CN208167686U - A kind of river course clear up device for water conservancy and hydropower - Google Patents

A kind of river course clear up device for water conservancy and hydropower Download PDF

Info

Publication number
CN208167686U
CN208167686U CN201820539919.1U CN201820539919U CN208167686U CN 208167686 U CN208167686 U CN 208167686U CN 201820539919 U CN201820539919 U CN 201820539919U CN 208167686 U CN208167686 U CN 208167686U
Authority
CN
China
Prior art keywords
welded
hook
hydropower
water conservancy
river course
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820539919.1U
Other languages
Chinese (zh)
Inventor
王化琮
Original Assignee
王化琮
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 王化琮 filed Critical 王化琮
Priority to CN201820539919.1U priority Critical patent/CN208167686U/en
Application granted granted Critical
Publication of CN208167686U publication Critical patent/CN208167686U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of river course clear up devices for water conservancy and hydropower, it is linked up with including two first, the side outer wall of two first hooks is welded with shaft, and the opposite side outer wall of two shafts is equipped with the device unit equidistantly distributed, described device unit includes fixed link, and one end of fixed link is welded on the side outer wall of shaft, the bottom outer wall middle position of the fixed link is welded with fixed ring, the side outer wall of the fixed ring is mounted with the second hook, and second hook bottom outer wall be welded with roller bearing, the both ends of the roller bearing are socketed with connecting plate, and the bottom outer wall of two connecting plates is welded with the same installing frame, the side outer wall of the installing frame is welded with two connecting bolts.The utility model is compact-sized, utility model, for the river course clear up of water conservancy and hydropower, can be easily installed, dismantles and repair according to the installation width of river width regulating device, device, the convenience for improving the practicability of device and using.

Description

A kind of river course clear up device for water conservancy and hydropower
Technical field
The utility model relates to river course clear up equipment technical field more particularly to a kind of river course clear ups for water conservancy and hydropower Device.
Background technique
Currently, water conservancy and hydropower is the basic industry of national economy and social development, particularly as being to utilize rivers and lakes equipotential In eminence and there is the water of potential energy to flow to lower, electric energy is converted by generator by potential energy therein, realizes water energy to electric energy Conversion.Rubbish can have usually been floated in river, and if these water for containing rubbish are directly entered the hydraulic turbine, can be to the hydraulic turbine Blade damage, it is therefore desirable to clearing up in river, the river course clear up device to circulate currently on the market exists mostly It is not easy to installation, disassembly and maintenance, lays larger workload, and cannot be according to the installation width etc. of river width regulating device Therefore deficiency in order to make up above-mentioned deficiency, proposes a kind of river course clear up device for water conservancy and hydropower.
Utility model content
Purpose of the utility model is to solve disadvantages existing in the prior art, and the one kind proposed is used for water conservancy water The river course clear up device of electricity.
To achieve the goals above, the utility model uses following technical solution:
A kind of river course clear up device for water conservancy and hydropower, including two first hooks, the one of two first hooks Side outer wall is welded with shaft, and the opposite side outer wall of two shafts is equipped with the device unit equidistantly distributed, the dress Setting unit includes fixed link, and one end of fixed link is welded on the side outer wall of shaft, in the bottom outer wall of the fixed link Between position be welded with fixed ring, the side outer wall of the fixed ring is mounted with the second hook, and the bottom outer wall weldering of the second hook It is connected to roller bearing, the both ends of the roller bearing are socketed with connecting plate, and the bottom outer wall of two connecting plates is welded with the same installation Frame, the side outer wall of the installing frame is welded with two connecting bolts, and two connecting bolts are L shape, two connections The bottom end of bolt is threaded with the first bolt, and the side outer wall of the installing frame is welded with two connecting tubes, the installation Four side inner walls of frame are welded with the same miscellaneous net of gear, and the bottom outer wall of the installing frame is welded with the third equidistantly distributed and hangs Hook, and the side inner wall of third hook is mounted with heavy ball, one end of the fixed link is welded with U-shaped connector, described solid Fixed pole side outer wall is welded with draw bar, and the side outer wall of draw bar is welded with slide bar, and slip pipe is socketed on the slide bar, and The bottom outer wall of slip pipe is welded with upright bar, and the side outer wall of the upright bar is welded with the clear miscellaneous hook equidistantly distributed.
Preferably, the two sides outer wall of the U-shaped connector is provided with threaded hole, and two threaded hole internal screw threads are connected with Two bolts.
Preferably, two connecting tubes are located at contour position respectively at two connecting bolts, and two connecting tubes Internal diameter specification is adapted with the specification of connecting bolt.
Preferably, adjacent described device unit is connected by U-shaped connector and the second bolt head and the tail, and adjacent two Installing frame is connected by connecting bolt with connecting tube.
Preferably, the clear miscellaneous hook is located at close to the side for keeping off miscellaneous net, and clear miscellaneous hook is L-shaped structure.
Preferably, the side outer wall of the upright bar is welded with bolt ring, and the side outer wall bolt for bolting ring has traction rope.
The beneficial effects of the utility model are:
1, by the setting of connecting bolt, U-shaped connector and connecting tube, convenient for construction personnel according to the width in practical river The installation width of regulating device, and device is installed, dismantle and is repaired convenient for construction personnel, improve the practical of device Property.
2, it by the setting of draw bar, traction rope and clear miscellaneous hook, is carried out convenient for staff to the rubbish that miscellaneous net stops is kept off It collects, improves the convenience that device uses.
3, vertical with water (flow) direction holding convenient for device by the setting of heavy ball, the contact area of expansion instrument and water, To stop more rubbish, reduce damage of the rubbish to the hydraulic turbine.
Detailed description of the invention
Fig. 1 be the utility model proposes a kind of river course clear up device for water conservancy and hydropower structural schematic diagram;
Fig. 2 be the utility model proposes a kind of river course clear up device for water conservancy and hydropower side structure schematic view;
Fig. 3 be the utility model proposes a kind of river course clear up device for water conservancy and hydropower hook miscellaneous clearly structural representation Figure.
In figure:1 connecting bolt, 2 U-shaped connectors, 3 fixed links, 4 fixed rings, 5 first hooks, 6 second hooks, 7 gears are miscellaneous Net, 8 installing frames, 9 device units, 10 heavy balls, 11 thirds hook, 12 connecting tubes, 13 draw bars, 14 bolt rings, 15 upright bars, 16 Clear miscellaneous hook.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole Embodiment.
Referring to Fig.1-3, a kind of river course clear up device for water conservancy and hydropower, including two first hooks 5, two first extensions The side outer wall of hook 5 is welded with shaft, and the opposite side outer wall of two shafts is equipped with the device unit equidistantly distributed 9, device unit 9 includes fixed link 3, and one end of fixed link 3 is welded on the side outer wall of shaft, outside the bottom of fixed link 3 Wall middle position is welded with fixed ring 4, and the side outer wall of fixed ring 4 is mounted with the second hook 6, and outside the bottom of the second hook 6 Wall is welded with roller bearing, and the both ends of roller bearing are socketed with connecting plate, and the bottom outer wall of two connecting plates is welded with the same installation Frame 8, the side outer wall of installing frame 8 is welded with two connecting bolts 1, and two connecting bolts 1 are L shape, two connecting bolts 1 Bottom end be threaded with the first bolt, the side outer wall of installing frame 8 is welded with two connecting tubes 12, four sides of installing frame 8 Inner wall is welded with the same miscellaneous net 7 of gear, and the bottom outer wall of installing frame 8 is welded with the third hook 11 equidistantly distributed, and third The side inner wall of hook 11 is mounted with heavy ball 10, and one end of fixed link 3 is welded with U-shaped connector 2, outside 3 side of fixed link Wall is welded with draw bar 13, and the side outer wall of draw bar 13 is welded with slide bar, and slip pipe, and the bottom of slip pipe are socketed on slide bar Outer wall is welded with upright bar 15, and the side outer wall of upright bar 15 is welded with the clear miscellaneous hook 16 equidistantly distributed.
In the utility model, the two sides outer wall of U-shaped connector 2 is provided with threaded hole, and two threaded hole internal screw thread connections There is the second bolt, two connecting tubes 12 are located at contour position, and the internal diameter of two connecting tubes 12 respectively at two connecting bolts 1 Specification is adapted with the specification of connecting bolt 1, and adjacent device unit 9 is connected by U-shaped connector 2 and the second bolt head and the tail It connects, and two adjacent installing frames 8 are connected by connecting bolt 1 and connecting tube 12, clear miscellaneous hook 16 keeps off the one of miscellaneous net 7 positioned at close Side, and clear miscellaneous hook 16 is L-shaped structure, the side outer wall of upright bar 15 is welded with bolt ring 14, and bolts the side outer wall bolt of ring 14 It is connected to traction rope.
Working principle:In use, two first hooks 5 are built in the relative position of river two sides, then by each dress It sets unit 9 to be sequentially connected with using U-shaped connector 2 and the second bolt, and connecting bolt 1 is plugged on neighboring devices unit 9 In connecting tube 12, aforesaid operations are repeated until the hook of the two of river two sides first 5 links together, builds and finishes Afterwards, traction rope is connect with rope rolling equipment, then the miscellaneous net 7 of gear of device intercepts the rubbish floated on river, when blocking When the rubbish cut reaches a certain amount of, starting rope rolling equipment, rope rolling equipment drives the clear miscellaneous hook 16 in upright bar 15 mobile to riverbank, and Rubbish is also mobile to riverbank under the drive of clear miscellaneous hook 16, and when rubbish reaches river side, staff is collected.
The preferable specific embodiment of the above, only the utility model, but the protection scope of the utility model is not It is confined to this, anyone skilled in the art is within the technical scope disclosed by the utility model, practical according to this Novel technical solution and its utility model design are subject to equivalent substitution or change, should all cover the protection model in the utility model Within enclosing.

Claims (6)

1. a kind of river course clear up device for water conservancy and hydropower, including two first hooks (5), which is characterized in that described in two The side outer wall of first hook (5) is welded with shaft, and the opposite side outer wall of two shafts is equipped with and equidistantly distributes Device unit (9), described device unit (9) includes fixed link (3), and one end of fixed link (3) is welded on outside the side of shaft On wall, the bottom outer wall middle position of the fixed link (3) is welded with fixed ring (4), wall hanging outside the side of the fixed ring (4) It is connected to the second hook (6), and the bottom outer wall of the second hook (6) is welded with roller bearing, the both ends of the roller bearing are socketed with connection Plate, and the bottom outer wall of two connecting plates is welded with the same installing frame (8), the side outer wall of the installing frame (8) is welded with Two connecting bolts (1), and two connecting bolts (1) are L shape, the bottom end of two connecting bolts (1) is threadedly coupled There is the first bolt, the side outer wall of the installing frame (8) is welded with two connecting tubes (12), in four sides of the installing frame (8) Wall is welded with the same miscellaneous net (7) of gear, and the bottom outer wall of the installing frame (8) is welded with the third hook equidistantly distributed (11), and the side inner wall of third hook (11) is mounted with heavy ball (10), and one end of the fixed link (3) is welded with U-shaped Connector (2), fixed link (3) side outer wall is welded with draw bar (13), and the side outer wall of draw bar (13) is welded with Slide bar is socketed with slip pipe on the slide bar, and the bottom outer wall of slip pipe is welded with upright bar (15), outside the side of the upright bar (15) Wall is welded with the clear miscellaneous hook (16) equidistantly distributed.
2. a kind of river course clear up device for water conservancy and hydropower according to claim 1, which is characterized in that the U-shaped company The two sides outer wall of connector (2) is provided with threaded hole, and two threaded hole internal screw threads are connected with the second bolt.
3. a kind of river course clear up device for water conservancy and hydropower according to claim 1, which is characterized in that two companies Adapter tube (12) is located at contour position respectively at two connecting bolts (1), and the internal diameter specification of two connecting tubes (12) is and company The specification for patching pin (1) is adapted.
4. a kind of river course clear up device for water conservancy and hydropower according to claim 1, which is characterized in that adjacent is described Device unit (9) is connected by U-shaped connector (2) and the second bolt head and the tail, and two adjacent installing frames (8) are inserted by connection Sell (1) and connecting tube (12) connection.
5. a kind of river course clear up device for water conservancy and hydropower according to claim 1, which is characterized in that the clear miscellaneous hook (16) it is located at close to the side for keeping off miscellaneous net (7), and clear miscellaneous hook (16) is L-shaped structure.
6. a kind of river course clear up device for water conservancy and hydropower according to claim 1, which is characterized in that the upright bar (15) side outer wall is welded with bolt ring (14), and the side outer wall bolt for bolting ring (14) has traction rope.
CN201820539919.1U 2018-04-16 2018-04-16 A kind of river course clear up device for water conservancy and hydropower Expired - Fee Related CN208167686U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820539919.1U CN208167686U (en) 2018-04-16 2018-04-16 A kind of river course clear up device for water conservancy and hydropower

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820539919.1U CN208167686U (en) 2018-04-16 2018-04-16 A kind of river course clear up device for water conservancy and hydropower

Publications (1)

Publication Number Publication Date
CN208167686U true CN208167686U (en) 2018-11-30

Family

ID=64370843

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820539919.1U Expired - Fee Related CN208167686U (en) 2018-04-16 2018-04-16 A kind of river course clear up device for water conservancy and hydropower

Country Status (1)

Country Link
CN (1) CN208167686U (en)

Similar Documents

Publication Publication Date Title
CA3020569C (en) Modularized ocean energy generating device and built-in module thereof
CN208633071U (en) A kind of water conservancy gate hoist of good airproof performance
CN201473003U (en) Curtain type cable trough for scrapping plate conveyor
CN208167686U (en) A kind of river course clear up device for water conservancy and hydropower
CN107386244B (en) Truss-like hydraulic bolt lifting device
CN204175507U (en) Small-sized assembled hydroelectric installation
CN108894202B (en) Lifting unit installation process for self-elevating drilling platform
CN207999641U (en) A kind of wind turbine hanging object mouth safety-door device
CN208078602U (en) A kind of high-tension cable upper boom bottom protection pipe
CN203846454U (en) Trash holding bank with anchor chain as suspension cable
CN208721046U (en) Depth detection apparatus is used in a kind of grouting of Bridge Piles deep hole
CN203452047U (en) Novel trash rack
CN204657112U (en) Module combined type guide device for section steel rolling mill
CN207218163U (en) One kind automation trapezoidal bridge frame
CN201865668U (en) Novel coal cutting machine
CN209500908U (en) A kind of Anti-falling scrapes board connecting equipment
CN206554050U (en) Floating object automatic fishing device is used in a kind of river environment protection
CN202337992U (en) Fire protection tour-inspection water supply equipment
CN202596237U (en) Cantilever for wind measurement tower
CN210368869U (en) Portable gate hoist with quick assembly disassembly function for diversion floodgate
CN208393335U (en) Concrete mixer two-stage telescopic outrigger oil tube connection device
CN213897039U (en) Water surface sundry cleaning device of hydropower station
CN211948316U (en) Inspection gallery structure of large bulb tubular unit and hydropower station
CN210765151U (en) Biomass gasification cracking heat supply equipment
CN205676079U (en) A kind of built-in lowering or hoisting gear for scratch board feces cleaning system

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20181130

Termination date: 20190416