- CN208250348U CN208250348U CN201820845606.9U CN201820845606U CN208250348U CN 208250348 U CN208250348 U CN 208250348U CN 201820845606 U CN201820845606 U CN 201820845606U CN 208250348 U CN208250348 U CN 208250348U
- Authority
- CN
- China
- Prior art keywords
- heat shield
- fixed
- blast furnace
- rails
- traction
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Blast Furnaces (AREA)
Abstract
本实用新型涉及炼铁中高炉设备技术领域,特别提供了一种高炉更换主铁沟隔热罩牵引装置,包括两个牵引车单元和钢轨,钢轨固定在隔热罩下方的出铁厂平台上,牵引车单元包括车轮、车轮轴和连接板,车轮轴有两个,通过连接板连接在一起,车轮轴的两端分别可转动地固定车轮,车轮与钢轨匹配,两个牵引车单元距离最远的两个车轮轴上分别固定牵引环,两个牵引环前方的合适位置分别设置定滑轮,设钢丝绳一端固定在牵引环上,另一端穿过定滑轮。本实用新型解决了现有技术中隔热罩经常被烧毁,不能及时更换的问题。
The utility model relates to the technical field of blast furnace equipment in ironmaking, and in particular provides a traction device for replacing the main iron ditch heat shield of a blast furnace, which includes two tractor units and rails, and the rails are fixed on the casting plant platform below the heat shield The tractor unit includes wheels, wheel shafts and connecting plates. There are two wheel shafts, which are connected together through the connecting plates. The two ends of the wheel shafts are respectively rotatably fixed to the wheels. Fix traction rings respectively on the far two wheel axles, fixed pulleys are respectively arranged at suitable positions in front of the two traction rings, and one end of the wire rope is fixed on the traction rings, and the other end passes through the fixed pulleys. The utility model solves the problem in the prior art that the heat shield is often burned and cannot be replaced in time.
Description
技术领域technical field
本实用新型涉及炼铁中高炉设备技术领域,特别提供了一种高炉更换主铁沟隔热罩牵引装置。The utility model relates to the technical field of blast furnace equipment in ironmaking, and in particular provides a traction device for replacing a heat shield of a main iron ditch of a blast furnace.
背景技术Background technique
目前,国内特大型高炉出铁时,在主铁沟上方必须盖上隔热罩,以防止飞溅的渣铁烫伤出铁口周围的炉前设备。隔热罩由钢结构和耐火材料组成,自身重量为18吨,由于受到高温铁水的长时间冲刷和侵蚀,导致隔热罩接触铁水部位经常损坏,更换频繁,月均消耗18-20个。当遇到出铁口大喷吹时,隔热罩经常被烧毁,甚至掉进主铁沟里,挡住液压泥炮运行轨迹,造成堵不上铁口,高炉被迫休风停炉,严重影响高炉正常生产。At present, when domestic extra-large blast furnaces tap iron, a heat shield must be covered above the main iron ditch to prevent the splashed slag iron from scalding the furnace equipment around the taphole. The heat shield is composed of steel structure and refractory materials, and its own weight is 18 tons. Due to the long-term erosion and erosion of high-temperature molten iron, the parts of the heat shield that contact the molten iron are often damaged and replaced frequently, with an average monthly consumption of 18-20 pieces. When encountering a large blast at the taphole, the heat shield is often burned, or even falls into the main iron ditch, blocking the running track of the hydraulic mud gun, resulting in the failure to block the taphole, and the blast furnace is forced to shut down, seriously affecting The blast furnace is in normal production.
另外,风口平台及出铁场平台框架结构由两部分组成,隔热罩放在风口平台及出铁场平台之间的主铁沟上,当出铁口出完铁水后将要堵上铁口时,由移盖机将隔热罩从主铁沟上移走。风口平台及出铁场平台之间高度为1.9米,隔热罩长4.8米,宽2.78米,高1.45米。更换隔热罩时炉前天车起重机吊钩不能拐弯,所以够不着隔热罩,由于空间太低移动吊车起重机的手臂伸的再长也够不着隔热罩。In addition, the frame structure of the tuyere platform and the casthouse platform is composed of two parts. The heat shield is placed on the main iron ditch between the tuyere platform and the casthouse platform. , the heat shield is removed from the main iron ditch by the cover removing machine. The height between the tuyere platform and the casthouse platform is 1.9 meters, the heat shield is 4.8 meters long, 2.78 meters wide and 1.45 meters high. When replacing the heat shield, the hook of the crane crane in front of the furnace cannot turn, so it cannot reach the heat shield. Because the space is too low, the arm of the mobile crane crane cannot reach the heat shield no matter how long it is extended.
另外,移盖机只能将隔热罩吊起585mm,并从主铁沟上将隔热罩横向移走,不能纵向移动。以往,更换一个隔热罩需要2.1小时,方法是工人用手拉葫芦,一点一点的将隔热罩纵向移出风口平台及出铁场平台之间,再用天车起重机吊装到卡车上运走。费时、费力,往往因为不能及时更换隔热罩而影响高炉正常生产。In addition, the cover removing machine can only lift the heat shield by 585mm, and remove the heat shield from the main iron channel horizontally, but cannot move vertically. In the past, it took 2.1 hours to replace a heat shield. The method is that workers use chain hoists to move the heat shield longitudinally out of the space between the tuyere platform and the casthouse platform bit by bit, and then use the crane to lift it onto the truck for transportation. Walk. It is time-consuming and laborious, and often affects the normal production of the blast furnace because the heat shield cannot be replaced in time.
实用新型内容Utility model content
为了解决上述技术问题,本实用新型提供了一种高炉更换主铁沟隔热罩牵引装置,以解决现有技术中隔热罩经常被烧毁,不能及时更换的问题。In order to solve the above technical problems, the utility model provides a traction device for replacing the heat shield of the main iron trough of the blast furnace to solve the problem that the heat shield in the prior art is often burned and cannot be replaced in time.
本实用新型是这样实现的,一种高炉更换主铁沟隔热罩牵引装置,包括两个牵引车单元和钢轨,钢轨固定在隔热罩下方的出铁厂平台上,牵引车单元包括车轮、车轮轴和连接板,车轮轴有两个,通过连接板连接在一起,车轮轴的两端分别可转动地固定车轮,车轮与钢轨匹配,两个牵引车单元距离最远的两个车轮轴上分别固定牵引环,两个牵引环前方的合适位置分别设置定滑轮,设钢丝绳一端固定在牵引环上,另一端穿过定滑轮。The utility model is achieved in this way, a traction device for replacing the heat shield of the main iron ditch of a blast furnace, including two tractor units and rails, the rails are fixed on the casting plant platform below the heat shield, and the tractor unit includes wheels, There are two wheel axles and connecting plates, which are connected together by connecting plates. The two ends of the wheel axles are respectively rotatably fixed to the wheels. The wheels are matched with the rails. The traction rings are respectively fixed, fixed pulleys are respectively arranged at suitable positions in front of the two traction rings, one end of the wire rope is fixed on the traction ring, and the other end passes through the fixed pulleys.
进一步地,在每个所述牵引车单元上,两个车轮轴的一端分别固定直角挡板。Further, on each tractor unit, one end of the two wheel axles is respectively fixed with a right-angle baffle.
进一步地,每个所述牵引车单元的尺寸为:长3690mm、宽240mm、高200mm,所述钢轨长度为:9000mm,两根钢轨跨距为:1710mm,两根钢轨延伸出风口平台4000mm。Further, the size of each tractor unit is: length 3690mm, width 240mm, height 200mm, the length of the rails is 9000mm, the span of the two rails is 1710mm, and the two rails extend to the air outlet platform by 4000mm.
与现有技术相比,本实用新型的优点在于:Compared with the prior art, the utility model has the advantages of:
1、在隔热罩烧毁之前快速、及时更换,避免飞溅的渣铁烫伤出铁口周围的炉前设备。1. Quickly and timely replace the heat shield before it burns out, so as to avoid the splashed slag and iron from scalding the furnace equipment around the taphole.
2、当遇到出铁口大喷吹时,提前更换隔热罩,避免隔热罩掉进主铁沟里,挡住液压泥炮运行轨迹,造成堵不上铁口,高炉被迫休风停炉,保证高炉正常生产。2. When encountering a large blow from the tap hole, replace the heat shield in advance to prevent the heat shield from falling into the main iron ditch and block the running track of the hydraulic mud gun, resulting in the failure to block the tap hole and the blast furnace being forced to shut down Furnace, to ensure the normal production of the blast furnace.
3、在任何高科技先进起重机械可望不可即的情况下,能把重量为18吨,长4.8米,宽2.78米,高1.45米的庞大物体,从风口平台及出铁场平台的夹缝中移出或移入。3. In the case that any high-tech advanced lifting machinery is out of reach, it can lift a huge object with a weight of 18 tons, a length of 4.8 meters, a width of 2.78 meters, and a height of 1.45 meters from the gap between the tuyere platform and the casthouse platform. Move in or out.
4、利用定滑轮不能省力,但能改变力的方向的原理,借用任何动力机械,比如叉车、天车等,拽住软钢丝绳都能将隔热罩从风口平台及出铁场平台的夹缝中移出或移入。4. Using fixed pulleys can not save labor, but can change the direction of force. Using any power machinery, such as forklifts, cranes, etc., can pull the heat shield from the gap between the tuyere platform and the casting yard platform by pulling the soft steel wire rope. Move out or move in.
5、省时、省力,更换一个隔热罩只需要20分钟,减轻工人劳动强度,提高工效6倍以上。5. Time-saving and labor-saving. It only takes 20 minutes to replace a heat shield, which reduces the labor intensity of workers and improves work efficiency by more than 6 times.
6、本实用新型是一种专用运输工具,价格低廉,可重复使用。6. The utility model is a special transportation tool, which is cheap and can be used repeatedly.
附图说明Description of drawings
下面结合附图及实施方式对本实用新型作进一步详细的说明:Below in conjunction with accompanying drawing and embodiment the utility model is described in further detail:
图1为本实用新型结构示意图;Fig. 1 is the structural representation of the utility model;
图2为本实用新型尺寸示意图;Fig. 2 is a schematic diagram of the size of the utility model;
图3为本实用新型牵引车单元尺寸示意图。Fig. 3 is a schematic diagram of the size of the tractor unit of the utility model.
具体实施方式Detailed ways
为了使本实用新型的目的、技术方案及优点更加清楚明白,下面结合附图及实施例,对本实用新型进行进一步详细说明。应当理解,此处所描述的具体实施例仅仅用于解释本实用新型,并不用于限定本实用新型。In order to make the purpose, technical solutions and advantages of the utility model clearer, the utility model will be further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described here are only used to explain the utility model, and are not intended to limit the utility model.
参考图1、图2和图3,本实用新型提供一种高炉更换主铁沟隔热罩牵引装置,包括两个牵引车单元和钢轨1,钢轨1固定在隔热罩下方的出铁厂平台上,牵引车单元包括车轮2、车轮轴3和连接板4,车轮轴3有两个,通过连接板4连接在一起,车轮轴3的两端分别可转动地固定车轮2,车轮2与钢轨1匹配,两个牵引车单元距离最远的两个车轮轴3上分别固定牵引环5,两个牵引环5前方的合适位置分别设置定滑轮6,设钢丝绳7一端固定在牵引环5上,另一端穿过定滑轮6。Referring to Fig. 1, Fig. 2 and Fig. 3, the utility model provides a traction device for replacing the heat shield of the main iron trench of a blast furnace, which includes two tractor units and a rail 1, and the rail 1 is fixed on the casting plant platform below the heat shield Above, the tractor unit includes a wheel 2, a wheel axle 3 and a connecting plate 4. There are two wheel axles 3, which are connected together through the connecting plate 4. The two ends of the wheel axle 3 are respectively rotatably fixed to the wheel 2. 1 matching, the traction rings 5 are respectively fixed on the two wheel axles 3 farthest from the two tractor units, the fixed pulleys 6 are respectively arranged at suitable positions in front of the two traction rings 5, and one end of the steel wire rope 7 is fixed on the traction ring 5, The other end passes through fixed pulley 6.
在每个所述牵引车单元上,两个车轮轴的一端分别固定直角挡板。On each tractor unit, one end of the two wheel axles is respectively fixed with a right-angle baffle.
作为技术方案的优选,每个所述牵引车单元的尺寸为:长3690mm、宽240mm、高200mm,所述钢轨长度为:9000mm,两根钢轨跨距为:1710mm,两根钢轨延伸出风口平台4000mm。As a preferred technical solution, the size of each tractor unit is: length 3690mm, width 240mm, height 200mm, the length of the rails is 9000mm, the span of the two rails is 1710mm, and the two rails extend the air outlet platform 4000mm.
当需要移出旧隔热罩时,用移盖机提起旧的隔热罩,用天车把两组牵引车同时吊装到钢轨1上,并且人工推到旧的隔热罩下方,移盖机落下旧的隔热罩并且移走,利用隔热罩自身重力把两组牵引车单元连接起来。直角挡板8设置在靠近主铁沟一侧,能防止隔热罩发生侧滑掉进主铁沟里,钢丝绳7一端钩住牵引环5另一端窜过定滑轮6与天车吊钩连接,天车吊钩向上吊起的同时把旧的隔热罩水平拽出风口平台,然后用天车直接吊起旧的隔热罩落到卡车上运走。When the old heat shield needs to be removed, use the cover remover to lift the old heat shield, use the crane to hoist the two sets of tractors onto the rail 1 at the same time, and manually push them under the old heat shield, and the cover remover will fall The old heat shield is also removed, and the two sets of tractor units are connected by the heat shield's own gravity. The right-angle baffle 8 is arranged on the side close to the main iron ditch, which can prevent the heat shield from slipping and falling into the main iron ditch. One end of the steel wire rope 7 hooks the traction ring 5 and the other end passes through the fixed pulley 6 to connect with the crane hook. While the crane hook is lifting upwards, the old heat shield is horizontally pulled out of the air outlet platform, and then the old heat shield is directly hoisted by the crane and dropped onto the truck for transport.
同理,当需要移入新隔热罩时,用天车把两组牵引车同时吊装到固定钢轨上,两组牵引车之间的跨度根据隔热罩的长度决定,直角挡板8设置在靠近主铁沟一侧,能防止隔热罩发生侧滑掉进主铁沟里,利用隔热罩自身重力把两组牵引车连接起来。钢丝绳7一端钩住牵引环5另一端窜过定滑轮6与天车吊钩连接,天车吊钩向上吊起的同时把新的隔热罩水平拽进风口平台,用移盖机抬起新的隔热罩,并且移走两组牵引车,用天车把两组牵引车摞起来吊装到固定位置。Similarly, when a new heat shield needs to be moved in, the two sets of tractors are hoisted on the fixed rail at the same time with the crane, the span between the two sets of tractors is determined according to the length of the heat shield, and the right-angle baffle 8 is set near One side of the main iron ditch can prevent the heat shield from slipping and falling into the main iron ditch, and use the heat shield's own gravity to connect the two sets of tractors. One end of the steel wire rope 7 is hooked to the traction ring 5 and the other end passes through the fixed pulley 6 to connect with the crane hook. When the crane hook is lifted upwards, the new heat shield is dragged horizontally into the tuyere platform, and the new heat shield is lifted by the cover shifter. The heat shield, and remove the two sets of tractors, and use the crane to stack the two sets of tractors and hoist them to a fixed position.
Claims (3)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201820845606.9U CN208250348U (en) | 2018-06-01 | 2018-06-01 | A kind of blast furnace replacement sow heat shield traction device |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201820845606.9U CN208250348U (en) | 2018-06-01 | 2018-06-01 | A kind of blast furnace replacement sow heat shield traction device |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN208250348U true CN208250348U (en) | 2018-12-18 |
Family
ID=64652869
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201820845606.9U Expired - Fee Related CN208250348U (en) | 2018-06-01 | 2018-06-01 | A kind of blast furnace replacement sow heat shield traction device |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN208250348U (en) |
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN111910032A (en) * | 2020-08-05 | 2020-11-10 | 北京首钢建设集团有限公司 | Professional tool for drilling holes in residual iron placed in blast furnace |
| CN112239796A (en) * | 2020-11-10 | 2021-01-19 | 中冶赛迪工程技术股份有限公司 | An emergency cover removal system, kit and method for main iron trench A cover |
| CN116769990A (en) * | 2023-05-23 | 2023-09-19 | 本钢板材股份有限公司 | A method for quickly replacing blast furnace hydraulic mud cannons |
-
2018
- 2018-06-01 CN CN201820845606.9U patent/CN208250348U/en not_active Expired - Fee Related
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN111910032A (en) * | 2020-08-05 | 2020-11-10 | 北京首钢建设集团有限公司 | Professional tool for drilling holes in residual iron placed in blast furnace |
| CN112239796A (en) * | 2020-11-10 | 2021-01-19 | 中冶赛迪工程技术股份有限公司 | An emergency cover removal system, kit and method for main iron trench A cover |
| CN116769990A (en) * | 2023-05-23 | 2023-09-19 | 本钢板材股份有限公司 | A method for quickly replacing blast furnace hydraulic mud cannons |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN208250348U (en) | A kind of blast furnace replacement sow heat shield traction device | |
| CN102618677B (en) | Method for cleaning materials in large-scale blast furnace in overhaul | |
| CN206447894U (en) | A kind of blast furnace gun machine slew gear equipment integral replacement device | |
| CN209243086U (en) | The device of the quick handling cleaning cupola well of overhaul 2500m3 blast furnace | |
| CN205034964U (en) | A hoist for vertical rolling mill transmission shaft | |
| CN110642143A (en) | Gravity type self-discharging lifting hook and use method thereof | |
| CN203143964U (en) | Device for quickly changing blast furnace air-tight box | |
| CN108946470A (en) | A kind of replacing options for converter entirety flue | |
| CN203256286U (en) | Blast furnace throat steel brick replacing apparatus | |
| CN204325394U (en) | Clay gun machine clay extruded mechanism more changing device | |
| CN204848915U (en) | Blast furnace stave overhauls conveyer | |
| CN209226402U (en) | A hoisting sling for removing large-diameter negative ring segments | |
| CN210596129U (en) | Mud gun slewing mechanism replacing device | |
| CN202543142U (en) | Device for charging cold coke into dry coke quenching device | |
| CN202575637U (en) | Lifting device for overhauling annealing furnaces | |
| CN206720571U (en) | Clear up the special hanger of the cold steel of converter charge door | |
| CN204416909U (en) | A kind of suspender for changing vertical miller roll | |
| CN205062096U (en) | Blast furnace water -cooling wall installation car | |
| CN208038480U (en) | A kind of trolley for replacing blast furnace front tapping machine rock drill | |
| CN205855760U (en) | A kind of oxygen rifle landing means of transport | |
| CN211644474U (en) | A mobile lifting trolley for online replacement of RH vacuum chamber insertion tubes for steelmaking and refining | |
| CN201648437U (en) | Converter repair combined device | |
| CN115475931A (en) | Method for replacing ladle arm lifting cylinder of ladle rotating table | |
| CN209226495U (en) | A kind of iron pipe vertical conveyance device | |
| CN204310565U (en) | Lifting appliance for replacing bucket type belt |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20181218 Termination date: 20190601 |
|