CN208516784U - Suspension electric hoist testing stand hanging apparatus - Google Patents

Suspension electric hoist testing stand hanging apparatus Download PDF

Info

Publication number
CN208516784U
CN208516784U CN201821128954.0U CN201821128954U CN208516784U CN 208516784 U CN208516784 U CN 208516784U CN 201821128954 U CN201821128954 U CN 201821128954U CN 208516784 U CN208516784 U CN 208516784U
Authority
CN
China
Prior art keywords
plate
hoisting
hoist
lifting
steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821128954.0U
Other languages
Chinese (zh)
Inventor
王松雷
邓宏康
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Special Equipment Safety Supervision Inspection Institute of Jiangsu Province
Original Assignee
Special Equipment Safety Supervision Inspection Institute of Jiangsu Province
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Special Equipment Safety Supervision Inspection Institute of Jiangsu Province filed Critical Special Equipment Safety Supervision Inspection Institute of Jiangsu Province
Priority to CN201821128954.0U priority Critical patent/CN208516784U/en
Application granted granted Critical
Publication of CN208516784U publication Critical patent/CN208516784U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Carriers, Traveling Bodies, And Overhead Traveling Cranes (AREA)

Abstract

一种悬挂式电动葫芦试验台吊装装置,包括支腿,支腿的内侧面通过法兰安装有端梁工字钢,位于端梁工字钢的上方的支腿的内侧面分别安装有支腿法兰板,两块支腿法兰板之间通过端梁螺栓和端梁法兰板安装吊装葫芦端梁,吊装葫芦端梁与端梁工字钢平行,吊装葫芦端梁的顶面焊接有轨道,轨道上安装台车,台车的顶部横向安装有吊装葫芦主梁,所述吊装葫芦主梁的底部安装有吊装葫芦,吊装葫芦底部设置有吊装吊钩,吊装吊钩上穿过钢丝绳,所述钢丝绳连接吊装板,吊装板的两端分别安装有对称的葫芦主梁轨道接头,所述葫芦主梁轨道接头固定在端梁工字钢加强板上,所述端梁工字钢加强板安装于端梁工字钢的底部两端。工作灵活、可靠。

A suspension type electric hoist test stand hoisting device, comprising outriggers, end beam I-beams are installed on the inner side of the outriggers through flanges, and outriggers are respectively installed on the inner sides of the outriggers located above the end beam I-beams Flange plate, the end beam of the hoisting hoist is installed between the two outrigger flange plates through the end beam bolt and the end beam flange plate, the end beam of the hoisting hoist is parallel to the I-beam of the end beam, and the top surface of the end beam of the hoisting hoist is welded with a track. A trolley is installed on the track, a main beam of a hoisting hoist is installed horizontally on the top of the trolley, a hoisting hoist is installed at the bottom of the main beam of the hoisting hoist, a hoisting hook is arranged at the bottom of the hoisting hoist, and the wire rope passes through the hoisting hook. The steel wire rope is connected to the hoisting plate, and the two ends of the hoisting plate are respectively installed with symmetrical hoist main beam rail joints, the hoist main beam rail joints are fixed on the end beam I-beam reinforcing plate, and the end beam I-beam reinforcing plate is installed on the end beam. The bottom ends of the end beam I-beam. Flexible and reliable work.

