A kind of use in waste water treatment settling tank
Technical field
The utility model relates to sewage treatment facility field, in particular to a kind of use in waste water treatment settling tank.
Background technique
Settling tank is that a kind of structures of suspended matter in water removal are removed using precipitation in sewage disposal process, it is utilized
The natural sedimentation of water or acting on to remove the suspended matter in water for coagulating sedimentation, suspended substance sedimentation to bottom of pond becomes sludge, therefore
It in removing sludge process needs that the sludge of bottom of pond is scraped a special place with mud scraper and dispose together, sedimentation basin has
It is a variety of such as rectangular, it is circular;For rectangular settling tank, the water outlet setting sewage draining exit at it carries out blowdown, due to it
Bottom be flat, sludgd deposition to bottom of pond, oneself will not clean up, therefore also need Slag Scraping Device, this has been resulted in greatly
The wasting of resources.
Summary of the invention
In order to make up for the defects of the prior art, the utility model provides a kind of sedimentations of the use in waste water treatment of environment-friendly high-efficiency
Pond.
The utility model is achieved by the following technical solution:
A kind of use in waste water treatment settling tank, including rectangular pond body, the rectangular pond body includes bottom of pond, in going out for rectangular pond body
Mouth end is equipped with sewage draining exit, it is characterized in that: the bottom of pond is step type, the sewage draining exit is located at the least significant end of bottom of pond.
The upper surface of the ladder is inclined surface.
Several cylinders are equipped in rectangular pond body two sides, a cylinder corresponds to step, and the output end of the cylinder protrudes into
Cleaning shoe is connected after in rectangular pond body.
The output end oblique of the cleaning shoe and cylinder, the cleaning shoe scrape mud facing towards sewage draining exit.
The beneficial effects of the utility model are:
Bottom of pond setting is made bottom of pond that heeling condition, and the surface of ladder integrally be presented by the utility model into a ladder
Be it is inclined, under the effect of sludge own wt, glide automatically along step, can be with even if there is small part to be retained on step
Periodically it is purged by cleaning shoe.Original mud-scraping ring section is substantially eliminated, resource is greatly saved.
Detailed description of the invention
The utility model will be further described below with reference to the accompanying drawings.
Fig. 1 is the overlooking structure diagram of the utility model;
Fig. 2 be Fig. 1 in A-A to cross section structure schematic diagram.
In figure, 1 rectangular pond body, 2 bottom of pond, 3 sewage draining exits, 4 ladders, 5 cylinders, 6 cleaning shoes.
Specific embodiment
Attached drawing is specific embodiment of the utility model.As shown in Figure 1, 2, this kind of use in waste water treatment settling tank, including side
Shape pond body 1, rectangular pond body 1 include bottom of pond 2, are equipped with sewage draining exit 3 in the outlet end of rectangular pond body 1, bottom of pond 2 is step type, blowdown
Mouth 3 is located at the least significant end of bottom of pond 2.
The upper surface of ladder 4 is preferably inclined surface, and the sludge fallen on so above can slide under the action of own wt
Next stage step.
Several cylinders 5, the corresponding step 4 of a cylinder 5 are equipped in rectangular 1 two sides of pond body, the output end of cylinder 5 protrudes into
Cleaning shoe 6 is connected after in rectangular pond body 1, cleaning shoe 6 is vertical with the upper surface of ladder 4, and preferably oblique with the output end of cylinder 5
It hands over, cleaning shoe 6 scrapes mud facing towards sewage draining exit 3, and the lower end of cleaning shoe 6 is contacted with the upper surface of ladder 4, front end and higher level's ladder
Facade contact.Camber can also be arranged in the facade of ladder 4 and upper surface, so that sludge is easier to be slipped to next stage rank
Ladder.The entire facade of every step and upper surface can also be further arranged to an arcwall face, steps at different levels
It forms the waveform tilted down only to fall down one by one so that sludge does not have standing ground, in such case
Under, cleaning shoe will design waviness, and the mating cylinder of several grades of ladders and one piece of lower end it is wavy scrape mud
Plate.
Process is as follows: gradually falling, is fallen on ladder 4 when sludge is separated from water under self gravitation effect, due to ladder 4
Upper surface be it is inclined, so sludge can't stay on ladder 4, he will continue to fall step by step along ladder 4,
It is discharged until from sewage draining exit 3, certain time is long, some remaining sludge can be inevitably gathered on ladder 4, then we can determine
Phase starts a lower cylinder 5, scrapes off the sludge of accumulation by cleaning shoe 6, how much electric power thus will not be substantially used, is had
Save resource to effect.
In addition to the technical characteristic described in the specification, remaining technical characteristic is technology known to those skilled in the art.