CN208539473U - A kind of Combined aluminum alloy cable testing bridge - Google Patents
A kind of Combined aluminum alloy cable testing bridge Download PDFInfo
- Publication number
- CN208539473U CN208539473U CN201820943916.4U CN201820943916U CN208539473U CN 208539473 U CN208539473 U CN 208539473U CN 201820943916 U CN201820943916 U CN 201820943916U CN 208539473 U CN208539473 U CN 208539473U
- Authority
- CN
- China
- Prior art keywords
- fixedly connected
- block
- aluminum alloy
- cable testing
- motion bar
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
The utility model relates to field of cable technology, and disclose a kind of Combined aluminum alloy cable testing bridge, including two gantry ontologies, by placing block overlap joint between the opposite face of two gantry ontologies, the inside for placing block is opened up there are two placing groove, top plate is fixedly connected between the inner wall of the placing groove two sides, top plate lower surface is fixedly connected with casing, and the internal activity of casing is connected with motion bar.The Combined aluminum alloy cable testing bridge, pass through setting motion bar, reset spring and clamping block, it is placed inside block so that two gantry ontologies are placed on, under the action of reset spring automatic rebounding, clamping block is promoted to extend to inside clamping groove automatically, so that two gantry ontologies are limited, so that the fit-state of two bridge joint ontologies is fixed, it ensure that the installation between two gantry ontologies, the mode for completing installation by extraneous tool is avoided the need for, has not only reached the purpose being easily installed and the efficiency for improving installment work.
Description
Technical field
The utility model relates to field of cable technology, specially a kind of Combined aluminum alloy cable testing bridge.
Background technique
Cable testing bridge is divided into the structures such as slot type, pellet type, ladder-type and grid type, by bracket, trailing arm and installation attachment etc.
It forms, gantry can independently be set up in building, can also be attached on various buildings and piping lane bracket, and structure letter should be embodied
It is single, it is handsome in appearance, configuration is flexible and easy to maintenance the features such as, whole parts are both needed to carry out zinc-plated processing, are mounted on outside building
Outdoor gantry, composite cable bridge-rack are a kind of Novel bridge frames, are the second generation products in cable testing bridge series, it is applicable in each
The laying of item engineering, various units, various cables, it has simple, flexible, easy for installation and novel form of configuration of structure etc. special
Point.
Installation between existing composite cable bridge-rack is needed mostly by other installation tools such as bolt, and operate expense
When it is laborious so that whole installation process is excessively cumbersome, bring inconvenience to the routine work of people.
Utility model content
(1) the technical issues of solving
In view of the deficiencies of the prior art, the utility model provides a kind of Combined aluminum alloy cable testing bridge, has and is convenient for
The advantages of combination, solves the problems, such as that installation process is excessively cumbersome.
(2) technical solution
Above-mentioned convenient for combined purpose to realize, the utility model provides the following technical solutions: a kind of Combined aluminum alloy
Cable testing bridge, including two gantry ontologies, by placing block overlap joint, the placement between the opposite face of two gantry ontologies
The inside of block is opened up there are two placing groove, is fixedly connected with top plate, the top plate lower surface between the inner wall of the placing groove two sides
It is fixedly connected with casing, the internal activity of described sleeve pipe is connected with motion bar, and the inside of top plate is run through on the top of the motion bar
And the upper surface for placing block is extended to, the surface of described sleeve pipe is fixedly connected with reset spring, and the reset spring is far from casing
One end be fixedly connected with the surface of motion bar, the bottom end of the motion bar is fixedly connected with movable plate, the gantry ontology
Upper surface offers clamping groove, and the lower surface of the movable plate is fixedly connected with clamping block, and the bottom of the clamping groove inner wall is solid
Dingan County is equipped with link block, and the bottom end of the clamping block and the upper surface of link block overlap.
Preferably, the top of the motion bar is connected with pulling plate, and the surface of the pulling plate is provided with anti-skid chequer.
Preferably, the two sides of the placing groove offer sliding slot, and the two sides of the movable plate are fixedly connected to cunning
Wheel, the inner wall overlap joint of the pulley one end and sliding slot far from movable plate.
Preferably, the bottom end of the motion bar is the cambered surface that radian is 60 degree.
Preferably, the upper surface of the link block offers dashpot, and the bottom of the dashpot inner wall is fixedly installed with
Two buffer springs, the top of two buffer springs are fixedly connected with the lower surface of buffer stopper, the buffer stopper it is upper
Surface and the bottom end of link block overlap.
