U true CN208619061U (en) 2019-03-19

Family

ID=65706309

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821147862.7U Active CN208619061U (en) 2018-07-19 2018-07-19 A kind of novel drilling and workover machines workover platform

Country Status (1)

Country Link
CN (1) CN208619061U (en)

Similar Documents

Publication Publication Date Title
CN203684630U (en) Power maintenance operation platform
CN201118141Y (en) Lift type hot-line work insulated platform
CN208619061U (en) A kind of novel drilling and workover machines workover platform
CN206971720U (en) Hydraulic climbing formwork varied angle is climbed adjusting means
CN209082950U (en) A kind of construction security platform
CN204454349U (en) Chip tower body with access ramp and platform saves
CN104727539B (en) Power equipment maintaining operating platform
CN203669328U (en) Quick-disassembly high-altitude working hanging basket
CN205078171U (en) Steel pipe pole activity cat ladder
CN206737800U (en) A kind of double ladder for building for being easy to regulation
CN205653119U (en) Ladder is used in building site construction convenient to go up and down
CN209398349U (en) A kind of mobile maintenance platform of ascending stair formula
CN212103679U (en) A construction platform for installation of assembled tower
CN207647455U (en) Electric system rope ladder
CN206636153U (en) Indoor individual layer scaffold
CN206053827U (en) A kind of extending insulating ladder
CN205936536U (en) Workbench device and pumping unit
CN206844610U (en) Reinforced indoor individual layer scaffold
CN203741726U (en) Bridge construction anti-dropping device
CN204760881U (en) Transmission line steel pipe tower cat ladder assistant
US7232009B1 (en) Ascension/descension apparatus and method
CN107035209A (en) It is a kind of that there is the intelligent single tube steel tower for preventing that non-working person from climbing
CN203097694U (en) All-directional fixed connection ladder
CN203783449U (en) Safe cave crawling ladder
CN211851627U (en) A cat ladder for safety engineering

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of utility model: Novel bore workover rig workover platform

Effective date of registration: 20190814

Granted publication date: 20190319

Pledgee: Agricultural Bank of China Limited by Share Ltd. Dongying Dongying District sub branch

Pledgor: SHANDONG KERUI MACHINERY MANUFACTURING Co.,Ltd.

Registration number: Y2019990000006

PP01 Preservation of patent right
PP01 Preservation of patent right

Effective date of registration: 20221017

Granted publication date: 20190319