CN208486541U - A kind of structural steelwork scaffold is built with steel pipe movement device - Google Patents

A kind of structural steelwork scaffold is built with steel pipe movement device Download PDF

Info

Publication number
CN208486541U
CN208486541U CN201821063740.XU CN201821063740U CN208486541U CN 208486541 U CN208486541 U CN 208486541U CN 201821063740 U CN201821063740 U CN 201821063740U CN 208486541 U CN208486541 U CN 208486541U
Authority
CN
China
Prior art keywords
steel pipe
guardrail
placing box
reel
take
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821063740.XU
Other languages
Chinese (zh)
Inventor
谢琴飞
洪富华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Xinyu Decoration Industry Co Ltd
Original Assignee
Zhejiang Xinyu Decoration Industry Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Xinyu Decoration Industry Co Ltd filed Critical Zhejiang Xinyu Decoration Industry Co Ltd
Priority to CN201821063740.XU priority Critical patent/CN208486541U/en
Application granted granted Critical
Publication of CN208486541U publication Critical patent/CN208486541U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of structural steelwork scaffolds to build with steel pipe movement device, including steel pipe placing box, guardrail is installed on the outside of the steel pipe placing box, the both ends of the guardrail are equipped with lengthened plate by hinge, the bottom end of the guardrail is equipped with wheel carrier, wheel is installed on the wheel carrier, pushing-pulling-rack is installed at the upper side of the guardrail, one end of the pushing-pulling-rack is equipped with grip, the top avris of the steel pipe placing box, which is equipped with, increases protective fence, the two sides for increasing protective fence are equipped with support rod, the side of the support rod is equipped with take-up reel, rope is installed on the take-up reel, the side of the take-up reel is equipped with rocking bar, the top of the support rod is equipped with lifting machine.Guardrail is installed on the outside of the utility model steel pipe placing box, wheel is installed below guardrail, it is mobile to facilitate control device by it, and is equipped with lengthened plate by hinge in the two sides of guardrail, can be carried to longer steel pipe by it.