Description

Suspension electric hoist testing stand hanging apparatus
Technical field
The utility model relates to hanging apparatus technical field, especially a kind of suspension electric hoist testing stand lifting dress It sets.
Background technique
Its trolley track of suspension electric hoist testing stand is located at below girder, and common CD type electric block, MD are electronic Cucurbit and Electric Chain Blocks, track are welding H-bar below pentagonal girder, and the lower flange of I-steel is as small Track road;Its track of European electric block is the lower flange of H-type girder.
Before suspension electric hoist test, need to hang on electric block trolley on the track below girder.Lifting electricity The method of dynamic cucurbit has hydraulic platform method;Crane loading method;Join hanging plate lift method.
Suspension electric hoist testing stand traditional at present exists following insufficient:
(1) electric block installation, disassembly are inconvenient.The track for hanging electric block is located at high aerial, the vehicle of electric block Wheel will be hung on I-steel or the bottom wing listrium of H profile steel, and either hydraulic elevating platform, crane loading or one hand over The installation and removal of the hanging plate connect, electric block are all more troublesome.
(2) test efficiency is low.Hydraulic platform perhaps crane loading lifting electric block or the tube sheet installation with handover Electric block all can only just can be carried out latter installation in previous off-test and after dismantling and prepare, and all working is serial It carries out, test efficiency is low.
(3) safety is not high.In high aerial installation, or it is installed on the hanging plate of one end handover, all there is cucurbit and applies The danger that worker person falls, working security be not high.
Utility model content
The applicant provides a kind of structurally reasonable suspension electric hoist for the disadvantage in above-mentioned existing production technology Testing stand hanging apparatus, to greatly improve use reliability.
Technical solution used by the utility model is as follows:
A kind of suspension electric hoist testing stand hanging apparatus, including the supporting leg being distributed at four angles, the supporting leg Medial surface is equipped with end carriage I-steel by flange, is separately installed with branch positioned at the medial surface of the supporting leg of the top of end carriage I-steel Leg flanged plate passes through end carriage bolt and end carriage flanged plate installation lifting cucurbit end carriage, the lifting between two pieces of supporting leg flanged plates Cucurbit end carriage is parallel with end carriage I-steel, and the top surface of lifting cucurbit end carriage is welded with track, and trolley is installed on the track, described Lifting cucurbit girder is horizontally installed at the top of trolley, the bottom of the lifting cucurbit girder is equipped with lifting cucurbit, described to hang Dress cucurbit bottom is provided with lifting suspension hook, lifts and passes through wirerope on suspension hook, the wirerope connection lifting plate, the lifting plate Both ends be separately installed with symmetrical cucurbit girder rail joint, the cucurbit girder rail joint is fixed on end carriage I-steel and adds On strong plate, the end carriage I-steel stiffening plate is installed on the bottom both ends of end carriage I-steel.
As a further improvement of the above technical scheme:
The mounting structure of the lifting plate are as follows: including the lifting plate at the structure of falling convex shape, the top peace of the lifting plate Equipped with lifting lug, earhole is provided on the lifting lug, the both ends of the lifting plate are provided with lifting plate pin shaft hole, and lower part is provided with multiple backstops Threaded hole lifts the lower part of plate using I-steel ladder web.
The mounting structure of the cucurbit girder rail joint are as follows: including end carriage I-steel stiffening plate, the end carriage I-steel Stiffening plate installs girder I-steel stiffening plate by fastening bolt, and the girder I-steel stiffening plate bottom is I-steel upper cover Plate, the lower part of the I-steel upper cover plate are I-steel, and the bottom of the I-steel is cucurbit track, the two sides of the I-steel Clamping plate is equipped with by fastener respectively, fixation hole and clamping plate pin shaft hole are had on the clamping plate.
The supporting leg is at cylindrical structure.
The girder I-steel stiffening plate is rectangular steel plates.
The end carriage I-steel stiffening plate is rectangular steel plates.
The lifting cucurbit end carriage is I-shaped fashioned iron.
The beneficial effects of the utility model are as follows:
The utility model is compact-sized, reasonable, easy to operate, can be with by cleverly designing the mounting structure of lifting plate On the cucurbit track that electric block is hung on lifting plate by ground, with lifting cucurbit by tested electric block integral hoisting, and It is connect with girder cucurbit track, realizes ground installation, whole promotion, is not necessarily to high-altitude application.
Meanwhile the utility model has following advantage:
(1) terrestrial operation is easy for installation and removal.Plate is lifted under the action of lifting suspension hook and lifting wirerope, decline To Near Ground, the trolley of tested cucurbit is hung on track, screw or shackle are screwed into backstop threaded hole, prevent trolley It derails in hoisting process.
(2) whole to be promoted.After tested cucurbit installs on ground, starting lifting cucurbit lifts plate together with tested cucurbit Rise together, when rise be raised slightly above girder I-steel top flange when,
(3) work efficiency is high.Lifting plate can have multiple, during electric block lifts, can carry out another An outer electric block can be preceding after electric block is sent into testing stand main orbit toward the installation operation on another lifting plate One lifting plate can be put down at once, and the lifting plate that second installs electric block is hung at once and completes three sections of tracks companies It connects, without installation in test --- lifting --- test --- serial operation of disassembly --- installation ---, can be installed, Lifting, test, the parallel work-flow dismantled, substantially increase the efficiency entirely tested.
(4) hill climbing test can be carried out.TSG Q7012-2008 " light and small heavy-duty hoisting equipment type approval test detailed rules and regulations " and corresponding Electric block product standard require that electric block carries out hill climbing test, the track of electric hoist test bench is usually to fix , it can not be raised, one can only be applied by fixed pulley, wirerope and counterweight by the opposite direction run in electric block Opposite force replaces.Lifting board ends in the utility model have lifting plate pin shaft hole, have fixation hole and clamping plate pin shaft on clamping plate Hole when lifting plate pin shaft hole and the alignment of clamping plate pin shaft hole, and is connected with pin shaft, lifts the lifting plate pin shaft hole and folder of the plate other end Fixation hole alignment on plate, and is connected with pin shaft, lifts the gradient that plate is just provided with 1/200 in this way, under the I-steel for lifting plate Flange plate just becomes cucurbit track, can carry out the hill climbing test of electric block.This avoid whole girder lifts of testing stand It rises, reduces cost, reduce technical difficulty, improve test efficiency.
(5) safe and reliable.It hangs assembly and disassembly to carry out on ground, does not need high altitude operation, so safety;It is convex to lift board ends Ladder web out is inserted into Boards wall, and rides on the recessed ladder web of I-steel, fixed reliable.
Detailed description of the invention
Fig. 1 is the main view of the utility model.
Fig. 2 is the side view of Fig. 1.
Fig. 3 is the main view of the utility model cucurbit girder rail joint.
Fig. 4 is the side view of Fig. 3.
Fig. 5 is the structural schematic diagram that the utility model lifts plate.
Wherein: 1, supporting leg;2, cucurbit track;3, I-steel;4, I-steel upper cover plate;5, girder I-steel stiffening plate;6, End carriage I-steel stiffening plate;7, end carriage I-steel;8, cucurbit end carriage is lifted;9, cucurbit girder is lifted;10, cucurbit is lifted;11, it hangs Fill suspension hook;12, wirerope;13, clamping plate;14, clamping plate pin shaft hole;15, fastening bolt;16, plate is lifted;17, I-steel ladder abdomen Plate;18, plate pin shaft hole is lifted;19, backstop threaded hole;20, lifting lug;21, earhole;22, end carriage flanged plate;23, supporting leg flanged plate; 24, end carriage bolt;25, trolley;26, fixation hole.
Specific embodiment
With reference to the accompanying drawing, illustrate specific embodiment of the present utility model.
As depicted in figs. 1 and 2, the suspension electric hoist testing stand hanging apparatus of the present embodiment, including it is distributed in four The medial surface of supporting leg 1 at angle, supporting leg 1 is equipped with end carriage I-steel 7 by flange, the branch positioned at the top of end carriage I-steel 7 The medial surface of leg 1 is separately installed with supporting leg flanged plate 23, passes through end carriage bolt 24 and end carriage method between two pieces of supporting leg flanged plates 23 The blue installation of plate 22 lifting cucurbit end carriage 8, lifting cucurbit end carriage 8 is parallel with end carriage I-steel 7, the top surface weldering of lifting cucurbit end carriage 8 It is connected to track, trolley 25 is installed on track, the top of trolley 25 is horizontally installed with lifting cucurbit girder 9, lifting cucurbit girder 9 Bottom is equipped with lifting cucurbit 10, and lifting 10 bottom of cucurbit is provided with lifting suspension hook 11, lifts and pass through wirerope 12 on suspension hook 11, The connection lifting plate 16 of wirerope 12, the both ends of lifting plate 16 are separately installed with symmetrical cucurbit girder rail joint, cucurbit girder Rail joint is fixed in end carriage I-steel stiffening plate 6, and end carriage I-steel stiffening plate 6 is installed on the bottom two of end carriage I-steel 7 End.
As shown in figure 5, the mounting structure of lifting plate 16 are as follows: including the lifting plate 16 at the structure of falling convex shape, lift plate 16 Top lifting lug 20 is installed, be provided with earhole 21 on lifting lug 20, the both ends of lifting plate 16 are provided with lifting plate pin shaft hole 18, and lower part is opened There are multiple backstop threaded holes 19, the lower part of lifting plate 16 uses I-steel ladder web 17.
As shown in Figure 3 and Figure 4, the mounting structure of cucurbit girder rail joint are as follows: including end carriage I-steel stiffening plate 6, end Beam I-steel stiffening plate 6 installs girder I-steel stiffening plate 5 by fastening bolt 15, and 5 bottom of girder I-steel stiffening plate is work Word steel upper cover plate 4, the lower part of I-steel upper cover plate 4 are I-steel 3, and the bottom of I-steel 3 is cucurbit track 2, the two of I-steel 3 Side passes through fastener respectively and is equipped with clamping plate 13, and fixation hole 26 and clamping plate pin shaft hole 14 are had on clamping plate 13.
Supporting leg 1 is at cylindrical structure.
Girder I-steel stiffening plate 5 is rectangular steel plates.
End carriage I-steel stiffening plate 6 is rectangular steel plates.
Lifting cucurbit end carriage 8 is I-shaped fashioned iron.
The specific structure and function of the utility model are as follows:
The utility model is mainly added by supporting leg 1, cucurbit track 2, I-steel 3, I-steel upper cover plate 4, girder I-steel Strong plate 5, end carriage I-steel 7, lifting cucurbit end carriage 8, lifting cucurbit girder 9, lifting cucurbit 10, is hung at end carriage I-steel stiffening plate 6 Fill suspension hook 11, lifting wirerope 12, clamping plate 13, clamping plate pin shaft hole 14, fastening bolt 15, lifting plate 16, I-steel ladder web 17, plate pin shaft hole 18, backstop threaded hole 19, lifting lug 20, earhole 21, end carriage flanged plate 22, supporting leg flanged plate 23, end carriage spiral shell are lifted Bolt 24, trolley 25, fixation hole 26 form.
Supporting leg 1 is cylindrical structure, there is four, and there is flange in the side of supporting leg 1, convenient for connection end carriage I-steel 7 and lifting Cucurbit end carriage 8;Cucurbit track 2 is the bottom wing listrium of I-steel 3, is formed by three sections, the one of the stretching of electric hoist test bench end Section, lifting one section of plate 16, be connected to 7 lower section of end carriage I-steel one section, make three sections to be linked to be one by lifting plate 16;Work Word steel 3 is I-shaped fashioned iron, and I-steel 3 is whole to be used as load bearing beam, and the lower flange of I-steel 3 is as the small of suspension electric block Track road is also formed by three sections, and electric hoist test bench end stretch out one section lifts one section of plate 16, is connected to end carriage