CN208516756U - A lifting tool for loading and unloading drainage pipes - Google Patents

A lifting tool for loading and unloading drainage pipes Download PDF

Info

Publication number
CN208516756U
CN208516756U CN201820306742.0U CN201820306742U CN208516756U CN 208516756 U CN208516756 U CN 208516756U CN 201820306742 U CN201820306742 U CN 201820306742U CN 208516756 U CN208516756 U CN 208516756U
Authority
CN
China
Prior art keywords
lifting
suspension hook
utility
loading
model
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820306742.0U
Other languages
Chinese (zh)
Inventor
朱家焕
丁得志
李定有
周海峰
黄焕然
袁海波
胡磊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Tiesiju Civil Engineering Group Co Ltd CTCE Group
Fifth Engineering Co Ltd of CTCE Group
Original Assignee
China Tiesiju Civil Engineering Group Co Ltd CTCE Group
Fifth Engineering Co Ltd of CTCE Group
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Tiesiju Civil Engineering Group Co Ltd CTCE Group, Fifth Engineering Co Ltd of CTCE Group filed Critical China Tiesiju Civil Engineering Group Co Ltd CTCE Group
Priority to CN201820306742.0U priority Critical patent/CN208516756U/en
Application granted granted Critical
Publication of CN208516756U publication Critical patent/CN208516756U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Load-Engaging Elements For Cranes (AREA)

Abstract

The utility model discloses a loading and unloading drain pipe lifting device, connect rings including two sets of lifting chains and the second of setting at the lifting chain top, two sets of lifting chain lower extremes all are equipped with the combination lifting hook, the combination lifting hook can be dismantled with the lifting chain through first connection rings and be connected, be equipped with multiunit lifting hook monomer in the combination lifting chain, through many strengthening rib fixed connection between the adjacent lifting hook monomer, the beneficial effects of the utility model are that: the utility model discloses structural design is simple, with low costs, easily draw materials, and processing simple manufacture, quick, the drain pipe of loading and unloading is easily put neatly, and has once hang more, loading and unloading characteristics such as simple, convenient, has shortened the handling time of drain pipe, has reduced labor production time, has reduced the labor cost, has improved production efficiency and productivity effect.

Description

A kind of handling drainpipe lifting device
Technical field
The utility model relates to technical field of engineering equipment, specifically a kind of handling drainpipe lifting device.
Background technique
With the fast development of urban construction, sewerage system construction is also followed by fast development, using prefabricated row Water pipe carries out the main form of construction work that drainage pipeline is mounted for sewerage system construction, and drainage pipeline is from prefabricated place to applying The construction speed that the lay day affects drainage pipeline is turned on workshop ground, is hung using wirerope to wearing drainpipe and hang over lifting machine It lifts in hook and is inserted in the preformed hole of drainpipe using drill rod, lifted with wirerope connection drill rod and lifting machine hook The lifting mode of tradition handling pipeline so relatively takes time and effort.
Utility model content
The purpose of this utility model is to provide a kind of handling drainpipe lifting devices, to solve to mention in above-mentioned background technique Out the problem of.
To achieve the above object, the utility model provides the following technical solutions:
A kind of handling drainpipe lifting device, including two groups of chain slings and be arranged at the top of chain sling second connection hanging ring, Two groups of chain sling lower ends are equipped with combination suspension hook, and the combination suspension hook is detachably connected by the first connection hanging ring with chain sling, It is equipped with multiple groups suspension hook monomer in the combination chain sling, is fixedly connected between the adjacent suspension hook monomer by more reinforcing ribs.
As a further solution of the present invention: it is U-shaped hanging ring that the first connection hanging ring, which connect hanging ring with second,.
As a further solution of the present invention: the monomer suspension hook is 28 reinforcing bar material of HRB400 φ.
As a further solution of the present invention: being equipped with two reinforcing ribs between the adjacent suspension hook monomer, and reinforce Muscle is 16 reinforcing bar material of HRB400 φ.
Compared with prior art, the utility model has the beneficial effects that the utility model structure design it is simple, at low cost, It is easy to draw materials, processing and fabricating simply, quickly, easily put neatly by the drainpipe of handling, and has and once hang more, loads and unloads simply, just The features such as prompt, has shortened the lay day of drainpipe, reduces the labour production time, reduces labour cost, improves production Efficiency and productivity effect.
Detailed description of the invention
Fig. 1 is the main view of the utility model.
Fig. 2 is the side view of the utility model.
Fig. 3 is the top view of the utility model.
In figure: 1- chain sling, 2- combine suspension hook, the connection of 3- first hanging ring, 4- lifting machine suspension hook, 5- second connection hanging ring, 6- Reinforcing rib, 7- suspension hook monomer.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work Every other embodiment obtained, fall within the protection scope of the utility model.
Please refer to Fig. 1-3, in the utility model embodiment, a kind of handling drainpipe lifting device, including two groups of chain slings 1 with And the second connection hanging ring 5 at 1 top of chain sling is set, it is removable by the second connection hanging ring 5 and lifting machine suspension hook 4 at the top of chain sling 1 Connection is unloaded, two groups of 1 lower ends of chain sling are equipped with combination suspension hook 2, and combination suspension hook 2 is detachably connected by the first connection hanging ring 3 with chain sling 1 It connects, it is U-shaped hanging ring that the first connection hanging ring 3, which connect hanging ring 5 with second, is equipped with multiple groups suspension hook monomer 7, monomer in combination chain sling 2 Suspension hook 7 is 28 reinforcing bar material of HRB400 φ and is bent into L-type structure by angle-bender, is passed through between adjacent suspension hook monomer 7 Two reinforcing ribs 6 are fixedly connected, and reinforcing rib 6 is 16 reinforcing bar material of HRB400 φ, can increase combination suspension hook 2 by reinforcing rib 6 Lateral confinement power, improve combination suspension hook 2 stability.When the utility model is used, first will by the second connection hanging ring 5 Chain sling 1 is connected on lifting machine suspension hook 4, and two groups of combination suspension hooks 2 are then connected respectively to two groups by the first connection hanging ring 3 and are hung 2 lower end of chain, and then the assembling of lifting device is completed, the suspension hook monomer 7 combined in suspension hook 2 is then distinguished into hook and such as arrives row side by side Then water pipe internal wall of pipe orifice starts lifting machine, can both carry out the lifting of drainpipe, when being lifted into predetermined position, lifting machine Power is unloaded, chain sling 1 loses upward pulling force, and combination suspension hook 2 can fall off and take out from drainpipe nozzle easily, so far complete At entire hoisting process, entire hoisting process is simple and fast, thus can rapidly and efficiently progress drainpipe lifting work.
It is obvious to a person skilled in the art that the present invention is not limited to the details of the above exemplary embodiments, and And without departing substantially from the spirit or essential attributes of the utility model, it can realize that this is practical new in other specific forms Type.Therefore, in all respects, the present embodiments are to be considered as illustrative and not restrictive, this is practical new The range of type is indicated by the appended claims rather than the foregoing description, it is intended that containing for the equivalent requirements of the claims will be fallen in All changes in justice and range are embraced therein.It should not treat any reference in the claims as limiting Related claim.
In addition, it should be understood that although this specification is described in terms of embodiments, but not each embodiment is only wrapped Containing an independent technical solution, this description of the specification is merely for the sake of clarity, and those skilled in the art should It considers the specification as a whole, the technical solutions in the various embodiments may also be suitably combined, forms those skilled in the art The other embodiments being understood that.

Claims (4)

1. a kind of handling drainpipe lifting device is hung including two groups of chain slings (1) and the second connection being arranged at the top of chain sling (1) Ring (5), which is characterized in that chain sling described in two groups (1) lower end is equipped with combination suspension hook (2), and the combination suspension hook (2) passes through first Connection hanging ring (3) is detachably connected with chain sling (1), and multiple groups suspension hook monomer (7) is equipped in the combination suspension hook (2), adjacent described It is fixedly connected between suspension hook monomer (7) by more reinforcing ribs (6).
2. a kind of handling drainpipe lifting device according to claim 1, which is characterized in that the first connection hanging ring (3) hanging ring (5) is connect with second is U-shaped hanging ring.
3. a kind of handling drainpipe lifting device according to claim 1, which is characterized in that the suspension hook monomer (7) is 28 reinforcing bar material of HRB400 φ.
4. a kind of handling drainpipe lifting device according to claim 1, which is characterized in that the adjacent suspension hook monomer (7) two reinforcing ribs (6) are equipped between, and reinforcing rib (6) is 16 reinforcing bar material of HRB400 φ.
CN201820306742.0U 2018-03-06 2018-03-06 A lifting tool for loading and unloading drainage pipes Expired - Fee Related CN208516756U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820306742.0U CN208516756U (en) 2018-03-06 2018-03-06 A lifting tool for loading and unloading drainage pipes

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820306742.0U CN208516756U (en) 2018-03-06 2018-03-06 A lifting tool for loading and unloading drainage pipes

Publications (1)

Publication Number Publication Date
CN208516756U true CN208516756U (en) 2019-02-19

Family

ID=65340850

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820306742.0U Expired - Fee Related CN208516756U (en) 2018-03-06 2018-03-06 A lifting tool for loading and unloading drainage pipes

Country Status (1)

Country Link
CN (1) CN208516756U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN118270643A (en) * 2024-05-31 2024-07-02 大庆正立达石油机械配件有限公司 Calandria device for petroleum well repairing operation

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN118270643A (en) * 2024-05-31 2024-07-02 大庆正立达石油机械配件有限公司 Calandria device for petroleum well repairing operation

Similar Documents

Publication Publication Date Title
CN103397629B (en) The disposable construction method for hanging of overlength reinforcing cage
CN104594696B (en) Double embrace bar group is utilized to found 1000kV tangent suspension tower construction method
CN109095343A (en) Assembled hanger
CN201699379U (en) Combined-type cable hook fixing hook
CN208516756U (en) A lifting tool for loading and unloading drainage pipes
CN204342257U (en) A kind of large-scale component turning device
CN105110205B (en) A kind of reverse method for dismounting of derrick crane
CN103381994B (en) Precast pile pile hanging method
CN105621231A (en) Combined lifting appliance special for large-diameter reinforced concrete drainage pipe
CN201907924U (en) Spreading wing-type winding drum lifting device
CN211226017U (en) Major diameter reinforced concrete pipe hoist
CN108516454A (en) A kind of hanging apparatus of prefabricated components
CN211393542U (en) Twist king block hoisting device
CN202897816U (en) Steel bar lifting hook
CN204224077U (en) A kind of steel construction piece mounting hanger
CN202353095U (en) Wire lifting arrangement structure for 8-bundled conductors on straight-path tower
CN209702095U (en) A kind of wire rod lifting device
CN206927467U (en) A kind of lifting pipeline instrument
CN223087434U (en) An easily shrinkable small-diameter reinforced concrete pipe hanger
CN207158598U (en) A kind of board suspender
CN208279171U (en) A kind of device for prefabricated components hoisting and hanging
CN204752046U (en) On --spot hoist and mount are with two steps of towers
CN220034619U (en) Hot dip galvanization lifting tool
CN204823978U (en) Scene stone removes tripod
CN221739731U (en) Pulley type pipeline lifting equipment

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP02 Change in the address of a patent holder
CP02 Change in the address of a patent holder

Address after: Wangjiang Road in Baohe District of Hefei city of Anhui Province, No. 96 230023

Co-patentee after: THE FIFITH CONSTRUCTION LTD.OF CHINA TIESIJU CIVIL ENGINEERING Group

Patentee after: CHINA TIESIJU CIVIL ENGINEERING GROUP Co.,Ltd.

Address before: 230023 technical center of China Railway four Bureau, No. 96 Wangjiang East Road, Anhui, 618, Hefei

Co-patentee before: THE FIFITH CONSTRUCTION LTD.OF CHINA TIESIJU CIVIL ENGINEERING Group

Patentee before: CHINA TIESIJU CIVIL ENGINEERING GROUP Co.,Ltd.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190219