CN208185683U - A kind of rapid pipe connecting tool - Google Patents
A kind of rapid pipe connecting tool Download PDFInfo
- Publication number
- CN208185683U CN208185683U CN201721661053.3U CN201721661053U CN208185683U CN 208185683 U CN208185683 U CN 208185683U CN 201721661053 U CN201721661053 U CN 201721661053U CN 208185683 U CN208185683 U CN 208185683U
- Authority
- CN
- China
- Prior art keywords
- connecting plate
- gear
- halfbody
- screw rod
- screw
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 239000000463 material Substances 0.000 claims description 4
- 239000007769 metal material Substances 0.000 claims description 3
- 239000004033 plastic Substances 0.000 claims description 3
- 238000000034 method Methods 0.000 description 4
- 238000010276 construction Methods 0.000 description 3
- 230000000694 effects Effects 0.000 description 2
- 238000011900 installation process Methods 0.000 description 2
- 229920001169 thermoplastic Polymers 0.000 description 2
- 239000004416 thermosoftening plastic Substances 0.000 description 2
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 2
- 230000002411 adverse Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 239000003292 glue Substances 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 239000013589 supplement Substances 0.000 description 1
Landscapes
- Gripping Jigs, Holding Jigs, And Positioning Jigs (AREA)
Abstract
本实用新型提供了一种快速接管工具,本接管工具包括卡箍和压力钳,卡箍上固定设置有第一连接板,压力钳的外侧壁上固定设置有与第一连接板平行的第二连接板,第一连接板和第二连接板之间设置有与卡箍轴线平行的第一螺杆、第二螺杆和驱动杆,第一螺杆和第二螺杆的下端均通过轴承与第一连接板相连,第一螺杆和第二螺杆的上端分别固定设置有第一齿轮和第二齿轮,驱动杆的下端与第一连接板通过轴承连接,驱动杆的上端连接有一摇柄,驱动杆上还固定设置有与第一齿轮和第二齿轮同时啮合的中间齿轮,第一螺杆和第二螺杆与第二连接板之间螺纹连接,驱动杆穿设在第二连接板上,且与第二连接板之间具有间隙。本实用新型具有结构简单、省时省力等优点。
The utility model provides a quick pipe connection tool. The pipe connection tool includes a clamp and a pressure clamp. A first connecting plate is fixedly arranged on the clamp. Connecting plate, between the first connecting plate and the second connecting plate, a first screw, a second screw and a driving rod parallel to the axis of the clamp are arranged, and the lower ends of the first screw and the second screw are connected to the first connecting plate through bearings. The upper ends of the first screw and the second screw are respectively fixed with the first gear and the second gear, the lower end of the driving rod is connected with the first connecting plate through a bearing, the upper end of the driving rod is connected with a rocker, and the driving rod is also fixed. There is an intermediate gear that meshes with the first gear and the second gear at the same time, the first screw rod and the second screw rod are threadedly connected with the second connecting plate, the driving rod is passed through the second connecting plate, and connected with the second connecting plate with gaps in between. The utility model has the advantages of simple structure, time saving and labor saving.
Description
技术领域technical field
本实用新型涉及一种工具,特别涉及一种快速接管工具。The utility model relates to a tool, in particular to a quick connecting tool.
背景技术Background technique
电线电缆套管、下水管等,需要在两根管连接处通过管套将两者连接,部分厚管可以采用热塑软化的方式实现接管,部分材质较薄,或所属材料不适合热塑的接管,需要通过打胶后,挤进的方式进行接管,受到施工环境和施工场地的限制,人力施工难度较大,且容易造成接管破损或变形,对接管效果、美观度、水密性和安全性有不良影响。Wire and cable sleeves, sewer pipes, etc., need to connect the two pipes through the sleeve at the joint. Some thick pipes can be connected by thermoplastic softening, and some materials are thinner, or the materials are not suitable for thermoplastics. The connection needs to be carried out by squeezing in after applying glue. Due to the limitations of the construction environment and the construction site, the manual construction is difficult, and it is easy to cause damage or deformation of the connection. But the effect, aesthetics, watertightness and safety of the connection There are adverse effects.
特别是在下水管接管作业过程中,由于上端水管和下端水管均处于固定状态,且一般处于墙角处,受环境的局限,无法采用其他压力推进的方式进行接管。Especially in the process of taking over the sewer pipe, since the upper water pipe and the lower water pipe are in a fixed state, and are generally at the corner, limited by the environment, it is impossible to adopt other pressure propulsion methods to take over.
发明内容Contents of the invention
本实用新型的目的是针对现有的技术存在的上述问题,提供一种快速接管工具,本实用新型所要解决的技术问题是如何快速对待接管进行接管作业,且省时省力。The purpose of this utility model is to provide a quick takeover tool for the above-mentioned problems existing in the existing technology. The technical problem to be solved by the utility model is how to quickly carry out the takeover operation of the waiting pipe, and save time and effort.
本实用新型的目的可通过下列技术方案来实现:一种快速接管工具,其特征在于,本接管工具包括卡箍和压力钳,所述卡箍上固定设置有第一连接板,所述压力钳的外侧壁上固定设置有与第一连接板平行的第二连接板,所述第一连接板和第二连接板之间设置有与卡箍轴线平行的第一螺杆、第二螺杆和驱动杆,所述第一螺杆和第二螺杆的下端均通过轴承与第一连接板相连,所述第一螺杆和第二螺杆的上端分别固定设置有第一齿轮和第二齿轮,所述驱动杆的下端与第一连接板通过轴承连接,所述驱动杆的上端连接有一摇柄,所述驱动杆上还固定设置有与第一齿轮和第二齿轮同时啮合的中间齿轮,所述第一螺杆和第二螺杆与第二连接板之间螺纹连接,所述驱动杆穿设在第二连接板上,且与第二连接板之间具有间隙。The purpose of this utility model can be achieved through the following technical solutions: a quick pipe connection tool, characterized in that the pipe connection tool includes a clamp and a pressure clamp, the clamp is fixedly provided with a first connecting plate, and the pressure clamp A second connecting plate parallel to the first connecting plate is fixedly arranged on the outer wall of the first connecting plate, and a first screw, a second screw and a driving rod parallel to the clamp axis are arranged between the first connecting plate and the second connecting plate , the lower ends of the first screw and the second screw are connected to the first connecting plate through bearings, the upper ends of the first screw and the second screw are respectively fixed with a first gear and a second gear, and the drive rod The lower end is connected to the first connecting plate through a bearing, and a rocker is connected to the upper end of the driving rod, and an intermediate gear that meshes with the first gear and the second gear is fixedly arranged on the driving rod, and the first screw rod and the second gear are fixed on the driving rod. The second screw rod is threadedly connected with the second connecting plate, and the driving rod is passed through the second connecting plate and has a gap with the second connecting plate.
举例安装过程:Example installation process:
接管包括两根待接管和一个接管套,接管套的两端均具有受力台阶。The connecting pipe includes two pipes to be connected and a connecting sleeve, and both ends of the connecting sleeve have stress-bearing steps.
下压接管套,使接管套与下端的待接管固定,将卡箍固定在下端的待接管的管壁外,然后将接管套部分插入待接管的端部,以对接管套进行定位,此时压力钳置于接管套上方,反向旋转摇柄,使压力钳下移,作用力作用在接管套上端的受力台阶上;安装上端的待接管原理同上,只需将摇柄的旋转方向和压力钳的作用面进行调整即可。Press down the pipe sleeve to fix the pipe sleeve with the lower end of the pipe to be connected, fix the clamp outside the pipe wall of the lower end of the pipe to be connected, and then insert the part of the pipe sleeve into the end of the pipe to be connected to position the pipe sleeve. Put the pressure clamp on the top of the connecting sleeve, rotate the crank handle in the opposite direction to move the pressure clamp down, and the force acts on the stress-bearing step at the upper end of the connecting sleeve; The action surface of the pressure clamp can be adjusted.
本接管工具,由于采用了第一螺杆和第二螺杆,能够保障作业过程中第一连接板和第二连接板保持平行状态,使接管的同轴度和平稳度较好。The connecting tool adopts the first screw rod and the second screw rod, which can ensure that the first connecting plate and the second connecting plate maintain a parallel state during operation, so that the concentricity and stability of the connecting pipe are better.
在上述的一种快速接管工具中,所述第一螺杆和第二螺杆上的螺纹尺寸相同,所述第一齿轮和第二齿轮的尺寸相同,所述中间齿轮位于第一齿轮和第二齿轮的正中间。In the above-mentioned quick connection tool, the screw threads on the first screw rod and the second screw rod have the same size, the first gear and the second gear have the same size, and the intermediate gear is located between the first gear and the second gear right in the middle.
在上述的一种快速接管工具中,所述卡箍包括半体一和半体二,所述半体一具有半圆形钳口;所述半体二的内径与半体一内径相同,且内径弧长小于半体一的内径弧长;所述半体一的一端和半体二的一端之间通过插销铰接,所述半体二的另一端与半体二的另一端之间通过若干螺栓相连。In the aforementioned quick connection tool, the clip includes a half body one and a half body two, the first half body has a semicircular jaw; the inner diameter of the second half body is the same as that of the first half body, and The arc length of the inner diameter is less than the arc length of the inner diameter of half body one; one end of half body one and one end of half body two are hinged by a bolt, and the other end of half body two and the other end of half body two are connected by several bolted together.
半体一的内径与待接管的外径相同,半体二的弧长较短,能够利用螺栓的锁紧,使卡箍与待接管之间保持较好的紧密度和同轴度。The inner diameter of half body 1 is the same as the outer diameter of the pipe to be connected, and the arc length of half body 2 is shorter, which can be locked by bolts to maintain a good tightness and coaxiality between the clamp and the pipe to be connected.
在上述的一种快速接管工具中,所述半体一为金属材料制成,所述半体二为塑料材质制成,所述第一连接板固定在半体一上。In the aforementioned quick connection tool, the first half is made of metal material, the second half is made of plastic, and the first connecting plate is fixed on the first half.
在上述的一种快速接管工具中,所述中间齿轮的直径小于第一齿轮的直径。In the above quick connection tool, the diameter of the intermediate gear is smaller than the diameter of the first gear.
可以通过中间齿轮和摇柄旋转半径的设计,使操作更加省力。The design of the intermediate gear and the radius of rotation of the crank handle can make the operation more labor-saving.
附图说明Description of drawings
图1是本接管工具的立体结构示意图。Fig. 1 is a three-dimensional structural schematic diagram of the connecting tool.
图中,1、卡箍;11、半体一;12、半体二;2、压力钳;31、第一连接板;32、第二连接板;41、第一螺杆;42、第二螺杆;43、驱动杆;44、摇柄;51、第一齿轮;52、第二齿轮;53、中间齿轮。In the figure, 1, clamp; 11, half body one; 12, half body two; 2, pressure clamp; 31, first connecting plate; 32, second connecting plate; 41, first screw rod; 42, second screw rod ; 43, drive rod; 44, rocking handle; 51, first gear; 52, second gear; 53, intermediate gear.
具体实施方式Detailed ways
以下是本实用新型的具体实施例并结合附图,对本实用新型的技术方案作进一步的描述,但本实用新型并不限于这些实施例。The following are specific embodiments of the utility model and in conjunction with the accompanying drawings, the technical solution of the utility model is further described, but the utility model is not limited to these embodiments.
如图1所示,本接管工具包括卡箍1和压力钳2,卡箍1上固定设置有第一连接板31,压力钳2的外侧壁上固定设置有与第一连接板31平行的第二连接板32,第一连接板31和第二连接板32之间设置有与卡箍1轴线平行的第一螺杆41、第二螺杆42和驱动杆43,第一螺杆41和第二螺杆42的下端均通过轴承与第一连接板31相连,第一螺杆41和第二螺杆42的上端分别固定设置有第一齿轮51和第二齿轮52,驱动杆43的下端与第一连接板31通过轴承连接,驱动杆43的上端连接有一摇柄44,驱动杆43上还固定设置有与第一齿轮51和第二齿轮52同时啮合的中间齿轮53,第一螺杆41和第二螺杆42与第二连接板32之间螺纹连接,驱动杆43穿设在第二连接板32上。As shown in Figure 1, the pipe connection tool includes a clamp 1 and a pressure clamp 2, the clamp 1 is fixedly provided with a first connecting plate 31, and the outer wall of the pressure clamp 2 is fixedly provided with a second connecting plate 31 parallel to the first connecting plate 31. Two connecting plates 32, a first screw 41, a second screw 42 and a drive rod 43 parallel to the axis of the clamp 1 are arranged between the first connecting plate 31 and the second connecting plate 32, the first screw 41 and the second screw 42 The lower ends of each are connected to the first connecting plate 31 through bearings, the upper ends of the first screw 41 and the second screw 42 are respectively fixed with a first gear 51 and a second gear 52, and the lower end of the driving rod 43 passes through the first connecting plate 31. Bearing connection, the upper end of driving rod 43 is connected with a rocking handle 44, is also fixedly provided with on the driving rod 43 the intermediate gear 53 that meshes with the first gear 51 and the second gear 52 simultaneously, the first screw rod 41 and the second screw rod 42 and the first screw rod 42 The two connecting plates 32 are threadedly connected, and the driving rod 43 is passed through the second connecting plate 32 .
举例安装过程:Example installation process:
接管包括两根待接管和一个接管套,接管套的两端均具有受力台阶。The connecting pipe includes two pipes to be connected and a connecting sleeve, and both ends of the connecting sleeve have stress-bearing steps.
下压接管套,使接管套与下端的待接管固定,将卡箍1固定在下端的待接管的管壁外,然后将接管套部分插入待接管的端部,以对接管套进行定位,此时压力钳2置于接管套上方,反向旋转摇柄44,使压力钳2下移,作用力作用在接管套上端的受力台阶上;安装上端的待接管原理同上,只需将摇柄44的旋转方向和压力钳2的作用面进行调整即可。Press down the pipe sleeve to fix the pipe sleeve with the lower end of the pipe to be connected, fix the clamp 1 outside the pipe wall of the lower end of the pipe to be connected, and then insert the sleeve part into the end of the pipe to be connected to position the pipe sleeve. When the pressure clamp 2 is placed above the connecting sleeve, the crank handle 44 is reversely rotated to move the pressure clamp 2 downward, and the force acts on the stressed step at the upper end of the connecting sleeve; The direction of rotation of 44 and the action surface of pressure clamp 2 can be adjusted.
本接管工具,由于采用了第一螺杆41和第二螺杆42,能够保障作业过程中第一连接板31和第二连接板32保持平行状态,使接管的同轴度和平稳度较好。The connecting tool adopts the first screw rod 41 and the second screw rod 42, which can ensure that the first connecting plate 31 and the second connecting plate 32 maintain a parallel state during operation, so that the concentricity and stability of the connecting pipe are better.
在上述的一种快速接管工具中,第一螺杆41和第二螺杆42上的螺纹尺寸相同,第一齿轮51和第二齿轮52的尺寸相同,中间齿轮53位于第一齿轮51和第二齿轮52的正中间。In the above-mentioned quick connection tool, the thread size on the first screw rod 41 and the second screw rod 42 are the same, the size of the first gear 51 and the second gear 52 are the same, and the intermediate gear 53 is located between the first gear 51 and the second gear 52 in the middle.
卡箍1包括半体一11和半体二12,半体一11具有半圆形钳口;半体二12的内径与半体一11内径相同,且内径弧长小于半体一11的内径弧长;半体一11的一端和半体二12的一端之间通过插销铰接,半体二12的另一端与半体二12的另一端之间通过若干螺栓相连。Clamp 1 includes half body one 11 and half body two 12, half body one 11 has a semicircular jaw; the inner diameter of half body two 12 is the same as the inner diameter of half body one 11, and the arc length of the inner diameter is less than the inner diameter of half body one 11 Arc length; one end of half body one 11 and one end of half body two 12 are hinged by a latch, and the other end of half body two 12 and the other end of half body two 12 are connected by some bolts.
半体一11的内径与待接管的外径相同,半体二12的弧长较短,能够利用螺栓的锁紧,使卡箍1与待接管之间保持较好的紧密度和同轴度。The inner diameter of the first half 11 is the same as the outer diameter of the pipe to be connected, and the arc length of the second half 12 is shorter, which can be locked by bolts to maintain a good tightness and coaxiality between the clamp 1 and the pipe to be connected .
半体一11为金属材料制成,半体二12为塑料材质制成,第一连接板31固定在半体一11上。The first half 11 is made of metal material, the second half 12 is made of plastic, and the first connecting plate 31 is fixed on the first half 11 .
中间齿轮53的直径小于第一齿轮51的直径;可以通过中间齿轮53和摇柄44旋转半径的设计,使操作更加省力。The diameter of the intermediate gear 53 is smaller than the diameter of the first gear 51; the design of the rotation radius of the intermediate gear 53 and the rocking handle 44 can make the operation more labor-saving.
本文中所描述的具体实施例仅仅是对本实用新型精神作举例说明。本实用新型所属技术领域的技术人员可以对所描述的具体实施例做各种各样的修改或补充或采用类似的方式替代,但并不会偏离本实用新型的精神或者超越所附权利要求书所定义的范围。The specific embodiments described herein are only examples to illustrate the spirit of the present invention. Those skilled in the technical field to which the utility model belongs can make various modifications or supplements to the described specific embodiments or adopt similar methods to replace them, but they will not deviate from the spirit of the utility model or go beyond the appended claims defined range.
Claims (5)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201721661053.3U CN208185683U (en) | 2017-12-01 | 2017-12-01 | A kind of rapid pipe connecting tool |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201721661053.3U CN208185683U (en) | 2017-12-01 | 2017-12-01 | A kind of rapid pipe connecting tool |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN208185683U true CN208185683U (en) | 2018-12-04 |
Family
ID=64441372
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201721661053.3U Expired - Fee Related CN208185683U (en) | 2017-12-01 | 2017-12-01 | A kind of rapid pipe connecting tool |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN208185683U (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN107781547A (en) * | 2017-12-01 | 2018-03-09 | 湖北科技学院 | A kind of rapid pipe connecting tool |
-
2017
- 2017-12-01 CN CN201721661053.3U patent/CN208185683U/en not_active Expired - Fee Related
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN107781547A (en) * | 2017-12-01 | 2018-03-09 | 湖北科技学院 | A kind of rapid pipe connecting tool |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN107218460A (en) | A kind of Quick connector of plug tube | |
| CN204004889U (en) | A kind of pipe connecting device | |
| CN203395431U (en) | Rapid pipe clamp | |
| CN103292080A (en) | Petroleum pipeline with taper-thread structures | |
| CN107842656A (en) | A kind of adapter driving tool | |
| CN207223787U (en) | Simple bended head counterpart stent | |
| CN205532369U (en) | Carbon fiber sucker rod with righting device | |
| CN201028136Y (en) | Rigid pipe fixture mechanism | |
| CN201012440Y (en) | Flexible positioning device for square tube welding | |
| CN203517102U (en) | Flexible pipe connector | |
| CN206846163U (en) | Straight pipe pressure-balancing type expansion joint | |
| CN206054987U (en) | A kind of novel pipe fitting | |
| CN202517235U (en) | Clamp for casing pipe of electric fitting pipe | |
| CN203343999U (en) | Tool special for disassembling servomotor connecting nut | |
| CN203856103U (en) | Partition wall mould easy to transport | |
| CN209622289U (en) | A pressure pipe type plastic composite pipe connection joint | |
| CN205392781U (en) | Easily adjust depth of extended overflow pipe's swirler | |
| CN204493941U (en) | Metal pipe joint device | |
| CN215293981U (en) | A temporary quick connection device for pipelines in water conservancy projects | |
| CN206903194U (en) | A kind of quick-detachable connector of steel tube | |
| CN205935423U (en) | A kind of building steel bar connection kit | |
| CN206543999U (en) | A kind of pump quick detacher | |
| CN204942856U (en) | Three of a kind of pressure-resistant corrosion-resistant for pipe-line system takes advantage of threeway | |
| CN205174832U (en) | Double -inner container structure of electric water heater | |
| CN107781547A (en) | A kind of rapid pipe connecting tool |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20181204 Termination date: 20201201 |
|
| CF01 | Termination of patent right due to non-payment of annual fee |