CN208279180U - A kind of armoured concrete slab hangs drawing device - Google Patents

A kind of armoured concrete slab hangs drawing device Download PDF

Info

Publication number
CN208279180U
CN208279180U CN201820500008.8U CN201820500008U CN208279180U CN 208279180 U CN208279180 U CN 208279180U CN 201820500008 U CN201820500008 U CN 201820500008U CN 208279180 U CN208279180 U CN 208279180U
Authority
CN
China
Prior art keywords
concrete slab
fixedly connected
screw rod
hanging
reinforced concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820500008.8U
Other languages
Chinese (zh)
Inventor
于永杰
吕钦斌
刘治国
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qingdao Jian Bond Metal Products Co Ltd
Original Assignee
Qingdao Jian Bond Metal Products Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qingdao Jian Bond Metal Products Co Ltd filed Critical Qingdao Jian Bond Metal Products Co Ltd
Priority to CN201820500008.8U priority Critical patent/CN208279180U/en
Application granted granted Critical
Publication of CN208279180U publication Critical patent/CN208279180U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

Drawing device is hung the utility model discloses a kind of armoured concrete slab, is related to concrete slab manufacture field, including hoist cable, fixing piece and built-in fitting, the hoist cable includes steel wire cable and the second screw rod being fixedly connected below steel wire cable;The fixing piece includes the first screw rod for being detachably fixed the discoid body for being connected to cover board lower surface and being fixedly connected below discoid body;The built-in fitting includes the pre-buried straight tube being vertically arranged and is fixedly connected below pre-buried straight tube and hangs draw piece, tell that hanging draw piece is capable of fixing inside concrete slab, the pre-buried straight tube offers the second threaded hole, second threaded hole can cooperate with the first screw rod or the second screw rod, solve the problems, such as that concrete prefabricated board hangs the defeated trouble of roping in the prior art, having reached easily to sling transport advantage for prefabricated armoured concrete slab.

Description

A kind of armoured concrete slab hangs drawing device
Technical field
The utility model relates to arrive the manufacture field of concrete slab, in particular to a kind of hanging for armoured concrete slab loads It sets.
Background technique
Armoured concrete slab, the plate made of reinforcing bar, concrete material are the bases in building construction and various engineering structures This structure or component are commonly used for roof system, superstructure, platform, wall, retaining wall, basis, terrace, road surface, pond etc., application range pole Extensively, armoured concrete slab is divided into square plate, plectane and sketch plate by flat shape.It is divided into one-way slabs by the stress mode of action of structure And two-way slab, most common to have one-way slabs, one-way slabs can be divided into Bars In Poured Concrete Slab and prefabricated board again, and prefabricated board is produced in precasting yard The precast concrete of machine-shaping directly transports to construction site installation.
The mode of existing processing precast slab is first to follow closely hollow mould processed with timber or the plate of other materials, After the hollow part of model is distributed upper reinforcing bar, hollow parts are filled with cement, to prevent from falling into foreign matter shadow during concrete forming The quality of concrete slab is rung, irony cover board is additionally provided with above hollow mould, after waiting concrete dries, removes cover board, knock-off plate Material, remaining is exactly concrete slab, after the completion of concrete board precast, then by operating personnel concrete slab is tied up the rope made of hemp or reinforcing bar Rope, is finally sling the rope made of hemp being bundled on concrete slab or reinforcing bar rope, and then sling concrete slab and hang model position by loop wheel machine again It sets, stacks stacking.
Above-mentioned concrete slab first can must just be made by operating personnel's rope made of hemp or the binding of reinforcing bar rope before being sling with loop wheel machine It is hung with loop wheel machine, but quality due to concrete slab and volume are all larger, operating personnel is very unlikely to when bundling, and the rope made of hemp or steel Muscle rope is thinner, and when being sling after binding with loop wheel machine, the side of concrete slab is easy to be damaged, shadow by the extruding force of the rope made of hemp or reinforcing bar rope Ring the use of concrete slab.
Utility model content
Drawing device is hung the purpose of the utility model is to provide a kind of armoured concrete slab, having can easily will be prefabricated Armoured concrete slab sling transport advantage.
The above-mentioned technical purpose of the utility model has the technical scheme that
A kind of armoured concrete slab hangs drawing device, including hoist cable, fixing piece and built-in fitting, and the hoist cable includes steel wire Rope and the second screw rod being fixedly connected below steel wire cable;The fixing piece includes being detachably fixed to be connected under cover board The discoid body on surface and the first screw rod being fixedly connected below discoid body;The built-in fitting include be vertically arranged it is pre-buried straight It manages and is fixedly connected on and hang draw piece below pre-buried straight tube, tell that hanging draw piece is capable of fixing inside concrete slab, it is described pre- It buries straight tube and offers the second threaded hole, the second threaded hole can cooperate with the first screw rod or the second screw rod.
By using above scheme, in use, discoid body, which is fixed on cover board lower surface, completes positioning, then pass through second Pre-buried straight tube is fixed below discoid body by threaded hole and the cooperation of the first screw rod, then will inject concrete in model, until mixed Solidifying soil upper surface is concordant with the upper surface of pre-buried straight tube, hangs draw piece at this time and is fully embedded in coagulation body, then after concrete dry i.e. For concrete prefabricated board, cover board is subsequently removed, and separates lower discoid body from cover board, then discoid body is taken from pre-buried straight tube Under, and the second threaded hole of pre-buried straight tube and the second screw rod are cooperated, the fixation of hoist cable and concrete slab can be completed, finally make Hanging hoist cable with loop wheel machine can convenient transport concrete plate.
Preferably, the discoid body upper surface offers multiple first threaded holes, spiral shell is also distinguished in first threaded hole Line is connected with the fixing bolt for being rotationally connected with cover board.
By using above scheme, discoid body can be fixed on lid by multiple fixing bolts and multiple first threaded holes The lower surface of plate, and when needing to separate discoid body with cover board, rotation fixing bolt can be dismantled easily.
Preferably, the upper surface of the discoid body is also provided with flat recess, and discoid body is in reverse frustoconic.
By using above scheme, when fixing piece is removed from built-in fitting, external tool can be used and pass through flat recess It easily removes, and can be easy to disassemble when operating personnel can be manually rotated discoid body by the discoid body of reverse frustoconic.
Preferably, it is described hang draw piece include be fixedly connected on pre-buried straight tube lower end supporting block and axis horizontal setting and It is connected to the suspending bars of supporting block.
By using above scheme, by being fixedly connected with supporting block in pre-buried straight tube lower end, then set by using level The suspending bars set, which are fixed on supporting block, can increase built-in fitting and the contact area inside concrete slab, and then guarantee to hang drawing coagulation Stability when native plate.
Preferably, being installed with external screw thread in the middle part of the suspending bars, the third spiral shell with external screw thread cooperation is offered in supporting block Pit.
By using above scheme, when work, can be cooperated by the external screw thread and third threaded hole of suspending bars, easily Suspending bars are dismantled from supporting block, so as to replace the suspending bars of different length according to work requirements.
Preferably, the discoid body upper surface is fixedly connected with multiple strong magnets.
By using above scheme, when work, can by multiple utilizing powerful magnet for adsorption in the lower surface of irony cover board into And the fixation of discoid body Yu cover board lower surface is completed, and facilitate plate-like in the lower surface of cover board by using utilizing powerful magnet for adsorption The disassembly of body and cover board simultaneously can easily adjust discoid body in the position of cover board lower surface, and then adjust built-in fitting in concrete slab Interior position.
Preferably, the draw piece that hangs includes the horizontal support plate for being fixedly connected on pre-buried straight tube lower end.
By using above scheme, when work, draw piece contact with inside concrete slab can be hung by support plate increase Area, and then guarantee to hang the fastness of drawing.
Preferably, level is fixedly connected with plurality of rods body in the support plate upper surface.
By using above scheme, it can further be increased by being fixedly connected with plurality of rods body on the supporting plate and hang drawing Contact area inside part and concrete slab, to further ensure that stability when concrete slab hangs drawing.
To sum up, the utility model has the following beneficial effects:
1. then passing through the second threaded hole and the first spiral shell in use, discoid body, which is fixed on cover board lower surface, completes positioning Pre-buried straight tube is fixed below discoid body by bar cooperation, then will inject concrete in model, up to concrete upper surface and in advance The upper surface for burying straight tube is concordant, hangs draw piece at this time and is fully embedded in coagulation body, is then concrete prefabricated board after concrete dry, Cover board is subsequently removed, and separates lower discoid body from cover board, then discoid body is removed from pre-buried straight tube, and by pre-buried straight tube The second threaded hole and the second screw rod cooperate, the fixation of hoist cable and concrete slab can be completed, finally hang hoist cable using loop wheel machine It can convenient transport concrete plate;
2. fixing piece is removed from built-in fitting, external tool can be used and easily removed by flat recess, and can It is easy to disassemble when operating personnel can be manually rotated discoid body with by the discoid body of reverse frustoconic;
3. when work, discoid body and lid can be completed in the lower surface of irony cover board by multiple utilizing powerful magnet for adsorption The fixation of plate lower surface, and facilitate the disassembly of discoid body and cover board simultaneously in the lower surface of cover board by using utilizing powerful magnet for adsorption Discoid body can easily be adjusted in the position of cover board lower surface, and then adjust position of the built-in fitting in concrete slab.
Detailed description of the invention
Fig. 1 is the perspective view of the explosion that fixing piece and embedded part structure are highlighted in embodiment one;
Fig. 2 is the perspective view of the explosion that hoist cable Yu fixing piece installation site are highlighted in embodiment one;
Fig. 3 is the schematic diagram that the fixed position of strong magnets is highlighted in embodiment two;
Fig. 4 is that the schematic diagram for hanging two structure of draw piece is highlighted in embodiment three.
In figure, 1, fixing piece;11, discoid body;111, flat recess;112, the first threaded hole;113, fixing bolt;114, strong Power magnet;12, the first screw rod;2, built-in fitting;21, pre-buried straight tube;211, the second threaded hole;22, draw piece one is hung;221, it supports Block;2211, third threaded hole;222, suspending bars;2221, external screw thread;23, draw piece two is hung;231, support plate;232, the body of rod;3, Hoist cable;31, steel wire cable;32, the second screw rod.
Specific embodiment
The utility model is described in further detail below in conjunction with attached drawing.The wherein identical attached drawing of identical components Label indicates.It should be noted that word "front", "rear" used in the following description, "left", "right", "up" and "down" refer to It is the direction in attached drawing, word " ground " and " top surface ", "inner" and "outside" are referred respectively to towards or away from particular elements geometry The direction at center.
Embodiment one: a kind of armoured concrete slab hangs drawing device, combined with Figure 1 and Figure 2, includes fixing piece 1 and fixing piece 1 is detachably fixed the built-in fitting 2 of connection and is detachably fixed the hoist cable 3 of connection with built-in fitting 2.When work, fixing piece 1 is consolidated Due to the lower surface of cover board, then built-in fitting 2 is fixed on to the lower section of fixing piece 1, then the casting concrete in hollow mould, Up to liquid level is concordant with the upper surface of built-in fitting 2 on the concrete in hollow mould, after then waiting concrete dry, built-in fitting 2 Just it is fixed on the inside of concrete slab, cover board and fixing piece 1 is then separated, removes cover board, then fixing piece 1 and built-in fitting 2 are divided From, and hoist cable 3 is fixed on built-in fitting 2, slinging hoist cable 3 finally by loop wheel machine can convenient transport concrete plate.
Fixing piece 1 includes discoid body 11 and the first screw rod 12 for being fixedly connected on 11 lower section of discoid body.Discoid body 11 is in Reverse frustoconic, and the upper surface of discoid body 11 is also provided with flat recess 111.For the following table convenient for discoid body 11 to be fixed on to cover board Face, discoid body 11 offer multiple first threaded holes 111 vertically, are threaded with upper end rotation connection in threaded hole 111 respectively In the fixing bolt 112 of cover board.When work, discoid body 11 can be fixed on to the lower surface of cover board by bolt 112, then again Built-in fitting 2 is fixed on to the first screw rod 12 of 11 lower section of discoid body, can guarantee that built-in fitting 2 is determined in casting concrete at this time Position, after concrete slab forming, rotary fixing screw bolt 112 can remove cover board from fixing piece 1, then by fixing piece 1 from pre-buried When removing on part 2, and the frictional force of operating personnel's hand and discoid body 11 can be increased by the discoid body 11 of reverse frustoconic, it is convenient Dismounting;If secondly fixing piece 1 is when connecting excessively secured with built-in fitting 2, also usable external tool, such as "-" type spanner, And the flat recess 111 by being opened on 11 on discoid body easily removes fixing piece 1 from built-in fitting 2.
Built-in fitting 2 includes pre-buried straight tube 21 and be fixedly connected on 21 lower section of pre-buried straight tube hang draw piece 1, pre-buried straight The inner vertical of pipe 21 opens up the second threaded hole 211, and the second threaded hole 211 can be threadedly connected to the first screw rod 12.Hang draw piece One 22 include the supporting block 221 for being fixedly connected on pre-buried 21 lower end of straight tube and horizontal connection in the suspending bars of supporting block 221 222,221 level of supporting block offers third threaded hole 2211, and external screw thread 2221 is installed in the middle part of suspending bars 222, passes through second Threaded hole 2211 and external screw thread 2221 cooperate, and suspending bars 222 are fixedly connected on supporting block 221.When work, pass through the second threaded hole 211 are threadedly coupled with the first screw rod 12, the connection of fixing piece 1 Yu built-in fitting 2 may be implemented, secondly by the suspending bars of setting 222 can increase the contact area inside concrete slab with built-in fitting 2, to guarantee that concrete slab hangs the stability of drawing, then its It is secondary, it can also be cooperated by third threaded hole 2211 and external screw thread 2221, dismantle and replace the suspending bars 222 of different length, from And meets difference and hang drawing demand.
Hoist cable 3 includes reinforcing bar rope 31 and the second screw rod 32 for being fixedly connected on 31 lower section of steel wire cable.It, can when work To cooperate by the second screw rod 32 and the second threaded hole 211, the fixation of hoist cable 3 and built-in fitting 2 is completed, is drawn convenient for hanging.
The course of work: in use, the discoid body 11 of fixing piece 1 is fixed on to the lower surface of cover board by fixing bolt 113, Then pre-buried straight tube 21 is completed to fix by the second threaded hole 211 and the first screw rod 12, is then injected into hollow mould mixed Solidifying soil is concordant with the upper end of pre-buried straight tube 21 up to the upper liquid level of concrete, has been embedded into concrete at this point, hanging draw piece 1, After waiting concrete dry, as concrete slab, rotary fixing screw bolt 113 removes cover board again at this time, then rotating disk body 11 Fixing piece 1 is removed from pre-buried straight tube 21, hoist cable 3 is subsequently completed by the second screw rod 32 and the cooperation of the second threaded hole 211 With the fixation of pre-buried straight tube 21, steel wire cable 31 is sling finally by loop wheel machine, can be sling concrete slab by built-in fitting 2, Convenient transport.
Embodiment two: a kind of armoured concrete slab hangs drawing device, in conjunction with Fig. 3, with embodiment one the difference is that Using multiple first threaded holes 112 opened up on multiple strong magnets 114 replacement discoid body 11 and it is threadedly connected to the first spiral shell Fixing bolt 113 in pit 112.
Strong magnets 114 are uniformly fixedly connected on the upper surface of discoid body 11.
Compared with embodiment one, advantage is: being fixed on the upper surface of discoid body 11 using strong magnets 114, can pass through Discoid body 11 is adsorbed in the lower surface of the cover board of irony by strong magnets 114, and then easily fixing piece 1 is fixed under cover board Surface, it is easy to operate, it is easy to disassemble, and fixing piece 1 is conveniently adjusted in the position of cover board lower surface, and then is adjusted built-in fitting 2 and existed Position in concrete slab.
Embodiment three: a kind of armoured concrete slab hangs drawing device, in conjunction with Fig. 4, with embodiment one the difference is that Draw piece 1 is hung using hanging in the substitution embodiment one of draw piece 2 23.
Hanging draw piece 2 23 includes the support plate 231 that level is fixedly connected on pre-buried 21 lower end of straight tube, and horizontal fixed company It is connected to the plurality of rods body 232 of 231 upper surface of support plate.
Compared with embodiment one, advantage is: by using support plate 231 and being fixedly connected in support plate 231 Plurality of rods body 232 further increases the contact area of built-in fitting 2 Yu coagulation body intralamellar part, and then can be adapted for volume Biggish concrete slab stablizes lifting.
This specific embodiment is only the explanation to the utility model, is not limitations of the present invention, ability Field technique personnel can according to need the modification that not creative contribution is made to the present embodiment after reading this specification, but As long as all by the protection of Patent Law in the scope of the claims of the utility model.

Claims (8)

1.一种钢筋混凝土板的吊拉装置,其特征在于:包括吊索(3)、固定件(1)以及预埋件(2),所述吊索(3)包括钢丝绳索(31)以及固定连接于钢丝绳索(31)下方的第二螺杆(32);所述固定件(1)包括可拆卸固定连接于盖板下表面的盘状体(11)以及固定连接于盘状体(11)下方的第一螺杆(12);所述预埋件(2)包括竖直设置的预埋直管(21)以及固定连接于预埋直管(21)下方的吊拉件,所诉吊拉件能够固定于混凝土板内部,所述预埋直管(21)开设有第二螺纹孔(211),第二螺纹孔(211)能够与第一螺杆(12)或第二螺杆(32配合。1. a suspension device for reinforced concrete slab, characterized in that: comprise sling (3), fixture (1) and embedded part (2), and described sling (3) comprises wire rope (31) and Fixedly connected to the second screw rod (32) below the steel wire rope (31); the fixture (1) includes a disc-shaped body (11) that is detachably and fixedly connected to the lower surface of the cover plate and a disc-shaped body (11) that is fixedly connected to the disc-shaped body (11). ) below the first screw rod (12); the embedded part (2) includes a vertically arranged embedded straight pipe (21) and a hanging member fixedly connected to the lower part of the embedded straight pipe (21), the said hanging The pull piece can be fixed inside the concrete slab, and the embedded straight pipe (21) is provided with a second threaded hole (211), and the second threaded hole (211) can cooperate with the first screw rod (12) or the second screw rod (32) . 2.根据权利要求1所述的一种钢筋混凝土板的吊拉装置,其特征在于:所述盘状体(11)上表面开设有多个第一螺纹孔(112),所述第一螺纹孔(112)内还分别螺纹连接有转动连接于盖板的固定螺栓(113)。2. A suspension device for a reinforced concrete slab according to claim 1, characterized in that: the upper surface of the disc-shaped body (11) is provided with a plurality of first threaded holes (112), and the first threaded Fixing bolts (113) that are rotatably connected to the cover plate are also threaded in the holes (112). 3.根据权利要求2所述的一种钢筋混凝土板的吊拉装置,其特征在于:所述盘状体(11)的上表面还开设有一字槽(111),且盘状体(11)呈倒圆台形。3. A hanging device for a reinforced concrete slab according to claim 2, characterized in that: the upper surface of the disc-shaped body (11) is also provided with a slot (111), and the disc-shaped body (11) It is rounded in shape. 4.根据权利要求1所述的一种钢筋混凝土板的吊拉装置,其特征在于:所述吊拉件包括固定连接于预埋直管(21)下端的支撑块(221)以及轴线水平设置且连接于支撑块(221)的吊拉杆(222)。4. The hanging device of a reinforced concrete slab according to claim 1, characterized in that: the hanging member includes a support block (221) fixedly connected to the lower end of the embedded straight pipe (21) and an axis horizontally arranged And be connected to the suspension rod (222) of support block (221). 5.根据权利要求4所述的一种钢筋混凝土板的吊拉装置,其特征在于:所述吊拉杆(222)中部固设有外螺纹(2221),支撑块(221)上开设有与外螺纹(2221)配合的第三螺纹孔(2211)。5. A hanging device for a reinforced concrete slab according to claim 4, characterized in that: the middle part of the hanging rod (222) is fixed with an external thread (2221), and the supporting block (221) is provided with an external thread (221). The third threaded hole (2211) matched with the thread (2221). 6.根据权利要求1所述的一种钢筋混凝土板的吊拉装置,其特征在于:所述盘状体(11)上端面固定连接有多个强力磁铁(114)。6. The lifting device for reinforced concrete slabs according to claim 1, characterized in that: the upper end surface of the disc-shaped body (11) is fixedly connected with a plurality of powerful magnets (114). 7.根据权利要求1所述的一种钢筋混凝土板的吊拉装置,其特征在于:所述吊拉件包括水平固定连接于预埋直管(21)下端的支撑板(231)。7. A hanging device for a reinforced concrete slab according to claim 1, characterized in that: the hanging member includes a support plate (231) horizontally and fixedly connected to the lower end of the embedded straight pipe (21). 8.根据权利要求7所述的一种钢筋混凝土板的吊拉装置,其特征在于:所述支撑板(231)上表面上水平固定连接多根杆体(232)。8. The lifting device for reinforced concrete slabs according to claim 7, characterized in that: the upper surface of the support plate (231) is horizontally and fixedly connected with a plurality of rods (232).
CN201820500008.8U 2018-04-09 2018-04-09 A kind of armoured concrete slab hangs drawing device Expired - Fee Related CN208279180U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820500008.8U CN208279180U (en) 2018-04-09 2018-04-09 A kind of armoured concrete slab hangs drawing device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820500008.8U CN208279180U (en) 2018-04-09 2018-04-09 A kind of armoured concrete slab hangs drawing device

Publications (1)

Publication Number Publication Date
CN208279180U true CN208279180U (en) 2018-12-25

Family

ID=64749346

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820500008.8U Expired - Fee Related CN208279180U (en) 2018-04-09 2018-04-09 A kind of armoured concrete slab hangs drawing device

Country Status (1)

Country Link
CN (1) CN208279180U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111646360A (en) * 2020-05-21 2020-09-11 中铁建工集团有限公司 Pre-embedded spreader for prefabricated concrete cover plate with dual application scenarios and method of using the same

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111646360A (en) * 2020-05-21 2020-09-11 中铁建工集团有限公司 Pre-embedded spreader for prefabricated concrete cover plate with dual application scenarios and method of using the same

Similar Documents

Publication Publication Date Title
CN207608238U (en) A kind of boom hoisting of building panel
CN107605177A (en) The construction method of efficient precast floor slab and its independent support frame
CN108756890A (en) A kind of sliding mode system being in the milk for vertical shaft concreting and rock mass
CN204402005U (en) A kind of novel overhanging unloading platform anchor ring
CN116607795A (en) A steel column hoisting positioning aid and positioning method
CN208279180U (en) A kind of armoured concrete slab hangs drawing device
CN208071101U (en) A kind of piping lane precast segment overturning and hoisting device
CN110512766A (en) A kind of the fabricated construction system and its construction method of steel plate concrete shear wall
CN209482359U (en) Urban road cast-in-place concrete well curb construction equipment
CN204001791U (en) A kind of built with ribbed bricks wall prefabricated construction lifting binding apparatus
CN207436503U (en) Efficient construction of precast floorslab hangs membrane module
CN206385807U (en) It is a kind of to hang the mould plate supporting device that hole is poured for reserved
CN111321807B (en) A prefabricated frame structure column-column cluster steel bar connection structure
CN211875454U (en) Vibrating rod support frame for pouring buttress concrete
CN208279170U (en) A kind of armoured concrete slab hangs drawing device
CN212200405U (en) Fast pile extension mould shell for cast-in-place pile
CN216428731U (en) High strength suspended ceiling conversion layer
CN203531381U (en) Temporary hanging and supporting device used for steel bar truss formworks
CN209493945U (en) A kind of distribution device and connection structure of deep basal pit huge foundation underplate concrete
CN102116084B (en) Hanging formwork device replacing supporting formwork for pouring concrete floor slab in multilayer building
CN208148158U (en) It is a kind of live with strength mortar preparation facilities
CN204174938U (en) A kind of concrete rotates carriage
CN213868215U (en) Support formwork in sump
CN202248861U (en) Device for substituting lifting formwork with supporting formwork in pouring of concrete floor of multi-storey building
CN219569595U (en) Concrete bucket hanger

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20181225

CF01 Termination of patent right due to non-payment of annual fee