work One section of 7 lower section of word steel makes three sections to be linked to be one by lifting plate 16;I-steel upper cover plate 4 is flat above I-steel 3 Various parts are welded in face above, are also formed by three sections, and one section stretched out and one section be connected to below end carriage I-steel 7 of girder It is welded with flanged plate above, one section of lifting plate 16 its weld lifting lug 20 above;Girder I-steel stiffening plate 5 is rectangle steel Plate is welded on the upper surface of I-steel upper cover plate 4, and two sides are bigger than the width of I-steel upper cover plate 4, and outer rim respectively has row's bolt hole, For connecting with end carriage I-steel stiffening plate 6 by fastening bolt 15, I-steel 3 is hung on into 7 lower section of end carriage I-steel;End carriage I-steel stiffening plate 6 is welded in the lower cover plate of end carriage I-steel 7 for the rectangular steel plates as girder I-steel stiffening plate 5 On, for being connect by fastening bolt 15 with girder I-steel stiffening plate 5;End carriage I-steel 7 is I-shaped fashioned iron, end weldering End carriage flanged plate 22 is connect, there is uniformly distributed bolt hole on flanged plate, is connect by end carriage bolt 24 with supporting leg flanged plate 23, end carriage work End carriage I-steel stiffening plate 6 is welded with below word steel 7, end carriage I-steel stiffening plate 6 and girder I-steel stiffening plate 5 pass through bolt It links together, so that girder I-steel 3 be made to hang on the lower section of end carriage I-steel 7;
Lifting cucurbit end carriage 8 is I-shaped fashioned iron, and both ends weld end carriage flanged plate 22, have uniformly distributed bolt on flanged plate Hole is connect by end carriage bolt 24 with supporting leg flanged plate 23, and the upper surface of lifting cucurbit end carriage 8 is welded with track;Lift cucurbit master Beam 9 is I-shaped fashioned iron, and both ends are through flanged joint on trolley 25, and bottom wing listrium is as the small track for lifting cucurbit 10 Road;Lifting cucurbit 10 is suspension electric block, is hung on the bottom wing listrium of lifting cucurbit girder 9, by lifting 11 He of suspension hook Lifting wirerope 12 lifts plate 16 to sling;Lifting suspension hook 11 is to connect lifting wirerope 12;Wirerope 12 is lifted to even Lifting suspension hook 11 and earhole 21 are connect, the lifting lifting plate 16 under the action of lifting suspension hook 11;Clamping plate 13 is rectangular steel plates, balanced welding Connect one section stretched out in electric hoist test bench end and the web of one section of I-steel 3 being connected to below end carriage I-steel 7 On, it is easy to lift the insertion of I-steel ladder web 17 of plate 16 and fixes;Clamping plate pin shaft hole 14 is corresponding with lifting plate pin shaft hole 18, It can reinforce one section of electric hoist test bench end stretching with pin shaft, lift one section of plate 16, be connected under end carriage I-steel 7 One section of bonding strength of side only can also connect one end with pin shaft, and the other end lifts by crane certain altitude, so that the gradient is 1/200, Hill climbing test track as electric block;Fastening bolt 15 connects girder I-steel stiffening plate 5 and end carriage I-steel stiffening plate 6, so that I-steel 3 is fixed below end carriage I-steel 7;Lifting plate 16 is stepped I-steel, the work of both ends protrusion Word steel ladder web 17 is inserted into clamping plate 13 and fixes, and rides on the recessed ladder web of I-steel 3, and welding is hung on top flange plate Ear 20, earhole 21 is provided on lifting lug 20, and there is lifting plate pin shaft hole 18 at both ends, is provided with backstop screw thread at bottom wing listrium on web Then hole 19, lifting plate 16 are inserted into the clamping plate 13 of both ends girder for facilitating the ground of electric block to install after whole promotion, Facilitate three sections of girders of connection, can also be used as the slope surface track of hill climbing test;I-steel ladder web 17 lifts the I-shaped of plate 16 Steel web both ends lower part is dismissed, and top retains, the protrusion of travel step type, for riding over the recessed ladder web of I-steel 3; Lifting plate pin shaft hole 18, which primarily serves the intensity for reinforcing connecting three sections of I-steel 3, can be used as hinged shaft in hill climbing test, take Another lower lifting plate pin shaft, and with 10 pull-up certain altitude of cucurbit is lifted, make to lift plate 16 as climbing track;Backstop spiral shell Pit 19 is distributed on the web of lifting plate 16, is close to bottom wing listrium, in order to after electric block is installed, integral lifting process In, the electric gourd carriage movement when lifting plate 16 is not horizontal of electric block 10 is overstepped the limit;Lifting lug 20 is welded on the work of lifting plate 16 It is symmetrical on word steel upper cover plate 4;Earhole 21 is through-hole on lifting lug 20, for being connect with wirerope 12, lifting lifting plate 16; End carriage flanged plate 22 is the flanged joint seat for being welded on end carriage I-steel 7 and lifting 8 both ends of cucurbit end carriage, is used for connection leg Flanged plate 23;Supporting leg flange 23 is the flanged joint seat for being welded on 1 inside of supporting leg, for connecting end carriage flanged plate 22;End carriage spiral shell Bolt 24 connects end carriage flanged plate 22 and supporting leg flanged plate 23, so that end carriage I-steel 7 and lifting cucurbit end carriage 8 are fixed on supporting leg 1 On;Trolley 25 is the mobile device for lifting cucurbit girder 9, and the both ends of lifting cucurbit girder 9 are welded on trolley 25, and trolley 25 is Rectangular solder box beam, lower section are equipped with operation wheel, and wheel is run on the track above lifting cucurbit end carriage 8, to drive Cucurbit girder 9 is lifted to run;Fixation hole 26 is located on clamping plate 13, for raising in one end of lifting plate 16, as hill climbing test When track, lifting plate pin shaft hole 18 and fixation hole 26 are penetrated with pin shaft, the gradient is maintained at 1/200.
In practical work process:
(1) installation of electric block.
The trolley track of electric block is hung on the cucurbit track 2 of lifting plate 16, connect power supply line and control line, used Backstop threaded hole before and after bolt or shackle insertion electric block trundle, prevents in hoisting process electric block in cucurbit rail It is moved on road 2;
(2) lifting of electric block.
Lifting wirerope 12 is connect by shackle with earhole 21, the lifting suspension hook 11 of decentralization lifting cucurbit 10, lifting is hung Hook 11 catches on lifting wirerope 12, and raising lifts suspension hook 11, and lifting plate 16 is lifted to higher than I-steel 3 to height, shifting is passed through Dynamic lifting cucurbit girder 9 and the position for lifting cucurbit 10, so that the I-steel ladder web 17 of lifting 16 both ends of plate protrusion is inserted into Clamping plate 13, and ride on the recessed ladder web of I-steel 3, such three sections of I-steel 3 have been linked to be one;
(3) test of electric block.
It is walked on stage by what electric block was tested, removes bolt or the shackle controlled in party's threaded hole 19, electric block is transported Row arrives electric hoist test bench, is tested according to the testing program of regulation.
(4) hill climbing test.
The unilateral earhole 21 that lifting plate 16 is sling with lifting suspension hook 11, by the fixation hole on clamping plate pin shaft hole 14 and clamping plate 13 26 alignment, and connected with pin shaft, lifting plate is just provided with 1/200 gradient in this way, lifts the I-steel bottom wing listrium of plate 16 just Become cucurbit climbing track, the hill climbing test of electric block can be carried out.
(5) disassembly of electric block.
After off-test, electric block is run on the cucurbit track 2 of 16 sections of plate of lifting, lifting suspension hook 11, which is caught on, to be hung Steel loading cord 12, lifting lifting plate 16 are higher than the height of I-steel 3, by mobile lifting cucurbit girder 9 and lift cucurbit 10 Position, so that lifting plate 16 is detached from, decentralization lifting plate 16 arrives ground, dismantles electric block.
(6) parallel work-flow.
While lifting the raising of plate 16, decentralization, lifting and electric block and testing, can carry out electric block installation and Disassembly;All operations can be with parallel work-flow.
Above description is the explanation to the utility model, is not the restriction to utility model, defined by the utility model Range is within the protection scope of the utility model referring to claim, can make any type of modification.

Claims (5)

1.一种悬挂式电动葫芦试验台吊装装置,其特征在于:包括分布在四个角处的支腿(1),所述支腿(1)的内侧面通过法兰安装有端梁工字钢(7),位于端梁工字钢(7)的上方的支腿(1)的内侧面分别安装有支腿法兰板(23),两块支腿法兰板(23)之间通过端梁螺栓(24)和端梁法兰板(22)安装吊装葫芦端梁(8),所述吊装葫芦端梁(8)与端梁工字钢(7)平行,吊装葫芦端梁(8)的顶面焊接有轨道,所述轨道上安装台车(25),所述台车(25)的顶部横向安装有吊装葫芦主梁(9),所述吊装葫芦主梁(9)的底部安装有吊装葫芦(10),所述吊装葫芦(10)底部设置有吊装吊钩(11),吊装吊钩(11)上穿过钢丝绳(12),所述钢丝绳(12)连接吊装板(16),所述吊装板(16)的两端分别安装有对称的葫芦主梁轨道接头,所述葫芦主梁轨道接头固定在端梁工字钢加强板(6)上,所述端梁工字钢加强板(6)安装于端梁工字钢(7)的底部两端。1. a suspension type electric hoist test stand hoisting device, is characterized in that: comprise outriggers (1) distributed at four corners, the inner side of described outriggers (1) is installed with end beam I-shaped by flange Steel (7), the inner side of the outrigger (1) located above the end beam I-beam (7) is respectively installed with outrigger flange plates (23), and the two outrigger flange plates (23) pass through between the two outrigger flange plates (23). The end beam bolts (24) and the end beam flange plate (22) are installed with a hoisting hoist end beam (8), the hoisting hoist end beam (8) is parallel to the end beam I-beam (7), and the hoisting hoist end beam (8) is parallel to the end beam I-beam (7). A rail is welded on the top surface, a trolley (25) is installed on the rail, a hoisting hoist main beam (9) is laterally installed on the top of the trolley (25), and a bottom of the hoisting hoist main beam (9) is installed with A hoisting hoist (10), the bottom of the hoisting hoist (10) is provided with a hoisting hook (11), the hoisting hook (11) passes through a wire rope (12), and the wire rope (12) is connected to the hoisting plate (16), The two ends of the hoisting plate (16) are respectively installed with symmetrical hoist main beam rail joints, the hoist main beam rail joints are fixed on the end beam I-beam reinforcing plate (6), and the end beam I-beam is reinforced The plate (6) is installed on both ends of the bottom of the end beam I-beam (7). 2.如权利要求1所述的悬挂式电动葫芦试验台吊装装置,其特征在于:所述吊装板(16)的安装结构为:包括成倒凸字形结构的吊装板(16),所述吊装板(16)的顶部安装有吊耳(20),所述吊耳(20)上开有耳孔(21),所述吊装板(16)的两端开有吊装板销轴孔(18),下部开有多个止挡螺纹孔(19),吊装板(16)的下部采用工字钢阶梯腹板(17)。2. The suspension type electric hoist test stand hoisting device according to claim 1, characterized in that: the installation structure of the hoisting plate (16) is: a hoisting plate (16) comprising an inverted convex structure, the hoisting plate (16) A lifting lug (20) is installed on the top of the plate (16), an ear hole (21) is opened on the lifting lug (20), and a lifting plate pin hole (18) is opened at both ends of the lifting plate (16), The lower part is provided with a plurality of stop threaded holes (19), and the lower part of the hoisting plate (16) adopts an I-beam stepped web (17). 3.如权利要求1所述的悬挂式电动葫芦试验台吊装装置,其特征在于:所述葫芦主梁轨道接头的安装结构为:包括端梁工字钢加强板(6),所述端梁工字钢加强板(6)通过紧固螺栓(15)安装主梁工字钢加强板(5),所述主梁工字钢加强板(5)底部为工字钢上盖板(4),所述工字钢上盖板(4)的下部为工字钢(3),所述工字钢(3)的底部为葫芦轨道(2),所述工字钢(3)的两侧分别通过紧固件安装有夹板(13),所述夹板(13)上分别开有固定孔(26)和夹板销轴孔(14)。3. The suspension type electric hoist test stand hoisting device as claimed in claim 1, characterized in that: the installation structure of the hoist main girder rail joint is: comprising an end beam I-beam reinforcing plate (6), the end beam The I-beam reinforcement plate (6) is installed with the main beam I-beam reinforcement plate (5) by fastening bolts (15), and the bottom of the main beam I-beam reinforcement plate (5) is an I-beam upper cover plate (4) , the lower part of the I-beam upper cover plate (4) is an I-beam (3), the bottom of the I-beam (3) is a hoist track (2), and the two sides of the I-beam (3) are The clamping plates (13) are respectively installed by means of fasteners, and the clamping plates (13) are respectively provided with fixing holes (26) and clamping plate pin shaft holes (14). 4.如权利要求1所述的悬挂式电动葫芦试验台吊装装置,其特征在于:所述支腿(1)成圆柱体结构。4. The hoisting device for a suspended electric hoist test stand according to claim 1, characterized in that: the outrigger (1) has a cylindrical structure. 5.如权利要求3所述的悬挂式电动葫芦试验台吊装装置,其特征在于:所述主梁工字钢加强板(5)为矩形钢板。5. The hoisting device of the suspended electric hoist test stand according to claim 3, characterized in that: the main beam I-beam reinforcing plate (5) is a rectangular steel plate.
CN201821128954.0U 2018-07-16 2018-07-16 Suspension electric hoist testing stand hanging apparatus Active CN208516784U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821128954.0U CN208516784U (en) 2018-07-16 2018-07-16 Suspension electric hoist testing stand hanging apparatus

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821128954.0U CN208516784U (en) 2018-07-16 2018-07-16 Suspension electric hoist testing stand hanging apparatus

Publications (1)

Publication Number Publication Date
CN208516784U true CN208516784U (en) 2019-02-19

Family

ID=65335903

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821128954.0U Active CN208516784U (en) 2018-07-16 2018-07-16 Suspension electric hoist testing stand hanging apparatus

Country Status (1)

Country Link
CN (1) CN208516784U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108639947A (en) * 2018-07-16 2018-10-12 江苏省特种设备安全监督检验研究院 Suspension electric hoist testing stand hanging apparatus
CN111395395A (en) * 2020-04-22 2020-07-10 中铁四局集团有限公司 Installation process of subway deep foundation pit cover excavation lower supporting system
CN111661756A (en) * 2020-06-23 2020-09-15 菲尔森智能装备(江苏)有限公司 Super-silent anti-swing crane

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108639947A (en) * 2018-07-16 2018-10-12 江苏省特种设备安全监督检验研究院 Suspension electric hoist testing stand hanging apparatus
CN108639947B (en) * 2018-07-16 2023-07-11 江苏省特种设备安全监督检验研究院 Suspended electric hoist test bench hoisting device
CN111395395A (en) * 2020-04-22 2020-07-10 中铁四局集团有限公司 Installation process of subway deep foundation pit cover excavation lower supporting system
CN111661756A (en) * 2020-06-23 2020-09-15 菲尔森智能装备(江苏)有限公司 Super-silent anti-swing crane

Similar Documents

Publication Publication Date Title
CN207244454U (en) Superelevation tower main cable saddle Lift-on/Lift-off System
CN105421249B (en) Dragging- hoisting combined type hanging basket structure and construction method
CN205387439U (en) Mast hoisting accessory
CN105401714B (en) Attached lifting scaffold and lifting method
CN208516784U (en) Suspension electric hoist testing stand hanging apparatus
CN106320182B (en) The long hoist cable of suspension bridge bank slope beam section, which is swung, moves mounting device and method
CN201458591U (en) Lifting device for installing sound barrier
CN106698208A (en) Hoisting equipment and hoisting method for external transportation of super high-rise building
CN206052568U (en) The long hoist cable of suspension bridge bank slope beam section swings shifting erecting device
CN101402436A (en) Method and apparatus for disassembling cargo boom of climbing tower crane
CN210460016U (en) Integrated form single power lift material platform
CN108639947B (en) Suspended electric hoist test bench hoisting device
CN214269987U (en) Hoisting device applied to high-rise building roof elevator shaft
CN106315426A (en) Block form tower crane mounting and jacking method for assembled building
CN205346600U (en) Big plate -girder hoist and mount specialized tool
CN114382015A (en) Construction method for vertical rotation of special-shaped steel main tower of cable-stayed bridge
CN209601982U (en) A flat-top tower crane that is convenient for manpower handling and installation
CN205500579U (en) Moving die carrier for lock
CN101695984B (en) Assembly method and assembly lifting appliance of vertical beam and horizontal beam under arc of midheight deck steel pipe concrete arch bridge
CN216863445U (en) Cable well lid opening tool
CN208732486U (en) Roofing monorail crane
CN213653209U (en) Integrated construction movable platform for bridge flange plate
CN105883645B (en) Method for dismantling attachment device of tower crane
CN108680376B (en) Multifunctional electric hoist test bench
CN208636051U (en) Multifunctional electric hoist test bench

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant