CN208219851U CN201820671805.2U CN201820671805U CN208219851U CN 208219851 U CN208219851 U CN 208219851U CN 201820671805 U CN201820671805 U CN 201820671805U CN 208219851 U CN208219851 U CN 208219851U
Authority
CN
China
Prior art keywords
prefabricated post
tenon
mortise
sleeve
splicing construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820671805.2U
Other languages
Chinese (zh)
Inventor
孙红亮
杨琳
张芸
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Henan Yuanda Tiancheng Residential Industrial Ltd By Share Ltd
Original Assignee
Henan Yuanda Tiancheng Residential Industrial Ltd By Share Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Henan Yuanda Tiancheng Residential Industrial Ltd By Share Ltd filed Critical Henan Yuanda Tiancheng Residential Industrial Ltd By Share Ltd
Priority to CN201820671805.2U priority Critical patent/CN208219851U/en
Application granted granted Critical
Publication of CN208219851U publication Critical patent/CN208219851U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

The utility model discloses a kind of prefabricated post splicing constructions, including lower prefabricated post and upper prefabricated post, mortise disposed in parallel there are two being opened up on the upper surface of the lower prefabricated post, the downside of mortise is wider, it is convexly equipped with the tenon that two cards that coincide respectively with two mortises are matched on the lower end surface of upper prefabricated post, is provided with concrete between tenon and the side wall of mortise.Being connected by mortise with tenon for the utility model belongs to the connection of tenon formula column, tenon formula column connection connect similar with the tenon formula column in modern age carpentery workshop building, it is in upper lower prop using a kind of concave-convex connection type combined, tenon is engaged with the fourth of the twelve Earthly Branches and plays connection function, one of tenon is inserted into another mortise, and two components is made to connect and fix.Although single component is thiner, rigidity is larger on the whole, and shock resistance is also quite strong.This connection type is easy to connect, and by the concrete binding between tenon and the side wall of mortise, the amount of pouring is small, and site-assembled work efficiency is high.

Description

Prefabricated post splicing construction
Technical field
The utility model relates to a kind of prefabricated post splicing construction more particularly to a kind of spellings that two prefabricated posts are stitched together Binding structure, belongs to assembled architecture field.
Background technique
Prefabricated assembled concrete structure, usually by some other Accessory Members such as prefabricated column, beam, plate and precast stair Composition.Compared with foreign countries, the PC structure type and engineering method in China are started late, and PC rate is lower.Restrict what PC structure was promoted Key factor is how to guarantee effective node connection type, how by suitable connection type make PC structure closest to Cast-in-place concrete structure makes PC structure can guarantee that necessary bearing capacity, energy dissipation capacity are the important topics of current structure design.
Precast concrete, English: precast concrete, thus claim PC component, refer in the factory by standardization, The concrete product of mechanized manner processing.Corresponding tradition cast-in-place concrete needs building-site molding, shows Field casting and scene maintenance.Precast concrete is widely used in the fields such as building, traffic, water conservancy, plays the part of in national economy Drill important role.
Compared with cast-in-place concrete, the precast concrete of the factorial production has many advantages:
Safety: for construction worker, metastable working environment is safely than complicated site operation in factory Number is higher;
Quality: the quality and technique of building element can be controlled preferably by mechanization production;
Speed: the standardization of preform sizes and characteristic can dramatically speed up installation speed and architectural engineering progress;
Cost: compared with conventional on-site molding, the mold in factory can be used with repetitive cycling, and overall cost is lower;Machine The demand that tool metaplasia is produced to artificial is less, with the continuous raising of cost of labor, the prefabricated component cost advantage meeting of large-scale production It is further obvious.
Environment: it is significantly reduced using the construction site field operation amount of prefabricated component, dust pollution, noise pollution are significantly dropped It is low.
It needs for prefabricated post to be stitched together in the prior art, current splicing is to realize to connect by cast-in-place part It connects, pours heavy workload, reduce site-assembled working efficiency.
Utility model content
The purpose of the utility model is to provide a kind of prefabricated post splicing constructions, to solve between prefabricated post in the prior art Splicing needs the problem of realizing by cast-in-place part, pour heavy workload, reduce site-assembled working efficiency.
In order to achieve the goal above, the utility model adopts the following technical solution:
A kind of prefabricated post splicing construction, including lower prefabricated post and upper prefabricated post are opened on the upper surface of the lower prefabricated post If the downside of mortise is wider there are two mortise disposed in parallel, be convexly equipped on the lower end surface of upper prefabricated post two respectively with two fourths of the twelve Earthly Branches The tenon that the identical card of eye is matched, is provided with concrete between tenon and the side wall of mortise.
The end of preset first reinforcing bar overhangs in a mortise in the lower prefabricated post, and the first reinforcement welding is fixed There is the first sleeve perpendicular to the first reinforcing bar, evacuation notch is offered on corresponding tenon, has in another tenon preset Second sleeve is welded on second reinforcing bar, first sleeve and second sleeve are conllinear, wear in first sleeve and second sleeve There is connecting rod, there is the through hole passed through for connecting rod in lower prefabricated post and upper prefabricated post.
The mortise is dovetail groove.
The lower prefabricated post and upper prefabricated post are the rectangle prefabricated post that cross section is rectangle.
The extending direction of the mortise is parallel with the diagonal line of cross section of lower prefabricated post.
The cross section of the lower prefabricated post and upper prefabricated post is square.
Being connected by mortise with tenon for the utility model belongs to the connection of tenon formula column, and tenon formula column connection is built with modern age carpentery workshop Tenon formula column connection in building is similar, is in upper lower prop using a kind of concave-convex connection type combined, tenon is played with fourth of the twelve Earthly Branches occlusion and connect Effect, one of tenon are inserted into another mortise, and two components is made to connect and fix.Although single component is thiner, But rigidity is larger on the whole, shock resistance is also quite strong.This connection type is easy to connect, and passes through the side of tenon and mortise Concrete binding between wall, the amount of pouring is small, and site-assembled work efficiency is high.
The end of preset first reinforcing bar overhangs in a mortise in the lower prefabricated post of the utility model, the first steel bar welding The first sleeve being fixed with perpendicular to the first reinforcing bar is connect, evacuation notch is offered on corresponding tenon, is had in another tenon Second sleeve is welded on preset second reinforcing bar, first sleeve and second sleeve are conllinear, first sleeve and second sleeve It is inside equipped with connecting rod, there is the through hole passed through for connecting rod in lower prefabricated post and upper prefabricated post, can be reinforced prefabricated up and down Bonding strength between column.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the utility model embodiment;
Fig. 2 is the structural schematic diagram of lower prefabricated post in Fig. 1;
Fig. 3 is the structural schematic diagram of upper prefabricated post in Fig. 1.
Specific embodiment
A kind of embodiment of prefabricated post splicing construction opens up on the upper surface of lower prefabricated post 1 in fig. 1, fig. 2 and fig. 3 There are two mortises 2 disposed in parallel, and mortise 2 here is trapezoidal mortise, and the downside of mortise is wider, the lower end surface of upper prefabricated post 3 On be convexly equipped with two tenons 4, two tenons 4 card that coincide respectively with two mortises 2 fits over and is arranged between tenon 4 and the side wall of mortise 2 There is concrete, concrete is cast in situs, and upper and lower two prefabricated posts are bonded together.
The end of preset first reinforcing bar overhangs in a mortise in lower prefabricated post 1, welds on the first reinforcing bar 5 solid Surely there is a first sleeve 6, first sleeve 6 offers evacuation notch 7 on corresponding tenon 4, the notch 7 is not perpendicular to the first reinforcing bar 5 Be it is logical, have on preset second reinforcing bar in another tenon 4 and be welded with second sleeve, second sleeve is perpendicular to the Two reinforcing bars, first sleeve and second sleeve are conllinear, are equipped with connecting rod in first sleeve and second sleeve, in lower prefabricated post and There is the through hole 8 passed through for connecting rod, the second reinforcing bar and second sleeve are in tenon, do not have body in attached drawing in upper prefabricated post It is existing.
The cross section of lower prefabricated post 1 and upper prefabricated post 3 is square.
The extending direction of two mortises is parallel with the diagonal line of cross section of lower prefabricated post.
In the present embodiment is the detailed description according to Figure of description to the progress of the embodiment of present patent application, at it In his embodiment, if do not need the technical characteristic bring technical effect in dependent claims, in dependent claims Technical characteristic can also be not provided with.

Claims (7)

1. a kind of prefabricated post splicing construction, including lower prefabricated post and upper prefabricated post, it is characterised in that: the lower prefabricated post it is upper Mortise disposed in parallel there are two opening up on end face, the downside of mortise is wider, is convexly equipped with two points on the lower end surface of upper prefabricated post The tenon that the card that do not coincide with two mortises is matched, is provided with concrete between tenon and the side wall of mortise.
2. prefabricated post splicing construction according to claim 1, it is characterised in that: preset first in the lower prefabricated post The end of reinforcing bar overhangs in a mortise, and the first reinforcement welding is fixed with the first sleeve perpendicular to the first reinforcing bar, corresponding Evacuation notch is offered on tenon, is had in another tenon and is welded with second sleeve on preset second reinforcing bar, first Sleeve and second sleeve are conllinear, and connecting rod is equipped in first sleeve and second sleeve, is had in lower prefabricated post and upper prefabricated post The through hole passed through for connecting rod.
3. prefabricated post splicing construction according to claim 1 or 2, it is characterised in that: the mortise is dovetail groove.
4. prefabricated post splicing construction according to claim 3, it is characterised in that: the lower prefabricated post and upper prefabricated post are Cross section is the rectangle prefabricated post of rectangle.
5. prefabricated post splicing construction according to claim 4, it is characterised in that: the extending direction of the mortise with it is lower pre- The diagonal line of the cross section of column processed is parallel.
6. prefabricated post splicing construction according to claim 3, it is characterised in that: the lower prefabricated post and upper prefabricated post Cross section is square.
7. prefabricated post splicing construction according to claim 6, it is characterised in that: the extending direction of the mortise with it is lower pre- The diagonal line of the cross section of column processed is parallel.
CN201820671805.2U 2018-05-08 2018-05-08 Prefabricated post splicing construction Expired - Fee Related CN208219851U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820671805.2U CN208219851U (en) 2018-05-08 2018-05-08 Prefabricated post splicing construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820671805.2U CN208219851U (en) 2018-05-08 2018-05-08 Prefabricated post splicing construction

Publications (1)

Publication Number Publication Date
CN208219851U true CN208219851U (en) 2018-12-11

Family

ID=64510301

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820671805.2U Expired - Fee Related CN208219851U (en) 2018-05-08 2018-05-08 Prefabricated post splicing construction

Country Status (1)

Country Link
CN (1) CN208219851U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113047455A (en) * 2021-04-07 2021-06-29 西安建筑科技大学 Assembled PC post-tenon formula bolted connection node
CN115370178A (en) * 2022-08-18 2022-11-22 河北建筑工程学院 An assembled replaceable and node reinforcement device with mortise and tenon structure

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113047455A (en) * 2021-04-07 2021-06-29 西安建筑科技大学 Assembled PC post-tenon formula bolted connection node
CN115370178A (en) * 2022-08-18 2022-11-22 河北建筑工程学院 An assembled replaceable and node reinforcement device with mortise and tenon structure
CN115370178B (en) * 2022-08-18 2023-08-04 河北建筑工程学院 An assembled replaceable and node reinforcement device with mortise and tenon structure

Similar Documents

Publication Publication Date Title
CN105649203B (en) Precast prestressed concrete frame bean column node with U-shaped muscle and sleeve
CN105625572A (en) Prefabricated prestressed concrete frame beam-column joint making disparate use of high performance materials
CN208219851U (en) Prefabricated post splicing construction
CN205776755U (en) A kind of encased steel plate multi-cavity combination type shear wall core wall structure system
CN106400982A (en) Stirrup-densified splicing joint for fabricated reinforced concrete columns
CN208441231U (en) A kind of beam column built from concrete dry method connecting node
CN110318472A (en) Steel core concrete column and armored concrete Prefabricated beam connection structure and connection method
CN206570955U (en) A kind of prefabricated post single hole provisions for grouting
CN105625573B (en) The bean column node of intensity presstressed reinforcing steel and regular reinforcement sleeve connection in beam bottom
CN213653875U (en) Prefabricated shear wall of assembly type structure
CN208702007U (en) By the prefabricated assembled concrete structure of slurry anchor overlap joint connection structure connection
CN221029813U (en) Assembled bridge anti-collision wall
CN206752693U (en) A kind of assembled steel reinforced concrete column of stirrup encryption and post splicing node
CN208441229U (en) The connection structure of precast beam and prefabricated post
CN208219865U (en) The package assembly of two coplanar full prefabricated panels
CN106760570A (en) Glomeration builds self-tightening type block masonry wall binding apparatus
CN108560718A (en) A kind of Core Walls Structure system and preparation method thereof of new steel plate compound shear wall composition
CN208219999U (en) Reinforcing bar grouting connection structure
CN219794662U (en) Template assembly capable of being flexibly assembled for bare concrete construction
CN218195862U (en) Cast-in-place prefabricating device of street lamp basis
CN208219846U (en) The assembling structure of side wall and prefabricated panel
CN208219850U (en) Prefabricated beam column connection structure
CN206233359U (en) A kind of assembled architecture reinforced concrete member
CN205577108U (en) Precast concrete frame system of differential use high performance material
CN205822448U (en) A kind of distinctiveness uses the precast frame bean column node of high performance material

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee