CN208586633U - Assembled ocean suction caisson foundation structure - Google Patents
Assembled ocean suction caisson foundation structure Download PDFInfo
- Publication number
- CN208586633U CN208586633U CN201821198468.6U CN201821198468U CN208586633U CN 208586633 U CN208586633 U CN 208586633U CN 201821198468 U CN201821198468 U CN 201821198468U CN 208586633 U CN208586633 U CN 208586633U
- Authority
- CN
- China
- Prior art keywords
- caisson foundation
- foundation structure
- steel plate
- circular steel
- suction caisson
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Foundations (AREA)
Abstract
The utility model discloses a kind of assembled ocean suction caisson foundation structures, including the columnar structured of multiple open at both ends;Each columnar structured top is equipped with the mounting groove of indent, and the mounting groove is used to cooperate with circular steel plate;Multiple tubular constructions are stitched together up and down, with a unification circular steel plate at the top of the tubular construction of top.It is connected by circular steel plate with more piece drum structure, becomes the small-sized caisson foundation structure of more piece, installation of sinking section by section under inside and outside differential pressure effect.This mode can effectively reduce the problems such as there are air inside drum structure sediment unevenness caused by uneven strata and staving, enduringly improve caisset foundation stability, efficiently reduce caisset in the buckling deformation of soft stratum;Also, original caisset length is reduced, certain flexibility is made it have, can effectively adapt to the unfavorable geological conditions such as weak sea bed, there is controllability.
Description
Technical field
The utility model relates to Geotechnical Engineering fields, especially build marine mining in ocean soft clay or sandy soil stratum
Platform provides a kind of novel sea suction caisson foundation structure.
Background technique
Suction caisson foundation structure is a kind of open bottom end, the major diameter steel drum structure of upper end closed, has and makes
Valence is low, the advantages such as reusable, in deep water Offshore Platform Engineering using more and more.But since ocean suction type is heavy
Box foundation structural volume is huge, transports and installs and is relative complex;Meanwhile large volume suction caisson foundation structure is installed at the scene
In the process, it is lowered into sea bed in inside and outside differential pressure effect, since sea-bed formations soft clay or sand inhomogeneities cause large volume
Caisson foundation structure memory has air, is unable to satisfy caisset and all sinks to sea bed, causes suction caisson foundation knot in this way
There are marginal security hidden danger for structure, and upper ocean production platform is easily caused to topple deformation, to jeopardize construction personnel's life peace
Complete and damage production equipment.At the same time, the work progress of large volume suction caisson foundation structure needs to put into a large amount of people
Power, equipment and financial resources, while also adding construction risk.It is continuous to ocean petroleum developing, Conventional marine with Chinese Sea resource
Suction caisson foundation structure cannot be guaranteed that marine resources fast and efficiently develop demand, this just constrains suction caisson
The development and application of foundation structure.For this purpose, fabricated construction theory and ocean suction caisson foundation structure composition is a kind of new
Type suction caisson foundation structure, uses for reference the construction method of fabricated construction, proposes a kind of assembled ocean suction caisson
Foundation structure, to meet the construction and stabilization of ocean area submerged structure.
Utility model content
The utility model to solve the above-mentioned problems, propose a kind of assembled ocean suction caisson foundation structure and its
Construction method, the structure can efficiently improve the installation speed and the scope of application of suction caisson foundation structure, reduce suction
The unstable failure of formula caisson foundation structure enduringly improves its self-stability energy, guarantees the construction of upper ocean production platform and operation
The personnel safety and equipment operation of period.
To achieve the goals above, the utility model adopts the following technical solution:
A kind of assembled ocean suction caisson foundation structure, including the columnar structured of multiple open at both ends;Each circle
The top of tubular construction is equipped with the mounting groove of indent, and the mounting groove is used to cooperate with circular steel plate;On multiple tubular constructions
Under be stitched together, with unifying circular steel plate at the top of the tubular construction of top.
Further, it is gradually reduced from inside to outside positioned at the columnar structured sidewall bottom thickness of the bottom, forms point
Sharp bottom, facilitates grafting.
Further, in addition to the bottom it is columnar structured other than, other columnar structured bottoms be equipped with and lower layer's tubular
The protrusion of structural top mounting groove cooperation.