Description

A kind of structural steelwork scaffold is built with steel pipe movement device
Technical field
The utility model relates to steel pipe movement device field, specifically a kind of structural steelwork scaffold is built to be moved with steel pipe Dynamic device.
Background technique
Steel pipe movement device facilitates control steel pipe movement, and convenient to lift, scaffold is to guarantee that each work progress is suitable The sharp workbench for carrying out and setting up.It is divided into external scaffolding, internal scaffolding by the position set up;The wooden foot can be divided by material difference Hand cradle, bamboo scaffolding, steel pipe scaffold;It is divided into pole type scaffold by structural form, bridge scaffold, door-type scaffold, hangs Working platform, suspended scaffold choose formula scaffold, climb formula scaffold, structural steelwork be made with steel based on structure, Mainly the components such as the girder steel made of fashioned iron and steel plate etc., steel column, steel truss form, and weldering is generallyd use between each component or component Seam, bolt or rivet interlacement, are one of main building construction types.Because its self weight is lighter, and easy construction, it is widely used in The fields such as large-sized workshop, bridge, venue, Super High.
The steel pipe movement device of current stage is there are many shortcomings, for example, inconvenient to use, can not carry out simultaneously It is promoted and mobile.
Utility model content
The purpose of this utility model is to provide a kind of structural steelwork scaffolds to build with steel pipe movement device, to solve Problem in the prior art inconvenient to use, can not being promoted and be moved simultaneously.
To achieve the above object, the utility model provides the following technical solutions: a kind of structural steelwork scaffold builds use Steel pipe movement device, including steel pipe placing box are equipped with guardrail on the outside of the steel pipe placing box, and the both ends of the guardrail pass through Hinge is equipped with lengthened plate, and the bottom end of the guardrail is equipped with wheel carrier, and wheel is equipped on the wheel carrier, the guardrail Upper side is equipped with pushing-pulling-rack, and one end of the pushing-pulling-rack is equipped with grip, the top avris installation of the steel pipe placing box Have and increase protective fence, the two sides for increasing protective fence are equipped with support rod, and the side of the support rod is equipped with take-up reel, institute It states and rope is installed on take-up reel, the side of the take-up reel is equipped with rocking bar, and the top of the support rod is equipped with lifting machine, One end of the lifting machine is equipped with first pulley, and bracket, the bracket are equipped at the side upper position of the lifting machine One end second pulley is installed, one end of the rope is equipped with hook.
Preferably, the outside of the guardrail and steel pipe placing box is by being welded to connect, and wheel carrier and guardrail are welded to connect.
Preferably, one end of the rope furls on take-up reel, and rope and first pulley and second pulley transmission connect It connects.
Preferably, there are two the lengthened plate is arranged altogether, and bottom end of the bottom end of two lengthened plates with steel pipe placing box It flushes.
Preferably, the inside of the take-up reel is equipped with Wire winding shaft, and Wire winding shaft and rocking bar are rotatablely connected.
Compared with prior art, the utility model has the beneficial effects that the outside of the utility model steel pipe placing box is installed There is guardrail, wheel is installed below guardrail, facilitates control device mobile by it, and pacify in the two sides of guardrail by hinge Equipped with lengthened plate, longer steel pipe can be carried by it, and be equipped with and increase in the top avris of steel pipe placing box Protective fence, is equipped with lifting machine in the two sides for increasing protective fence, is equipped with first pulley and second pulley in the side of lifting machine, Rope is installed in first pulley and second pulley, steel pipe can be promoted by it, this device is allow to carry steel Pipe is mobile, and can be promoted.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the utility model.
Fig. 2 is the side view of the take-up reel of the utility model.
Fig. 3 is the top view of the lengthened plate of the utility model.
In figure: 1, lifting machine;2, first pulley;3, second pulley;4, bracket;5, rope;6, it links up with;7, fixing sleeve;8, Take-up reel;9, support rod;10, increase protective fence;11, grip;12, pushing-pulling-rack;13, lengthened plate;14, wheel carrier;15, wheel; 16, steel pipe placing box;17, guardrail;18, rocking bar;19, hinge.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work Every other embodiment obtained, fall within the protection scope of the utility model.
Please refer to Fig. 1~3, in the utility model embodiment, a kind of structural steelwork scaffold is built to be filled with steel pipe movement Set, including steel pipe placing box 16, the outside of steel pipe placing box 16 is equipped with guardrail 17, guardrail 17 be used to steel pipe placing box 16 into The outside of row protection, guardrail 17 and steel pipe placing box 16 is by being welded to connect, and wheel carrier 14 and guardrail 17 are welded to connect, guardrail 17 both ends are equipped with lengthened plate 13 by hinge 19, and the stability of steel pipe placement can be improved in lengthened plate 13, can place compared with Long steel pipe, there are two the total settings of lengthened plate 13, and the bottom end of two lengthened plates 13 is flushed with the bottom end of steel pipe placing box 16, shield The bottom end on column 17 is equipped with wheel carrier 14, and wheel 15 is equipped on wheel carrier 14, and the upper side of guardrail 17 is equipped with pushing-pulling-rack 12, pushing-pulling-rack 12 facilitates control device mobile, and one end of pushing-pulling-rack 12 is equipped with grip 11, the top avris of steel pipe placing box 16 It is equipped with and increases protective fence 10, increasing protective fence 10 can be improved the storage capacity of steel pipe placing box 16, increase the two of protective fence 10 Side is equipped with support rod 9, and the side of support rod 9 is equipped with take-up reel 8, and take-up reel 8, which is used to spend rope 5, to be furled, take-up reel 8 Inside Wire winding shaft is installed, and Wire winding shaft and rocking bar 18 are rotatablely connected, and are equipped with rope 5 on take-up reel 8, and rope 5 is used to pair Hook 6 carries out lifting control, and one end of rope 5 furls on take-up reel 8, and rope 5 and first pulley 2 and second pulley 3 pass Dynamic connection, the side of take-up reel 8 are equipped with rocking bar 18, and the top of support rod 9 is equipped with lifting machine 1, one end installation of lifting machine 1 There is first pulley 2, bracket 4 is installed at the side upper position of lifting machine 1, one end of bracket 4 is equipped with second pulley 3, rope One end of rope 5 is equipped with hook 6.
The working principle of the utility model is: the equipment is when in use, lengthened plate 13 is unfolded, is then placed on steel pipe In steel pipe placing box 16, is facilitated by pushing-pulling-rack 12 and push steel pipe placing box 16 mobile, be transported through it by steel pipe, work as needs When being promoted to steel pipe, the Wire winding shaft in take-up reel 8 is controlled by rocking bar 18 and is rotated, furls it to rope 5, the Under the action of one pulley 2 and second pulley 3, make the lifting of its control hook 6, is fixed by linking up with 6 pairs of steel pipes, is then shaken Shake bar 18, it is made to control the lifting of steel pipe.
It is obvious to a person skilled in the art that the present invention is not limited to the details of the above exemplary embodiments, and And without departing substantially from the spirit or essential attributes of the utility model, it can realize that this is practical new in other specific forms Type.Therefore, in all respects, the present embodiments are to be considered as illustrative and not restrictive, this is practical new The range of type is indicated by the appended claims rather than the foregoing description, it is intended that containing for the equivalent requirements of the claims will be fallen in All changes in justice and range are embraced therein.It should not treat any reference in the claims as limiting Related claim.

Claims (5)

1. a kind of structural steelwork scaffold is built with steel pipe movement device, including steel pipe placing box (16), it is characterised in that: institute It states and is equipped on the outside of steel pipe placing box (16) guardrail (17), the both ends of the guardrail (17) are equipped with lengthening by hinge (19) The bottom end of plate (13), the guardrail (17) is equipped with wheel carrier (14), is equipped with wheel (15) on the wheel carrier (14), described It is equipped at the upper side of guardrail (17) pushing-pulling-rack (12), one end of the pushing-pulling-rack (12) is equipped with grip (11), the steel The top avris of pipe placing box (16), which is equipped with, to be increased protective fence (10), and the two sides for increasing protective fence (10) are equipped with support The side of bar (9), the support rod (9) is equipped with take-up reel (8), is equipped with rope (5), the receipts on the take-up reel (8) The side of drum (8) is equipped with rocking bar (18), and the top of the support rod (9) is equipped with lifting machine (1), the lifting machine (1) One end be equipped with first pulley (2), bracket (4), the bracket are installed at the side upper position of the lifting machine (1) (4) one end is equipped with second pulley (3), and one end of the rope (5) is equipped with hook (6).
2. a kind of structural steelwork scaffold according to claim 1 is built with steel pipe movement device, it is characterised in that: institute The outside of guardrail (17) and steel pipe placing box (16) is stated by being welded to connect, and wheel carrier (14) and guardrail (17) are welded to connect.
3. a kind of structural steelwork scaffold according to claim 1 is built with steel pipe movement device, it is characterised in that: institute The one end for stating rope (5) furls on take-up reel (8), and rope (5) and first pulley (2) and second pulley (3) are sequentially connected.
4. a kind of structural steelwork scaffold according to claim 1 is built with steel pipe movement device, it is characterised in that: institute It states there are two the total settings of lengthened plate (13), and the bottom end of two lengthened plates (13) is flushed with the bottom end of steel pipe placing box (16).
5. a kind of structural steelwork scaffold according to claim 1 is built with steel pipe movement device, it is characterised in that: institute The inside for stating take-up reel (8) is equipped with Wire winding shaft, and Wire winding shaft and rocking bar (18) are rotatablely connected.
CN201821063740.XU 2018-07-06 2018-07-06 A kind of structural steelwork scaffold is built with steel pipe movement device Active CN208486541U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821063740.XU CN208486541U (en) 2018-07-06 2018-07-06 A kind of structural steelwork scaffold is built with steel pipe movement device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821063740.XU CN208486541U (en) 2018-07-06 2018-07-06 A kind of structural steelwork scaffold is built with steel pipe movement device

Publications (1)

Publication Number Publication Date
CN208486541U true CN208486541U (en) 2019-02-12

Family

ID=65249754

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821063740.XU Active CN208486541U (en) 2018-07-06 2018-07-06 A kind of structural steelwork scaffold is built with steel pipe movement device

Country Status (1)

Country Link
CN (1) CN208486541U (en)

Similar Documents

Publication Publication Date Title
CN100549348C (en) Construction method for hanging wide span arcuated open-web beam
CN103643800B (en) The erection & lift system of buckling-restrained bracing member and construction method thereof
CN106219419B (en) The large-scale swing arm tower crane original position of high-rise building is converted to plug-in construction method by interior climb
CN203128099U (en) Slipping type pipeline lifting device
CN208486541U (en) A kind of structural steelwork scaffold is built with steel pipe movement device
CN105110205B (en) A kind of reverse method for dismounting of derrick crane
CN105152052A (en) Glass curtain wall component lifting device and glass curtain wall component installing method
CN203559570U (en) Operating platform for steel pipe support frame overhung on surrounding columns
CN209957286U (en) Liftable simple and easy installation device of jib
CN204983692U (en) Concrete panel's hoist device
CN105822132A (en) Unit type assembly and erection method of extra-high-voltage power transmission iron pylon
CN207748760U (en) A kind of bridge crane of hoisting large-size drainpipe
CN209601999U (en) A kind of packaged type power-assisted pipeline boom hoisting
CN203624932U (en) Portable indoor material lifter
CN208249734U (en) One kind is built the road gantry crane
CN207877094U (en) A kind of adjustable glass carrying bearing-ring device for building
CN106542441A (en) A kind of Pickling-shop special purpose crane
CN206530037U (en) A kind of elevating platform assembly for Construction of Silo
CN110748140A (en) Track beam hanging basket special for stepped curtain wall
CN205558447U (en) Found pole appurtenance
CN206244301U (en) A kind of architectural engineering tower crane anti-sway control device
CN106320525B (en) Light shaft ceiling large span round steel tubular truss rotation-sliding construction method
CN204643648U (en) Pylon and hanging basket thereof
CN205802841U (en) Manual multifunctional ground jack
CN209021523U (en) A kind of no outrigger is fully welded workbench

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant