CN208122040U CN201820367095.4U CN201820367095U CN208122040U CN 208122040 U CN208122040 U CN 208122040U CN 201820367095 U CN201820367095 U CN 201820367095U CN 208122040 U CN208122040 U CN 208122040U
Authority
CN
China
Prior art keywords
wall
groove
interior
box body
ejector pin
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820367095.4U
Other languages
Chinese (zh)
Inventor
梁勇
艾华庭
邓爱武
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hubei Yongsheng Construction Engineering Co Ltd
Original Assignee
Hubei Yongsheng Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hubei Yongsheng Construction Engineering Co Ltd filed Critical Hubei Yongsheng Construction Engineering Co Ltd
Priority to CN201820367095.4U priority Critical patent/CN208122040U/en
Application granted granted Critical
Publication of CN208122040U publication Critical patent/CN208122040U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

A kind of assembled architecture wall, the first groove and the second groove are offered respectively in wall upper and lower ends, two square tubes are respectively clamped into the first groove and the second groove, multiple groups lifting mechanism is equipped in wall lower end, the lifting mechanism includes being fixed at intracorporal first box body of wall, axis connection in the guide of the first box body lower end, the ejector pin that is arranged in guide and to be mounted on the intracorporal bevel gear transmission of the first box in the intracorporal screw rod of the first box, connection;Screw rod upper end is fixedly connected with the driven gear in bevel gear transmission, and limited block is fixed in guide, and sliding slot is offered on ejector pin, and the limited block is positioned in the chute, and screw rod lower thread is connected in ejector pin;Guide lower end is connected with the second groove floor, and bevel gear transmission is moved to outside guide by screw drive ejector pin, the utility model can quickly and easily between two pieces of walls gap adjustment it is supreme under it is wide.

Description

A kind of assembled architecture wall
Technical field
The utility model relates to a kind of assembled architecture walls.
Background technique
Current building wall board is generally taken and is built with light-weight brick or clay brick scene, fixed with cement mortar by hand Method is constructed, and this building wall board Resources for construction consumption is big, seriously polluted, is unable to satisfy the requirement of " four sections, one environmental protection ". In order to reduce pollution and reduce labor intensity, shorten the site operation period, assembled architecture comes into being, it has construction speed Block saves the advantages of labour, construction quality height and wallboard can dismantle reduction building waste repeatedly.
At present wallboard assembly be first wallboard is hung on floor by loop wheel machine after, then from multiple workers simultaneously with, by wallboard It adjusts to vertical, it is then wide above and below the gap adjusted between adjacent two blocks of wallboards, between sealing element is mounted to In gap, it is ensured that the sealing effect of sealing element guarantees that wall upper end is parallel;Crowbar is usually used in the method in existing adjustment gap Wall is agitated it is wide to gap, then wall lower end fill in timber wedge support, this method of adjustment is not only time-consuming and laborious, but also It is easy to damage wallboard, wall construction precision is low.
Summary of the invention
It is to be solved in the utility model to be to provide a kind of assembled architecture wall, can quickly and easily to two pieces of walls it Between gap adjustment it is supreme under it is wide.
In order to solve the above-mentioned technical problem, the technical solution of the utility model is:
A kind of assembled architecture wall, including wall and two square tubes being respectively and fixedly installed on ceiling and floor, Two square tubes are corresponding up and down, offer the first groove and the second groove respectively in wall upper and lower ends, two square tubes are respectively clamped into In the first groove and the second groove, it is equipped with multiple groups lifting mechanism in wall lower end,
The lifting mechanism include be fixed at intracorporal first box body of wall, axis connection the intracorporal screw rod of the first box, It is connected to the guide in the first box body lower end, the ejector pin that is arranged in guide and is mounted on the intracorporal Bevel Gear Transmission machine of the first box Structure;Screw rod upper end is fixedly connected with the driven gear in bevel gear transmission, and limited block is fixed in guide, on ejector pin Sliding slot is offered, the limited block is positioned in the chute, and screw rod lower thread is connected in ejector pin;Guide lower end and second recessed Groove bottom is connected, and bevel gear transmission is moved to outside guide by screw drive ejector pin.
For screw rod through position-limit mechanism axis connection in the first box body, the position-limit mechanism includes being fixed on screw rod Position-arresting disk and two are mounted on the intracorporal plane bearing of the first box, and position-arresting disk rotates between two plane bearings.
Driving gear wheel shaft one end is fixedly connected with a rotating block in bevel gear transmission, is equipped in rotating block interior Hexagonal.
Multiple sliding equipments are installed in wall lower end, the sliding equipment includes being fixed on intracorporal second box body of wall, Idler wheel is equipped in the second box body, the second groove floor is exposed in idler wheel lower end.
Multiple jacks are begun in the square tube of floor, each jack is corresponding with each ejector pin of wall, the square tube below each jack Inside it is respectively and fixedly provided with one piece of supporting block.
First depth of groove is greater than the second depth of groove, when square tube is resisted against the first bottom portion of groove when wall upper end, second Groove is higher than end surfaces above floor, and second groove is that the baffle for being separately positioned on wall two sides by two pieces is constituted, wherein One block baffle is fixedly connected by more screwed pipes with wall, and in addition a block baffle passes through screw and screwed pipe detachable connection.
A jackscrew is mounted in each block baffle, jackscrew is resisted against on square tube surface.
The beneficial effects of the utility model are:The utility model drives ejector pin to move in the room using bevel gear transmission It is dynamic, the tilt angle of wall is adjusted using the ejector pin of rise, gap between adjacent two pieces of walls is adjusted to upper and lower It is wide, so that sealing element is smoothly installed in gap, it is easy to operate;Still further aspect, due to wall upper end and Lower end depth of groove is different, therefore can be realized the Fast Installation or disassembly to wall, reduces labor intensity, shortens construction week Phase;On the other hand, sliding equipment can allow wall to translate in square tube, and worker is facilitated to be adjusted wall position;Another party Face, ejector pin can be moved into jack, are positioned using jack to ejector pin, wall is avoided to shake, improve the installation quality of wall; On the other hand, jackscrew can lock wall upper end, prevent wall upper end from swaying forwards and backwards so that wall be mounted so as to it is more firm Gu.
Detailed description of the invention
The utility model is described further with reference to the accompanying drawing:
Fig. 1 is the main view the schematic diagram of the section structure of the utility model,
Fig. 2 is the main view the schematic diagram of the section structure of the utility model
Fig. 3 is the schematic diagram of the section structure of the utility model,
Fig. 4 is the partial enlargement structural representation in Fig. 2 at A,
Fig. 5 is the schematic diagram of the section structure of the utility model about sliding equipment,
