CN208167799U - A kind of ripple steel composites structure and the double storehouse pipe galleries of reinforced concrete combination assembled - Google Patents

A kind of ripple steel composites structure and the double storehouse pipe galleries of reinforced concrete combination assembled Download PDF

Info

Publication number
CN208167799U
CN208167799U CN201820646348.1U CN201820646348U CN208167799U CN 208167799 U CN208167799 U CN 208167799U CN 201820646348 U CN201820646348 U CN 201820646348U CN 208167799 U CN208167799 U CN 208167799U
Authority
CN
China
Prior art keywords
steel
reinforced concrete
partition
pedestal
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820646348.1U
Other languages
Chinese (zh)
Inventor
孙成业
孙濛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sun Haorui
Original Assignee
大连宜而居科技有限公司
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 大连宜而居科技有限公司 filed Critical 大连宜而居科技有限公司
Priority to CN201820646348.1U priority Critical patent/CN208167799U/en
Application granted granted Critical
Publication of CN208167799U publication Critical patent/CN208167799U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model belongs to technical field of building construction, disclose a kind of ripple steel composites structure and the double storehouse pipe galleries of reinforced concrete combination assembled, it is provided with reinforced concrete footing, pedestal is arranged in bottom plate two sides, partition pedestal is set in the pedestal of two sides, prefabricated reinforced concrete partition is set on the partition pedestal, and every piece of partition exposed steel bar is connected using grout sleeve.The ripple steel composites structure and the double storehouse pipe galleries of reinforced concrete combination assembled actively lead steel construction in the application of building field,, green construction superfluous to neutralizing China's output of steel plays positive effect, steel construction and armored concrete composite type, solves the unfavorable factor of the waterproof and anticorrosion of simple steel construction, improve the service life of product, the duration is shortened, comprehensive cost is reduced, improves seismic behavior.Inside installation cable bearer, conduit bracket, quick construction, reduce the influence of Construction on Environment, economize on resources.

Description

A kind of ripple steel composites structure and the double storehouse pipe galleries of reinforced concrete combination assembled
Technical field
The utility model belongs to technical field of building construction more particularly to a kind of ripple steel composites structure and armored concrete Combination assembled double storehouse pipe galleries.
Background technique
Currently, the prior art commonly used in the trade is such:Cast-in-site armored concrete underground pipe gallery, work of constructing Phase is long, and comprehensive cost height, waste of resource, construction are complicated, has greater environmental impacts.Prefabricated reinforced concrete assembled underground is comprehensive Piping lane must have a die apparatus in production, mold put into production it is at high cost, and transport, installation cost it is high, waterproof performance is not so good as Cast-in-situ steel reinforced concrete piping lane, quality are difficult to ensure.The city integrated piping lane in China is in the starting stage at present, manages in the prior art Corridor cost is high, long in time limit, waterproof performance is bad, waste of resource.
In conclusion problem of the existing technology is:Prefabricated reinforced concrete assembled underground pipe gallery is producing Shi Bixu has a die apparatus, mold put into production it is at high cost, and transport, installation cost it is high, waterproof performance is mixed not as good as cast in place reinforced bar Solidifying soil piping lane, quality are difficult to ensure.The city integrated piping lane in China is in the starting stage at present, in the prior art piping lane cost it is high, It is long in time limit, waterproof performance is bad, waste of resource.
Summary of the invention
In view of the problems of the existing technology, the utility model provides a kind of ripple steel composites structure and armored concrete Combination assembled double storehouse pipe galleries.
The utility model is realized in this way a kind of ripple steel composites structure and the double storehouses of reinforced concrete combination assembled are comprehensive It closes piping lane and is provided with reinforced concrete footing, bottom plate two sides are arranged pedestal, partition pedestal, the partition base is arranged in the pedestal of two sides Prefabricated reinforced concrete partition is set on seat, and every piece of partition exposed steel bar is connected using grout sleeve.
Corrugated steel both ends bolt, nut connection drilling angle steel stile, the drilling of angle steel another side are pre-buried, pre- with two sides pedestal It stays bolt to connect by nut to lock, welding H-bar in corrugated steel, partition installs I-steel and forms two piping lane spaces.
I-steel setting cable personal gantry, cable testing bridge, telecommunications gantry, is arranged fashioned iron pipe carrier, type inside corrugated steel Power cable, communication cable, middle water pipe, heating tube, feed pipe is arranged in steel column on gantry.
In conclusion advantages of the present invention and good effect are:The ripple steel composites structure and reinforced concrete combination fill Actively lead steel construction in the application of building field, green construction superfluous to neutralizing China's output of steel with the double storehouse pipe galleries of formula Positive effect, steel construction and armored concrete composite type are played, solves the unfavorable factor of the waterproof and anticorrosion of simple steel construction, The service life for improving product, shortens the duration, reduces comprehensive cost, improves seismic behavior.Inside installation cable branch Frame, conduit bracket, quick construction reduce the influence of Construction on Environment, economize on resources.
Detailed description of the invention
Fig. 1 is that ripple steel composites structure provided by the embodiment of the utility model and the double storehouses of reinforced concrete combination assembled are comprehensive Close piping lane standard section layout drawing
Fig. 2 is that ripple steel composites structure provided by the embodiment of the utility model and the double storehouses of reinforced concrete combination assembled are comprehensive Close the structural schematic diagram of piping lane;
Fig. 3 is corrugated steel construction provided by the embodiment of the utility model and the double storekeeper corridors of prefabricated reinforced concrete assembled Structural schematic diagram;
In figure:1, reinforced concrete footing;2, two sides pedestal;3, intermediate base;4, prefabricated reinforced concrete partition;5, wave Line steel plate;6, I-steel;7, fashioned iron;8, concrete layer;9, screw-thread steel;10, pre-buried reserved bolt;11, pre-buried reserved screw-thread steel; 12, steel side waterstop;13, exterior sheathing;14, the pre-buried screw-thread steel of prefabricated partition;15, grout sleeve;16, pre-buried at the top of prefabricated partition Steel plate;17, partition pre-embedded steel slab;18, personal gantry;19, electric power gantry;20, telecommunications gantry;21, thermal pipe;22, feed pipe; 23, middle water pipe;24, insulating layer;25, drill steel plate;26, pedestal pre-embedded steel slab;27, pre-buried, reserved screw-thread steel;28, drill angle Steel.
Specific embodiment
For the invention, features and effects that can further appreciate that the utility model, the following examples are hereby given, and cooperates Detailed description are as follows for attached drawing.
The ripple steel composites structure and the double storehouse pipe galleries of reinforced concrete combination assembled are provided with armored concrete bottom Seat 1, bottom plate two sides are arranged pedestal, partition pedestal are arranged in the two sides pedestal 2, are arranged on the partition pedestal precast reinforced mixed Solidifying soil partition 4, every piece of partition exposed steel bar are filled using the connection types such as 15 connection of grout sleeve, welded lap, mechanical connection, note Pulp material or cast-in-place concrete.
The double storehouse pipe galleries of the ripple steel composites structure and reinforced concrete combination assembled, corrugated steel both ends spiral shell Bolt, nut connection drilling 28 stile of angle steel, the drilling of angle steel another side are connect with pre-buried, the reserved bolt of two sides pedestal 2 by nut It locks, welding H-bar 6 in corrugated steel, partition installs I-steel 6 and forms two piping lane spaces.Corrugated steel, 9 peripheral hardware of screw-thread steel are mixed Solidifying soil.
The double storehouse pipe galleries of the ripple steel composites structure and reinforced concrete combination assembled, internal I-steel 6 are set Cable personal gantry 18, cable testing bridge, telecommunications gantry 20 are set, 7 pipe carrier of fashioned iron is set, and 7 column of fashioned iron is arranged on gantry Power cable, communication cable, middle water pipe 23, heating tube, feed pipe 22.
The construction of the double storehouse pipe galleries of the ripple steel composites structure and reinforced concrete combination assembled, foundation pit Excavation finishes, and bed course finishes, and footing foundation finishes, and is laid with reinforcing bar, and assembling reinforcement finishes, and supporting two sides exterior sheathing 13, scene is poured Infuse concrete pedestal.After a period of time, support template cast-in-place concrete pedestal, pre-buried, reserved screw-thread steel 27, pre-buried, reserved steel Side waterstop 12, pre-buried reserved bolt 10 want control a dimensional accuracy, construction quality, reach acceptance criteria.Armored concrete reaches To examining, after acceptance criteria, prefabricated reinforced concrete partition 4 is transported to scene and is installed with intermediate base 3, setting supporting, support Frame, partition bottom grout sleeve 15 connect with reserved screw-thread steel and infuse grouting material.By factory's rolling, drilling, the ripple bent Steel plate 5 is pre-assembled, dismounts number after correction deformation is qualified.The welding of corrugated steel inner round side connect drilling steel plate 25 with I-steel 6, Corrugated steel does ball blast or derusting by sandblasting processing, inside primer spray, intermediate coat finishing coat, is transported to in-site installation, steel is arranged outside corrugated steel Side waterstop 12, is arranged screw-thread steel outside the outer waterstop of the corrugated steel, the screw-thread steel and base seat reserve screw-thread steel welding or Mechanical connection, the outer supporting steel of pedestal and corrugated steel control within 200mm with curvature template, cast-in-place concrete, concrete thickness. Corrugated steel, I-steel 6 install integral spray fireproof coating 6-8mm after cable bearer, conduit bracket.
The above is only the preferred embodiment to the utility model, is not made in any form to the utility model Limitation, it is all according to the technical essence of the utility model any simple modification made to the above embodiment, equivalent variations with Modification, is all within the scope of the technical scheme of the utility model.

Claims (3)

1. a kind of ripple steel composites structure and the double storehouse pipe galleries of reinforced concrete combination assembled, which is characterized in that the wave Line steel composites structure and the double storehouse pipe galleries of reinforced concrete combination assembled are provided with reinforced concrete footing, and bottom plate two sides are set Pedestal is set, two sides pedestal is interior to be arranged partition pedestal, setting prefabricated reinforced concrete partition on the partition pedestal, outside every piece of partition Reveal reinforcing bar to connect using grout sleeve.
2. ripple steel composites structure as described in claim 1 and the double storehouse pipe galleries of reinforced concrete combination assembled, special Sign is that corrugated steel both ends bolt, nut connection drilling angle steel stile, angle steel another side drills pre-buried, pre- with two sides pedestal It stays bolt to connect by nut to lock, welding H-bar in corrugated steel, partition installs I-steel and forms two piping lane spaces.
3. ripple steel composites structure as described in claim 1 and the double storehouse pipe galleries of reinforced concrete combination assembled, special Sign is that I-steel setting cable personal gantry, cable testing bridge, telecommunications gantry, is arranged fashioned iron pipe carrier, fashioned iron inside corrugated steel Power cable, communication cable, middle water pipe, heating tube, feed pipe is arranged in column on gantry.
CN201820646348.1U 2018-05-03 2018-05-03 A kind of ripple steel composites structure and the double storehouse pipe galleries of reinforced concrete combination assembled Expired - Fee Related CN208167799U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820646348.1U CN208167799U (en) 2018-05-03 2018-05-03 A kind of ripple steel composites structure and the double storehouse pipe galleries of reinforced concrete combination assembled

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820646348.1U CN208167799U (en) 2018-05-03 2018-05-03 A kind of ripple steel composites structure and the double storehouse pipe galleries of reinforced concrete combination assembled

Publications (1)

Publication Number Publication Date
CN208167799U true CN208167799U (en) 2018-11-30

Family

ID=64368970

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820646348.1U Expired - Fee Related CN208167799U (en) 2018-05-03 2018-05-03 A kind of ripple steel composites structure and the double storehouse pipe galleries of reinforced concrete combination assembled

Country Status (1)

Country Link
CN (1) CN208167799U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111677007A (en) * 2020-05-27 2020-09-18 浙江大学 Comprehensive pipe gallery adopting sprayed ultrahigh-toughness cement-based composite material and construction method thereof
CN113089720A (en) * 2021-03-18 2021-07-09 兰州大学 Corrugated steel pipe gallery based on prestressed tendons

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111677007A (en) * 2020-05-27 2020-09-18 浙江大学 Comprehensive pipe gallery adopting sprayed ultrahigh-toughness cement-based composite material and construction method thereof
CN113089720A (en) * 2021-03-18 2021-07-09 兰州大学 Corrugated steel pipe gallery based on prestressed tendons

Similar Documents

Publication Publication Date Title
CN107060140B (en) Prefabricated double-steel-tube concrete shear wall and assembling method thereof
CN109235499B (en) Open-cut underground building structure assembly type construction method
CN101769008B (en) Method for constructing quake-proof masonry house by utilizing prefabricated constructional column ring beams
CN205955263U (en) Building structure consolidates to reform transform and uses overcoat frame
CN104452795A (en) Additional elevator foundation structure of old building and construction method of additional elevator foundation structure
KR100787178B1 (en) Light weight steel frame foundation flooring material and method for construction
CN208167799U (en) A kind of ripple steel composites structure and the double storehouse pipe galleries of reinforced concrete combination assembled
CN103334497A (en) Connection method of scope system frame column steel bar
CN103410173A (en) Construction method for vertical post pouring belt plugging of underground structural outer wall
CN103774664A (en) Waterproof structure of basement anti-floating steel anchor rope and construction method
CN105971304A (en) Outer-jacketing frame for reinforcement and transformation of building structure
CN110439291B (en) Assembly type production construction method suitable for low-rise building
CN110805178A (en) Standard construction method of spraying-building type composite wall
CN205296893U (en) Embedded steel construction assembly house
CN113697640A (en) Finished hoistway of integrally assembled elevator added in existing multi-story building and construction method
CN103352584A (en) Externally covering strengthening method
CN111591852A (en) Construction method for additionally installing elevator and application thereof
CN109267578B (en) Inclined plane plain concrete structure and construction method thereof
CN106368445A (en) Existing building reinforcing and self-supporting thermal insulation integrated system and construction method
CN208037775U (en) A kind of positioning member for the positioning of elevator rail holder
CN206635786U (en) Prefabricated assembled transformer substation foundation structure
CN101761287A (en) Reinforced concrete windowsill coping adverse construction method
CN112112193B (en) Double-sided superposed pipe gallery side wall with concealed columns and manufacturing method thereof
CN207277898U (en) A kind of antitheft sound-insulation and heat-insulation heat insulation anti-shock building of assembling type steel structure
CN113863679A (en) Construction method of prefabricated house structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20210106

Address after: 116000 1-2-2, No. 11, songyuli, economic and Technological Development Zone, Jinzhou District, Dalian City, Liaoning Province

Patentee after: Sun Haorui

Address before: Room 2824, 9-1 Haifu Road, Jinzhou Free Trade Zone, Dalian, Liaoning 117000

Patentee before: DALIAN YIERJU TECHNOLOGY Co.,Ltd.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20181130

Termination date: 20210503