CN208411274U - A kind of construction management construction budget plotting unit - Google Patents

A kind of construction management construction budget plotting unit Download PDF

Info

Publication number
CN208411274U
CN208411274U CN201820808757.7U CN201820808757U CN208411274U CN 208411274 U CN208411274 U CN 208411274U CN 201820808757 U CN201820808757 U CN 201820808757U CN 208411274 U CN208411274 U CN 208411274U
Authority
CN
China
Prior art keywords
pallet
drawing board
turntable
attachment device
plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820808757.7U
Other languages
Chinese (zh)
Inventor
李明慧
安明强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201820808757.7U priority Critical patent/CN208411274U/en
Application granted granted Critical
Publication of CN208411274U publication Critical patent/CN208411274U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Road Signs Or Road Markings (AREA)

Abstract

The utility model relates to plotting unit technical field more particularly to a kind of construction management construction budget plotting units, comprising: pedestal, lifting device, pallet, attachment device, drawing board, fixed frame, plastic plate;The pedestal is semicircle shape structure;The top of pedestal is arranged in the lifting device, and lifting device is bolted mode with pedestal and is connected;The top of lifting device is arranged in the pallet, and pallet is bolted mode with lifting device and is connected;The top of pallet is arranged in the attachment device, and attachment device is connected with pallet by turntable;The top of attachment device is arranged in the drawing board, and drawing board is bolted mode with attachment device and is connected;Improvement on through the above structure, the device have adjustable range wider, use and shows and facilitate, when can guarantee operating interruptions the integrality of drawing case the advantages of, thus the problem of effective solution existing apparatus and deficiency.

