CN208502210U - Wall elevation construction operating platform - Google Patents

Wall elevation construction operating platform Download PDF

Info

Publication number
CN208502210U
CN208502210U CN201820768859.0U CN201820768859U CN208502210U CN 208502210 U CN208502210 U CN 208502210U CN 201820768859 U CN201820768859 U CN 201820768859U CN 208502210 U CN208502210 U CN 208502210U
Authority
CN
China
Prior art keywords
operating platform
ladder
protect
construction
frame structure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820768859.0U
Other languages
Chinese (zh)
Inventor
甄虎
徐洪瑞
王殿军
江海波
张晓波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Seventh Engineering Division Corp Ltd
Original Assignee
China Construction Seventh Engineering Division Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Seventh Engineering Division Corp Ltd filed Critical China Construction Seventh Engineering Division Corp Ltd
Priority to CN201820768859.0U priority Critical patent/CN208502210U/en
Application granted granted Critical
Publication of CN208502210U publication Critical patent/CN208502210U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Ladders (AREA)

Abstract

The utility model provides a kind of wall elevation construction operating platform; belong to field of steel structure construction; including ladder and the operating platform being arranged on the ladder; the ladder is vertical ladder; top is provided with for hanging over the suspension part on wall purlins or girder steel; the operating platform includes protect-ing frame structure and the bottom plate that the protect-ing frame structure bottom is arranged in, and the protect-ing frame structure and the ladder are fixedly installed.Wall elevation construction operating platform provided by the utility model can provide protective platform safely, conveniently, stable in construction, easy for construction, time saving and energy saving, substantially increase work task efficiency, eliminate security risk, achieved the purpose that safety in production.Have the characteristics that easy to operate, dismounting is convenient, be used in turn, it is both beautiful and practical, very big help is played to safety construction.

