CN208302524U - A kind of storage-tank waste gas processing unit - Google Patents

A kind of storage-tank waste gas processing unit Download PDF

Info

Publication number
CN208302524U
CN208302524U CN201820123315.9U CN201820123315U CN208302524U CN 208302524 U CN208302524 U CN 208302524U CN 201820123315 U CN201820123315 U CN 201820123315U CN 208302524 U CN208302524 U CN 208302524U
Authority
CN
China
Prior art keywords
blower
tank
valve
storage
pipe line
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820123315.9U
Other languages
Chinese (zh)
Inventor
曹东学
刘忠生
王海波
廖昌建
王晶
李磊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sinopec Dalian Petrochemical Research Institute Co ltd
China Petroleum and Chemical Corp
Original Assignee
China Petroleum and Chemical Corp
Sinopec Dalian Research Institute of Petroleum and Petrochemicals
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Petroleum and Chemical Corp, Sinopec Dalian Research Institute of Petroleum and Petrochemicals filed Critical China Petroleum and Chemical Corp
Priority to CN201820123315.9U priority Critical patent/CN208302524U/en
Application granted granted Critical
Publication of CN208302524U publication Critical patent/CN208302524U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Exhaust Gas Treatment By Means Of Catalyst (AREA)

Abstract

The utility model discloses a kind of storage-tank waste gas processing units, including storage tank, exhaust pipe line, bleed valve, blower, blower introduction pipe line, blower to draw pipeline and oxidation unit;Tank top connects exhaust pipe line, and exhaust pipe line is connected with bleed valve, connects blower by blower introduction pipe line, and blower draws pipeline through blower and connects oxidation unit, and air inlet line is arranged in blower introduction pipe line.The utility model introduces air before blower, by adjusting exhaust gas and air mass flow, stablize the gas flow into blower, blower is always maintained at working condition, service intermittent influence caused by fan life is avoided, ensure that the continuous and steady operation of oxidation unit.

Description

A kind of storage-tank waste gas processing unit
Technical field
The utility model relates to a kind of storage-tank waste gas processing units, belong to petrochemical enterprise storage-tank waste gas processing technique neck Domain.
Background technique
The exhaust gas of the tank fields such as the acid water tank field of petrochemical enterprise, Oil Tank discharge is main foul gas pollution Source, the pollutants such as volatile hydrocarbon containing higher concentration in exhaust gas, if effective method is not taken to handle, it will serious dirty Ambient enviroment is contaminated, the health of staff is influenced.Therefore, tank field exhaust emission is avoided to be directly discharged to ambient enviroment, Tank field exhaust emission is timely and effectively handled, is a kind of important means for protecting environment.
Catalysis oxidation and regenerative oxidation are common two methods of VOCs treatment in recent years.Catalysis oxidation (catalysis combustion Burn) technology refers under lower temperature (250~450 DEG C), by the effect of catalyst, the combustible component in exhaust gas aoxidized For CO2And H2O, to achieve the purpose that purification gas, catalytic oxidation has low operation temperature, treatment effeciency height, reaction thorough Bottom, the advantages that low energy consumption and safe operation.Regenerative oxidation (heat-accumulation combustion) technology refer to using accumulation of heat body heat transmitting by the way of, Make organic exhaust gas and purified discharge gas alternate cycles, and absorb and release heat with heat storage, passes through periodic variation Airflow direction to keep fire box temperature to stablize, regenerative oxidation method have the heat treatment thermal efficiency is high, treatment effeciency is high, low energy consumption, The advantages that treatment effect is reliable and stable.But it is lower that two methods of catalysis oxidation and regenerative oxidation are required to handled exhaust gas concentration To guarantee safety, therefore before exhaust gas enters catalysis oxidation or regenerative oxidation device, need to introduce large quantity of air by blower Exhaust gas is diluted.
Storage tank exhaust includes calling out suction and discharge and small breathing to be vented, and it is mainly related to storage tank input and output material to call out suction and discharge, small Breathing exhaust is mainly related to environment temperature, and when environment temperature increases, temperature raising can cause storage tank to be vented in storage tank Phenomenon, when the environment temperature decreases, temperature reduction can cause storage tank venting event occur in storage tank.For Petroleum Storage Tank, Contain pollutant in the exhaust of storage tank Big and Small Breath, discharge gas needs collection to handle.It collects gas and generally uses air-introduced machine, compressor Deng the closed bleed of progress, there may be the excessive exhaust being drawn in storage tank during closed bleed, lead to storage tank storing liquid Phenomena such as body volatilization loss increases.
CN205517146U discloses a kind of tank deck exhaust gas absorption device, including fan housing and pipeline, and the fan housing passes through two The hinged ring flange of block is connect with pipeline, and the other end of pipeline is equipped with negative-pressure air fan, the bottom that air duct is contacted with tank deck Equipped with the gasket enclosed around air duct one, the side of gasket is equipped at least one through-hole, so that filling into when absorbing exhaust gas a certain amount of Air, reduce the volume of exhaust gas absorption device, enhance the continuity of work.But since tank deck aperture and shim through bore are straight Lead in succession, tank deck exhaust gas may be spilt into surrounding air from the through-hole of gasket, even and if blower continuous work, exhaust gas flow and The pressure of tank deck is also difficult to keep stablizing, and is unfavorable for the continuous and steady operation of rear end oil gas treating device.
CN205837686U discloses a kind of petroleum storage tank respiratory system, the breather valve including being located at tank top, breathing Valve connects a bifurcated head, and bifurcated head includes cylindric main body, and main body wall is equipped with oil gas interface and nitrogen interface, bifurcated head It is interior to be equipped with rotation plugging plate, oil gas interface or nitrogen interface are connected to switch breather valve.It is capable of handling the oil gas of storage tank volatilization, Avoid pollution environment, and supplying nitrogen oil gas or atmosphere in oil gas treating device is avoided to enter storage tank causes tank inside to be corroded Aggravation.But the rotation closure plate of bifurcated head is driven by motor and is rotated, and motor is easy to happen failure and poorly sealed easy leakage, and Using metal detection body and close to switch, system failure point is more to be easy to happen exception, and atmosphere valve when system exception It opens, tank deck exhaust gas can be spilt into air, cause environmental pollution.
Utility model content
In view of the deficiencies of the prior art, the utility model provides a kind of storage-tank waste gas processing unit, is arranged before blower Bleed valve can introduce exhaust gas and air simultaneously, by automatically adjusting air mass flow, mix with air the exhaust gas into blower Total gas flow rate is stablized, and blower is always maintained at working condition, avoids service intermittent influence caused by fan life, guarantees The continuous and steady operation of oxidation unit.
The storage-tank waste gas processing unit of the utility model, including storage tank, exhaust pipe line, bleed valve, blower, blower draw Enter pipeline, blower draws pipeline and oxidation unit;Tank top connects exhaust pipe line, and bleed valve connects exhaust pipe line And blower introduction pipe line, blower draw pipeline through blower and connect oxidation unit.
The storage tank includes controlling nitrogen on the nitrogen pipeline into storage tank and nitrogen pipeline for introducing nitrogen gas into The nitrogen valve of entrance, nitrogen pipeline are generally positioned at storage tank top;Nitrogen valve is pressure opening and closing valve, and tank inner pressure is lower than setting When value, nitrogen is opened and supplemented into storage tank to nitrogen valve, and when tank inner pressure is greater than or equal to setting value, nitrogen valve is closed.
The exhaust emission tube line is used for the exhaust gas let-down vessel in storage tank, and setting control is useless on exhaust emission tube line The exhaust gas valve of gas discharge, exhaust emission tube line are generally positioned at tank top;The exhaust gas valve is pressure-regulating valve, passes through storage Pressure signal is sent to exhaust gas valve and then adjusts the aperture of exhaust gas valve by the pressure gauge on tank.
The storage tank is generally several, in parallel between storage tank when storage tank number more than one, the exhaust gas of each storage tank Discharge pipe line summarizes to bleed valve;The storage tank includes the pressure gauge for monitoring tank internal pressure, and pressure gauge is generally set It is placed in tank top.
The oxidation unit is that the combustible component in exhaust gas is oxidized to CO2And H2O;Oxidation unit generally can be to urge Change oxidation unit or regenerative oxidation device.
The exhaust gas for flowing through exhaust gas valve is sent into blower introduction pipe line by the bleed valve, while according to the size of exhaust gas flow The air mass flow of sucking is automatically adjusted, and the air of sucking is also fed into blower introduction pipe line.
The bleed valve 5 includes valve body 55, exhaust gas inlet 51, air intake 52, gas vent 53 and air intake Baffle 54 and spring 56.
The bleed valve body 55 is made of straight pipe 551 and cavity segment 552, and the side wall of cavity segment 552 or bottom are set There is air intake 52, is directly communicated with atmosphere;551 lower part of valve body straight pipe is connect with exhaust pipe line, is bleed valve exhaust gas Import 51;551 top of valve body straight pipe is connect with blower introduction pipe line, is bleed valve gas vent 53.The sky of the bleed valve 5 Air intake baffle 54 is equipped at gas entrance 52, air intake baffle 54 is fixedly connected with 56 one end of spring, when cavity segment 552 When side wall is equipped with air intake 52,56 other end of spring is fixedly connected with 551 outer wall of straight pipe, when 552 bottom of cavity segment is equipped with When air intake 52,56 other end of spring is fixedly connected with 552 inner wall of cavity segment.
The bleed valve air intake 52 can be one or more, and preferably 2 ~ 8,52 shape of air intake can be Round, rectangular or oval, circular, when multiple air intakes 52 are arranged, each air intake 52 is preferably circumferentially uniform Distribution.
Exhaust gas flow into bleed valve 5 is of different sizes, and 5 inside and outside differential pressure of bleed valve is just different, bleed valve air intake gear The position of plate 54 automatically adjusts under the action of inside and outside differential pressure, so that the air capacity into bleed valve 5 is adjusted, so that from bleed valve The gas flow that gas vent 53 flows out keeps stablizing.In its natural state, spring 56 is in micro- compressive state, air intake gear Plate 54 fits closely under the effect of spring 56 with air intake 52, air intake 52 in the closure state, with guarantee it is closed not Gas blowby.When the exhaust gas flow for entering bleed valve 5 is larger, the pressure of 54 inside of air intake baffle is greater than the pressure in outside, empty Gas inlet baffle 54 is fitted closely with air intake 52, and air intake 52 is in closed state, and exhaust gas is from bleed valve gas vent Blower introduction pipe line, which is flowed through, after 53 outflows enters blower;When the exhaust gas flow for entering bleed valve 5 is smaller, air intake baffle 54 The pressure of inside is less than the pressure in outside, and air intake baffle 54 is separated with air intake 52, and air intake 52 is in open shape State, air enter bleed valve 5 and mix with exhaust gas, and mixed gas flows through blower after the outflow of bleed valve gas vent 53 and introduces pipe Line enters blower;When not having exhaust gas to enter bleed valve 5, the pressure of 54 inside of air intake baffle is less than the pressure in outside, empty Gas inlet baffle 54 is separated with air intake 52, and air intake 52 is in the open state, and air enters after bleed valve 5 from bleed valve Gas vent 53 flows out, and flows through blower introduction pipe line and enters blower.
When fixed value of the pressure value that the pressure gauge on storage tank measures lower than setting, nitrogen valve is opened, and is started to storage tank Interior supplement nitrogen, exhaust valve opening degree minimum are even switched off, and the exhausted air quantity very little for flowing through bleed valve even flows through bleed valve without exhaust gas, Bleed valve is automatically drawn into large quantity of air;
When the pressure value that the pressure gauge on storage tank measures is equal to the fixed value of setting, the gaseous pressure in storage tank is more steady It is fixed, nitrogen is neither required supplementation with without discharge exhaust gas, and nitrogen valve is closed, and exhaust valve opening degree minimum is even switched off, and flows through bleed The exhausted air quantity very little of valve even flows through bleed valve without exhaust gas, and bleed valve is automatically drawn into large quantity of air;
When the pressure value that the pressure gauge on storage tank measures is higher than fixed value, nitrogen valve is closed, and exhaust gas valve is opened, exhaust gas valve Aperture with pressure value size automatically adjust, bleed valve introduce air amount with exhaust gas flow size automatically adjust.
In above-mentioned three kinds of situations, by the automatic adjustment of the switch of nitrogen valve, exhaust gas valve and bleed valve, tie up pressure inside the tank It is fixed to keep steady, while making to keep stablizing by the gas flow of blower, is conducive to the safety and continuous and steady operation of oxidation unit.
The storage-tank waste gas processing unit of the utility model is simple, reliable, can will focus on after the gas sampling of storage tank, By introducing air before blower, exhaust gas is diluted using air, reduces exhaust gas concentration, exhaust gas concentration is made to meet catalysis Oxidation or the requirement of regenerative oxidation device, to eliminate the air in catalysis oxidation or regenerative oxidation device processing waste gas system Dilution air;Meanwhile air is introduced before blower, and air mass flow is adjusted according to the flow of exhaust gas, mix with air exhaust gas The total flow of gas is kept constant, therefore the gas flow for entering blower is stablized, and blower is always maintained at working condition, avoids interval Formula work is influenced caused by fan life, is conducive to the continuous and steady operation of subsequent catalyst oxidation or regenerative oxidation device.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the utility model.
Fig. 2 is the structural schematic diagram of the bleed valve one (air intake is located at cavity segment bottom) used in the utility model.
Fig. 3 is the structural schematic diagram of the bleed valve two (air intake is located at cavity segment side wall) used in the utility model.
Fig. 4 is the air intake arrangement schematic diagram of the bleed valve one used in the utility model.
Fig. 5 is the air intake arrangement schematic diagram of the bleed valve two used in the utility model.
Wherein, 1- storage tank, 2- nitrogen pipeline, 3- nitrogen valve, 4- pressure gauge, 5- bleed valve, 6- exhaust gas valve, the discharge of 7- exhaust gas Pipeline, 8- blower introduction pipe line, 9- blower, 10- blower draw pipeline, 11- oxidation unit;
5- bleed valve includes: 51- exhaust gas inlet, 52- air intake, 53- gas vent, 54- air intake baffle, 55- Valve body, 56- spring;55- valve body includes: 551- straight pipe, 552- cavity segment.
Specific embodiment
The storage-tank waste gas processing unit of the utility model is described in further detail with reference to the accompanying drawing.
The storage-tank waste gas processing unit of the utility model be achieved in that into bleed valve 5 exhaust gas flow size not Together, 5 inside and outside differential pressure of bleed valve is just different, and the position of bleed valve air intake baffle 54 is adjusted automatically under the action of inside and outside differential pressure Section, so that the air capacity into bleed valve 5 is adjusted, so that the gas flow flowed out from bleed valve gas vent 53 keeps stablizing. In its natural state, spring 56 is in micro- compressive state, and air intake baffle 54 is tight with air intake 52 under the effect of spring 56 Closely connected conjunction, air intake 52 in the closure state, to guarantee closed not gas blowby.When the exhaust gas flow for entering bleed valve 5 is larger When, the pressure of 54 inside of air intake baffle is greater than the pressure in outside, and air intake baffle 54 is fitted closely with air intake 52, Air intake 52 is in closed state, and exhaust gas flows through blower introduction pipe line 8 into blower after the outflow of bleed valve gas vent 53 9;When the exhaust gas flow for entering bleed valve 5 is smaller, the pressure of 54 inside of air intake baffle is less than the pressure in outside, and air enters Mouth baffle 54 is separated with air intake 52, and air intake 52 is in the open state, and air enters bleed valve 5 and mixes with exhaust gas, Mixed gas flows through blower introduction pipe line 8 after the outflow of bleed valve gas vent 53 and enters blower 9;When there is no exhaust gas to enter bleed When valve 5, the pressure of 54 inside of air intake baffle is less than the pressure in outside, and air intake baffle 54 is separated with air intake 52, Air intake 52 is in the open state, and air flows out after entering bleed valve 5 from bleed valve gas vent 53, flows through blower and introduces pipe Line 8 enters blower 9.
Nitrogen valve 3 when fixed value of the pressure value that the pressure gauge 4 on storage tank 1 measures lower than setting, on nitrogen pipeline 2 It opens, starts to supplement nitrogen into storage tank 1;When the pressure value that the pressure gauge 4 on storage tank 1 measures is equal to the fixed value of setting, Gaseous pressure in storage tank 1 is more stable, and the nitrogen valve 3 on nitrogen pipeline 2 is closed.When above-mentioned two situations, storage tank 1 is without exhaust gas Discharge, the 6 aperture minimum of exhaust gas valve on exhaust pipe line 7 are even switched off, and large quantity of air enters bleed valve 5 at this time, air from Enter subsequent oxidation device 11 through blower 9 after the outflow of gas vent 53 of bleed valve 5.When the pressure that the pressure gauge 4 on storage tank 1 measures When force value is higher than fixed value, storage tank 1 need to discharge exhaust gas outward, and nitrogen valve 3 is closed, and exhaust gas valve 6 is opened, the aperture of exhaust gas valve 6 with The size of the pressure value that 1 top pressure table 4 of storage tank measures automatically adjusts, into bleed valve 5 air with exhaust gas flow size Automatic adjustment, i.e., pressure value increases in storage tank 1, and 6 aperture of exhaust gas valve increases, and the exhaust gas flow into bleed valve 5 increases, then enters The air mass flow of bleed valve 5 reduces, and the total flow for mixing with air gas from the exhaust gas of the outlet of bleed valve 5 outflow is kept constant, because This gas flow for entering subsequent oxidation device 11 through blower 9 keeps stablizing, and guarantees the continuous and steady operation of oxidation unit 11.
Embodiment 1
Certain 5000m3Gasoline product tank, tank deck are equipped with pressure gauge, when the pressure value of pressure gauge detection is higher than 1200pa, with The exhaust gas valve stored up on tank connected exhaust pipe line is opened, and exhaust gas is discharged from storage tank, and exhaust gas flow is generally not more than 100m3/ h.When the exhaust gas flow for entering bleed valve is larger, the air mass flow into bleed valve reduces;When the waste gas stream for entering bleed valve When measuring smaller, the air mass flow into bleed valve increases.Exhaust gas and air total flow keep 1000m3/ h enters after flowing through blower Treating capacity is 1000m3The catalytic oxidizing equipment of/h.Blower is continuously run, and avoids service intermittent caused by fan life It influences, through catalytic oxidizing equipment treated gas qualified discharge.

Claims (9)

1. a kind of storage-tank waste gas processing unit, it is characterised in that draw including storage tank, exhaust pipe line, bleed valve, blower, blower Enter pipeline, blower draws pipeline and oxidation unit;Tank top connects exhaust pipe line, and bleed valve connects exhaust pipe line And blower introduction pipe line, blower draw pipeline through blower and connect oxidation unit;The bleed valve will flow through the exhaust gas of exhaust gas valve It is sent into blower introduction pipe line, is sent into according to the air mass flow of the size of exhaust gas flow automatic adjustment sucking, and by the air of sucking Blower introduction pipe line.
2. storage-tank waste gas processing unit described in accordance with the claim 1, it is characterised in that: the storage tank includes for by nitrogen It is introduced to and controls the nitrogen valve that nitrogen enters on the nitrogen pipeline and nitrogen pipeline in storage tank, nitrogen pipeline is set to storage tank Top;Nitrogen valve is pressure opening and closing valve.
3. storage-tank waste gas processing unit described in accordance with the claim 1, it is characterised in that: the exhaust pipe line is used for will Exhaust gas let-down vessel in storage tank, the exhaust gas valve of setting control exhaust gas discharge, the setting of exhaust pipe line on exhaust pipe line In tank top;The exhaust gas valve is pressure-regulating valve.
4. storage-tank waste gas processing unit described in accordance with the claim 1, it is characterised in that: the storage tank is several, works as storage When tank number more than one, in parallel between storage tank, the exhaust pipe congruence of each storage tank is always to bleed valve.
5. storage-tank waste gas processing unit described in accordance with the claim 1, it is characterised in that: the storage tank includes for monitoring storage The pressure gauge of tank internal pressure.
6. storage-tank waste gas processing unit described in accordance with the claim 1, it is characterised in that: the bleed valve (5) includes valve body (55), exhaust gas inlet (51), air intake (52), gas vent (53) and air intake baffle (54) and spring (56).
7. storage-tank waste gas processing unit according to claim 6, it is characterised in that: the valve body (55) is by straight pipe (551) constituted with cavity segment (552), the side wall of cavity segment (552) or bottom are equipped with air intake (52), directly with big gas phase It is logical;Valve body straight pipe (551) lower part is connect with exhaust pipe line, is bleed valve exhaust gas inlet (51);Valve body straight pipe (551) Top is connect with blower introduction pipe line, is bleed valve gas vent (53);It is equipped at the air intake (52) of the bleed valve (5) Air intake baffle (54), air intake baffle (54) are fixedly connected with spring (56) one end, when the side wall of cavity segment (552) is set When having air intake (52), spring (56) other end is fixedly connected with straight pipe (551) outer wall, when cavity segment (552) bottom is set When having air intake (52), spring (56) other end is fixedly connected with cavity segment (552) inner wall.
8. storage-tank waste gas processing unit according to claim 6, it is characterised in that: the bleed valve air intake is 1 A or multiple, air intake shape is one or more in round, rectangular or ellipse.
9. storage-tank waste gas processing unit according to claim 6, it is characterised in that: when multiple air intakes are arranged, respectively Air intake is circumferentially uniformly distributed.
CN201820123315.9U 2018-01-25 2018-01-25 A kind of storage-tank waste gas processing unit Active CN208302524U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820123315.9U CN208302524U (en) 2018-01-25 2018-01-25 A kind of storage-tank waste gas processing unit

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820123315.9U CN208302524U (en) 2018-01-25 2018-01-25 A kind of storage-tank waste gas processing unit

Publications (1)

Publication Number Publication Date
CN208302524U true CN208302524U (en) 2019-01-01

Family

ID=64731811

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820123315.9U Active CN208302524U (en) 2018-01-25 2018-01-25 A kind of storage-tank waste gas processing unit

Country Status (1)

Country Link
CN (1) CN208302524U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115388414A (en) * 2022-08-26 2022-11-25 上海环境保护有限公司 Fresh air supplementing system of heat accumulating type incinerator and control method thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115388414A (en) * 2022-08-26 2022-11-25 上海环境保护有限公司 Fresh air supplementing system of heat accumulating type incinerator and control method thereof

Similar Documents

Publication Publication Date Title
CN208145765U (en) A kind of storage-tank waste gas processing system
CN108592054B (en) A coking plant VOCs treatment system
CN207941393U (en) Storage-tank waste gas processing unit
CN208302524U (en) A kind of storage-tank waste gas processing unit
CN209782906U (en) Energy-conserving exhaust system in laboratory
CN204574091U (en) A kind of boiler energy-saving emission-reduction system
CN110180311A (en) A kind of flue gas graded processing device of garbage incinerating power plant
CN211697699U (en) Improved smoke and dust detection device
CN217052131U (en) Non-condensable gas recovery purifier
CN211659718U (en) Volatile liquid storage tank respiratory opening waste gas treatment device
CN222816553U (en) Energy-saving tail gas purifying device for boiler
CN204851391U (en) Automobile tail gas treatment device
CN213221624U (en) Multi-stage type flue gas desulfurization spray tower
CN210114976U (en) Intelligent absorption system of chemical sulfur-containing tail gas
CN115945052A (en) Be used for containing sulphur industrial waste gas clean system
CN220640690U (en) Medical transfer box for supplying gas
CN209322467U (en) A kind of low energy consumption device for recovering oil and gas
CN208809783U (en) A kind of pre- spray type desulfurization absorption tower
CN222019262U (en) Low-temperature catalytic treatment equipment for waste gas nitrogen oxides
CN221788798U (en) Multistage environmental protection dust collector
CN217431351U (en) Hydrogen sulfide waste gas treatment system and control equipment
CN218646934U (en) Tail gas interference-free discharge device for precision analysis instrument
CN213913096U (en) Coking desulfurization regenerator tail gas processing apparatus
CN219539823U (en) Solid waste smoke and dust concentration control denitration treatment facility
CN219792884U (en) Desulfurizing tower for methane desulfurization

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20240402

Address after: 100728 No. 22 North Main Street, Chaoyang District, Beijing, Chaoyangmen

Patentee after: CHINA PETROLEUM & CHEMICAL Corp.

Country or region after: China

Patentee after: Sinopec (Dalian) Petrochemical Research Institute Co.,Ltd.

Address before: 100728 No. 22 North Main Street, Chaoyang District, Beijing, Chaoyangmen

Patentee before: CHINA PETROLEUM & CHEMICAL Corp.

Country or region before: China

Patentee before: DALIAN RESEARCH INSTITUTE OF PETROLEUM AND PETROCHEMICALS, SINOPEC Corp.