CN208411274U - A kind of construction management construction budget plotting unit - Google Patents
A kind of construction management construction budget plotting unit Download PDFInfo
- Publication number
- CN208411274U CN208411274U CN201820808757.7U CN201820808757U CN208411274U CN 208411274 U CN208411274 U CN 208411274U CN 201820808757 U CN201820808757 U CN 201820808757U CN 208411274 U CN208411274 U CN 208411274U
- Authority
- CN
- China
- Prior art keywords
- pallet
- drawing board
- turntable
- attachment device
- plate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Road Signs Or Road Markings (AREA)
Abstract
The utility model relates to plotting unit technical field more particularly to a kind of construction management construction budget plotting units, comprising: pedestal, lifting device, pallet, attachment device, drawing board, fixed frame, plastic plate;The pedestal is semicircle shape structure;The top of pedestal is arranged in the lifting device, and lifting device is bolted mode with pedestal and is connected;The top of lifting device is arranged in the pallet, and pallet is bolted mode with lifting device and is connected;The top of pallet is arranged in the attachment device, and attachment device is connected with pallet by turntable;The top of attachment device is arranged in the drawing board, and drawing board is bolted mode with attachment device and is connected;Improvement on through the above structure, the device have adjustable range wider, use and shows and facilitate, when can guarantee operating interruptions the integrality of drawing case the advantages of, thus the problem of effective solution existing apparatus and deficiency.
Description
Technical field
It draws and fills the utility model relates to plotting unit technical field more particularly to a kind of construction management construction budget
It sets.
Background technique
Graphing of Engineering is a profession basis subject, based on the Theory of Projections of descriptive geometry, with ruler, compasses, figure
Plate is tool, using blackboard, wooden model, wall chart as medium, has more than 200 years history.Graphing of Engineering is in training student as creation
Property thinking basis spatial imagination and ideation and all various aspects such as process of industrialization is promoted to played an important role, work
Journey figure is essential technological document in production, is " language of engineering technology " general in world wide, and one good to draw
Map device can make the work of illustrator's progress more efficiently, but existing plotting unit has the following insufficient:
1. existing drawing board is mostly that easy yoke carries drawing board, drawing board angle fix or adjustable range by
Limit is unfavorable for using being unfavorable for it and be shown and because angle is limited;
2. existing drawing board is usually that directly drawing paper is fixed in plate face, when operating interruptions, easily because of various meanings
The engineering drawing drawn is caused to occur outside damaged or dirty.
Utility model content
The purpose of this utility model is to provide a kind of construction management construction budget plotting units, to solve above-mentioned back
The existing drawing board proposed in scape technology is mostly that easy yoke carries drawing board, and drawing board angle is fixed or adjustable range
It is limited, it is unfavorable for using being unfavorable for it and be shown and because angle is limited;When operating interruptions, easily because caused by various accidents
There is damaged or dirty problem and deficiency in the engineering drawing drawn.
The purpose of this utility model and effect are reached by technical solution in detail below:
A kind of construction management construction budget plotting unit, comprising: pedestal, pallet, attachment device, is drawn lifting device
Chart board, fixed frame, plastic plate, lifting handle, hydraulic cylinder, lead bar, turntable, fixed plate, connecting shaft, plummer, locking hand
Handle;The pedestal is semicircle shape structure;The top of pedestal is arranged in the lifting device, and lifting device and pedestal pass through bolt
Fixed form is connected;The top of lifting device is arranged in the pallet, and pallet and lifting device are bolted mode
It is connected;The top of pallet is arranged in the attachment device, and attachment device is connected with pallet by turntable;The drawing board
The top of attachment device is set, and drawing board is bolted mode with attachment device and is connected;The fixed frame is set up
It sets on the top of drawing board, and fixed frame is connected with drawing board by chimeric mode;The plastic plate is arranged in fixed frame
The middle part of frame, and plastic plate is wanted to connect with fixed frame by snap fit;The side of hydraulic cylinder is arranged in the lifting handle;
The inside of hydraulic cylinder is arranged in the lead bar;The top for stating lead bar is arranged in the turntable, and turntable passes through with lead bar
Flange is connected;The top of turntable is arranged in the fixed plate, and fixed plate is bolted mode with turntable and is connected;Institute
The middle part that fixed plate is arranged in connecting shaft is stated, and connecting shaft is connected with fixed plate by set and mode;The plummer setting
In the circumference of connecting shaft, and plummer with connecting shaft by being connected under chimeric mode;The set lever is arranged in attachment device
Side.
