CN208346656U - A kind of hanging basket for the construction of bridge coping prestress wire two times tensioning - Google Patents

A kind of hanging basket for the construction of bridge coping prestress wire two times tensioning Download PDF

Info

Publication number
CN208346656U
CN208346656U CN201820988704.8U CN201820988704U CN208346656U CN 208346656 U CN208346656 U CN 208346656U CN 201820988704 U CN201820988704 U CN 201820988704U CN 208346656 U CN208346656 U CN 208346656U
Authority
CN
China
Prior art keywords
platform
construction
bridge
platform bracket
bracket
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820988704.8U
Other languages
Chinese (zh)
Inventor
杜景余
何艳龙
侯兆隆
赵永旭
钟凯
朱丹丹
张雨宾
李玉府
吴曼
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Road and Bridge International Co Ltd
China Communications Road and Bridge North China Engineering Co Ltd
Original Assignee
Road and Bridge International Co Ltd
China Communications Road and Bridge North China Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Road and Bridge International Co Ltd, China Communications Road and Bridge North China Engineering Co Ltd filed Critical Road and Bridge International Co Ltd
Priority to CN201820988704.8U priority Critical patent/CN208346656U/en
Application granted granted Critical
Publication of CN208346656U publication Critical patent/CN208346656U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model provides a kind of hanging basket for the construction of bridge coping prestress wire two times tensioning, including a platform bracket, and platform bracket bottom is equipped with two bearing bars, installs two electric blocks respectively in platform bracket top surface two sides;On bridge floor above two bent caps of bridge between the opposite two sides of two width box beams, set up two platform sunpenders, the both ends of every platform sunpender hang a fixed pulley respectively, and the traction rope of each electric block is fixedly connected after a fixed pulley excessively respectively with bearing bar one end of mesa base on platform bracket.When the utility model carries out bent cap prestress wire two times tensioning, it is not take up hoisting machinery, without setting up bracket, saves construction cost, and enough construction spaces can be provided to guarantee construction safety.

Description

A kind of hanging basket for the construction of bridge coping prestress wire two times tensioning
Technical field
The utility model belongs to bridge construction field, is a kind of fusion steel pipe support platform, door shaped stent platform Hanging basket for the construction of bent cap prestress wire two times tensioning.
Background technique
As urban road congestion controls the occupancy in soil and farmland, city and surrounding city ring to make full use of space Line large size elevated bridge generally occurs, and due to surging for the volume of traffic, former Four-Lane Road road surface has been unsatisfactory for transport need, creates ring Line overpass is mostly six-lane or eight lane double width structures.With generally answering for high-strength concrete and high-strength underrelaxation steel strand wires With from bridge construction material, mitigation bridge self weight is saved, structure connects load assignment, transmitting etc. and considers pier top bent cap It is designed as pre-stressed concrete coping.In order to avoid because making bent cap tensile region section occur cracking or antiarch value after single tension Phenomenon, design carry out tensioning, single tension symmetrical tensioning partial prestressing after bent cap concrete strength reaches 100% in two times Steel beam removes the support systems such as bent cap bed die and bracket, carries out two times tensioning again after having lifted precast beam, and symmetrical tensioning is remaining Steel strand wires.
Bed die and operation platform when first time tensioning can be by Coping Construction are operated, because of mould material turnover and frame The factors such as beam space is limited, all remove the support systems such as bent cap bed die and bracket after bent cap first time tensioning is complete.Second The secondary current common practice of tensioning is that jack is being hung to tension steel strand with small tonnage hoisting machinery between two width bridges under bridge In same height, door shaped stent or steel pipe frame are set up between two bent cap stretching ends as operation platform, operator is in bracket On by jack pass through steel strand wires carry out stretching construction.Because space under bridge limits, door shaped stent or the steel pipe frame construction set up are flat The area and bearing capacity of platform are limited, and tensioning equipment cannot be placed on thereon, and in the construction process, hoisting machinery always cannot be from It opens, occupies for a long time mechanical;Scaffold building not only consumes human and material resources, but also the used time longer also lacks safety guarantee.
Summary of the invention
The purpose of this utility model is that for the current bridge construction construction girder pre-stressed steel strand wires two times tensioning mistake of middle cover Bracket sets up the problems such as difficult, safety guarantee is not easy, construction cost is high, occupancy is mechanical for a long time in journey, provides a kind of operation letter Single, easy for construction bent cap prestress wire two times tensioning hanging basket.
The technical solution of the utility model is as follows:
A kind of hanging basket for the construction of bridge coping prestress wire two times tensioning, it is characterised in that: rectangular including one The platform bracket of shape, the platform bracket bottom is transversely provided with two bearing bars being parallel to each other along platform, on platform bracket top Face two sides are installed by two electric blocks respectively;On bridge floor above two bent caps of bridge between the opposite two sides of two width box beams, Two platform sunpenders being parallel to each other are set up, the equivalent width of the spacing between two platform sunpenders and the platform bracket, every The both ends of platform sunpender hang a fixed pulley respectively, and the traction rope of each electric block is fixed sliding around crossing one respectively on platform bracket It is fixedly connected after wheel with bearing bar one end of platform bracket bottom.
Further, the above-mentioned hanging basket for the construction of bridge coping prestress wire two times tensioning, in the week of platform bracket It encloses and is additionally provided with guardrail.
Further, the above-mentioned hanging basket for the construction of bridge coping prestress wire two times tensioning, in two box beam top surfaces position Divide in one between two platform sunpenders and hangs a chain block on strap bolt respectively, the chain lower end difference of two chain blocks It is fixedly connected with the platform bracket bottom.
The utility model production is simple, and Master Cost is low, and turnover rate is high, transport it is easy to use, using the utility model into The construction of row bridge coping prestress wire two times tensioning, compares door shaped stent or steel pipe frame operation platform, can be less with one Hoisting machinery, also avoid bracket set up, remove, the time of base treatment and cost, while not influencing sidewalk vehicle under bridge also It is current, construction cost can be saved, construction efficiency is improved, accelerates construction progress and shortens the construction time.The utility model firm stable, There is sufficiently large working space, effective guarantee can be played to safe construction.
Detailed description of the invention
Fig. 1 is the side structure schematic view of the utility model direction across bridge.
Specific embodiment
As shown in Figure 1, a kind of hanging basket for the construction of bridge coping prestress wire two times tensioning, including a rectangle Platform bracket 1,1 bottom of platform bracket is transversely provided with two bearing bars being parallel to each other 2 along platform, on platform bracket top Face two sides are installed by two electric blocks 3 respectively;Bridge floor above two bent caps 4 of bridge between the opposite two sides of two width box beams 5 On, two platform sunpenders 6 being parallel to each other are set up, the equivalent width of the spacing between two platform sunpenders 6 and the platform bracket, The both ends of every platform sunpender 6 hang a fixed pulley 7 respectively, and the traction rope 31 of each electric block 3 is around respectively on platform bracket It is fixedly connected after crossing a fixed pulley 7 with described 2 one end of bearing bar.
To guarantee that guardrail 8 can be arranged in construction safety, the utility model around platform bracket 1.
In the utility model specific implementation process, to guarantee construction safety, can also set up defences the insurance system that falls.Fall arrest is protected Dangerous system mainly includes two chain blocks 9.Two chain blocks 9 be suspended on respectively two box beams, 5 top surface be located at two platform sunpenders it Between one in divide on strap bolt 10,91 lower end of chain of two chain blocks 9 respectively with 1 bottom of platform bracket is fixed connects It connects.
It is further to the structure and application mode of the utility model below by way of the Application Example an of the utility model Explanation.The overpass bridge constructed in this application embodiment is double width bridge, and superstructure uses prefabricated PC concrete Small box girder, Cast-in-Situ Continuous Beam, steel box girder, substructure use twin columns prestressed concrete cover beam, and each pier stud divides into cushion cap Connect 2 1.5m pile foundations.Standard paragraphs bridge floor is 16.0 meters wide, bent cap length be 14.4 meters, width be 2.0 meters, a height of 1.8 meters, each lid Beam has 5 beam N1 and 5 beam N2 steel strand wires, and left and right width bent cap end spacing is 3.6 meters.Box beam lifting erection construction is completed above bent cap Afterwards, two times tensioning construction is carried out.
Two times tensioning is constructed using the utility model.The platform bracket of the utility model is 5.0 meters long, wide 2.5 meters of works For operation platform, platform skeleton is made of longitudinal at least 4 48 steel pipes of Φ, lateral more 28 screw-thread steels of Φ, and platform top surface is laid with Anti-skidding plank, platform base transversely set two I14 I-steel as bearing bar, and 1.2 meters of high guardrails are arranged in platform periphery.Platform 4 0.5 ton of minisize electric hoists of upper fixed installation, as platform lifting system.
Platform needs between the pier stud below two bent caps of tensioning in back court processing and fabricating, operating to construction site.
It is controlled above bent cap between prefabricated top surface of the beam and sets up 2 32 fining twisted steels of Φ as platform sunpender.Every The both ends of sunpender pass through one fixed pulley of steel wire hang.The traction rope of each electric block bypasses certain pulley respectively on platform Afterwards, it is fixedly connected with bearing bar one end of mesa base.
In Bridge Design, the gap between two width bridges is median strip, general in the opposite two sides top surface of prefabricated case beam It is all preset in more and divides strap bolt.The utility model divides on strap bolt between two platform sunpenders, passes through steel wire Rope hangs one 10 tons of chain blocks as fall arrest insurance system respectively, and the chain of two chain blocks hangs down into platform bracket respectively On, and be fixedly connected with platform bracket bottom surface.
When carrying out two times tensioning construction, the tensioning equipments such as stretch-draw jack 11 are transported on platform 1.Start 4 electronic calabashes Reed 3 after platform is promoted 50cm, tenses two chain blocks 9 of fall arrest insurance system, after so that chain block is played a role, Platform is continued to lift up, it is synchronous to tense chain block, platform is promoted to after the height for needing tensioning, electric block is lockked in power-off, Two chain blocks are locked simultaneously, and in two bent caps, 4 end, installation stretch-draw jack 11 carries out two times tensioning construction operation.

Claims (3)

1. a kind of hanging basket for the construction of bridge coping prestress wire two times tensioning, it is characterised in that: including a rectangle Platform bracket, the platform bracket bottom is transversely provided with two bearing bars being parallel to each other along platform, in platform bracket top surface Two sides are installed by two electric blocks respectively;On bridge floor above two bent caps of bridge between the opposite two sides of two width box beams, take If two platform sunpenders being parallel to each other, the equivalent width of spacing and the platform bracket between two platform sunpenders, every flat The both ends of platform sunpender hang a fixed pulley respectively, and the traction rope of each electric block is around a fixed pulley excessively respectively on platform bracket It is fixedly connected afterwards with bearing bar one end of platform bracket bottom.
2. the hanging basket according to claim 1 for the construction of bridge coping prestress wire two times tensioning, feature exist In: guardrail is equipped with around the platform bracket.
3. the hanging basket according to claim 1 for the construction of bridge coping prestress wire two times tensioning, feature exist In: divide in one between two platform sunpenders in two box beam top surfaces and hang a chain block on strap bolt respectively, two pull The chain lower end of cucurbit is fixedly connected with the platform bracket bottom respectively.
CN201820988704.8U 2018-06-25 2018-06-25 A kind of hanging basket for the construction of bridge coping prestress wire two times tensioning Active CN208346656U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820988704.8U CN208346656U (en) 2018-06-25 2018-06-25 A kind of hanging basket for the construction of bridge coping prestress wire two times tensioning

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820988704.8U CN208346656U (en) 2018-06-25 2018-06-25 A kind of hanging basket for the construction of bridge coping prestress wire two times tensioning

Publications (1)

Publication Number Publication Date
CN208346656U true CN208346656U (en) 2019-01-08

Family

ID=64880987

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820988704.8U Active CN208346656U (en) 2018-06-25 2018-06-25 A kind of hanging basket for the construction of bridge coping prestress wire two times tensioning

Country Status (1)

Country Link
CN (1) CN208346656U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110067201A (en) * 2019-03-15 2019-07-30 上海建工七建集团有限公司 A kind of movable type tensioning platform and its application method
CN112030749A (en) * 2020-07-15 2020-12-04 中交第一航务工程局有限公司 Construction method of walking type bent cap operation platform
CN112726409A (en) * 2020-12-29 2021-04-30 中铁一局集团有限公司 Hoisting device for bridge water surface pile tie beam and construction method thereof

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110067201A (en) * 2019-03-15 2019-07-30 上海建工七建集团有限公司 A kind of movable type tensioning platform and its application method
CN112030749A (en) * 2020-07-15 2020-12-04 中交第一航务工程局有限公司 Construction method of walking type bent cap operation platform
CN112726409A (en) * 2020-12-29 2021-04-30 中铁一局集团有限公司 Hoisting device for bridge water surface pile tie beam and construction method thereof
CN112726409B (en) * 2020-12-29 2022-11-01 中铁一局集团有限公司 Hoisting device for bridge water surface pile tie beam and construction method thereof

Similar Documents

Publication Publication Date Title
CN100441779C (en) Space-precasting translation-emplacing method for bridge construction
CN208346656U (en) A kind of hanging basket for the construction of bridge coping prestress wire two times tensioning
CN106677070A (en) Construction support and method for overhead large-span heavy-duty cross beam
CN102943440A (en) Method for constructing bridges
CN107905114A (en) A kind of construction method of large span Successive interference cancellation
CN105239510A (en) Dismounting beam support used for high pier small-radius curve cast-in-situ box beam and construction method
CN106592962A (en) Large-height-difference long-span stiff-skeleton cladding concrete formwork construction method and apparatus
CN111270618B (en) Bridge reconstruction construction method based on half-width traffic protection
CN107165062A (en) A kind of method for removing Existing Railway Line gate-type pier capping beam protecting canopy frame
CN106976157A (en) A kind of post stretching precast beam pedestal for being applicable different length and cross sectional shape
CN107245953A (en) The bent device and crossed construction method of a kind of multilayer bridge structure
CN114059825A (en) Structure of road protection shed crossing large flow under limited clearance and construction method thereof
CN110468743B (en) Movable hanging bracket for transformation of old bridge pier cap and construction method
CN210049103U (en) High-grade high-speed highway bracket spanned by large-span cast-in-place box girder
CN205934735U (en) A operation platform for stretch -draw of cantilever bent cap
KR100981982B1 (en) Precast coping lifting system
CN206887771U (en) A kind of small across footpath plate-beam construction platform structure
CN105735099B (en) Construction time uses the simple supported-to-continuous girder bridge and its construction method of external prestressing
CN208328660U (en) The U-shaped girder construction of the Two bors d's oeuveres of combined bridge
CN102535344A (en) Concrete transportation method for bridge body of high-pier bridge in gully region
CN214885356U (en) Shaped steel hard protector that encorbelments suitable for high-rise building
CN210797285U (en) Dual-purpose device used as pier column template and prestress support
CN204401464U (en) A kind of construction of cast-in-place box girders construction bracket system
CN211142816U (en) Construction platform
CN204530507U (en) Long span steel-concrete composite beam cable-stayed bridge limit steel case anchoring temporarily system

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant