CN208218210U - Prefabricated lifting device that marks time - Google Patents

Prefabricated lifting device that marks time Download PDF

Info

Publication number
CN208218210U
CN208218210U CN201820651620.5U CN201820651620U CN208218210U CN 208218210 U CN208218210 U CN 208218210U CN 201820651620 U CN201820651620 U CN 201820651620U CN 208218210 U CN208218210 U CN 208218210U
Authority
CN
China
Prior art keywords
suspension hook
section
lifting
lifting device
marking time
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820651620.5U
Other languages
Chinese (zh)
Inventor
乔黎春
张乐
刘腾
许可
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Civil Engineering Co Ltd
Original Assignee
China Construction Civil Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Civil Engineering Co Ltd filed Critical China Construction Civil Engineering Co Ltd
Priority to CN201820651620.5U priority Critical patent/CN208218210U/en
Application granted granted Critical
Publication of CN208218210U publication Critical patent/CN208218210U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model relates to a prefabricated lifting device that marks time, including two cross arrangement's lifting rod and two fixed pulleys of cover in the lifting rod bottom, the lifting rod is connected through the transfer bearing that sets up in lifting rod cross position below. The lifting rod comprises a lifting hook and a lifting ring arranged at the top of the lifting hook, the lifting hook comprises a lifting hook straight section, a lifting hook vertical section and a lifting hook bent section, an obtuse angle is formed between the lifting hook straight section and the lifting hook vertical section, and an acute angle is formed between the lifting hook vertical section and the lifting hook bent section. The hook bending section is in threaded connection with a first nut, and the first nut and the end part of the hook bending section are sleeved with a fixed wheel. The prefabricated lifting device of marking time is applicable to the prefabricated hoist and mount of marking time in large-scale venue, simple structure, and the cost of manufacture is low, and construction convenience need not reserve rings at the both ends of marking time moreover, has guaranteed that the prefabrication is marked time pleasing to the eye, has still reduced the waste of resource, improves the efficiency of construction.

Description

A kind of prefabricated lifting device of marking time
Technical field
The utility model relates to the realm of building construction, more particularly to a kind of prefabricated lifting device of marking time.
Background technique
Currently, usually reserving hanging ring when installation tread at the both ends marked time, then being sling by lifting equipment Hanging ring is gradually installed from top to bottom.For this mounting means due to needing to remove hanging ring after the installation is completed, the both ends marked time will Hole is left, the beauty marked time is influenced.And it is prefabricated when marking time, each, which is marked time, requires that there are two hanging rings, after installing again It needs to remove, causes the waste of resource.In addition, the dismounting of hanging ring is also required to a large amount of time and efforts, increase construction cost.
Utility model content
The purpose of this utility model is to provide a kind of prefabricated lifting device of marking time, it is to solve current step plate installation After need to remove hanging ring, the both ends marked time will leave hole, influence beauty, and waste of resource takes a substantial amount of time And energy, increase construction cost the technical issues of.
In order to solve the above-mentioned technical problem, the utility model provides a kind of prefabricated lifting device of marking time, it is characterised in that: packet Two vertical loading boards arranged in a crossed manner and two fast pulleys covered in vertical loading board bottom are included, the vertical loading board is by being arranged in vertical loading board Transfer bearing connection below crossover location;
The vertical loading board includes suspension hook and the hanging ring that is arranged at the top of suspension hook, and the suspension hook includes suspension hook straight section, suspension hook Perpendicular section and suspension hook curved segment, the suspension hook straight section and suspension hook erect to be arranged in obtuse angle between section, the suspension hook erect section and suspension hook curved segment it Between setting at an acute angle;
The suspension hook curved segment is threaded with the first nut, and first nut and the end of suspension hook curved segment are cased with fixation Wheel.
Preferably, the transfer bearing includes two the second nuts and a middle hinged arm, and second nut is respectively welded It is connected on the inside of suspension hook straight section, the middle hinged arm and the second nut thread bolt, and then two suspension hook straight sections are connected.
Preferably, spring is provided between second nut.
Preferably, gasket is provided between second nut and spring.
Preferably, reinforcing rod is provided on the outside of the suspension hook straight section.
Preferably, the angle that the suspension hook straight section and suspension hook erect between section is 120 °~170 °.
Preferably, the angle that the suspension hook erects between section and suspension hook curved segment is 60 °~120 °.
Preferably, the hanging ring is 180 ° of crotches.
Compared with prior art, it the characteristics of the utility model and has the beneficial effect that
(1) it when the prefabricated lifting device of marking time of the utility model is lifted for marking time, does not need reserved at the both ends marked time Hanging ring avoids and removes reserved hanging ring after the completion of marking time lifting in the prior art, influences beauty of marking time, while reducing resource wave Take, shortens the construction time.
(2) the prefabricated lifting device structure of marking time of the utility model is simple, is made of the existing material in construction site, system Make it is at low cost, it is easy to carry, it is easy for construction, and load-bearing capacity is good, marks time and does not have the danger of landing, ensured construction peace Entirely.
(3) the prefabricated lifting device of marking time of the utility model is particularly suitable for the prefabricated lifting marked time of large stadium, practical Property is strong, is with the promotion of good sense.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the prefabricated lifting device of marking time of the utility model.
Fig. 2 is the structural schematic diagram of the vertical loading board of the utility model.
Fig. 3 is part A enlarged drawing in Fig. 1.
Fig. 4 is the usage state diagram of the prefabricated lifting device of marking time of this utility model.
Appended drawing reference: 11- hanging ring, 12- suspension hook, 121- suspension hook straight section, 122- suspension hook erect section, 123- suspension hook curved segment, 2- and add Strong bar, 3- fast pulley, 4- transfer bearing, the second nut of 41-, hinged arm, 43- spring, 44- gasket, the first nut of 5- in 42-.
Specific embodiment
To make technological means of the utility model, character of innovation, reaching purpose and effect is easy to understand, below The present invention will be further described.
The embodiment recorded herein is the specific specific embodiment of the utility model, for illustrating the utility model Design, be it is explanatory and illustrative, should not be construed as the limit to the utility model embodiment and the scope of the utility model System.In addition to the embodiment recorded herein, those skilled in the art can also be public based on the claim of this application book and specification institute For the content opened using obvious other technical solutions, these technical solutions include using doing to the embodiment recorded herein The technical solution of any obvious substitutions and modifications out.
As shown in Figures 1 to 3, a kind of prefabricated lifting device of marking time includes two vertical loading boards arranged in a crossed manner and two cover and hanging The fast pulley (3) of bar bottom is filled, vertical loading board passes through transfer bearing (4) connection being arranged in below vertical loading board crossover location.
Vertical loading board is preferably HRB400E reinforcing bar, and the diameter of reinforcing bar is 28mm.Vertical loading board includes that suspension hook (12) and setting are being hung Hanging ring (11) at the top of hook (12), hanging ring (11) are 180 ° of crotches.Suspension hook (12) includes suspension hook straight section (121), the perpendicular section of suspension hook (122) and suspension hook curved segment (123), the length of suspension hook straight section (121) are preferably 1000mm, and the length that suspension hook erects section (122) is preferred Length for 300mm, suspension hook curved segment (123) is preferably 210mm.Vertical loading board can be integrally formed, can also be with segmented welding.
The angle that suspension hook straight section (121) and suspension hook erect between section (122) is 120 °~170 °.More preferably 150 ° folders Angle.It is 60 °~120 ° that suspension hook, which erects the angle between section (122) and suspension hook curved segment (123),.More preferably 105 ° of angles.Suspension hook It is welded and connected with reinforcing rod (2) on the outside of straight section (121), for enhancing vertical loading board stress, improves the stability of lifting.
Suspension hook curved segment (123) is threaded with the first nut (5), the end sleeve of the first nut (5) and suspension hook curved segment (123) There are fast pulley (3).Fast pulley (3) can be marked time the size adjusting fast pulley in both ends cavity according to different grandstands with vernier angle (3), and adjust the back side the first nut (5) it is fixed.
Vertical loading board passes through transfer bearing (4) connection being arranged in below vertical loading board crossover location.Transfer bearing (4) includes two A second nut (41) and a middle hinged arm (42), the second nut (41), which is respectively welded, to be connected on the inside of suspension hook straight section (121), in Hinged arm (42) and the second nut (41) screw thread bolt, and then two suspension hook straight sections (121) are connected.(between the second nut (41) Be provided with spring (43), can guarantee that suspension hook (12) and hanging ring (11) are freely rotated in angular range), the second nut (41) and Gasket (44) are provided between spring (43).
As shown in figure 4, will be hung with crane or fork truck wirerope first when being marked time using prefabricated lifting device lifting of marking time Ring (11) is sling, and sends someone to be directed at the hole location that grandstand is marked time, and suspension hook curved segment (123) is protruded into the hole location of grandstand step plate, adjustment Fast pulley (3) and the first nut (5), are then lifted by crane.
The above various embodiments is only used for that the utility model is explained, and does not constitute the limit to scope of the claims Fixed, other alternative means that those skilled in the art are contemplated that according to the utility model description should all be practical at this Within novel scope of protection of the claims.

Claims (8)

1. a kind of prefabricated lifting device of marking time, it is characterised in that: cover and lifting including two vertical loading boards arranged in a crossed manner and two The fast pulley (3) of bar bottom, the vertical loading board pass through transfer bearing (4) connection being arranged in below vertical loading board crossover location;
The vertical loading board includes the hanging ring (11) of suspension hook (12) and setting at the top of suspension hook (12), and the suspension hook (12) includes to hang Hook straight section (121), suspension hook erect section (122) and suspension hook curved segment (123), and the suspension hook straight section (121) and suspension hook erect between section (122) It is arranged in obtuse angle, the suspension hook erects setting at an acute angle between section (122) and suspension hook curved segment (123);
The suspension hook curved segment (123) is threaded with the first nut (5), the end of first nut (5) and suspension hook curved segment (123) Portion is cased with fast pulley (3).
2. the prefabricated lifting device of marking time of one kind according to claim 1, it is characterised in that: the transfer bearing (4) includes Two the second nuts (41) and a middle hinged arm (42), second nut (41), which is respectively welded, is connected to suspension hook straight section (121) Inside, the middle hinged arm (42) and the second nut (41) screw thread bolt, and then two suspension hook straight sections (121) are connected.
3. the prefabricated lifting device of marking time of one kind according to claim 2, it is characterised in that: between second nut (41) It is provided with spring (43).
4. the prefabricated lifting device of marking time of one kind according to claim 3, it is characterised in that: second nut (41) and bullet Gasket (44) are provided between spring (43).
5. the prefabricated lifting device of marking time of one kind according to claim 1, it is characterised in that: the suspension hook straight section (121) Outside is provided with reinforcing rod (2).
6. the prefabricated lifting device of marking time of one kind according to claim 1, it is characterised in that: the suspension hook straight section (121) with It is 120 °~170 ° that suspension hook, which erects the angle between section (122),.
7. the prefabricated lifting device of marking time of one kind according to claim 1, it is characterised in that: the suspension hook erect section (122) with Angle between suspension hook curved segment (123) is 60 °~120 °.
8. the prefabricated lifting device of marking time of one kind according to claim 1, it is characterised in that: the hanging ring (11) is 180 ° curved Hook.
CN201820651620.5U 2018-05-03 2018-05-03 Prefabricated lifting device that marks time Expired - Fee Related CN208218210U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820651620.5U CN208218210U (en) 2018-05-03 2018-05-03 Prefabricated lifting device that marks time

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820651620.5U CN208218210U (en) 2018-05-03 2018-05-03 Prefabricated lifting device that marks time

Publications (1)

Publication Number Publication Date
CN208218210U true CN208218210U (en) 2018-12-11

Family

ID=64509941

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820651620.5U Expired - Fee Related CN208218210U (en) 2018-05-03 2018-05-03 Prefabricated lifting device that marks time

Country Status (1)

Country Link
CN (1) CN208218210U (en)

Similar Documents

Publication Publication Date Title
CN106081926A (en) Harbour Radix Saposhnikoviae crane with mechanical arm gripping device
CN210855040U (en) Wire lifter
CN201217612Y (en) Aerial rail U shaped beam hoisting device
CN208218210U (en) Prefabricated lifting device that marks time
CN209038875U (en) A kind of building construction reinforcing bar is perpendicular to hang auxiliary device
CN202073046U (en) Main truss system of downward hanging basket
CN207093932U (en) Construction spring hanger
CN209305390U (en) Power rail insulating support is connect under one kind
CN103738861A (en) Integral hoisting method for A type column of steel pipe of ultra-high voltage transformer station
CN105731271A (en) Combined tower crane for roof construction and construction method thereof
CN205646501U (en) A line pole installing support for low pressure terminal equipment
CN105305316B (en) A kind of mountain region effort-saving circuit line lifter
CN206219042U (en) Overlength storehouse plate hoist device
CN106088431A (en) Laminated floor slab and laminated floor slab construction method for hanging
CN205610535U (en) Seaming type roofing photovoltaic supporting structure
CN204057652U (en) A kind of equal-diameter pole special hanger
CN205419584U (en) Be used for soft wall frame that adheres to of tower crane
CN210763896U (en) Inner ring opening string beam hoisting structure
CN203639105U (en) Suspension type temporary hoisting operation platform
CN214786355U (en) Transmission device for suspension cable suspension bridge of ball curtain stage
CN205875410U (en) A hang module system all for tube structure room panel construction
CN223016333U (en) A lightweight crane anti-tilt safety cable installation structure
CN222714892U (en) A kind of wooden box hanger bracket for car frame
CN203794392U (en) Supporting structure for lengthening wall-attached component of construction hoist
CN205076674U (en) Gantry crane's assembly auxiliary device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20181211