CN208235958U - A kind of construction line-plotting device - Google Patents
A kind of construction line-plotting device Download PDFInfo
- Publication number
- CN208235958U CN208235958U CN201820422374.6U CN201820422374U CN208235958U CN 208235958 U CN208235958 U CN 208235958U CN 201820422374 U CN201820422374 U CN 201820422374U CN 208235958 U CN208235958 U CN 208235958U
- Authority
- CN
- China
- Prior art keywords
- fixed
- material stock
- hollow pipe
- stock frame
- elastic component
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Working Measures On Existing Buildindgs (AREA)
Abstract
The utility model relates to a kind of line-plotting device more particularly to a kind of construction line-plotting devices.The technical problem to be solved by the present invention is to provide it is a kind of convenient for control spread ash quantity number construction line-plotting device.In order to solve the above-mentioned technical problem, the utility model provides such a construction line-plotting device, includes material stock frame, support rod, wheel, piston, the first hollow pipe, fixed plate, the first elastic component, the second hollow pipe, fixed pulley, bracing wire, push rod, annulus and strut;Support rod is installed on material stock frame bottom, and wheel is fixed in support rod bottom, and material stock arch is provided with first through hole;Piston is removably installed on material stock arch, and is located in first through hole;Material stock frame bottom is provided with discharge port.The utility model achieved the effect that convenient for control spread ash quantity number.
Description
Technical field
The utility model relates to a kind of line-plotting device more particularly to a kind of construction line-plotting devices.
Background technique
It generally requires to draw lines in advance to accurately carry out construction in construction, be required according to construction drawing,
It draws lines on ground again, mostly uses greatly spread ash, such large labor intensity by hand at present, and spread ash outside and be easy to appear fugitive dust to body
In addition nocuousness manually spreads ash and be easy to cause waste.
Existing construction line-plotting device haves the shortcomings that the number for spreading ash quantity be unable to control, therefore needs research and development one
Kind convenient for control spread ash quantity number construction line-plotting device.
Utility model content
(1) technical problems to be solved
The utility model in order to overcome construction line-plotting device have the shortcomings that be unable to control spread ash quantity number, this
Utility model technical problems to be solved be to provide it is a kind of convenient for control spread ash quantity number construction line-plotting device.
(2) technical solution
In order to solve the above-mentioned technical problem, the utility model provides such a construction line-plotting device, including
There are material stock frame, support rod, wheel, piston, the first hollow pipe, fixed plate, the first elastic component, the second hollow pipe, fixed pulley, drawing
Line, push rod, annulus and strut;Support rod is installed on material stock frame bottom, and wheel is fixed in support rod bottom, and material stock arch is provided with
First through hole;Piston is removably installed on material stock arch, and is located in first through hole;Material stock frame bottom is provided with discharging
Mouthful, the first hollow pipe is fixed in material stock frame inner top;Fixed plate one end is fixed in one inside portion of the first hollow pipe, and the other end is affixed
In another inside portion of the first hollow pipe;It opens in fixed plate and is slidably connected with the second through-hole, the second hollow pipe with the first hollow pipe;The
One elastic component one end is fixed in fixed plate bottom, and the other end is fixed at the top of the second hollow pipe;Fixed pulley is fixed in material stock frame top
Portion, push rod are fixed in one side of material stock frame;Strut is fixed at the top of push rod, and annulus is removably placed in strut;
Bracing wire one end is fixed at the top of the second hollow pipe, and it is fixed that the other end is wire-wrapped in through first through hole, the first hollow pipe, material stock arch
Pulley is connect with annulus.
Preferably, which further includes having installing frame, electromagnet, the second elastic component and iron block;Peace
It frames up and is fixed in material stock frame bottom, electromagnet is fixed in bottom in installing frame, and iron block is affixed by the second elastic component and electromagnet.
Preferably, which further includes having connecting rod and third elastic component;Support bar top is opened recessed
Slot;It is fixed in material stock frame bottom at the top of connecting rod, and connecting rod bottom is located in groove;Third elastic component one end is fixed in connection
Bar bottom, the other end are fixed in bottom portion of groove.
Preferably, which further includes having handle and snap-gauge;Handle is fixed in top land, snap-gauge
It is hinged with support rod.
(3) beneficial effect
The utility model is by the effect of piston, and when preventing the present apparatus from working, the lime in storing frame passes through first through hole
Material stock frame out is drifted, causes to waste, is cooperated by the second hollow pipe and bracing wire, is convenient for present apparatus blowing, passes through the second hollow pipe
Cooperate with the first elastic component, stops blowing convenient for the present apparatus, make staff preferably control bracing wire by annulus, reach
Convenient for control spread ash quantity number effect.
Detailed description of the invention
Fig. 1 is the first front view structure structural schematic diagram of the utility model.
Fig. 2 is second of front view structure structural schematic diagram of the utility model.
Fig. 3 is the enlarged structure schematic diagram of A in the utility model Fig. 2.
Fig. 4 is the third front view structure structural schematic diagram of the utility model.
Fig. 5 is the 4th kind of front view structure structural schematic diagram of the utility model.
The label in accompanying drawing is: 1- material stock frame, 2- support rod, 3- wheel, 4- first through hole, 5- piston, 6- discharge port, 7-
First hollow pipe, 8- fixed plate, the first elastic component of 9-, the second hollow pipe of 10-, the second through-hole of 11-, 12- fixed pulley, 13- bracing wire,
14- push rod, 15- annulus, 16- strut, 17- installing frame, 18- electromagnet, the second elastic component of 19-, 20- iron block, 21- groove, 22-
Connecting rod, 23- third elastic component, 24- handle, 25- snap-gauge.
Specific embodiment
The utility model is further described with reference to the accompanying drawings and examples.
Embodiment 1
A kind of construction line-plotting device, as shown in Figs. 1-5, include material stock frame 1, support rod 2, wheel 3, piston 5,
First hollow pipe 7, fixed plate 8, the first elastic component 9, the second hollow pipe 10, fixed pulley 12, bracing wire 13, push rod 14,15 and of annulus
Strut 16;Support rod 2 is installed on 1 bottom of material stock frame, and wheel 3 is fixed in 2 bottom of support rod, and it is logical that first is provided at the top of material stock frame 1
Hole 4;Piston 5 is removably installed on 1 top of material stock frame, and is located in first through hole 4;1 bottom of material stock frame is provided with discharging
Mouth 6, the first hollow pipe 7 is fixed in 1 inner top of material stock frame;8 one end of fixed plate is fixed in 7 one inside portion of the first hollow pipe, another
End is fixed in another inside portion of the first hollow pipe 7;It is opened in fixed plate 8 and the second through-hole 11, the second hollow pipe 10 and first hollow
Pipe 7 is slidably connected;First elastic component, 9 one end is fixed in 8 bottom of fixed plate, and the other end is fixed in 10 top of the second hollow pipe;It is fixed
Pulley 12 is fixed in 1 top of material stock frame, and push rod 14 is fixed in 1 one side of material stock frame;Strut 16 is fixed in 14 top of push rod, and circle
Ring 15 is removably placed in strut 16;13 one end of bracing wire is fixed in the top of the second hollow pipe 10, and the other end is through the
One through-hole 4, the first hollow pipe 7 are wire-wrapped in fixed pulley 12 at the top of material stock frame 1 and connect with annulus 15.
When needing to be drawn lines using the present apparatus, piston 5 is extracted first from first through hole 4, is fallen into material stock frame 1
Enter lime, after lime fills, piston 5 is filled in into first through hole 4, when so that the present apparatus working, the lime in storing frame will not lead to
It crosses first through hole 4 and drifts material stock frame 1 out, then annulus 15 is removed from strut 16, then annulus 15 is placed in finger, by pushing away
Bar 14 can pushing meanss it is mobile, when needing to draw lines, the finger that control is hung on annulus 15 moves right, and annulus 15 drives bracing wire
13 move right, and bracing wire 13 drives the second hollow pipe 10 to move up, thus the first elastic component 9 of compression, at this point, the second hollow pipe
10 no longer stop lime, and lime is fallen on ground by discharge port 6, and when not needing setting-out, control is hung on the finger of annulus 15
It is moved to the left, the first hollow pipe 7 is moved down by the effect of the first elastic component 9, is cooperated with material stock frame 1, is stopped to control lime
Only fall, in this way, achieved the effect that convenient for control spread ash quantity number.
Further, which further includes having installing frame 17, electromagnet 18, the second elastic component 19 and iron
Block 20;Installing frame 17 is fixed in 1 bottom of material stock frame, and electromagnet 18 is fixed in bottom in installing frame 17, and iron block 20 passes through the second bullet
Property part 19 and electromagnet 18 are affixed;When lime is pasted on 1 inner wall of material stock frame, control electromagnet 18 is powered, and electromagnet 18 produces
Iron block 20 is drawn through by magnetisation power, and when electromagnet 18 powers off, electromagnet 18 loses magnetic force, and iron block 20 is by the second elasticity
Part 19 is acted on to material stock frame 1 is hit, and repeatedly, can effectively be beaten down the lime being pasted on 1 inner wall of material stock frame, is convenient for
Save lime.
Further, which further includes having connecting rod 22 and third elastic component 23;2 top of support rod
Recessing 21;1 bottom of material stock frame is fixed at the top of connecting rod 22, and 22 bottom of connecting rod is located in groove 21;Third elastic component
23 one end are fixed in 22 bottom of connecting rod, and the other end is fixed in 21 bottom of groove;Since construction field scene is to be uneven, pass through
Connecting rod 22 and third elastic component 23 cooperate, and when so that device working, to have the function that damping, improve making for device
The property used.
Further, which further includes having handle 24 and snap-gauge 25;Handle 24 is fixed in the top of piston 5
Portion, snap-gauge 25 and support rod 2 are hinged;It is convenient for pulling up in piston 5 by handle 24, plays the role of labour-saving, pass through snap-gauge 25
Convenient for fixing vehicle wheel 3, anti-locking apparatus when not in use, is moved, and causes danger.
The control mode of the utility model is controlled by manually starting and turning off the switch, the wiring diagram of dynamical element with
The offer of power supply belongs to the common knowledge of this field, and the utility model is mainly used to protect mechanical device, so this is practical
It is novel not to be explained control mode and wiring arrangement.
Preferred embodiments of the present invention above described embodiment only expresses, the description thereof is more specific and detailed,
But it should not be understood as limiting the scope of the patent of the utility model.It should be pointed out that for the common of this field
For technical staff, without departing from the inventive concept of the premise, several deformations can also be made, improves and substitutes, these are all
Belong to the protection scope of the utility model.Therefore, the scope of protection shall be subject to the appended claims for the utility model patent.
Claims (4)
1. a kind of construction line-plotting device, which is characterized in that include material stock frame (1), support rod (2), wheel (3), live
Fill in (5), the first hollow pipe (7), fixed plate (8), the first elastic component (9), the second hollow pipe (10), fixed pulley (12), bracing wire
(13), push rod (14), annulus (15) and strut (16);Support rod (2) is installed on material stock frame (1) bottom, and wheel (3) is fixed in branch
Strut (2) bottom, material stock frame (1) top are provided with first through hole (4);Piston (5) is removably installed on material stock frame (1) top
Portion, and be located in first through hole (4);Material stock frame (1) bottom is provided with discharge port (6), and the first hollow pipe (7) is fixed in material stock frame
(1) inner top;Fixed plate (8) one end is fixed in (7) one inside portion of the first hollow pipe, and the other end is fixed in the first hollow pipe (7)
Another inside portion;It opens in fixed plate (8) and is slidably connected with the second through-hole (11), the second hollow pipe (10) with the first hollow pipe (7);
First elastic component (9) one end is fixed in fixed plate (8) bottom, and the other end is fixed at the top of the second hollow pipe (10);Fixed pulley
(12) it is fixed at the top of material stock frame (1), push rod (14) is fixed in (1) one side of material stock frame;Strut (16) is fixed in push rod (14)
Top, and annulus (15) is removably placed in strut (16);Bracing wire (13) one end is fixed in the second hollow pipe (10)
Top, the other end are wire-wrapped in fixed pulley (12) and annulus at the top of first through hole (4), the first hollow pipe (7), material stock frame (1)
(15) it connects.
2. a kind of construction line-plotting device according to claim 1, which is characterized in that construction setting-out dress
Set further includes having installing frame (17), electromagnet (18), the second elastic component (19) and iron block (20);Installing frame (17) is fixed in material stock
Frame (1) bottom, electromagnet (18) are fixed in installing frame (17) interior bottom, and iron block (20) passes through the second elastic component (19) and electromagnet
(18) affixed.
3. a kind of construction line-plotting device according to claim 2, which is characterized in that construction setting-out dress
Set further includes having connecting rod (22) and third elastic component (23);Recessing (21) at the top of support rod (2);It is solid at the top of connecting rod (22)
It is connected to material stock frame (1) bottom, and connecting rod (22) bottom is located in groove (21);Third elastic component (23) one end is fixed in connection
Bar (22) bottom, the other end are fixed in groove (21) bottom.
4. a kind of construction line-plotting device according to claim 3, which is characterized in that construction setting-out dress
Set further includes having handle (24) and snap-gauge (25);Handle (24) is fixed at the top of piston (5), and snap-gauge (25) and support rod (2) are cut with scissors
It connects.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201820422374.6U CN208235958U (en) | 2018-03-27 | 2018-03-27 | A kind of construction line-plotting device |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201820422374.6U CN208235958U (en) | 2018-03-27 | 2018-03-27 | A kind of construction line-plotting device |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN208235958U true CN208235958U (en) | 2018-12-14 |
Family
ID=64585649
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201820422374.6U Expired - Fee Related CN208235958U (en) | 2018-03-27 | 2018-03-27 | A kind of construction line-plotting device |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN208235958U (en) |
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN109479473A (en) * | 2018-12-28 | 2019-03-19 | 济宁市农业科学研究院 | One cultivates on experimental plot with anti-blocking scriber and its application method |
| CN109644638A (en) * | 2018-12-28 | 2019-04-19 | 济宁市农业科学研究院 | A field scriber and method of using the same |
| CN114396034A (en) * | 2022-01-23 | 2022-04-26 | 涂秋慧 | Quick line drawing device for geological exploration |
| CN118422877A (en) * | 2022-11-25 | 2024-08-02 | 罗福波 | A construction laying equipment |
-
2018
- 2018-03-27 CN CN201820422374.6U patent/CN208235958U/en not_active Expired - Fee Related
Cited By (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN109479473A (en) * | 2018-12-28 | 2019-03-19 | 济宁市农业科学研究院 | One cultivates on experimental plot with anti-blocking scriber and its application method |
| CN109644638A (en) * | 2018-12-28 | 2019-04-19 | 济宁市农业科学研究院 | A field scriber and method of using the same |
| CN109479473B (en) * | 2018-12-28 | 2020-03-31 | 济宁市农业科学研究院 | Anti-blocking scriber for test field and using method thereof |
| CN109644638B (en) * | 2018-12-28 | 2020-04-03 | 济宁市农业科学研究院 | Land scriber and use method thereof |
| CN114396034A (en) * | 2022-01-23 | 2022-04-26 | 涂秋慧 | Quick line drawing device for geological exploration |
| CN114396034B (en) * | 2022-01-23 | 2024-02-09 | 中测科技(广州)有限公司 | Quick line drawing device for geological exploration |
| CN118422877A (en) * | 2022-11-25 | 2024-08-02 | 罗福波 | A construction laying equipment |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN208235958U (en) | A kind of construction line-plotting device | |
| CN203736142U (en) | A new type of garbage shovel | |
| CN206260275U (en) | Solid fertilizer fertilizer applicator | |
| CN209582590U (en) | A kind of environmental sanitation dustbin apparatus | |
| CN204014783U (en) | Fishpond trash-removal device | |
| CN207560815U (en) | A kind of multi-functional picker for dragon fruit | |
| CN206624287U (en) | A kind of garbage in scenic spot case with quick smoke extinguishing apparatus | |
| CN207290663U (en) | A kind of blowning installation on demoulding mechanism | |
| CN206699609U (en) | One kind gently opens folding stack structure umbrella stand | |
| CN209089860U (en) | A kind of sand storage fresh-keeping device for ginger picking parts | |
| CN205525188U (en) | Paper handkerchief packagine machine's bag framing mechanism | |
| CN212524135U (en) | Cell suspension partial shipment device | |
| CN108677849A (en) | A kind of portable environmental-protection type gardens device for collecting fallen leaves | |
| CN203575428U (en) | Insect catching device | |
| CN207767338U (en) | A kind of deinsectization device for plant protection | |
| CN207190371U (en) | A kind of handle bridging channel devices | |
| CN206760027U (en) | A kind of plant transplanting mechanical device | |
| CN208023960U (en) | A kind of handheld garden construction marking device | |
| CN206841991U (en) | A kind of wound packages polyester thread transporter | |
| CN206986607U (en) | Waterleaf paper for velcanized fiber produces special pressing device | |
| CN207928603U (en) | A kind of dedicated fire box of fire-fighting | |
| CN209246058U (en) | A kind of boiler tubing blockage-clearing device | |
| CN205474184U (en) | Textile waste collecting system | |
| CN108684269A (en) | Rice seedling fixator and field arranging apparatus | |
| CN204056892U (en) | Novel garbage can |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20181214 |