As advanced optimizing for the technical program, a kind of construction management construction budget plotting unit of the utility model
The pallet is recessed disk-like structure, and pallet is connected with turntable by snap fit.
As advanced optimizing for the technical program, a kind of construction management construction budget plotting unit of the utility model
The fixed plate is provided at two altogether in the upside of turntable, and connecting shaft is set to the middle position of fixed plate at two.
As advanced optimizing for the technical program, a kind of construction management construction budget plotting unit of the utility model
The fixed frame is U-shape, and the frame of fixed frame is internally provided with rectangular recess.
As advanced optimizing for the technical program, a kind of construction management construction budget plotting unit of the utility model
The plastic plate is rectangular-shaped, and plastic plate is transparent plastics material.
As advanced optimizing for the technical program, a kind of construction management construction budget plotting unit of the utility model
The drawing board is rectangular-shaped, and drawing board is magnetic board.
Due to the application of the above technical scheme, the utility model has the advantage that compared with prior art
1, a kind of construction management construction budget plotting unit of the utility model passes through setting pallet, turntable, fixed plate
And connecting shaft makes the drawing board of the device that can carry out freely adjusting for plane 360 deg and longitudinal 300 degree of ranges, greatly
Its practical convenience is improved, and the position for adjusting its drawing board is facilitated to be shown.
2, a kind of construction management construction budget plotting unit of the utility model by setting U-shape fixed frame and
Transparent plastic plate makes the device that the figure that it has been drawn be effectively protected when can break at work and is not damaged or by dirty.
3, the utility model through the above structure on improvement, have adjustable range it is wider, use and show facilitate, can
When guaranteeing operating interruptions the integrality of drawing case the advantages of, thus the problem of effective solution existing apparatus and not
Foot.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the utility model;
Fig. 2 is the side structure schematic view of the utility model;
Fig. 3 is the backsight structural representation of the utility model;
Fig. 4 is the attachment device structural schematic diagram of the utility model;
Fig. 5 is the A point structure schematic diagram of the utility model.
In figure: pedestal 1, lifting device 2, pallet 3, attachment device 4, drawing board 5, fixed frame 6, plastic plate 7, lifting hand
Handle 201, hydraulic cylinder 202, lead bar 203, turntable 401, fixed plate 402, connecting shaft 403, plummer 404, set lever 13.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model
Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole
Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work
Every other embodiment obtained, fall within the protection scope of the utility model.
Fig. 1 to Fig. 5 is please referred to, the utility model provides a kind of technical solution:
A kind of construction management construction budget plotting unit, comprising: pedestal 1, lifting device 2, pallet 3, attachment device
4, drawing board 5, fixed frame 6, plastic plate 7, lifting handle 201, hydraulic cylinder 202, lead bar 203, turntable 401, fixed plate
402, connecting shaft 403, plummer 404, set lever 13;Pedestal 1 is semicircle shape structure;The upper of pedestal 1 is arranged in lifting device 2
Portion, and lifting device 2 is bolted mode with pedestal 1 and is connected;The top of lifting device 2, and pallet is arranged in pallet 3
3, which are bolted mode with lifting device 2, is connected;The top of pallet 3, and attachment device 4 and support is arranged in attachment device 4
Disk 3 is connected by turntable 401;The top of attachment device 4 is arranged in drawing board 5, and drawing board 5 and attachment device 4 pass through spiral shell
Bolt fixed form is connected;The top of drawing board 5 is arranged in fixed frame 6, and fixed frame 6 passes through chimeric side with drawing board 5
Formula is connected;The middle part of fixed frame 6 is arranged in plastic plate 7, and plastic plate 7 is wanted to connect with fixed frame 6 by snap fit;
The side of hydraulic cylinder 202 is arranged in lifting handle 201;The inside of hydraulic cylinder 202 is arranged in lead bar 203;The setting of turntable 401 exists
The top of lead bar 203 is stated, and turntable 401 is connected with lead bar 203 by flange;Turntable 401 is arranged in fixed plate 402
Top, and fixed plate 402 is bolted mode with turntable 401 and is connected;Connecting shaft 403 is arranged in fixed plate 402
Portion, and connecting shaft 403 is connected with fixed plate 402 by set and mode;The circumference of connecting shaft 403 is arranged in plummer 404, and
Plummer 404 is with connecting shaft 403 by connecting under chimeric mode;The side of attachment device 4 is arranged in set lever 13.
Specifically, pallet 3 is recessed disk-like structure, and pallet 3 is connected with turntable 401 by snap fit, for drawing
The rotation of plate 5 is adjusted.
Specifically, fixed plate 402 is provided at two altogether in the upside of turntable 401, connecting shaft 403 is set to fixed plate at two
102 middle position, the rotation for drawing board 5 are adjusted.
Specifically, fixed frame 6 is U-shape, and the frame of fixed frame 6 is internally provided with rectangular recess, for drawing
The rotation of plate 5 is adjusted.
Specifically, plastic plate 7 is rectangular-shaped, and plastic plate 7 is transparent plastics material, for protecting drawing and being conducive to exhibition
Show.
Specifically, drawing board 5 is rectangular-shaped, and drawing board 5 is magnetic board, facilitates fixed drawing.
Specifically used method and effect:
When using the device, lifting device 2 is bolted to the top of pedestal 1, pallet 3 be bolted to
The top of lifting device 2, attachment device 4 is put into using turntable 401 to be blocked and is connected in pallet 3;Drawing board 5 and 404 phase of plummer
Connection;Drawing is fixed to the top of drawing board 5 by magnet, hydraulic cylinder 202 is controlled by lifting handle 201 and goes up and down lead bar
203 adjust drawing board 5 to suitable height, unclamp set lever 13, adjust drawing board 5 using connecting shaft 403 and plummer 404
To suitable pitch angle, will set lever 13 lock after start to draw, interruption of work or carry out drawing displaying when, will fix
Frame 6 snaps into the top of drawing board 5, and plastic plate 7 is then inserted into 6 middle part of U-shaped fixed frame, prevent drawing dirty and by
To damage, drawing board 5 is directly rotated using turntable 401 and pallet 3, is shown convenient for it.
In summary: a kind of construction management construction budget plotting unit, by the way that pallet, turntable, fixed plate is arranged
And connecting shaft makes the drawing board of the device that can carry out freely adjusting for plane 360 deg and longitudinal 300 degree ranges, setting U
The fixed frame of shape and transparent plastic plate make the device that the figure that it has been drawn be effectively protected when can break at work and are not damaged
Bad or to solve existing drawing board be mostly that easy yoke carries drawing board by dirty, drawing board angle is fixed or is adjusted
Range is limited, is unfavorable for using being unfavorable for it and be shown and because angle is limited;When operating interruptions, easily because various accidents are made
Damaged or dirty problem is caused at the engineering drawing drawn.
While there has been shown and described that the embodiments of the present invention, for the ordinary skill in the art,
It is understood that these embodiments can be carried out with a variety of variations in the case where not departing from the principles of the present invention and spirit, repaired
Change, replacement and variant, the scope of the utility model is defined by the appended claims and the equivalents thereof.
Claims (6)
1. a kind of construction management construction budget plotting unit, comprising: pedestal (1), lifting device (2), pallet (3), connection
Device (4), drawing board (5), fixed frame (6), plastic plate (7), lifting handle (201), hydraulic cylinder (202), lead bar
(203), turntable (401), fixed plate (402), connecting shaft (403), plummer (404), set lever (13);It is characterized by:
The pedestal (1) is semicircle shape structure;The lifting device (2) is arranged on the top of pedestal (1), and lifting device (2) and bottom
Seat (1) mode of being bolted is connected;The pallet (3) is arranged on the top of lifting device (2), and pallet (3) and liter
Falling unit (2) mode of being bolted is connected;The attachment device (4) is arranged on the top of pallet (3), and attachment device
(4) it is connected with pallet (3) by turntable (401);The drawing board (5) is arranged on the top of attachment device (4), and drawing board
(5) it is connected with attachment device (4) mode of being bolted;The fixed frame (6) is arranged on the top of drawing board (5),
And fixed frame (6) is connected with drawing board (5) by chimeric mode;The plastic plate (7) is arranged in fixed frame (6)
Portion, and plastic plate (7) is wanted to connect with fixed frame (6) by snap fit;The lifting handle (201) is arranged in hydraulic cylinder
(202) side;Inside of lead bar (203) setting in hydraulic cylinder (202);Lead is being stated in turntable (401) setting
The top of bar (203), and turntable (401) is connected with lead bar (203) by flange;Fixed plate (402) setting is turning
The top of disk (401), and fixed plate (402) is connected with turntable (401) mode of being bolted;The connecting shaft (403)
Middle part in fixed plate (402) is set, and connecting shaft (403) is connected with fixed plate (402) by set and mode;The carrying
Platform (404) be arranged connecting shaft (403) circumference, and plummer (404) with connecting shaft (403) by being connected under chimeric mode;
Side of set lever (13) setting in attachment device (4).
2. a kind of construction management construction budget plotting unit according to claim 1, it is characterised in that: the pallet
It (3) is recessed disk-like structure, and pallet (3) is connected with turntable (401) by snap fit.
3. a kind of construction management construction budget plotting unit according to claim 1, it is characterised in that: the fixation
Plate (402) is provided at two altogether in the upside of turntable (401), and connecting shaft (403) is set to the interposition of fixed plate at two (402)
It sets.
4. a kind of construction management construction budget plotting unit according to claim 1, it is characterised in that: the fixation
Frame (6) is U-shape, and the frame of fixed frame (6) is internally provided with rectangular recess.
5. a kind of construction management construction budget plotting unit according to claim 1, it is characterised in that: the plastics
Plate (7) is rectangular-shaped, and plastic plate (7) is transparent plastics material.
6. a kind of construction management construction budget plotting unit according to claim 1, it is characterised in that: the drawing
Plate (5) is rectangular-shaped, and drawing board (5) is magnetic board.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820808757.7U CN208411274U (en) | 2018-05-25 | 2018-05-25 | A kind of construction management construction budget plotting unit |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820808757.7U CN208411274U (en) | 2018-05-25 | 2018-05-25 | A kind of construction management construction budget plotting unit |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208411274U true CN208411274U (en) | 2019-01-22 |
Family
ID=65112567
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201820808757.7U Expired - Fee Related CN208411274U (en) | 2018-05-25 | 2018-05-25 | A kind of construction management construction budget plotting unit |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208411274U (en) |
-
2018
- 2018-05-25 CN CN201820808757.7U patent/CN208411274U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103439245B (en) | Portable field artificial raining-simulated apparatus | |
CN204657837U (en) | A kind of vertical tube weld jig | |
CN208411274U (en) | A kind of construction management construction budget plotting unit | |
CN204414911U (en) | A kind of mathematics teaching in junior middle school Automatic Drawing blackboard | |
CN110508862A (en) | Total group of localization method of energy-conservation conduit | |
CN206545394U (en) | A kind of aluminum alloy mould plate diagonal brace means for correcting | |
CN201249610Y (en) | Mathematical drawing rule | |
CN210137952U (en) | Graphic panel frame for architectural design | |
CN207358865U (en) | Workpiece slope dimension measuring device | |
CN206605964U (en) | A kind of primary school teaching electric compasses easy to use | |
CN206450224U (en) | One kind mapping support frame | |
CN206234563U (en) | Shatter-resistant tripod is used in one kind measurement | |
CN205678375U (en) | A kind of planar design display can adjust heightening frame | |
CN205777114U (en) | A kind of Portable column reinforcing bar location instrument | |
CN211552810U (en) | Reference object structure for AR ranging | |
CN206905739U (en) | A kind of earthwork grade of side slope measurement apparatus | |
CN209359939U (en) | Height-adjustable engineering plotting unit | |
CN204854930U (en) | Electronic scale device with food information of traceing back | |
CN208035774U (en) | A kind of tool of more dividing any angles | |
CN203282290U (en) | Rectangular blade fixing jig | |
CN207867784U (en) | A kind of physics teaching optics instrument lens | |
CN208342636U (en) | A kind of hood quality inspection clamping device | |
CN205342505U (en) | A cutting bed -jig for fluid reservoir bulb limb | |
CN206588854U (en) | A kind of crotch bend pipe space positioning apparatus | |
CN217959503U (en) | Show platform device of transformer intelligence fortune dimension management and control |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20190122 Termination date: 20190525 |