CN208455844U - A kind of direct burial dividing joint construction - Google Patents

A kind of direct burial dividing joint construction Download PDF

Info

Publication number
CN208455844U
CN208455844U CN201820567061.XU CN201820567061U CN208455844U CN 208455844 U CN208455844 U CN 208455844U CN 201820567061 U CN201820567061 U CN 201820567061U CN 208455844 U CN208455844 U CN 208455844U
Authority
CN
China
Prior art keywords
divider
concrete
dividing joint
direct burial
joint construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820567061.XU
Other languages
Chinese (zh)
Inventor
管基海
许仕达
王东
蒋东艳
宋甜甜
王冬冬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Sixth Engineering Division Co Ltd
China Construction Sixth Bureau Construction Development Co Ltd
Original Assignee
China Construction Sixth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Sixth Engineering Division Co Ltd filed Critical China Construction Sixth Engineering Division Co Ltd
Priority to CN201820567061.XU priority Critical patent/CN208455844U/en
Application granted granted Critical
Publication of CN208455844U publication Critical patent/CN208455844U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
  • Building Environments (AREA)

Abstract

The utility model belongs to construction engineering technical field, disclose a kind of direct burial dividing joint construction, divider including dividing joint design position is arranged in, divider bottom is bonded on the basal plane of lower part by adhesive mortar, divider two sides are fixed with elongated corner protector, and divider is permanently embedded in concrete after casting concrete;Divider is made of polystyrol plastic foam plate, and thickness is of same size with partitioning slot;Elongated be arranged of elongated corner protector extends to divider top in divider two sides, and by divider two sides basal planes tilted, and height is consistent with divider height.The utility model can be used for concrete cushion, mattess, rigid waterproof layer, tradition is replaced using dedicated divider and separates template and caulking material, the dividing joint design position being disposably embedded in concrete is not dismantled, it can guarantee that dividing joint position is accurate, straight, equivalent width, beautiful and generous, and meet use and waterproof requirement, and concrete can continuous placing reach overall leveling.