Description

A kind of construction management construction budget plotting unit
Technical field
It draws and fills the utility model relates to plotting unit technical field more particularly to a kind of construction management construction budget It sets.
Background technique
Graphing of Engineering is a profession basis subject, based on the Theory of Projections of descriptive geometry, with ruler, compasses, figure Plate is tool, using blackboard, wooden model, wall chart as medium, has more than 200 years history.Graphing of Engineering is in training student as creation Property thinking basis spatial imagination and ideation and all various aspects such as process of industrialization is promoted to played an important role, work Journey figure is essential technological document in production, is " language of engineering technology " general in world wide, and one good to draw Map device can make the work of illustrator's progress more efficiently, but existing plotting unit has the following insufficient:
1. existing drawing board is mostly that easy yoke carries drawing board, drawing board angle fix or adjustable range by Limit is unfavorable for using being unfavorable for it and be shown and because angle is limited;
2. existing drawing board is usually that directly drawing paper is fixed in plate face, when operating interruptions, easily because of various meanings The engineering drawing drawn is caused to occur outside damaged or dirty.
Utility model content
The purpose of this utility model is to provide a kind of construction management construction budget plotting units, to solve above-mentioned back The existing drawing board proposed in scape technology is mostly that easy yoke carries drawing board, and drawing board angle is fixed or adjustable range It is limited, it is unfavorable for using being unfavorable for it and be shown and because angle is limited;When operating interruptions, easily because caused by various accidents There is damaged or dirty problem and deficiency in the engineering drawing drawn.
The purpose of this utility model and effect are reached by technical solution in detail below:
A kind of construction management construction budget plotting unit, comprising: pedestal, pallet, attachment device, is drawn lifting device Chart board, fixed frame, plastic plate, lifting handle, hydraulic cylinder, lead bar, turntable, fixed plate, connecting shaft, plummer, locking hand Handle;The pedestal is semicircle shape structure;The top of pedestal is arranged in the lifting device, and lifting device and pedestal pass through bolt Fixed form is connected;The top of lifting device is arranged in the pallet, and pallet and lifting device are bolted mode It is connected;The top of pallet is arranged in the attachment device, and attachment device is connected with pallet by turntable;The drawing board The top of attachment device is set, and drawing board is bolted mode with attachment device and is connected;The fixed frame is set up It sets on the top of drawing board, and fixed frame is connected with drawing board by chimeric mode;The plastic plate is arranged in fixed frame The middle part of frame, and plastic plate is wanted to connect with fixed frame by snap fit;The side of hydraulic cylinder is arranged in the lifting handle; The inside of hydraulic cylinder is arranged in the lead bar;The top for stating lead bar is arranged in the turntable, and turntable passes through with lead bar Flange is connected;The top of turntable is arranged in the fixed plate, and fixed plate is bolted mode with turntable and is connected;Institute The middle part that fixed plate is arranged in connecting shaft is stated, and connecting shaft is connected with fixed plate by set and mode;The plummer setting In the circumference of connecting shaft, and plummer with connecting shaft by being connected under chimeric mode;The set lever is arranged in attachment device Side.
As advanced optimizing for the technical program, a kind of construction management construction budget plotting unit of the utility model The pallet is recessed disk-like structure, and pallet is connected with turntable by snap fit.
As advanced optimizing for the technical program, a kind of construction management construction budget plotting unit of the utility model The fixed plate is provided at two altogether in the upside of turntable, and connecting shaft is set to the middle position of fixed plate at two.
As advanced optimizing for the technical program, a kind of construction management construction budget plotting unit of the utility model The fixed frame is U-shape, and the frame of fixed frame is internally provided with rectangular recess.
As advanced optimizing for the technical program, a kind of construction management construction budget plotting unit of the utility model The plastic plate is rectangular-shaped, and plastic plate is transparent plastics material.
As advanced optimizing for the technical program, a kind of construction management construction budget plotting unit of the utility model The drawing board is rectangular-shaped, and drawing board is magnetic board.
Due to the application of the above technical scheme, the utility model has the advantage that compared with prior art
1, a kind of construction management construction budget plotting unit of the utility model passes through setting pallet, turntable, fixed plate And connecting shaft makes the drawing board of the device that can carry out freely adjusting for plane 360 deg and longitudinal 300 degree of ranges, greatly Its practical convenience is improved, and the position for adjusting its drawing board is facilitated to be shown.
2, a kind of construction management construction budget plotting unit of the utility model by setting U-shape fixed frame and Transparent plastic plate makes the device that the figure that it has been drawn be effectively protected when can break at work and is not damaged or by dirty.
3, the utility model through the above structure on improvement, have adjustable range it is wider, use and show facilitate, can When guaranteeing operating interruptions the integrality of drawing case the advantages of, thus the problem of effective solution existing apparatus and not Foot.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the utility model;
Fig. 2 is the side structure schematic view of the utility model;
Fig. 3 is the backsight structural representation of the utility model;
Fig. 4 is the attachment device structural schematic diagram of the utility model;
Fig. 5 is the A point structure schematic diagram of the utility model.
In figure: pedestal 1, lifting device 2, pallet 3, attachment device 4, drawing board 5, fixed frame 6, plastic plate 7, lifting hand Handle 201, hydraulic cylinder 202, lead bar 203, turntable 401, fixed plate 402, connecting shaft 403, plummer 404, set lever 13.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work Every other embodiment obtained, fall within the protection scope of the utility model.
Fig. 1 to Fig. 5 is please referred to, the utility model provides a kind of technical solution:
A kind of construction management construction budget plotting unit, comprising: pedestal 1, lifting device 2, pallet 3, attachment device 4, drawing board 5, fixed frame 6, plastic plate 7, lifting handle 201, hydraulic cylinder 202, lead bar 203, turntable 401, fixed plate 402, connecting shaft 403, plummer 404, set lever 13;Pedestal 1 is semicircle shape structure;The upper of pedestal 1 is arranged in lifting device 2 Portion, and lifting device 2 is bolted mode with pedestal 1 and is connected;The top of lifting device 2, and pallet is arranged in pallet 3 3, which are bolted mode with lifting device 2, is connected;The top of pallet 3, and attachment device 4 and support is arranged in attachment device 4 Disk 3 is connected by turntable 401;The top of attachment device 4 is arranged in drawing board 5, and drawing board 5 and attachment device 4 pass through spiral shell Bolt fixed form is connected;The top of drawing board 5 is arranged in fixed frame 6, and fixed frame 6 passes through chimeric side with drawing board 5 Formula is connected;The middle part of fixed frame 6 is arranged in plastic plate 7, and plastic plate 7 is wanted to connect with fixed frame 6 by snap fit; The side of hydraulic cylinder 202 is arranged in lifting handle 201;The inside of hydraulic cylinder 202 is arranged in lead bar 203;The setting of turntable 401 exists The top of lead bar 203 is stated, and turntable 401 is connected with lead bar 203 by flange;Turntable 401 is arranged in fixed plate 402 Top, and fixed plate 402 is bolted mode with turntable 401 and is connected;Connecting shaft 403 is arranged in fixed plate 402 Portion, and connecting shaft 403 is connected with fixed plate 402 by set and mode;The circumference of connecting shaft 403 is arranged in plummer 404, and Plummer 404 is with connecting shaft 403 by connecting under chimeric mode;The side of attachment device 4 is arranged in set lever 13.
Specifically, pallet 3 is recessed disk-like structure, and pallet 3 is connected with turntable 401 by snap fit, for drawing The rotation of plate 5 is adjusted.
Specifically, fixed plate 402 is provided at two altogether in the upside of turntable 401, connecting shaft 403 is set to fixed plate at two 102 middle position, the rotation for drawing board 5 are adjusted.
Specifically, fixed frame 6 is U-shape, and the frame of fixed frame 6 is internally provided with rectangular recess, for drawing The rotation of plate 5 is adjusted.
Specifically, plastic plate 7 is rectangular-shaped, and plastic plate 7 is transparent plastics material, for protecting drawing and being conducive to exhibition Show.
Specifically, drawing board 5 is rectangular-shaped, and drawing board 5 is magnetic board, facilitates fixed drawing.
Specifically used method and effect:
When using the device, lifting device 2 is bolted to the top of pedestal 1, pallet 3 be bolted to The top of lifting device 2, attachment device 4 is put into using turntable 401 to be blocked and is connected in pallet 3;Drawing board 5 and 404 phase of plummer Connection;Drawing is fixed to the top of drawing board 5 by magnet, hydraulic cylinder 202 is controlled by lifting handle 201 and goes up and down lead bar 203 adjust drawing board 5 to suitable height, unclamp set lever 13, adjust drawing board 5 using connecting shaft 403 and plummer 404 To suitable pitch angle, will set lever 13 lock after start to draw, interruption of work or carry out drawing displaying when, will fix Frame 6 snaps into the top of drawing board 5, and plastic plate 7 is then inserted into 6 middle part of U-shaped fixed frame, prevent drawing dirty and by To damage, drawing board 5 is directly rotated using turntable 401 and pallet 3, is shown convenient for it.
In summary: a kind of construction management construction budget plotting unit, by the way that pallet, turntable, fixed plate is arranged And connecting shaft makes the drawing board of the device that can carry out freely adjusting for plane 360 deg and longitudinal 300 degree ranges, setting U The fixed frame of shape and transparent plastic plate make the device that the figure that it has been drawn be effectively protected when can break at work and are not damaged Bad or to solve existing drawing board be mostly that easy yoke carries drawing board by dirty, drawing board angle is fixed or is adjusted Range is limited, is unfavorable for using being unfavorable for it and be shown and because angle is limited;When operating interruptions, easily because various accidents are made Damaged or dirty problem is caused at the engineering drawing drawn.
While there has been shown and described that the embodiments of the present invention, for the ordinary skill in the art, It is understood that these embodiments can be carried out with a variety of variations in the case where not departing from the principles of the present invention and spirit, repaired Change, replacement and variant, the scope of the utility model is defined by the appended claims and the equivalents thereof.

Claims (6)

1. a kind of construction management construction budget plotting unit, comprising: pedestal (1), lifting device (2), pallet (3), connection Device (4), drawing board (5), fixed frame (6), plastic plate (7), lifting handle (201), hydraulic cylinder (202), lead bar (203), turntable (401), fixed plate (402), connecting shaft (403), plummer (404), set lever (13);It is characterized by: The pedestal (1) is semicircle shape structure;The lifting device (2) is arranged on the top of pedestal (1), and lifting device (2) and bottom Seat (1) mode of being bolted is connected;The pallet (3) is arranged on the top of lifting device (2), and pallet (3) and liter Falling unit (2) mode of being bolted is connected;The attachment device (4) is arranged on the top of pallet (3), and attachment device (4) it is connected with pallet (3) by turntable (401);The drawing board (5) is arranged on the top of attachment device (4), and drawing board (5) it is connected with attachment device (4) mode of being bolted;The fixed frame (6) is arranged on the top of drawing board (5), And fixed frame (6) is connected with drawing board (5) by chimeric mode;The plastic plate (7) is arranged in fixed frame (6) Portion, and plastic plate (7) is wanted to connect with fixed frame (6) by snap fit;The lifting handle (201) is arranged in hydraulic cylinder (202) side;Inside of lead bar (203) setting in hydraulic cylinder (202);Lead is being stated in turntable (401) setting The top of bar (203), and turntable (401) is connected with lead bar (203) by flange;Fixed plate (402) setting is turning The top of disk (401), and fixed plate (402) is connected with turntable (401) mode of being bolted;The connecting shaft (403) Middle part in fixed plate (402) is set, and connecting shaft (403) is connected with fixed plate (402) by set and mode;The carrying Platform (404) be arranged connecting shaft (403) circumference, and plummer (404) with connecting shaft (403) by being connected under chimeric mode; Side of set lever (13) setting in attachment device (4).
2. a kind of construction management construction budget plotting unit according to claim 1, it is characterised in that: the pallet It (3) is recessed disk-like structure, and pallet (3) is connected with turntable (401) by snap fit.
3. a kind of construction management construction budget plotting unit according to claim 1, it is characterised in that: the fixation Plate (402) is provided at two altogether in the upside of turntable (401), and connecting shaft (403) is set to the interposition of fixed plate at two (402) It sets.
4. a kind of construction management construction budget plotting unit according to claim 1, it is characterised in that: the fixation Frame (6) is U-shape, and the frame of fixed frame (6) is internally provided with rectangular recess.
5. a kind of construction management construction budget plotting unit according to claim 1, it is characterised in that: the plastics Plate (7) is rectangular-shaped, and plastic plate (7) is transparent plastics material.
6. a kind of construction management construction budget plotting unit according to claim 1, it is characterised in that: the drawing Plate (5) is rectangular-shaped, and drawing board (5) is magnetic board.
CN201820808757.7U 2018-05-25 2018-05-25 A kind of construction management construction budget plotting unit Expired - Fee Related CN208411274U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820808757.7U CN208411274U (en) 2018-05-25 2018-05-25 A kind of construction management construction budget plotting unit

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820808757.7U CN208411274U (en) 2018-05-25 2018-05-25 A kind of construction management construction budget plotting unit

Publications (1)

Publication Number Publication Date
CN208411274U true CN208411274U (en) 2019-01-22

Family

ID=65112567

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820808757.7U Expired - Fee Related CN208411274U (en) 2018-05-25 2018-05-25 A kind of construction management construction budget plotting unit

Country Status (1)

Country Link
CN (1) CN208411274U (en)

Similar Documents

Publication Publication Date Title
CN103439245B (en) Portable field artificial raining-simulated apparatus
CN204657837U (en) A kind of vertical tube weld jig
CN208411274U (en) A kind of construction management construction budget plotting unit
CN204414911U (en) A kind of mathematics teaching in junior middle school Automatic Drawing blackboard
CN110508862A (en) Total group of localization method of energy-conservation conduit
CN206545394U (en) A kind of aluminum alloy mould plate diagonal brace means for correcting
CN201249610Y (en) Mathematical drawing rule
CN210137952U (en) Graphic panel frame for architectural design
CN207358865U (en) Workpiece slope dimension measuring device
CN206605964U (en) A kind of primary school teaching electric compasses easy to use
CN206450224U (en) One kind mapping support frame
CN206234563U (en) Shatter-resistant tripod is used in one kind measurement
CN205678375U (en) A kind of planar design display can adjust heightening frame
CN205777114U (en) A kind of Portable column reinforcing bar location instrument
CN211552810U (en) Reference object structure for AR ranging
CN206905739U (en) A kind of earthwork grade of side slope measurement apparatus
CN209359939U (en) Height-adjustable engineering plotting unit
CN204854930U (en) Electronic scale device with food information of traceing back
CN208035774U (en) A kind of tool of more dividing any angles
CN203282290U (en) Rectangular blade fixing jig
CN207867784U (en) A kind of physics teaching optics instrument lens
CN208342636U (en) A kind of hood quality inspection clamping device
CN205342505U (en) A cutting bed -jig for fluid reservoir bulb limb
CN206588854U (en) A kind of crotch bend pipe space positioning apparatus
CN217959503U (en) Show platform device of transformer intelligence fortune dimension management and control

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190122

Termination date: 20190525