Preferably, the two sides inner wall of the dashpot is provided with wear-resistant pad, and the wear-resistant pad is Elastic flexible glue block, described
The two sides of buffer stopper pass through wear-resistant pad and the inner wall of dashpot is slidably connected.
(3) beneficial effect
Compared with prior art, the utility model provides a kind of Combined aluminum alloy cable testing bridge, the beneficial effect having
Fruit: the Combined aluminum alloy cable testing bridge, by setting motion bar, reset spring and clamping block, so that two gantry ontologies are put
It sets and is placing inside block, under the action of reset spring automatic rebounding, clamping block is promoted to extend to inside clamping groove automatically, made
It obtains two gantry ontologies to be limited, so that the fit-states of two bridge joint ontologies are fixed, ensure that two gantry ontologies
Between installation, avoid the need for by extraneous tool complete installation mode, do not only reached the purpose being easily installed and
Improve the efficiency of installment work.
Detailed description of the invention
FIG. 1 is a schematic structural view of the utility model;
Fig. 2 is the utility model structure front elevational view;
Fig. 3 is the utility model connecting block structure cross-sectional view.
In figure: block, 3 placing grooves, 4 top plates, 5 casings, 6 motion bars, 7 pulling plates, 8 reset springs, 9 are placed in Bridge 1 frame ontology, 2
Movable plate, 10 sliding slots, 11 pulleys, 12 clamping grooves, 13 clamping blocks, 14 link blocks, 15 dashpots, 16 buffer springs, 17 buffer stoppers,
18 wear-resistant pads.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model
Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole
Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work
Every other embodiment obtained, fall within the protection scope of the utility model.
A kind of Combined aluminum alloy cable testing bridge referring to FIG. 1-2, including two gantry ontologies 1, two gantry ontologies 1
Opposite face between overlapped by placing block 2, the inside for placing block 2 is opened up there are two placing groove 3,3 two sides inner wall of placing groove it
Between be fixedly connected with top plate 4,4 lower surface of top plate is fixedly connected with casing 5, and the internal activity of casing 5 is connected with motion bar 6, living
The bottom end of lever 6 is the cambered surface that radian is 60 degree, and the top of motion bar 6, which is run through the inside of top plate 4 and extended to, places block 2
Upper surface, the top of motion bar 6 are connected with pulling plate 7, and the surface of pulling plate 7 is provided with anti-skid chequer, and anti-skid chequer, which improves, pulls pulling plate 7
When stability, the surface of casing 5 is fixedly connected with reset spring 8, under the action of 8 automatic rebounding of reset spring, promotes
Clamping block 13 is extended to automatically inside clamping groove 12, so that two gantry ontologies 1 are limited, so that two bridge ontology 1
Fit-state is fixed, and ensure that the installation between two gantry ontologies 1, avoids the need for completing to install by extraneous tool
Mode, do not only reached the purpose being easily installed and the efficiency for improving installment work, reset spring 8 is far from casing 5
One end is fixedly connected with the surface of motion bar 6, and the bottom end of motion bar 6 is fixedly connected with movable plate 9, and the two sides of placing groove 3 are opened
Equipped with sliding slot 10, the two sides of movable plate 9 are fixedly connected to pulley 11, the one end of pulley 11 far from movable plate 9 and sliding slot 10
Inner wall overlap joint, pulley 11 rolled along 10 direction of sliding slot, thus improve movable plate 9 it is mobile when stability, gantry
The upper surface of ontology 1 offers clamping groove 12, and the lower surface of movable plate 9 is fixedly connected with clamping block 13,12 inner wall of clamping groove
Bottom is fixedly installed with link block 14, and the bottom end of clamping block 13 and the upper surface of link block 14 overlap, the upper surface of link block 14
Dashpot 15 is offered, there are two buffer spring 16, the tops of two buffer springs 16 for the bottom fixed installation of 15 inner wall of dashpot
End is fixedly connected with the lower surface of buffer stopper 17, and the upper surface of buffer stopper 17 and the bottom end of link block 14 overlap, and utilizes buffering
Block 17 avoids impulse force excessive and causes to damage to clamping block 13 so that clamping block 13 and clamping groove 12 form soft landing, dashpot 15
Two sides inner wall be provided with wear-resistant pad 18, wear-resistant pad 18 is Elastic flexible glue block, and the two sides of buffer stopper 17 pass through wear-resistant pad
18 are slidably connected with the inner wall of dashpot 15, are reduced using wear-resistant pad 18 and are produced between movable buffer stopper 17 and dashpot 15
Raw abrasion.