Description

A kind of direct burial dividing joint construction
Technical field
The utility model belongs to construction engineering technical field, in particular to a kind of be used for concrete cushion, coagulation Soil face, rigid waterproof layer direct burial dividing joint construction.
Background technique
When concrete cushion, mattess, rigid waterproof layer area are larger, to prevent because of concrete shrinkage and temperature Deformation generates crack, it is desirable that dividing joint is arranged at regular intervals, so that the deformation of concrete is released.Stay the biography for setting dividing joint System way is to set the pre-buried wood lath in seam position as separation template before casting concrete.Wood lath width is greater than coagulation Soil thickness, wood lath top surface is higher by concrete surface after embedment, rises at seam, so by wood lath after concreting finishes solidification Embedding sealing material is filled out in seam afterwards.There are the fixed difficulty of wood lath, casting concretes to be easily displaced, become in the process for this way Shape, damage, it is difficult to guarantee that dividing joint position is accurate, straight;Block placement is unable to control concrete overall leveling, dividing joint two sides Obvious difference of height is presented in concrete surface;Wood lath acts difficulty, will cause concrete surface damage during playing item;Dividing joint Interior sealing material over time can aging, cracking, the defects of infiltration.Stayed using this method set dividing joint need to be through boarding The multiple working procedures such as embedding sealing material are filled out in the impaired concrete surface of item, casting concrete, disassembly wood lath, repairing, seam, are mixed in addition Solidifying soil is unable to continuous placing, acts the wood lath damage also to the greatest extent, can not reuse, and need to put into more material, artificial, delay is applied Work progress;And because in the dividing joint of ground sealing material need to often reprocess, replace, later maintenance is cumbersome.
Dividing joint is arranged in concrete cushion, mattess, the rigid waterproof layer of larger area, it is therefore an objective to discharge concrete Contraction and temperature deformation, prevent crack.Dividing joint set-up mode is directly related to construction quality, especially whole coagulation Tulou ground dividing joint is also relate to perception effect, use and water-proof function.In view of traditional preset slot mode in control dividing joint Equal existing defects on Forming Quality, concrete overall leveling and caulking material durability form common quality defect, and investment is big, into Degree is slow, and maintenance is cumbersome, necessitates so that exploring new improvement construction and technique.
Utility model content
To be solved in the utility model is traditional preset slot mode in control dividing joint Forming Quality, concrete overall leveling And on caulking material durability the technical issues of equal existing defects, a kind of direct burial dividing joint construction is provided, can be used for concrete Bed course, mattess, rigid waterproof layer replace tradition using dedicated divider and separate template and caulking material, disposably bury The dividing joint design position set in concrete is not dismantled, draw materials convenient, construct convenient, Maintenance free simple with structure The features such as, it is ensured that dividing joint position is accurate, straight, equivalent width, beautiful and generous, and meets use and waterproof requirement, and mixed Solidifying soil can continuous placing reach overall leveling.
In order to solve the above-mentioned technical problem, the utility model is achieved by technical solution below:
A kind of direct burial dividing joint construction, the divider including dividing joint design position is arranged in, the divider bottom It is bonded on the basal plane of lower part by adhesive mortar, the divider two sides are fixed with elongated corner protector, described point after casting concrete Parting bead is permanently embedded in concrete;The divider is made of polystyrol plastic foam plate, thickness and partitioning slot width It is identical;Elongated be arranged of the elongated corner protector extends to institute in the divider two sides, and by divider two sides basal planes tilted Divider top is stated, height is consistent with the divider height.
When wherein, at for concrete cushion or the rigid waterproof layer for having building coats, the divider top and coagulation Native face flushes.
Wherein, when for mattess or at the rigid waterproof layer without building coats, the divider top mark height It is high in concrete top mark, while outseam is cut in dividing joint position in top of concrete.
Wherein, the height of the divider is 2/3 concrete thickness.
Wherein, the width of the outseam is 3~5mm, and depth is seam bottom away from the 5~10mm of divider top.
Wherein, the adhesive mortar, which uses, mixes 108 glue proportion for the polymer cement fine sand of 1:1 slurry.
Wherein, the elongated corner protector is used with concrete plate with the dry pea gravel concreten of strength grade.
Wherein, the elongated corner protector and basal plane are tilted at 45o angle.
The beneficial effects of the utility model are:
The direct burial dividing joint construction of the utility model, can be used for concrete cushion, mattess, rigid waterproof layer, It separates template and caulking material by direct-burried styrofoam divider substitution, and cheap, Maintenance free, replacement can be saved largely Construction material and cost are saved, it is existing at stitching of poor quality, concrete surface out-of-flatness, embedding to solve the reserved dividing joint mode of tradition Common quality defect not gram is attacked in seam material infiltration easy to aging etc. long, substantially increases construction quality and perception effect.Compared to tradition side Formula, construction technology is greatly simplified, to dramatically speed up construction speed, and largely saves hand labor, economic benefit and society Remarkable benefit, it is in addition simple and easy to do, there is promotional value.
Detailed description of the invention
Fig. 1 is the direct burial dividing joint construction schematic diagram for concrete cushion or the rigid waterproof layer for having building coats;
Fig. 2 is for mattess or the direct burial dividing joint construction schematic diagram of the rigid waterproof layer without building coats;
Fig. 3 is the fixed schematic diagram of installation of divider in direct burial dividing joint construction;
Fig. 4 is the structural schematic diagram of divider in direct burial dividing joint construction.
In above-mentioned figure: 1, concrete cushion;2, divider;3, mattess;4, outseam;5, adhesive mortar;6, elongated Corner protector.
Specific embodiment
For the content, feature and effect that can further appreciate that the utility model, the following examples are hereby given, and cooperates attached drawing Detailed description are as follows:
As shown in Figures 1 to 4, it present embodiments provides a kind of for concrete cushion, mattess, rigid waterproof layer Etc. direct burial dividing joint construction, mainly include divider 2, adhesive mortar 5, elongated corner protector 6.Divider 2 is arranged in lattice Design position is stitched, bottom is bonded on the basal plane of lower part by adhesive mortar 5, and two sides are fixed with elongated corner protector 6, casting concrete It is permanently embedded in concrete afterwards.Embedding absolute altitude is divided into two kinds by using position: having building sides for concrete cushion 1 or design When at the rigid waterproof layer of layer, the top of divider 2 is flushed with concrete surface;For mattess 3 or without the rigidity of building coats When at waterproof layer, divider 2 top mark height is high in concrete top mark, separately cuts outseam 4 in dividing joint position in top of concrete, Using embedding material filling is filled out in outseam 4, the width of outseam 4 is generally 3~5mm, and depth is to stitch bottom to push up 5~10mm away from divider 2.
Divider 2 is processed using thickness=dividing joint width polystyrol plastic foam plate.2 height of divider is (wide Degree): when having at the rigid waterproof layer of building coats for concrete cushion 1 or design=concrete thickness -3mm;For coagulation When soil face 3 or the rigid waterproof layer without building coats etc.=2/3 concrete thickness.Divider 2 is arranged perpendicular to basal plane Dividing joint design position.2 bottom surface of divider and basal plane are with the bonding of adhesive mortar 5.
Adhesive mortar 5, which uses, mixes 108 glue proportion for the polymer cement fine sand of 1:1 slurry, with a thickness of 3mm.
Elongated corner protector 6 plays fixed and protection divider 2, using thin with the dry of strength grade with concrete plate Stone concrete, elongated to be put on 2 two sides of divider, elongated corner protector 6 is pressed by 2 two sides basal plane of divider to be extended with basal plane at 45o angle It is pushed up to divider 2,2 height of height=divider.
The direct burial dividing joint construction of the present embodiment, Specific construction process are as follows:
1) preparation of construction
(1) divider 2 is processed: choosing requires the polystyrol plastic foam plate of thickness, and size is tailored into lath as required, Seek straight, equivalent width.
(2) it adhesive mortar 5: is matched and is prepared by the design of 1:1 using 108 glue and polymer cement fine sand slurry.
(3) elongated corner protector 6: prepare and concrete plate with strength grade dry pea gravel concreten.
2) dividing joint is constructed
Steps are as follows:
(1) it clears up basal plane: removing rubbish, the sundries, mucilage on basal plane, rinse well, dry.
(2) snap the line, set ash cake: the dividing joint position line and control line are popped up on basal plane;According to designed elevation on basal plane Ash cake is set at regular intervals.Ash cake top surface absolute altitude is top of concrete absolute altitude.
(3) divider 2 is installed: divider 2 being mounted on dividing joint position by line.Step are as follows:
A, it is laid with adhesive mortar 5: using point sticking method, 5 An of adhesive mortar≤500mm spacing point is layered on basal plane along snap the line On;Laying depth about 3mm;
B, it installs divider 2: divider 2 being installed in partitioning slot position by snap the line;Divider 2 is located at adhesive mortar 5 It is upper and vertical with basal plane, 2 top mark of divider height is controlled according to neighbouring ash cake bracing wire and draws logical line to look for divider 2 directly at top.
(4) the elongated corner protector 6 of construction: after divider 2 is installed, rigid pea gravel concreten is dried extremely simultaneously in 2 two sides of divider Divider 2 pushes up, and makes real, and forms elongated corner protector 6.
(5) casting concrete: after the dry pea gravel concreten of elongated corner protector 6 reaches some strength, plate coagulation is poured Soil;It should be noted that the protection to divider 2 during disturbing concrete, 2 side concrete of divider uses hand punning, prevents from breaking Or it deforms and shifts to divider 2.
(6) concrete surface processing and maintenance: concrete surface presses the levelling stranding hair of design requirement or press polish.It is carried out in accordance with regulations Maintenance.
(7) top of concrete joint-cutting:
Mattess 3 or rigid waterproof layer top of concrete without building coats cut outseam 4, step in dividing joint position Suddenly are as follows:
A, snap the line: 2 position of divider is in top of concrete bullet lattice suture in corresponding concrete;
B, joint-cutting: lancing time was no more than 2 days after the completion of concreting;The width of outseam 4 is generally 3~5mm, deep Degree pushes up 5~10mm away from divider 2 for seam bottom;Using machinery according to wire cutting, guarantee that lancing location is accurate, logical straight.
C, joint-cutting is filled: being used in outseam 4 and is filled out embedding material filling.
It could be aware that in summary, the direct burial dividing joint construction of the utility model has the advantage that
1) divider 2 of the utility model uses polystyrol plastic foam plate, and the deformation of concrete can be made to obtain sufficiently Release, especially polystyrol plastic foam plate have elasticity, concrete expansion deformation can be absorbed, to prevent hollowing, crack It generates.
2) divider 2 of the utility model uses polystyrol plastic foam plate, has good with two sides concrete Deform phase permeability curve, it is ensured that in deformation process with concrete surface tight joint close always, in addition polystyrene foam plastics Plate is hydrophobic material, Gu waterproof effect is more preferably.
3) for mattess 3 or when the rigid waterproof layer without building coats of the utility model, will be built in divider 2 It in concrete, is not contacted with air, can avoid divider aging.
4) the achievable concrete one-piece casting of the utility model is conducive to control overall leveling.
5) the permanent embedding not disassembly of the divider 2 of the utility model, can avoid damage concrete.
6) the elongated corner protector 6 of the utility model also plays protective action, prevents it from constructing while fixed divider 2 It is destroyed in the process.
7) the utility model is secondary in dividing joint position in mattess 3 or rigid waterproof layer top surface without building coats Outseam 4 is cut, makes it in the deformation process expanded with heat and contract with cold, position is stitched by cutting in the crack of generation.
8) the utility model structure is simple, materials convenience, and convenient, Maintenance free of constructing is easy to spread.
Although being described above in conjunction with preferred embodiment of the attached drawing to the utility model, the utility model is not It is confined to above-mentioned specific embodiment, the above mentioned embodiment is only schematical, is not restrictive, ability The those of ordinary skill in domain is not departing from invention objective and scope of the claimed protection feelings under the enlightenment of the utility model Under condition, the specific transformation of many forms can also be made, these are belonged within the protection scope of the utility model.

Claims (7)

1. a kind of direct burial dividing joint construction, which is characterized in that the divider including dividing joint design position is arranged in, described point Parting bead bottom is bonded on the basal plane of lower part by adhesive mortar, and the divider two sides are fixed with elongated corner protector, casting concrete The divider is permanently embedded in concrete afterwards;The divider is made of polystyrol plastic foam plate, thickness with point Space is of same size;The elongated corner protector is elongated to be arranged in the divider two sides, and by divider two sides basal planes tilted The divider top is extended to, height is consistent with the divider height.
2. a kind of direct burial dividing joint construction according to claim 1, which is characterized in that when for concrete cushion or having When at the rigid waterproof layer of building coats, the divider top is flushed with concrete surface.
3. a kind of direct burial dividing joint construction according to claim 1, which is characterized in that when for mattess or nothing When at the rigid waterproof layer of building coats, divider top mark height is high in concrete top mark, at the same top of concrete in Dividing joint position is cut with outseam.
4. a kind of direct burial dividing joint construction according to claim 3, which is characterized in that the height of the divider is 2/ 3 concrete thickness.
5. a kind of direct burial dividing joint construction according to claim 3, which is characterized in that the width of the outseam be 3~ 5mm, depth are seam bottom away from the 5~10mm of divider top.
6. a kind of direct burial dividing joint construction according to claim 1, which is characterized in that the elongated corner protector is used and mixed Dry pea gravel concreten of the concrete board block with strength grade.
7. a kind of direct burial dividing joint construction according to claim 1, which is characterized in that the elongated corner protector and basal plane at 45 ° of angle inclinations.
CN201820567061.XU 2018-04-19 2018-04-19 A kind of direct burial dividing joint construction Expired - Fee Related CN208455844U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820567061.XU CN208455844U (en) 2018-04-19 2018-04-19 A kind of direct burial dividing joint construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820567061.XU CN208455844U (en) 2018-04-19 2018-04-19 A kind of direct burial dividing joint construction

Publications (1)

Publication Number Publication Date
CN208455844U true CN208455844U (en) 2019-02-01

Family

ID=65155997

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820567061.XU Expired - Fee Related CN208455844U (en) 2018-04-19 2018-04-19 A kind of direct burial dividing joint construction

Country Status (1)

Country Link
CN (1) CN208455844U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111636633A (en) * 2020-05-13 2020-09-08 中国十七冶集团有限公司 Product for roof waterproof protective layer separation seam construction and construction method
CN112342876A (en) * 2020-10-30 2021-02-09 中国五冶集团有限公司 Retaining structure for foam concrete pouring rapid partition construction and construction method thereof
CN114016738A (en) * 2021-06-22 2022-02-08 北京城建六建设集团有限公司 Turnover concrete dividing joint construction device and construction method thereof
CN114319878A (en) * 2021-11-24 2022-04-12 山东枣建建设集团有限公司 Combined roof PVC lattice bar and installation and construction method thereof

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111636633A (en) * 2020-05-13 2020-09-08 中国十七冶集团有限公司 Product for roof waterproof protective layer separation seam construction and construction method
CN112342876A (en) * 2020-10-30 2021-02-09 中国五冶集团有限公司 Retaining structure for foam concrete pouring rapid partition construction and construction method thereof
CN114016738A (en) * 2021-06-22 2022-02-08 北京城建六建设集团有限公司 Turnover concrete dividing joint construction device and construction method thereof
CN114016738B (en) * 2021-06-22 2023-06-16 北京城建六建设集团有限公司 Turnover concrete grid joint construction device and construction method thereof
CN114319878A (en) * 2021-11-24 2022-04-12 山东枣建建设集团有限公司 Combined roof PVC lattice bar and installation and construction method thereof

Similar Documents

Publication Publication Date Title
CN208455844U (en) A kind of direct burial dividing joint construction
US3874140A (en) Structural wall member with sculptured surface and method of making same
US3969851A (en) Architectural paving system with individual control joint paving
CN103806356B (en) A kind of preparation method of decorative concrete earth construction
CN105829621B (en) Expansion joint setting method and device for inducing concrete cracks
CN106401144A (en) Construction technology for addition type wear resisting concrete ground
CN108442724B (en) Earthen site crack repairing method
CN103161241A (en) Filling-hole non-mortar reinforcement building block brickwork shear wall and construction method thereof
CN209099113U (en) A kind of pavement pavement structure
CN107060171A (en) The super flat reinforced concrete flooring of large area and colored diamond dust surface layer one-step moulding method
CN108412093A (en) A kind of Modern Landscape decoration loam wall and its construction method
CN103938869A (en) Construction method for line pipes and line boxes in MS building block rear building wall body
CN107100184A (en) Caved in the composite foundation and construction method with sapping area for arid biogeographic zone earthen ruins
CN109338842A (en) Colorful water-permeable road surface and construction method
CN104404857B (en) A kind of permeable tile work ground and construction method
CN106760552A (en) Thickness of concrete floor and flatness control device and method
CN105421178B (en) A kind of zone of heating construction Craft for cold district
CN108868065A (en) Equipment, method is stayed in a kind of construction of concrete floor expansion joint
CN207891924U (en) The board-like expanded joint structure of basement bottom board groove
CN203716410U (en) Novel roof grid seam
CN112080979B (en) Pavement structure of parking apron and construction method of concrete surface layer of pavement structure
CN105926656B (en) Construction Method of Mass Concrete Foundation
CN203296208U (en) Pouring hole non-mortar reinforcing bar building block brickwork shear wall
CN216634850U (en) Composite integrally-assembled floor
KR100961257B1 (en) Manufacturing method of eco-friendly stone block

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20190211

Address after: 300300 No. 219 Bawei Road, Hedong District, Tianjin

Co-patentee after: CONSTRUCTION DEVELOPMENT Co.,Ltd. OF CHINA CONSTRUCTION SIXTH ENGINEERING DIVISION

Patentee after: CHINA CONSTRUCTION SIXTH ENGINEERING DIVISION Corp.,Ltd.

Address before: No. 72 Hangzhou Road, Tianjin Binhai New Area, 300451

Patentee before: CHINA CONSTRUCTION SIXTH ENGINEERING DIVISION Corp.,Ltd.

TR01 Transfer of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190201

CF01 Termination of patent right due to non-payment of annual fee