Fig. 6 is the schematic diagram of the section structure of the utility model about the first groove,
Fig. 7 is the schematic diagram of the section structure of the utility model after bevel gear transmission drives ejector pin downlink.
In figure:Ceiling 1, floor 2, wall 3, square tube 4, lifting mechanism 5, sliding equipment 6,7 first groove of setscrew 31, the second groove 32, gap 33, jack 41, supporting block 42, limited block 50, guide 51, ejector pin 52, screw rod 53, position-arresting disk 54, Plane bearing 55, driven gear 56, driving gear 57, rotating block 58, the first box body 59, the second box body 61, idler wheel 62, baffle 81, screwed pipe 82, screw 83, jackscrew 84.
Specific embodiment
As shown in Fig. 1 to 7, a kind of assembled architecture wall, including wall 3 and two are respectively and fixedly installed to ceiling 1 With the square tube 4 on floor 2, square tube 4 is installed on ceiling 1 and floor by setscrew 7, and two about 4 square tubes are corresponding, The first groove 31 and the second groove 32 are offered respectively in 3 upper and lower ends of wall, and two square tubes 4 are respectively clamped into the first groove 31 In the second groove 32, it is equipped with multiple groups lifting mechanism in 3 lower end of wall,
The lifting mechanism 5 includes the first box body 59 being fixed in wall 3, axis connection in the first box body 59 Screw rod 53, connection in the guide 51 of 59 lower end of the first box body, the ejector pin 52 that is arranged in guide 51 and be mounted on the first box body Bevel gear transmission in 59;53 upper end of screw rod is fixedly connected with the driven gear 56 in bevel gear transmission, in guide It is fixed with limited block 50 in 51, sliding slot is offered on ejector pin 52, the limited block 50 is positioned in the chute, 53 lower end of screw rod It is threaded in ejector pin 52;51 lower end of guide is connected with 32 bottom surface of the second groove, and bevel gear transmission passes through screw rod 53 Driving ejector pin 52 is moved to outside guide 51.
57 wheel shaft one end of driving gear is fixedly connected with a rotating block 58 in bevel gear transmission, in rotating block 58 Equipped with interior hexagonal.
The application method and working principle of the utility model be:As shown in fig. 1 to 4,
Each piece of wall 3 is installed in two square tubes 4 by the first step, measures lower gap width between each piece of wall 3, and Afterwards along 4 mobile wall 3 of square tube, make 3 lower gap of wall in regulation predetermined size, when adjustment, distance block can be prevented Only in square tube 4, then push wall 3 that lower section gap thus can quickly be adjusted distance block angle to regulation ruler to It is very little.
Second step then utilizes allen wrench, and the rotation of driving bevel gear transmission mechanism pushes up ejector pin 52 from guide 51 Emersion comes, and ejector pin 52 is resisted against on 4 surface of square tube, and 3 upper gap of wall is adjusted to predetermined size;
Gap between third step, measurement 3 upper end of wall and ceiling 1, then synchronous, equivalent rotate in each lifting mechanism Bevel gear transmission, wall 3 is subjected to integral lifting, is realized to the tune in the gap between 3 upper end of wall and ceiling 1 It is whole.
It can be seen that the utility model drives ejector pin 52 mobile in the room using bevel gear transmission, rise is utilized Ejector pin 52 tilt angle of wall 3 is adjusted, by between adjacent two pieces of walls 3 gap adjustment it is supreme under it is wide, make Sealing element can be smoothly installed in gap, easy to operate.
For screw rod 53 through position-limit mechanism axis connection in the first box body 59, the position-limit mechanism includes being fixed at screw rod Position-arresting disk 54 and two plane bearings 55 being mounted in the first box body 59 on 53, position-arresting disk 54 two plane bearings 55 it Between rotate.This mechanism can be convenient rotary screw 53.
As shown in figure 5, being equipped with multiple sliding equipments 6 in 3 lower end of wall, the sliding equipment 6 includes being fixed on wall 3 The second interior box body 61, is equipped with idler wheel 62 in the second box body 61, and 32 bottom surface of the second groove is exposed in 62 lower end of idler wheel.It is this can Wall 3 is pushed to translate in square tube 4 to facilitate.
As shown in figure 3, beginning with multiple jacks 41 in 2 square tube 4 of floor, each jack 41 is opposite with each ejector pin 52 of wall 3 It answers, is respectively and fixedly provided with one piece of supporting block 42 in square tube 4 below each jack 41.Jack 41 can limit ejector pin 52, prevent It is overturned before and after wall 3, improves the strong degree after wall 3 is installed.
As seen in figs, 31 depth of the first groove is greater than 32 depth of the second groove, when 3 upper end square tube 4 of wall is resisted against When the first 31 bottom of groove, the second groove 32 is higher than 4 end face of square tube on floor 2, and second groove 32 is set respectively by two pieces The composition of baffle 81 in 3 two sides of wall is set, one of baffle 81 is fixedly connected by more screwed pipes 82 with wall 3, and in addition one Block baffle 81 passes through screw 83 and 82 detachable connection of screwed pipe.
When wall 3 to be installed in two square tubes 4, can first remove wherein to a block baffle 81, it is then recessed by second Slot 32 snaps onto square tube 4, is finally spliced two block baffles 81 using screw 83, realizes the quick assembling to wall 3, when When needing to dismantle, then baffle 81 can be first dismantled, then takes out wall 3.
As shown in fig. 6, being mounted on a jackscrew 84 in each block baffle 81, jackscrew 84 is resisted against on 4 surface of square tube.? 3 gap of wall all after adjustment, each piece of jackscrew 84 can be screwed, lock, be prevented on wall 3 to 3 upper end of wall End sways forwards and backwards so that wall 3 be mounted so as to it is stronger.

Claims (7)

1. a kind of assembled architecture wall, including wall(3)Ceiling is respectively and fixedly installed to two(1)The floor and(2)On Square tube(4), two square tubes(4)It is corresponding up and down, in wall(3)Upper and lower ends offer the first groove respectively(31)It is recessed with second Slot(32), two square tubes(4)It is respectively clamped into the first groove(31)With the second groove(32)It is interior, it is characterised in that:In wall(3) Lower end is equipped with multiple groups lifting mechanism(5),
The lifting mechanism(5)Including being fixed at wall(3)The first interior box body(59), axis connection is in the first box body (59)Interior screw rod(53), connection in the first box body(59)The guide of lower end(51), be arranged in guide(51)Interior ejector pin(52) Be mounted on the first box body(59)Interior bevel gear transmission;Screw rod(53)Driven tooth in upper end and bevel gear transmission Wheel(56)It is fixedly connected, in guide(51)Inside it is fixed with limited block(50), in ejector pin(52)On offer sliding slot, the limited block (50)It is positioned in the chute, screw rod(53)Lower thread is connected to ejector pin(52)It is interior;Guide(51)Lower end and the second groove (32)Bottom surface is connected, and bevel gear transmission passes through screw rod(53)Drive ejector pin(52)It is moved to guide(51)Outside.
2. a kind of assembled architecture wall according to claim 1, it is characterised in that:Screw rod(53)Pass through position-limit mechanism axis It is connected to the first box body(59)Interior, the position-limit mechanism includes being fixed at screw rod(53)On position-arresting disk(54)Pacify with two Mounted in the first box body(59)Interior plane bearing(55), position-arresting disk(54)In two plane bearings(55)Between rotate.
3. a kind of assembled architecture wall according to claim 1, it is characterised in that:Driving tooth in bevel gear transmission Take turns wheel shaft one end and a rotating block(58)It is fixedly connected, in rotating block(58)It is interior to be equipped with interior hexagonal.
4. a kind of assembled architecture wall according to claim 1, it is characterised in that:In wall(3)Lower end is equipped with more A sliding equipment(6), the sliding equipment(6)Including being fixed on wall(3)The second interior box body(61), in the second box body(61) It is interior to be equipped with idler wheel(62), idler wheel(62)Expose the second groove in lower end(32)Bottom surface.
5. a kind of assembled architecture wall according to claim 1, it is characterised in that:On floor(2)Square tube(4)Upper beginning There are multiple jacks(41), each jack(41)With wall(3)Each ejector pin(52)It is corresponding, in each jack(41)Lower section square tube(4)It is interior It is respectively and fixedly provided with one piece of supporting block(42).
6. a kind of assembled architecture wall according to claim 1, it is characterised in that:First groove(31)Depth is greater than the Two grooves(32)Depth works as wall(3)Upper end square tube(4)It is resisted against the first groove(31)When bottom, the second groove(32)It is higher than Floor(2)Upper square tube(4)End face, second groove(32)It is to be separately positioned on wall by two pieces(3)The baffle of two sides(81) It constitutes, one of baffle(81)Pass through more screwed pipes(82)With wall(3)It is fixedly connected, in addition a block baffle(81)Pass through spiral shell Silk(83)With screwed pipe(82)Detachable connection.
7. a kind of assembled architecture wall according to claim 6, it is characterised in that:In each block baffle(81)On be respectively mounted There is a jackscrew(84), jackscrew(84)It is resisted against square tube(4)On surface.
CN201820367095.4U 2018-03-19 2018-03-19 A kind of assembled architecture wall Expired - Fee Related CN208122040U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820367095.4U CN208122040U (en) 2018-03-19 2018-03-19 A kind of assembled architecture wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820367095.4U CN208122040U (en) 2018-03-19 2018-03-19 A kind of assembled architecture wall

Publications (1)

Publication Number Publication Date
CN208122040U true CN208122040U (en) 2018-11-20

Family

ID=64199134

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820367095.4U Expired - Fee Related CN208122040U (en) 2018-03-19 2018-03-19 A kind of assembled architecture wall

Country Status (1)

Country Link
CN (1) CN208122040U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108265859A (en) * 2018-03-19 2018-07-10 湖北勇胜建设工程有限公司 A kind of assembled architecture wall
CN109853787A (en) * 2019-01-25 2019-06-07 湖南工程学院 It is a kind of to facilitate installation and mobile indoor partition device

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108265859A (en) * 2018-03-19 2018-07-10 湖北勇胜建设工程有限公司 A kind of assembled architecture wall
CN109853787A (en) * 2019-01-25 2019-06-07 湖南工程学院 It is a kind of to facilitate installation and mobile indoor partition device
CN109853787B (en) * 2019-01-25 2020-07-14 湖南工程学院 Indoor partition device convenient to install and move

Similar Documents

Publication Publication Date Title
CN108265859A (en) A kind of assembled architecture wall
CN208122040U (en) A kind of assembled architecture wall
CN102359282B (en) Wall building and painting device
CN202755627U (en) Wall plaster troweling machine
CN212452589U (en) Underground continuous wall guide wall template device for subway station
CN201065634Y (en) Automatic plastering machine
CN110778137B (en) Assembled counterfort fixing device
CN212532092U (en) Lifting device for building engineering
CN211522821U (en) Good removal invert trestle of stability
CN211447893U (en) Strutting arrangement for civil engineering
CN108679371A (en) A kind of heavy duty equipment clamping device
CN215407287U (en) Convenient building engineering construction of dismantling is with promoting support
CN213269065U (en) A building bearing diagonal structure for construction
CN210507150U (en) But segmental beam pier kicking block notch template of whole dismouting
CN211815617U (en) U type precast beam hoist and mount positioner
CN219691141U (en) Wall body masonry device for building engineering
CN217325359U (en) Building construction pile driving positioning device
CN220149082U (en) Tower crane combined base
CN215411076U (en) Electromechanical device's installation bears uses regulation bed hedgehopping device
CN220226902U (en) Auxiliary component for shield tunnel wall back grouting
CN219692440U (en) Mechanical pipe jacking guide rail device
CN215212380U (en) Novel formwork support device for building construction
CN2734894Y (en) Wall plastering machine
CN214695044U (en) Slope protection paver slipform forming structure
CN215671102U (en) Adjustable strutting arrangement for civil engineering

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20181120

Termination date: 20190319

CF01 Termination of patent right due to non-payment of annual fee