CN208280126U - The leaf pier shaft steel reinforcement cage positioning device of crape myrtle - Google Patents

The leaf pier shaft steel reinforcement cage positioning device of crape myrtle Download PDF

Info

Publication number
CN208280126U
CN208280126U CN201820535985.1U CN201820535985U CN208280126U CN 208280126 U CN208280126 U CN 208280126U CN 201820535985 U CN201820535985 U CN 201820535985U CN 208280126 U CN208280126 U CN 208280126U
Authority
CN
China
Prior art keywords
reinforcement cage
leaf
steel reinforcement
pier shaft
crape myrtle
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820535985.1U
Other languages
Chinese (zh)
Inventor
韩学明
赵云强
周权
刘燕燕
裘高松
王朝训
郑蔓
刘博�
郑竞友
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Communications Construction Group Co Ltd
Original Assignee
Zhejiang Handover Group Ltd By Share Ltd Railway Branch
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Handover Group Ltd By Share Ltd Railway Branch filed Critical Zhejiang Handover Group Ltd By Share Ltd Railway Branch
Priority to CN201820535985.1U priority Critical patent/CN208280126U/en
Application granted granted Critical
Publication of CN208280126U publication Critical patent/CN208280126U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model discloses a kind of leaf pier shaft steel reinforcement cage positioning devices of crape myrtle, including the leaf pier shaft steel reinforcement cage of crape myrtle, two located lateral channel steels and two longitudinal register channel steels on crape myrtle leaf pier shaft steel reinforcement cage outer surface, the cushion cap template being respectively arranged on two located lateral channel steel both ends and two longitudinal register channel steel both ends;Two longitudinal register channel steels are respectively positioned on the top of two located lateral channel steels, cross-distribution is grid-shaped two-by-two for two located lateral channel steels and two longitudinal register channel steels, each piece of cap mold backboard is equipped with several templates installation main rib beam to crape myrtle leaf pier shaft steel reinforcement cage side, and the junction of every located lateral channel steel and every longitudinal register channel steel is equipped with sizing regulating mechanism.The utility model has the characteristics that can be improved pier shaft steel reinforcement cage integral hoisting quality.

Description

The leaf pier shaft steel reinforcement cage positioning device of crape myrtle
Technical field
The utility model relates to reinforcing bar field of locating technology, and referring in particular to one kind can be improved pier shaft steel reinforcement cage integral hoisting The leaf pier shaft steel reinforcement cage positioning device of the crape myrtle of quality.
Background technique
Large aperture, big depth cast-in-place concrete pile are usually required in the heavy constructions such as bridge, electric field construction.It is driving piles During, guarantee that position of steel reinforcement cage during filling concrete is accurately very important, otherwise reinforcing bar cage location is inclined It moves, tilt more, pile foundation thickness of protection tier will be caused inadequate, to cause the quality problems of engineering construction.
Currently, the positioning method that construction enterprises use domestic mostly is that scene is fixed by the way of welding short steel rod on steel reinforcement cage Position, i.e., in steel reinforcement cage external welding bar dowel, the shortcomings that bar dowel horizontally toward hole wall direction, this mode, is steel reinforcement cage under Be easy during putting to shake, cause spacer bar to hit casing, the phenomenon that steel reinforcement cage deviation occur, influence pier construction progress and Construction quality.Therefore, a kind of pier shaft steel reinforcement cage positioning device that can be improved pier shaft steel reinforcement cage integral hoisting quality is designed, it is just aobvious It obtains very necessary.
Utility model content
The utility model is to overcome in the prior art, and it is inclined that existing steel reinforcement cage positioning method is easy to appear steel reinforcement cage Position, the problem of influencing pier shaft steel reinforcement cage integral hoisting quality, providing one kind can be improved pier shaft steel reinforcement cage integral hoisting quality The leaf pier shaft steel reinforcement cage positioning device of crape myrtle.
To achieve the above object, the utility model uses following technical scheme:
A kind of leaf pier shaft steel reinforcement cage positioning device of crape myrtle, including the leaf pier shaft steel reinforcement cage of crape myrtle are set to the leaf pier of crape myrtle Two located lateral channel steels and two longitudinal register channel steels on body steel reinforcement cage outer surface, are respectively arranged on two located lateral channel steels Cushion cap template on both ends and two longitudinal register channel steel both ends;Two longitudinal register channel steels are respectively positioned on two located lateral channel steels Top, cross-distribution is grid-shaped two-by-two for two located lateral channel steels and two longitudinal register channel steels, each piece of cap mold backboard Several templates installation main rib beam, every located lateral channel steel and every longitudinal direction are equipped with to crape myrtle leaf pier shaft steel reinforcement cage side The junction of locating slot steel is equipped with sizing regulating mechanism.
In the utility model, two located lateral channel steels and two longitudinal register channel steels are used to reinforce the positioning to steel reinforcement cage It is inclined to solve steel reinforcement cage mounting plane position for accuracy, location dimension size of the sizing regulating mechanism to adjust steel reinforcement cage The larger problem in position.The utility model has the characteristics that can be improved pier shaft steel reinforcement cage integral hoisting quality.
Preferably, the leaf pier shaft steel reinforcement cage of crape myrtle is equipped with a delineation position stirrup, positioning stirrup and the leaf pier shaft of crape myrtle Steel reinforcement cage is fixedly connected.Positioning stirrup is difficult to control for solving the problems, such as that steel reinforcement cage is mounted on upright position deviation, and it is fixed to improve Level exactness.
Preferably, each sizing regulating mechanism includes two rectangular round hole slots, it is set to two long square circulars Bolt on hole slot, bolt upper and lower ends are equipped with gasket and nut, and bolt is slidably connected with two rectangular round hole slots respectively. Sizing regulating mechanism at the delivery position of longitudinal register channel steel and located lateral channel steel, to adjust steel reinforcement cage positioning rule It is very little, locking reinforcing is carried out with screw bolt and nut after position adjusting is accurate.
Preferably, a rectangular round hole slot position of each sizing regulating mechanism is on located lateral channel steel, separately One rectangular round hole slot position is on longitudinal register channel steel.The structure makes when adjusting steel reinforcement cage location dimension, Neng Gou It is adjusted on horizontal and vertical, improves positioning accuracy.
Preferably, each template installation main rib beam in monolithic cushion cap template equidistantly arranges.Main rib beam is equidistantly arranged Column strengthen the stability of entire positioning device when in use.
Preferably, crape myrtle leaf pier shaft steel reinforcement cage cross section is in rectangle.
Therefore, the utility model has the following beneficial effects: (1) solves, steel reinforcement cage mounting plane position deviation is biggish to be asked Topic improves the accuracy of plan-position positioning;(2) it can be improved steel bar cage protecting layer thickness qualification rate;(3) reinforce to steel reinforcement cage High process control when installation.
Detailed description of the invention
Fig. 1 is a kind of elevation of the utility model;
Fig. 2 is a kind of plan view of the utility model;
Fig. 3 is a kind of close-up plan view in Fig. 2 at A;
Fig. 4 is a kind of structural schematic diagram of sizing regulating mechanism in the utility model.
In figure: the leaf pier shaft steel reinforcement cage 1 of crape myrtle, located lateral channel steel 2, longitudinal register channel steel 3, cushion cap template 4, template peace Fill main rib beam 5, sizing regulating mechanism 6, positioning stirrup 7, rectangular round hole slot 8, bolt 9, gasket 10, nut 11.
Specific embodiment
The utility model is further described with specific embodiment with reference to the accompanying drawing:
A kind of leaf pier shaft steel reinforcement cage positioning device of crape myrtle as depicted in figs. 1 and 2, including the leaf pier shaft steel reinforcement cage of crape myrtle 1, two located lateral channel steels 2 and two longitudinal register channel steels 3 on crape myrtle leaf pier shaft steel reinforcement cage outer surface are set respectively Cushion cap template 4 on two located lateral channel steel both ends and two longitudinal register channel steel both ends;Two longitudinal register channel steels are equal Positioned at the top of two located lateral channel steels, cross-distribution is in net two-by-two for two located lateral channel steels and two longitudinal register channel steels Trellis, each piece of cap mold backboard are equipped with several templates installation main rib beam 5, every cross to crape myrtle leaf pier shaft steel reinforcement cage side Sizing regulating mechanism 6 is equipped with to the junction of locating slot steel and every longitudinal register channel steel.
Crape myrtle leaf pier shaft steel reinforcement cage cross section is in rectangle, and the leaf pier shaft steel reinforcement cage of crape myrtle is equipped with a delineation position stirrup 7, Positioning stirrup is fixedly connected with the leaf pier shaft steel reinforcement cage of crape myrtle.Positioning stirrup is mounted on upright position deviation for solving steel reinforcement cage Uncontrollable problem improves positional accuracy.
In addition, each sizing regulating mechanism includes two rectangular round hole slots 8, it is set to two rectangular round hole slots On bolt 9, bolt upper and lower ends are equipped with gasket 10 and nut 11, and bolt connects with two rectangular round hole slots slidings respectively It connects.Sizing regulating mechanism at the delivery position of longitudinal register channel steel and located lateral channel steel, it is fixed to adjust steel reinforcement cage Position size carries out locking reinforcing with screw bolt and nut after position adjusting is accurate.One of each sizing regulating mechanism is rectangular Round hole slot position is on located lateral channel steel, another rectangular round hole slot position is on longitudinal register channel steel.The structure makes It when adjusting steel reinforcement cage location dimension, can be adjusted on horizontal and vertical, improve positioning accuracy.
Each template installation main rib beam in monolithic cushion cap template equidistantly arranges.Main rib beam equidistantly arrange strengthen it is whole The stability of a positioning device when in use.
In addition, cushion cap concrete is additionally provided between crape myrtle leaf pier shaft steel reinforcement cage bottom, each piece of cushion cap template, for holding By, the load that is transmitted by pier shaft steel reinforcement cage of distribution.
The application method for carrying out positioning adjusting to the leaf pier shaft steel reinforcement cage of crape myrtle using the utility model is as follows:
After the completion of pile foundation hole cleaning, the leaf pier shaft steel reinforcement cage of crape myrtle is transferred to two cross of the utility model using crane To among locating slot steel and two located lateral channel steels, using at the delivery position of longitudinal register channel steel and located lateral channel steel Sizing regulating mechanism is adjusted the plan-position of steel reinforcement cage on horizontal and vertical, and spiral shell is used after adjusting accurately in position Screw bolt and nut carries out locking reinforcing, and to casting concrete, shape between crape myrtle leaf pier shaft steel reinforcement cage bottom, each piece of cushion cap template At cushion cap.
It should be understood that the present embodiment is merely to illustrate the utility model rather than limitation the scope of the utility model.Furthermore It should be understood that after reading the content taught by the present invention, those skilled in the art can make the utility model various Change or modification, these equivalent forms also fall within the scope of the appended claims of the present application.

Claims (6)

1. a kind of leaf pier shaft steel reinforcement cage positioning device of crape myrtle, characterized in that including the leaf pier shaft steel reinforcement cage (1) of crape myrtle, be set to Two located lateral channel steels (2) and two longitudinal register channel steels (3) on crape myrtle leaf pier shaft steel reinforcement cage outer surface, are respectively arranged on Cushion cap template (4) on two located lateral channel steel both ends and two longitudinal register channel steel both ends;Two longitudinal register channel steels are equal Positioned at the top of two located lateral channel steels, cross-distribution is in net two-by-two for two located lateral channel steels and two longitudinal register channel steels Trellis, each piece of cap mold backboard are equipped with several templates to crape myrtle leaf pier shaft steel reinforcement cage side and install main rib beam (5), and every The junction of located lateral channel steel and every longitudinal register channel steel is equipped with sizing regulating mechanism (6).
2. the leaf pier shaft steel reinforcement cage positioning device of crape myrtle according to claim 1, characterized in that the leaf pier shaft reinforcing bar of crape myrtle Cage is equipped with delineation position stirrup (7), and positioning stirrup is fixedly connected with the leaf pier shaft steel reinforcement cage of crape myrtle.
3. the leaf pier shaft steel reinforcement cage positioning device of crape myrtle according to claim 1, characterized in that each sizing is adjusted Mechanism includes two rectangular round hole slots (8), the bolt (9) on two rectangular round hole slots, and bolt upper and lower ends are equal Equipped with gasket (10) and nut (11), bolt is slidably connected with two rectangular round hole slots respectively.
4. the leaf pier shaft steel reinforcement cage positioning device of crape myrtle according to claim 3, characterized in that each sizing is adjusted The rectangular round hole slot position of one of mechanism is on located lateral channel steel, another rectangular round hole slot position is in longitudinal register channel steel On.
5. the leaf pier shaft steel reinforcement cage positioning device of crape myrtle according to claim 1 or 2 or 3 or 4, characterized in that monolithic is held Each template installation main rib beam in platform template equidistantly arranges.
6. the leaf pier shaft steel reinforcement cage positioning device of crape myrtle according to claim 1 or 2 or 3 or 4, characterized in that common crapemyrtle leaf Shape pier shaft steel reinforcement cage cross section is in rectangle.
CN201820535985.1U 2018-04-16 2018-04-16 The leaf pier shaft steel reinforcement cage positioning device of crape myrtle Active CN208280126U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820535985.1U CN208280126U (en) 2018-04-16 2018-04-16 The leaf pier shaft steel reinforcement cage positioning device of crape myrtle

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820535985.1U CN208280126U (en) 2018-04-16 2018-04-16 The leaf pier shaft steel reinforcement cage positioning device of crape myrtle

Publications (1)

Publication Number Publication Date
CN208280126U true CN208280126U (en) 2018-12-25

Family

ID=64750937

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820535985.1U Active CN208280126U (en) 2018-04-16 2018-04-16 The leaf pier shaft steel reinforcement cage positioning device of crape myrtle

Country Status (1)

Country Link
CN (1) CN208280126U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111926707A (en) * 2020-07-14 2020-11-13 中建安装集团有限公司 Positioning device and method for realizing assembly joint connection in assembly bridge engineering

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111926707A (en) * 2020-07-14 2020-11-13 中建安装集团有限公司 Positioning device and method for realizing assembly joint connection in assembly bridge engineering

Similar Documents

Publication Publication Date Title
CN204781624U (en) Floor elevation and roughness controlling means
CN106702907B (en) A kind of Bridge guardrail base adjustable flange disk construction method
CN208280126U (en) The leaf pier shaft steel reinforcement cage positioning device of crape myrtle
CN211665759U (en) Guide positioning device for permanent steel casing of large onshore pile foundation
CN205804768U (en) A kind of adjustment height can have enough to meet the need the split heads of use
CN110670734A (en) Fixing device for pre-buried steel plate under shock insulation support and construction method thereof
CN212477455U (en) Pre-buried positioner of bridge suspension cable anchor cylinder
CN103334584B (en) Template regulating system for sliding form system
CN112095485A (en) Bridge stay cable anchor cylinder pre-embedded positioning device and using method thereof
CN208857703U (en) Variable cross-section high pier overmolded structure
CN206801039U (en) Concrete cast-in-situ plate thickness adjustable controller
CN102926532B (en) Mounting method for templates of box-type steel skeleton inclined column
CN110158953A (en) Round silo thickness platform plate holes internal model bracing means and its construction method
CN211228923U (en) Fixing device for pre-buried steel plate under shock insulation support
CN215889394U (en) Device for controlling elevation of cast large-area floor slab
CN214219929U (en) Unilateral formwork reinforced structure of basement outer wall
CN215055273U (en) A assembled template for installing support bracket embedded box
CN214116620U (en) Adjustable support for accurate positioning of permanent double-steel-pipe column
CN203361633U (en) Template regulating system of sliding form system
CN210013489U (en) Three-in-one plate thickness controller
CN204940304U (en) A kind of odd-shaped cross section foundation pit supporting pile
CN210621745U (en) Foundation bolt fixing frame assembly
CN103397654B (en) Construction method for transforming reinforced concrete column into stiff column for connection
CN114369996A (en) Method for mounting steel pipe column of pier in bridge water
CN212612427U (en) Device for ensuring position of pile foundation reinforcement cage mounting plane

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20190329

Address after: 310000 Qianjiang Building, 2031 Jiangling Road, Binjiang District, Hangzhou City, Zhejiang Province

Patentee after: Zhejiang construction group Limited by Share Ltd

Address before: 310051 5th Floor, Qianjiang Building, 2031 Jiangling Road, Binjiang District, Hangzhou City, Zhejiang Province

Patentee before: Zhejiang handover group Limited by Share Ltd Railway Branch