Further, the columnar structured diameter is 10m, is highly 3m, thickness 0.2m.
Further, the diameter of the circular steel plate is slightly less than the diameter of cylinder.
Specific installation method is as follows:
Firstly, circular steel plate is fixed at the top of drum by stripped thread rotation at the top of first segment drum, one is become
Caisson foundation structure, i.e. first segment caisson foundation structure;
Secondly, performing pressure difference inside and outside staving, first segment caisset is installed;
Then, after the installation is completed, circular steel plate is separated with first segment drum structure for first segment caisson foundation structure;Again
It is secondary, circular steel plate is connected with the second pitch circle barrel structure, forms the second section caisson foundation structure, the same manner is sunk to installing
In place, and so on the caisson foundation structure for installing other joint numbers, until reaching design requirement.
The working principle of the utility model are as follows:
It is connected by circular steel plate with more piece drum structure, the small-sized caisson foundation structure of more piece is become, in interior external pressure
Sink to installing section by section under difference effect.This mode can effectively reduce drum structure sediment unevenness caused by uneven strata with
The problems such as there are air inside staving enduringly improves caisset foundation stability, efficiently reduces caisset in weakness
The buckling deformation on stratum;Also, original caisset structure length is reduced, certain flexibility is made it have, can effectively fit
The unfavorable geological conditions such as weak sea bed are answered, there is controllability.
The utility model has the following beneficial effects:
1. being connected by circular steel plate with more piece drum structure, the small-sized caisson foundation structure of more piece is become, inside and outside
Sink to installing section by section under differential pressure action.This mode can effectively reduce the unevenness of drum structure sediment caused by uneven strata
With the problems such as there are air inside staving, caisset foundation stability is enduringly improved, efficiently reduces caisset soft
The buckling deformation on weak stratum;Also, reduce original caisset length (this refers to during transportation, the caisson of single-unit
Structure length is reduced relative to original monolithic construction length), certain flexibility is made it have, weak sea can be effectively adapted to
The unfavorable geological conditions such as bed have controllability.
2. in terms of caisson foundation structural stability: the scope of application of caisson foundation structure can be effectively improved, it is heavy to reduce
Box structure foundation instability destroys, enduringly improves its self-stability energy, the personnel safety during guaranteeing caisset construction and runing
And equipment operation.
3. in terms of severe geological conditions adaptability: breaking too long, plastic deformation bad adaptability of original caisson foundation structure etc.
Deficiency makes it have certain flexibility, can effectively adapt to the unfavorable geological conditions such as weak sea bed, has controllability.
4. construction aspect: suction caisson foundation as marine petroleum exploitation platform Deep Foundation Structure, construction technology at
It is ripe, convenient and efficient.
Detailed description of the invention
The accompanying drawings constituting a part of this application is used to provide further understanding of the present application, and the application's shows
Meaning property embodiment and its explanation are not constituted an undue limitation on the present application for explaining the application.
Fig. 1, Fig. 2 are the schematic diagram of circular steel plate in the suction caisson foundation structure of assembled ocean.
Fig. 3 is the skiagraph of first segment drum structure in the suction caisson foundation structure of assembled ocean.
Fig. 4 is the skiagraph of other pitch circle barrel structures in the suction caisson foundation structure of assembled ocean.
Fig. 5 is the schematic diagram that assembled ocean suction caisson foundation structure is completed.
Wherein, unit: m;1, circular steel plate;2, first segment drum structure;3, the drum structure of other sections.
Specific embodiment
It is noted that following detailed description is all illustrative, it is intended to provide further instruction to the application.Unless another
It indicates, all technical and scientific terms used herein has usual with the application person of an ordinary skill in the technical field
The identical meanings of understanding.
It should be noted that term used herein above is merely to describe specific embodiment, and be not intended to restricted root
According to the illustrative embodiments of the application.As used herein, unless the context clearly indicates otherwise, otherwise singular
Also it is intended to include plural form, additionally, it should be understood that, when in the present specification using term "comprising" and/or " packet
Include " when, indicate existing characteristics, step, operation, device, component and/or their combination;
In order to facilitate narration, if there is "upper", "lower", " left side " " right side " printed words in the utility model, only indicate and attached drawing
The upper and lower, left and right direction of itself is consistent, not to structure rise restriction effect, it is only for convenient for description the utility model and
Simplify description, rather than the equipment of indication or suggestion meaning or element must have a particular orientation, with specific orientation construction
And operation, therefore should not be understood as limiting the present invention.
As background technique is introduced, since ocean suction caisson foundation structural volume is huge, transport and installation phase
To complexity;Meanwhile large volume suction caisson foundation structure is lowered into sea bed in inside and outside differential pressure effect at the scene in installation process
It is interior, since sea-bed formations soft clay or sand inhomogeneities cause large volume caisson foundation structure memory to have air, it is unable to satisfy
Caisset all sinks to sea bed, causes suction caisson foundation structure there are marginal security hidden danger in this way, easily causes
Portion's marine mining platform topples deformation, to jeopardize construction personnel's life security and damage production equipment.At the same time, large volume
The work progress of suction caisson foundation structure needs to put into a large amount of manpower, equipment and financial resources, while also adding construction wind
Danger.Continuous to ocean petroleum developing with Chinese Sea resource, Conventional marine suction caisson foundation structure cannot be guaranteed ocean
Resource fast and efficiently develops demand, this just constrains the development and application of suction caisson foundation structure.For this purpose, will assembly
Formula architectural concept and a kind of novel suction caisson foundation structure of ocean suction caisson foundation structure composition use for reference assembled knot
The construction method of structure proposes a kind of assembled ocean suction caisson foundation structure, to meet ocean area submerged structure
It constructs and stablizes.
In a kind of typical embodiment of the application, circular steel plate is having a size of diameter 9.9m, height as shown in Figure 1:
0.2m。
As shown in Fig. 2, the drum of assembled ocean suction caisson foundation structure first segment is having a size of diameter 10m, height
3m, thickness 0.2m;Its sidewall bottom thickness gradually reduces from inside to outside, forms sharp bottom, is conveniently inserted into heavy sea of faces's bed
In;Its top is equipped with the mounting groove of indent, and the mounting groove is used to cooperate with circular steel plate.
As shown in figure 3, the drum of the other sections of assembled ocean suction caisson foundation structure is having a size of diameter 10m, height
3m, thickness 0.2m;Bottom is equipped with the protrusion with mounting groove cooperation at the top of lower layer's tubular construction;Its top is equipped with the installation of indent
Slot, the mounting groove are used to cooperate with circular steel plate.
As shown in figure 4, in sequence, respectively connecting every pitch circle barrel structure with circular steel plate, it incite somebody to action this using inside and outside differential pressure
In pitch circle barrel structure sinking sea of faces bed, circular steel plate is sling, next pitch circle barrel structure is installed, with this more piece drum structure of sinking,
To make a combination thereof be assembled into a complete suction caisson foundation structure.
Specifically, assembled ocean suction caisson foundation construction method is as follows:
(1) circular steel plate and drum structure fabrication
Diameter is 10m, is highly 3m, and the drum structure of thickness 0.2m is several;Diameter is 9.9m, is highly the circle of 0.2m
Steel plate, can be prefabricated in precast plant.
(2) first segment drum structure is installed
First segment drum structure is connect with circular steel plate, using inside and outside differential pressure by this section drum structure sinking sea of faces bed
It is interior, sling circular steel plate.
The installation of (3) second pitch circle barrel structures
Second pitch circle barrel structure is connected with first segment drum structural top, then by the second pitch circle barrel structure and circular steel plate
Connection slings circular steel plate using inside and outside differential pressure by this section drum structure sinking sea of faces's bed.Other each pitch circle barrel structure installations
Method is identical.To which composite assembly is at a complete suction caisson foundation structure.
It is above-mentioned although specific embodiments of the present invention are described with reference to the accompanying drawings, but it is not practical new to this
The limitation of type protection scope, those skilled in the art should understand that, based on the technical solution of the present invention, ability
Field technique personnel do not need to make the creative labor the various modifications or changes that can be made still in the protection model of the utility model
Within enclosing.
Claims (5)
1. a kind of assembled ocean suction caisson foundation structure, which is characterized in that the cylinder-shaped knot including multiple open at both ends
Structure;Each columnar structured top is equipped with the mounting groove of indent, and the mounting groove is used to cooperate with circular steel plate;Multiple cylinders
Shape structure is stitched together up and down, with a unification circular steel plate at the top of the tubular construction of top.
2. assembled ocean suction caisson foundation structure as described in claim 1, which is characterized in that positioned at the circle of the bottom
The sidewall bottom thickness of tubular construction gradually reduces from inside to outside, forms sharp bottom, facilitates grafting.
3. assembled ocean suction caisson foundation structure as described in claim 1, which is characterized in that in addition to the circle of the bottom
Outside tubular construction, other columnar structured bottoms are equipped with the protrusion with mounting groove cooperation at the top of lower layer's tubular construction.
4. assembled ocean suction caisson foundation structure as described in claim 1, which is characterized in that described columnar structured
Diameter be 10m, be highly 3m, thickness 0.2m.
5. assembled ocean suction caisson foundation structure as described in claim 1, which is characterized in that the circular steel plate
Diameter is slightly less than the diameter of cylinder.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821198468.6U CN208586633U (en) | 2018-07-26 | 2018-07-26 | Assembled ocean suction caisson foundation structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821198468.6U CN208586633U (en) | 2018-07-26 | 2018-07-26 | Assembled ocean suction caisson foundation structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208586633U true CN208586633U (en) | 2019-03-08 |
Family
ID=65541494
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821198468.6U Expired - Fee Related CN208586633U (en) | 2018-07-26 | 2018-07-26 | Assembled ocean suction caisson foundation structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208586633U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108677990A (en) * | 2018-07-26 | 2018-10-19 | 山东大学 | Assembled ocean suction caisson foundation structure and its construction method |
-
2018
- 2018-07-26 CN CN201821198468.6U patent/CN208586633U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108677990A (en) * | 2018-07-26 | 2018-10-19 | 山东大学 | Assembled ocean suction caisson foundation structure and its construction method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
WO2021012860A1 (en) | Pile-bucket composite truss type offshore wind turbine foundation and construction process thereof | |
CN111827274B (en) | High-strength grouting method for marine wind power weakly-weathered bedrock single-pile socketed foundation | |
CN108425379B (en) | Deep sea inner ring type submarine suction anchor and installation method thereof | |
CN204370469U (en) | A kind of drilled pile long leg jacket offshore wind turbine foundation | |
CN103306682B (en) | Long-span and high-side-wall underground space building and excavation support method thereof | |
CN101311421B (en) | Radical anchorage and construction method thereof | |
CN107663865A (en) | A kind of cable-stayed type immersed tube tunnel structure and method | |
CN111456075A (en) | Pile barrel composite truss type offshore wind turbine foundation and construction process thereof | |
CN104912045A (en) | Hollow cylinder pier used for fixing overwater platform structure at water bottom and installation and construction method thereof | |
CN105780806A (en) | Offshore wind turbine foundation for long-leg jacket of drilling piles and construction method of offshore wind turbine foundation | |
CN108677990A (en) | Assembled ocean suction caisson foundation structure and its construction method | |
CN210797617U (en) | Pile barrel composite truss type offshore wind turbine foundation | |
CN208586633U (en) | Assembled ocean suction caisson foundation structure | |
CN108677991B (en) | Suction type combined foundation structure suitable for stratum easy to liquefy and construction method | |
CN205776157U (en) | Assembled underground continuous wall | |
CN208685648U (en) | A kind of suction type combination foundation structure suitable for stratum of easily liquefying | |
CN108528638A (en) | A kind of arc-shaped combination anchor of the suction penetration type with wing plate | |
CN215211130U (en) | Pre-tensioned pile anchor combined foundation for shallow covering layer seabed | |
CN212200387U (en) | Diaphragm wall foundation steel guide wall structure in deep water soft silt area | |
CN106930317A (en) | A kind of dismountable many base large bearing capacity suction base apparatuses | |
CN103306248A (en) | High dam spillway foundation drainage system and excavation method | |
CN110453690A (en) | A kind of recyclable Anchored Sheet Pile Wall for Excavation structure and construction method | |
CN105544597A (en) | Combined foundation structure suitable for lagoon face island-reef environment and construction method thereof | |
CN206581314U (en) | Screw head muscle body posttension pile foundation | |
CN206220121U (en) | Assembled point anchor barricade |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20190308 Termination date: 20190726 |