When in use, two gantry ontologies 1 are placed on to the inside for placing block 2, so that placing groove 3 and clamping groove 12 are opened
It is opposite at mouthful, while two pulling plates 7 are pulled, so that motion bar 6 extends the outside for placing block 2, so that reset spring 8 is pressed
Contracting, so that card adapter plate 13 be driven to be accommodated into the inside of placing groove 3, unclamps pulling plate 7, in reset spring 8 so that movable plate 9 rises
Under the action of automatic rebounding, reset spring 8 is released, so that movable plate 9 restores to initial position, to drive clamping block
13 extend to the inside of clamping groove 12, so that gantry ontology 1 is fixed on the inside for placing block 2 by clamping block 13, to complete two
The installation of a gantry ontology 1.
In conclusion the Combined aluminum alloy cable testing bridge, by the way that motion bar 6, reset spring 8 and clamping block 13 is arranged,
It is placed inside block 2 so that two gantry ontologies 1 are placed on, under the action of 8 automatic rebounding of reset spring, promotes clamping block 13
Automatically it extends to inside clamping groove 12, so that two gantry ontologies 1 are limited, so that the fit-state of two bridge joint ontologies 1
It is fixed, ensure that the installation between two gantry ontologies 1, avoid the need for the mode for completing installation by extraneous tool,
The purpose being easily installed and the efficiency for improving installment work are not only reached.
It should be noted that, in this document, relational terms such as first and second and the like are used merely to a reality
Body or operation are distinguished with another entity or operation, are deposited without necessarily requiring or implying between these entities or operation
In any actual relationship or order or sequence.Moreover, the terms "include", "comprise" or its any other variant are intended to
Non-exclusive inclusion, so that the process, method, article or equipment including a series of elements is not only wanted including those
Element, but also including other elements that are not explicitly listed, or further include for this process, method, article or equipment
Intrinsic element.In the absence of more restrictions, the element limited by sentence "including a ...", it is not excluded that
There is also other identical elements in process, method, article or equipment including the element.
While there has been shown and described that the embodiments of the present invention, for the ordinary skill in the art,
It is understood that these embodiments can be carried out with a variety of variations in the case where not departing from the principles of the present invention and spirit, repaired
Change, replacement and variant, the scope of the utility model is defined by the appended claims and the equivalents thereof.
Claims (6)
1. a kind of Combined aluminum alloy cable testing bridge, including two gantry ontologies (1), it is characterised in that: two gantry sheets
By placing block (2) overlap joint between the opposite face of body (1), the inside for placing block (2) is opened up there are two placing groove (3), institute
It states and is fixedly connected with top plate (4) between the inner wall of placing groove (3) two sides, top plate (4) lower surface is fixedly connected with casing (5),
The internal activity of described sleeve pipe (5) is connected with motion bar (6), and the top of the motion bar (6) is run through the inside of top plate (4) and prolonged
The upper surface for placing block (2) is extended to, the surface of described sleeve pipe (5) is fixedly connected with reset spring (8), the reset spring (8)
One end far from casing (5) is fixedly connected with the surface of motion bar (6), and the bottom end of the motion bar (6) is fixedly connected with activity
The upper surface of plate (9), the gantry ontology (1) offers clamping groove (12), and the lower surface of the movable plate (9) is fixedly connected with
The bottom of clamping block (13), clamping groove (12) inner wall is fixedly installed with link block (14), the bottom end of the clamping block (13)
It is overlapped with the upper surface of link block (14).
2. a kind of Combined aluminum alloy cable testing bridge according to claim 1, it is characterised in that: the motion bar (6)
Top is connected with pulling plate (7), and the surface of the pulling plate (7) is provided with anti-skid chequer.
3. a kind of Combined aluminum alloy cable testing bridge according to claim 1, it is characterised in that: the placing groove (3)
Two sides offer sliding slot (10), and the two sides of the movable plate (9) are fixedly connected to pulley (11), and the pulley (11) is remote
The inner wall of one end and sliding slot (10) from movable plate (9) overlaps.
4. a kind of Combined aluminum alloy cable testing bridge according to claim 1, it is characterised in that: the motion bar (6)
Bottom end is the cambered surface that radian is 60 degree.
5. a kind of Combined aluminum alloy cable testing bridge according to claim 1, it is characterised in that: the link block (14)
Upper surface offers dashpot (15), and there are two the bottom fixed installations of dashpot (15) inner wall buffer spring (16), and two
The top of a buffer spring (16) is fixedly connected with the lower surface of buffer stopper (17), the upper surface of the buffer stopper (17)
It is overlapped with the bottom end of link block (14).
6. a kind of Combined aluminum alloy cable testing bridge according to claim 5, it is characterised in that: the dashpot (15)
Two sides inner wall is provided with wear-resistant pad (18), and the wear-resistant pad (18) is Elastic flexible glue block, the two sides of the buffer stopper (17)
It is slidably connected by wear-resistant pad (18) and the inner wall of dashpot (15).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820943916.4U CN208539473U (en) | 2018-06-20 | 2018-06-20 | A kind of Combined aluminum alloy cable testing bridge |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820943916.4U CN208539473U (en) | 2018-06-20 | 2018-06-20 | A kind of Combined aluminum alloy cable testing bridge |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208539473U true CN208539473U (en) | 2019-02-22 |
Family
ID=65390855
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201820943916.4U Expired - Fee Related CN208539473U (en) | 2018-06-20 | 2018-06-20 | A kind of Combined aluminum alloy cable testing bridge |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208539473U (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110686802A (en) * | 2019-11-11 | 2020-01-14 | 徐州瓦特电气科技有限公司 | Wireless temperature measuring device for cable intermediate joint |
CN111146745A (en) * | 2019-12-28 | 2020-05-12 | 安庆市晶科电子有限公司 | Cable split-type assembled external support for transistor |
CN113471905A (en) * | 2021-07-03 | 2021-10-01 | 江苏国美钢网桥架有限公司 | Self-locking grid bridge connecting structure with extensible mechanism and using method |
CN113471768A (en) * | 2021-07-02 | 2021-10-01 | 深圳市比瑞特照明科技有限公司 | Sleeve lamp area connector and sleeve lamp area |
-
2018
- 2018-06-20 CN CN201820943916.4U patent/CN208539473U/en not_active Expired - Fee Related
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110686802A (en) * | 2019-11-11 | 2020-01-14 | 徐州瓦特电气科技有限公司 | Wireless temperature measuring device for cable intermediate joint |
CN111146745A (en) * | 2019-12-28 | 2020-05-12 | 安庆市晶科电子有限公司 | Cable split-type assembled external support for transistor |
CN111146745B (en) * | 2019-12-28 | 2021-04-09 | 安庆市晶科电子有限公司 | Cable split-type assembled external support for transistor |
CN113471768A (en) * | 2021-07-02 | 2021-10-01 | 深圳市比瑞特照明科技有限公司 | Sleeve lamp area connector and sleeve lamp area |
CN113471768B (en) * | 2021-07-02 | 2023-05-30 | 深圳市比瑞特照明科技有限公司 | Sleeve lamp strip connector and sleeve lamp strip |
CN113471905A (en) * | 2021-07-03 | 2021-10-01 | 江苏国美钢网桥架有限公司 | Self-locking grid bridge connecting structure with extensible mechanism and using method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN208539473U (en) | A kind of Combined aluminum alloy cable testing bridge | |
US20220333393A1 (en) | Flexible glass protective net with landscape function for falling objects and design method thereof | |
CN107591752A (en) | A kind of ladder-type bridge frame | |
CN206023664U (en) | Wallboard and wall panel assembly | |
CN208381734U (en) | A kind of aluminum profile assemblies of combinative stability | |
CN209244141U (en) | A kind of indoor decoration skirting for being easy to splice | |
CN208619590U (en) | A kind of mechanical equipment of good buffer effect | |
CN209207405U (en) | A kind of assembly and disassembly tooling for rail damping device fastening clip | |
CN208845861U (en) | A kind of push pipe port connecting apparatus | |
CN202914886U (en) | Accessory special for nuclear power bridge | |
CN211903061U (en) | Fixing device for warmer | |
CN109944334A (en) | A kind of concrete compression-resistanmodifier plate | |
CN211117355U (en) | Elastic anti-seismic support convenient for height adjustment | |
CN204040502U (en) | A kind of full glass curtain wall temporary fastening device | |
CN208844846U (en) | A kind of indoor wallboard structure of fast assembling-disassembling | |
CN207214402U (en) | A kind of mounting structure of air curtain | |
CN208908330U (en) | A kind of adjustable Novel cable bridge | |
CN114737702B (en) | High-altitude curtain wall system of building board | |
CN208486440U (en) | A kind of architectural decoration hanging plate being convenient to clean | |
CN103332555B (en) | The built-in elevator wall-attached frame of a kind of counterweight | |
CN208207282U (en) | A kind of communications optical cable joint connector | |
CN207597812U (en) | Glass wall fixed structure | |
CN218025107U (en) | Wall attaching device with quick assembly structure for crane | |
CN209562056U (en) | A kind of ladder-type cable testing bridge | |
CN212394780U (en) | Rail glass brush |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20190222 Termination date: 20190620 |
|
CF01 | Termination of patent right due to non-payment of annual fee |