Description

Wall elevation construction operating platform
Technical field
The utility model belongs to steel structure construction technology field, is to be related to a kind of wall elevation construction operation more specifically Platform.
Background technique
Steel-structure factory building is in daily construction, and people stands on girder steel or wall purlins only by a peace when wall elevation construction Full band guarantees safety, and there are larger security risks, and while constructing is inconvenient.Especially shingle nail, wall purlins etc. were installed Cheng Zhong, material shakes larger when lifting, and construction personnel is easy to be led to itself unstability by Effect of Materials is shaken, and there is the wind that falls greatly very much Danger.
Utility model content
It is existing in the prior art to solve the purpose of this utility model is to provide a kind of wall elevation construction operating platform It is inconvenient and there is the technical issues of security risk when wall elevation construction.
In order to achieve the above purposes, the technical solution adopted by the utility model is: provides a kind of wall elevation construction operating platform, The operating platform for including: ladder and being arranged on the ladder, the ladder are vertical ladder, and top is provided with for hanging over wall Suspension part on face purlin or girder steel, the operating platform include protect-ing frame structure and the bottom that the protect-ing frame structure bottom is arranged in Plate, the protect-ing frame structure and ladder fixed setting.
Further, the bottom plate of the operating platform is hingedly arranged with the protect-ing frame structure.
Further, the operating platform is one or more.
Further, the interconnecting piece with ladder cooperation is provided in the protect-ing frame structure, the interconnecting piece passes through spiral shell Bolt is fixedly connected with the ladder.
Further, the width of the ladder is 600mm, and ladder step spacing is 450mm.
Further, the bottom plate is the steel plate of 3mm thickness, and the size of the bottom plate is 600*600*900mm.
Further, the ladder and the protect-ing frame structure pass through 30mm square steel and are welded.
The beneficial effect of wall elevation construction operating platform provided by the utility model is:
Compared with prior art, the utility model wall elevation construction operating platform can provide safely, just in construction Prompt, stable protective platform, it is easy for construction, time saving and energy saving, it substantially increases work task efficiency, eliminate security risk, Safety in production is achieved the purpose that.Have the characteristics that easy to operate, dismounting is convenient, be used in turn, it is both beautiful and practical, to safety Civilized construction plays very big help.
Detailed description of the invention
It, below will be to embodiment or the prior art in order to illustrate more clearly of the technical scheme in the embodiment of the utility model Attached drawing needed in description is briefly described, it should be apparent that, the accompanying drawings in the following description is only that this is practical new Some embodiments of type for those of ordinary skill in the art without any creative labor, can be with It obtains other drawings based on these drawings.
Fig. 1 is the structural schematic diagram of wall elevation construction operating platform provided by the embodiment of the utility model.
Wherein, each appended drawing reference in figure:
1- ladder;The suspension part 11-;2- operating platform;21- protect-ing frame structure;22- bottom plate.
Specific embodiment
In order to which technical problem to be solved in the utility model, technical solution and beneficial effect is more clearly understood, with Lower combination accompanying drawings and embodiments, the present invention will be further described in detail.It should be appreciated that specific reality described herein It applies example to be only used to explain the utility model, is not used to limit the utility model.
It should be noted that it can be directly another when element is referred to as " being fixed on " or " being set to " another element On one element or indirectly on another element.When an element is known as " being connected to " another element, it can To be directly to another element or be indirectly connected on another element.
It is to be appreciated that term " length ", " width ", "upper", "lower", "front", "rear", "left", "right", "vertical", The orientation or positional relationship of the instructions such as "horizontal", "top", "bottom" "inner", "outside" is that orientation based on the figure or position are closed System, is merely for convenience of describing the present invention and simplifying the description, rather than the device or element of indication or suggestion meaning are necessary It with specific orientation, is constructed and operated in a specific orientation, therefore should not be understood as limiting the present invention.
In addition, term " first ", " second " are used for descriptive purposes only and cannot be understood as indicating or suggesting relative importance Or implicitly indicate the quantity of indicated technical characteristic.Define " first " as a result, the feature of " second " can be expressed or Implicitly include one or more of the features." multiple ", " several " are meant that two in the description of the present invention, It is a or more than two, unless otherwise specifically defined.
Referring to Fig. 1, existing be illustrated wall elevation construction operating platform provided by the utility model.The wall facade is applied Work operating platform, including ladder 1 and the operating platform 2 being arranged on the ladder 1, the ladder 1 is vertical ladder, and top is set It is equipped with for hanging over the suspension part 11 on wall purlins or girder steel, the operating platform 2 includes protect-ing frame structure 21 and is arranged in institute The bottom plate 22 of 21 bottom of protect-ing frame structure is stated, the protect-ing frame structure 21 and the ladder 1 are fixedly installed.
Wall elevation construction operating platform provided by the utility model is used for the various constructing operations of steel-structure factory building wall facade, The utility model is directly hung to construction part with crane when use, 1 upper end of ladder by suspension part 11 be hung on wall purlins or On girder steel, top and bottom can be fixed with iron wire to prevent from shaking, and construction personnel is climbed from top or lower part to behaviour by ladder 1 Make on the bottom plate 22 of platform 2, constructing operation is carried out inside protect-ing frame structure 21.
Wall elevation construction operating platform provided by the utility model, can be provided in construction safely, conveniently, it is stable anti- Platform is protected, it is easy for construction, time saving and energy saving, it substantially increases work task efficiency, eliminate security risk, reached safe life The purpose of production.Have the characteristics that easy to operate, dismounting is convenient, be used in turn, it is both beautiful and practical, safety construction is played Very big help.
Further, referring to Fig. 1, a kind of specific reality as wall elevation construction operating platform provided by the utility model Apply mode, the bottom plate 22 of the operating platform 2 and the hingedly setting of the protect-ing frame structure 21.So that bottom plate 22 forms protect-ing frame structure 21 Gate-type dump bottom, convenient for construction personnel from 1 lower part of ladder enter the operating platform 2 inside.
Further, referring to Fig. 1, a kind of specific reality as wall elevation construction operating platform provided by the utility model Mode is applied, the operating platform 2 is one or more.I.e. in the utility model, the quantity of operating platform 2, position are not limited to, It can be adjusted according to actual condition.
Further, referring to Fig. 1, a kind of specific reality as wall elevation construction operating platform provided by the utility model Apply mode, be provided in the protect-ing frame structure 21 with the ladder 1 cooperation interconnecting piece, the interconnecting piece by bolt with it is described Ladder 1 is fixedly connected.
Further, referring to Fig. 1, a kind of specific reality as wall elevation construction operating platform provided by the utility model Mode is applied, the width of the ladder 1 is 600mm, and ladder step spacing is 450mm.The length of ladder 1 can be according to live practical determining.
Further, referring to Fig. 1, a kind of specific reality as wall elevation construction operating platform provided by the utility model Mode is applied, the bottom plate 22 is the steel plate of 3mm thickness, and the size of the bottom plate 22 is 600*600*900mm.
Further, referring to Fig. 1, a kind of specific reality as wall elevation construction operating platform provided by the utility model Mode is applied, the ladder 1 and the protect-ing frame structure 21 are welded by 30mm square steel.
The above is only the preferred embodiment of the utility model only, is not intended to limit the utility model, all at this Made any modifications, equivalent replacements, and improvements etc., should be included in the utility model within the spirit and principle of utility model Protection scope within.

Claims (7)

1. wall elevation construction operating platform, it is characterised in that: described including ladder and the operating platform being arranged on the ladder Ladder is vertical ladder, and top is provided with for hanging over the suspension part on wall purlins or girder steel, and the operating platform includes protecting Shield frame and the bottom plate that the protect-ing frame structure bottom is set, the protect-ing frame structure and ladder fixed setting.
2. wall elevation construction operating platform as described in claim 1, it is characterised in that: the bottom plate of the operating platform with it is described Protect-ing frame structure is hingedly arranged.
3. wall elevation construction operating platform as described in claim 1, it is characterised in that: the operating platform is one or more It is a.
4. wall elevation construction operating platform as described in claim 1, it is characterised in that: be provided in the protect-ing frame structure and institute The interconnecting piece of ladder cooperation is stated, the interconnecting piece is fixedly connected by bolt with the ladder.
5. wall elevation construction operating platform as described in claim 1, it is characterised in that: the width of the ladder is 600mm, ladder Step spacing is 450mm.
6. wall elevation construction operating platform as described in claim 1, it is characterised in that: the bottom plate is the steel plate of 3mm thickness, institute The size for stating bottom plate is 600*600*900mm.
7. wall elevation construction operating platform as described in claim 1, it is characterised in that: the ladder and the protect-ing frame structure are equal It is welded by 30mm square steel.
CN201820768859.0U 2018-05-22 2018-05-22 Wall elevation construction operating platform Expired - Fee Related CN208502210U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820768859.0U CN208502210U (en) 2018-05-22 2018-05-22 Wall elevation construction operating platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820768859.0U CN208502210U (en) 2018-05-22 2018-05-22 Wall elevation construction operating platform

Publications (1)

Publication Number Publication Date
CN208502210U true CN208502210U (en) 2019-02-15

Family

ID=65293115

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820768859.0U Expired - Fee Related CN208502210U (en) 2018-05-22 2018-05-22 Wall elevation construction operating platform

Country Status (1)

Country Link
CN (1) CN208502210U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112127611A (en) * 2020-09-23 2020-12-25 中国五冶集团有限公司 Assembly type high-altitude corbel construction operation platform device
CN112716350A (en) * 2020-12-31 2021-04-30 福建省闽南建筑工程有限公司 Improved suspension support frame for cleaning building outer wall glass
CN113802825A (en) * 2021-09-24 2021-12-17 上海宝冶集团有限公司 Hanging scaffold

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112127611A (en) * 2020-09-23 2020-12-25 中国五冶集团有限公司 Assembly type high-altitude corbel construction operation platform device
CN112716350A (en) * 2020-12-31 2021-04-30 福建省闽南建筑工程有限公司 Improved suspension support frame for cleaning building outer wall glass
CN112716350B (en) * 2020-12-31 2022-10-28 福建省闽南建筑工程有限公司 Improved suspension support frame for cleaning building outer wall glass
CN113802825A (en) * 2021-09-24 2021-12-17 上海宝冶集团有限公司 Hanging scaffold

Similar Documents

Publication Publication Date Title
CN208502210U (en) Wall elevation construction operating platform
CN206873896U (en) Cage for the construction of oil gas storage tank outer wall pipe support
CN207245138U (en) Boat scaffold adjustable in pitch
CN109024896A (en) A kind of bilayer anticollision assembling type steel structure truss bars processing is anti-to pound canopy
CN208518306U (en) Horizontal operation platform for daylighting roof construction
CN206219988U (en) Foldable hanging basket
CN105735624A (en) Cage for installing roof ceiling sheet
CN207160249U (en) Structure is built in a kind of interim room in quick detachable building site
CN104860245B (en) A kind of two grades of inspection platforms of energy-saving appliance of boiler
CN206487178U (en) Distribution box protection canopy is used in one kind construction
CN108756721B (en) A kind of cement shaft tower Anti-drop ladder structure
CN202731270U (en) Movable platform for aerial installation operation of space steel structure
CN207332341U (en) Protective shed structure of reserved hole of tower crane
CN202913679U (en) Double-function construction operation protection derrick in elevator shaft way
CN206667721U (en) The construction integrated system of operating platform on a kind of wide-angle Sloping roof
CN205421955U (en) Cage that installation roofing furred ceiling board was used
CN206987720U (en) A kind of double shield cage cat ladders
CN208856819U (en) People channel on setting tower crane
CN203961405U (en) Yi Zhong sightseeing tower
CN206091013U (en) Novel convertible canopy steel construction
CN206956739U (en) A kind of portable edge protection device
CN208039796U (en) A kind of safety-type hanging basket of construction
CN207073209U (en) A kind of fireproof steel structure
CN206800974U (en) Lower-hanging type outer wall moving cantilever operation frame
CN207277207U (en) A kind of bridge top construction safety protection column

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190215

CF01 Termination of patent right due to non-payment of annual fee