CN208098202U - A kind of construction waste crusher - Google Patents

A kind of construction waste crusher Download PDF

Info

Publication number
CN208098202U
CN208098202U CN201820125423.XU CN201820125423U CN208098202U CN 208098202 U CN208098202 U CN 208098202U CN 201820125423 U CN201820125423 U CN 201820125423U CN 208098202 U CN208098202 U CN 208098202U
Authority
CN
China
Prior art keywords
casing
dust
concrete
roller
reinforcing bar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820125423.XU
Other languages
Chinese (zh)
Inventor
黄文军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Boxin Shengyi Environmental Technology Co Ltd
Original Assignee
Beijing Boxin Shengyi Environmental Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Boxin Shengyi Environmental Technology Co Ltd filed Critical Beijing Boxin Shengyi Environmental Technology Co Ltd
Priority to CN201820125423.XU priority Critical patent/CN208098202U/en
Application granted granted Critical
Publication of CN208098202U publication Critical patent/CN208098202U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of construction waste crushers, its key points of the technical solution are that:Including casing, the side of casing offers feed inlet, crushing device is provided in feed inlet, the dust-extraction unit of fugitive dust is generated when being provided in the casing for reducing breaking concrete, the dust-extraction unit includes the washing dust-falling mechanism for being set to casing inner top and the wind-force dust collection mechanism for being set to two sidewalls in casing, the wind-force dust collection mechanism includes several L-type pipes for being arranged in casing two sidewalls, L-type pipe circumferential surface is set to for manipulating the rotary components of L-type pipe rotation, it is set to the air-exhausting duct that outside casing and L-type pipe is rotatablely connected, the blower that is set in air-exhausting duct and for reducing the filter screen in air-exhausting duct outside fugitive dust discharge air-exhausting duct.The utility model has the advantages that:By in the engineering of concrete disintegrating, the diffusion of dust is reduced, staff is made to be in good working environment.

Description

A kind of construction waste crusher
Technical field
The utility model relates to building waste process fields, and in particular to a kind of construction waste crusher.
Background technique
Building waste is primarily referred to as the materials such as reinforced concrete block caused by removal house etc., corrugation, these materials warp After the processing such as sorting, broken, screening, can recovery section steel, broken concrete block can also be used as concrete again Raw material recycle, therefore the value of building waste recycling with higher.
Authorization Notice No. is that the Chinese patent of CN201520907695.1 discloses a kind of construction waste crusher.Including machine Shell, cabinet top are equipped with feed inlet, and bottom of shell is equipped with discharge bucket, and feed inlet bottom is detachably equipped with sieve, in casing From top to bottom it is sequentially installed with primary crushing mechanism and second-time breakage mechanism, primary crushing mechanism includes rotation axis and mounting disc, Rotation axis and mounting disc are connected, and mounting disc periphery is fixed with more drive rods, and drive rod passes through mounting disc and both ends are detachable Quartering hammer is installed, rotation axis is rotatably installed on casing;Second-time breakage mechanism includes breaking disc and drive shaft, and breaking disc is fixed It is mounted on drive shaft upper end, breaking disc is equipped with sieve pore, is equipped with multiple crushing cutters on breaking disc, sieve is fixedly installed in casing Net, sieve are located at below breaking disc, and sieve and drive shaft lower end are rotatablely connected.
A kind of construction waste crusher of the utility model, either primary crushing mechanism or second-time breakage mechanism, During broken, concrete fracture can all generate a large amount of dust, and dust sheds from inlet port and outlet port, to surrounding Environment causes certain pollution, affects staff and normally constructs.
Utility model content
The purpose of the utility model is to provide a kind of construction waste crushers, its advantage is that by the engineering of concrete disintegrating In, the diffusion of dust is reduced, staff is made to be in good working environment.
The above-mentioned technical purpose of the utility model technical scheme is that:
A kind of construction waste crusher, including casing, the side of casing offer feed inlet, are provided in feed inlet broken Device, it is characterized in that:The dust-extraction unit of fugitive dust, the dedusting are generated when being provided in the casing for reducing breaking concrete Device includes the washing dust-falling mechanism for being set to casing inner top and the wind-force dust collection mechanism for being set to two sidewalls in casing, described Wind-force dust collection mechanism includes several L-type pipes for being arranged in casing two sidewalls, is set to L-type pipe circumferential surface for manipulating L-type Guan Xuan The rotary components that turn are set to the outer air-exhausting duct being rotatablely connected with L-type pipe of casing, the blower being set in air-exhausting duct and for subtracting Filter screen in few air-exhausting duct outside fugitive dust discharge air-exhausting duct.
Through the above technical solutions, when construction waste crusher work, crushing device starting, to concrete roller Pressure, cutting during vibration is sieved, can generate a large amount of dust, and dust passes through the feed inlet disperse of casing in air, worked Personnel's sucking will very influence the health of staff, wash the setting of dust-falling mechanism by the water mist of sprinkling to raising Dust is humidified, and is incorporated dust in water inlet mist, to fall into casing, is reduced dispersing for dust.The wind-force is inhaled Dirt mechanism can suck dust remaining in air in casing into air-exhausting duct, by the effect of filter screen, to reduce dust Influence to external environment.The setting of rotary components enables 360 degree of L-type pipe of rotation, and the dust on L-type pipe periphery is all inhaled Enter, promotes the efficiency of sucking dust.
The utility model is further arranged to:The washing dust-falling mechanism includes passing through the sequentially connected rotation spray of connecting tube Head, water pump and water tank, rotary nozzle is arranged in the top of casing and is directed toward in casing, be opened in casing lower surface for be discharged contain There is the hole of dust waste liquid.
Through the above technical solutions, rotary nozzle is in rotary manner by the water in water tank when washing dust-falling mechanism starting It is injected in casing, thus shroud most space in casing by water mist, when generating dust, water mist and mix dust, To be drained to outside casing from hole, to have the function that remove part dust.
The utility model is further arranged to:The rotary components include being set to L-type pipe circumferential surface and fixing with L-type pipe to connect The rack gear connect, the second force piece rotated with the matched gear of rack gear and sliding tooth wheel.
Through the above technical solutions, the second force piece of starting, band moving gear is rotated, by driving L-type with engaging for rack gear Pipe rotation, when blower starting, the rotation of L-type pipe all sucks the dust in 360 degree of directions into air-exhausting duct, to make L-type pipe It is more efficient to suck dust.
The utility model is further arranged to:The casing offers discharge port, the machine away from the one side of feed inlet It includes being set in turn in casing that the side of shell, which is provided with and guides feed inlet into for transmitting the primary conveyer belt of material, crushing device, Primary roller press mechanism for pulverizing the preliminary roll-in of the concrete for wrapping up reinforcing bar is set in casing and is used to that reinforcing bar will to be wrapped up The secondary roller press mechanism for hobbing mechanism, being set to the interior concrete roll-in fine crushing for being used to wrap up reinforcing bar of casing of concrete cutting And it is set to the vibrating screen mechanism in casing for separating residual concrete and reinforcing bar.
Through the above technical solutions, a kind of building waste processing equipment, it is disposed in casing for by coagulation The native primary roller press mechanism separated with reinforcing bar hobs mechanism, secondary roller press mechanism and vibrating screen mechanism.Primary roller press mechanism is main The concrete for being wrapped in reinforcing bar surrounding is driven away broken, although reinforcing bar and concrete can not be separated, concrete fragmentation can be made Stick on reinforcing bar, hob mechanism and concrete mainly hobbed into fritter entity, make it easier to carry out later period process, then lead to Cross secondary roller press mechanism the concrete of fritter is pulverized it is more fine crushing, to be separated with reinforcing bar, eventually by vibrating screen mechanism Concrete and reinforcing bar filtering are split into different positions, thus convenient to concrete and reinforcing bar recycling and utilization.
The utility model is further arranged to:The primary roller press mechanism includes flushing with feed inlet and turning with casing inner wall First transfer roller of dynamic connection, the first actuator for being fixedly connected with casing and live-roller being driven to rotate are set to the first transmission It the first compression roller right above roller and drives the second actuator of the first compression roller and is fixedly connected with driving first with casing and squeeze Pressure roller is used to squeeze the first force piece of the concrete of package reinforcing bar, and being provided on first compression roller will wrap up for facilitating The concrete of reinforcing bar squeezes broken expression lobes.
Through the above technical solutions, building waste is placed on primary conveyer belt, make armored concrete from feed inlet into Enter into casing to mobile to discharge outlet on the first transfer roller, at this time the suppressing action by the first force piece, makes the One compression roller is contacted with building waste, and the influence for the protrusion that is squeezed makes the concrete rupture of monolith at bulk, but by reinforcing bar Influence is also sticked together the first actuator with reinforcing bar and the second actuator makes building waste during pulverizing, and will build rubbish Rubbish is transmitted to next mechanism, so primary roller press mechanism primarily serves the effect tentatively crushed to building waste.
The utility model is further arranged to:The mechanism that hobs includes one for being set to the first transfer roller and deviating from feed inlet Side and the first transfer roller it is horizontal and with several second transfer rollers of casing rotation connection, driving the second transfer roller rotation second Actuator and the cutting assembly for being set to concrete chopping of the second transfer roller top for reinforcing bar will to be wrapped up.
Through the above technical solutions, primary roller press mechanism after hours, building waste is sent to the second transfer roller On, during building waste is mobile, the concrete for wrapping up reinforcing bar is hobbed under the action of cutting assembly, makes coagulation Soil fragments into tiny bulk after being under pressure, but the reinforcing bar for making to make adhesion concrete can't be damaged to reinforcing bar It enters in next mechanism.
The utility model is further arranged to:The cutting assembly includes being set to above the second transfer roller to be vertically arranged Cutter and driving cutter, which push, will wrap up the second force piece of the concrete chopping of reinforcing bar.
Through the above technical solutions, pushing the concrete to package reinforcing bar by the job control cutter of the second force piece It is hobbed, makes concrete by under the pressure of cutter, it may appear that the case where fracture, keep concrete more fine crushing, it is easier to The processing of next mechanism.
The utility model is further arranged to:The secondary roller press mechanism includes being set to the second transfer roller to pass away from first The secondary conveyer belt for sending the oblique cabinet top setting in the side of roller, is set to secondary conveyer belt below the end of the second transfer roller Squeeze broken component.
Through the above technical solutions, being sent on secondary conveyer belt by the building waste for hobbing mechanism, passed through secondary It send band that building waste is transmitted to eminence, then is squeezed broken component and building waste is subjected to extruding separation again, make most mixed Solidifying soil and reinforcing bar, which are separated from, to be come.
The utility model is further arranged to:It is described that squeeze broken component include horizontally disposed the first support for being separated by certain interval The second compression roller and third compression roller, driving that plate and the second support plate and the first support plate and the second support plate are rotatablely connected The third actuator and the 4th driving of second compression roller and third compression roller to rotation in the middle part of the second compression roller and third compression roller The third force piece and the 4th force piece of part and the second compression roller of driving and the movement of third compression roller opposite direction.
Through the above technical solutions, the second compression roller and third compression roller third actuator and fourth drive member drive Under dynamic, to the second compression roller and the middle part rotation of third compression roller to make to obtain sufficiently by the building waste of secondary roller press mechanism Extruding, also assisted extrusion can be carried out to concrete by control third force piece and the flexible of the 4th force piece, due to by The roll-in and extruding in the first two stage, keep concrete more fine crushing, shown when the second compression roller and third compression roller rotate Wait, it is easier to building waste is squeezed it is broken, so that concrete and reinforcing bar be made to separate.
The utility model is further arranged to:The vibrating screen mechanism includes being set to below secondary roller press mechanism and to book material Vibration sieve tray plate that mouth is obliquely installed, several filter hole being opened on vibration sieve tray plate, the sieve tray plate that will shake are fixedly connected with casing Several elastic components, driving vibration sieve tray panel vibration vibrating motor.
Through the above technical solutions, the building waste through secondary roller press mechanism, which drops on vibration sieve tray plate, is vibrated motor Effect make to stick in unstable concrete on reinforcing bar and fallen from filter hole, thus reach reinforcing bar and concrete filtering and point From filtered reinforcing bar can take advantage of a situation to discharge outlet movement, so that reinforcing bar be separated, recycled and utilized.
In conclusion the utility model has the advantages that:
One, the discharge for reducing dust, the setting for washing dust-falling mechanism add the dust raised by the water mist of sprinkling It is wet, it incorporates dust in water inlet mist, to fall into casing, reduces dispersing for dust.The wind-force dust collection mechanism can incite somebody to action Remaining dust is sucked into air-exhausting duct in air in casing, by the effect of filter screen, to reduce dust to external environment Influence;
Two, concrete and reinforcing bar are separated, by primary roller press mechanism, hobs mechanism, secondary roller press mechanism and vibrating sieving machine Building waste is carried out roll-in by the effect of structure, cutting, vibration sieve to reaching the separation of concrete and reinforcing bar, thus make concrete and Reinforcing bar separation.
Detailed description of the invention
Fig. 1 is the structural scheme of mechanism of construction waste crusher;
Fig. 2 is the schematic diagram of internal structure of construction waste crusher;
Fig. 3 is the structural schematic diagram for embodying primary roller press mechanism and hobbing mechanism;
Fig. 4 embodies the structural schematic diagram of secondary roller press mechanism and vibrating screen mechanism;
Fig. 5 is the structural schematic diagram for embodying wind-force dust collection mechanism;
Fig. 6 is the cross-sectional view for embodying wind-force dust collection mechanism.
In figure, 1, casing;11, feed inlet;12, discharge port;13, conveyer belt is collected;2, crushing device;21, primary roll-in Mechanism;211, the first transfer roller;2111, expression lobes;212, first motor;213, fixed frame;214, the first compression roller;215, Second motor;216, the first electric pushrod;22, mechanism is hobbed;221, the second transfer roller;222, third motor;223, cutting group Part;2231, cutter;2232, the second electric pushrod;23, secondary roller press mechanism;231, secondary conveyer belt;2311, inclined plate; 232, broken component is squeezed;2321, third electric pushrod;2322, the 4th electric pushrod;2323, the first support plate;2324, second Fagging;2325, the second compression roller;2326, third compression roller;2327, protrusion is pulverized;24, vibrating screen mechanism;241, shake sieve tray plate; 2411, filter hole;242, baffle;243, spring;244, vibrating motor;3, dust-extraction unit;31, dust-falling mechanism is washed;311, it revolves Turn spray head;312, water tank;313, water pump;314, connecting tube;315, hole;32, wind-force dust collection mechanism;321, L-type pipe;322, it revolves Turn component;3221, rack gear;3222, gear;3223, the 7th motor;323, air-exhausting duct;324, blower;325, filter screen;4, just Grade conveyer belt.
Specific embodiment
A kind of building waste processing equipment, as depicted in figs. 1 and 2, the casing 1 of the rectangle including being supported in ground, casing 1 Side offer the feed inlet 11 of rectangle, casing 1 offers the discharge port 12 of rectangle, casing away from the one side of feed inlet 11 Be provided in 1 by the concrete for wrapping up reinforcing bar carry out broken crushing device 2 and will it is broken in the dust that generates be dusted Dust-extraction unit 3.The primary conveyer belt 4 that building waste is guided into feed inlet 11 is provided with outside casing 1.
As depicted in figs. 1 and 2, crushing device 2 includes the primary roll squeezer set gradually from feed inlet 11 to discharge port 12 Structure 21 hobs mechanism 22, secondary roller press mechanism 23 and vibrating screen mechanism 24(Herein as shown in Figure 4).
As shown in Figures 2 and 3, primary roller press mechanism 21 includes flushing with feed inlet 11 and being rotatablely connected with 1 inner wall of casing Three the first transfer rollers 211, driving the first transfer roller 211 rotate and be fixedly connected with casing 1 three first motors 212, It is set to the U-shaped fixed frame 213 right above the first transfer roller 211, is set to 213 liang of insides of fixed frame and 213 turns of fixed frame First compression roller 214 of dynamic connection, the second motor 215 for being fixedly connected with fixed frame 213 and the first compression roller 214 being driven to rotate And it is set to 213 top of fixed frame and is fixedly connected with driving fixed frame 213 with casing 1 and move up and down to armored concrete progress The first electric pushrod 216 squeezed.Several expression lobes are provided on 214 circumferential surface of first transfer roller 211 and the first compression roller 2111.When concrete enters on the first transfer roller 211 from feed inlet 11, control the first electric pushrod 216 pushing makes first The expression lobes 2111 of transfer roller 211 and the first compression roller 214 are contacted with concrete, to make concrete be broken, by The driving of one motor 212 and the second motor 215 transmits concrete to next mechanism, tentatively realizes and squeezes concrete Broken purpose.
As shown in Figures 2 and 3, hob mechanism 22 include be set to the first transfer roller 211 away from feed inlet 11 side with First transfer roller 211 is horizontal and is fixedly connected with driving second with three the second transfer rollers 221 of the rotation connection of casing 1, with casing 1 The three third motors 222 and be set to above the second transfer roller 221 for being cut what concrete was cut that transfer roller 221 rotates Cut component 223.Cutting assembly 223 includes the cutter 2231 being vertically arranged and is fixedly connected with driving cutter with casing 1 2231 the second electric pushrods 2232 cut downwards, the output shaft of the second electric pushrod 2232 are fixedly connected with cutter 2231. When being transmitted on the second transfer roller 221 via the concrete of primary roller press mechanism 21, the second electric pushrod 2232 drives cutter 2231 pairs of concrete are cut, make concrete cut it is smaller, cutter decline distance it is limited, only to concrete surface into Row cutting is made concrete burst apart but is also sticked on reinforcing bar due to the effect that cutter push, and is transmitted to next mechanism.
As shown in Figure 2 and Figure 4, secondary roller press mechanism 23 includes being set to the second transfer roller 221(Herein as shown in Figure 3)Back Side from the first transfer roller 211 simultaneously to the 1 angularly disposed secondary conveyer belt 231 in top of casing and is set to secondary conveyer belt 231 squeeze broken component 232 below one end of the second transfer roller 221.It squeezes between broken component 232 and secondary conveyer belt 231 and sets It is equipped with the inclined plate 2311 that the armored concrete of transmission is guided into and squeezes broken component 232, inclined plate is fixedly connected with 1 two sides inner wall of casing. Squeezing broken component 232 includes that opposite horizontally disposed third electric pushrod 2321 and the 4th electric pushrod are fixedly connected with casing 1 2322, the first U-shaped support plate 2323 being fixedly connected with third electric pushrod 2321 and 2322 telescopic rod of the 4th electric pushrod It is squeezed with the second support plate 2324, with the second of the 2324 two inner sidewall rotation connections of the first support plate 2323 and the second support plate Roller 2325 and third compression roller 2326.The circumferential surface of second compression roller 2325 and third compression roller 2326 be provided with several pulverize it is convex 2327 are played, for carrying out pulverizing work to concrete.It is transmitted to 231 on secondary conveyer belt via the concrete for hobbing mechanism 22, It is dropped between the second compression roller 2325 and third compression roller 2326 from the end of secondary conveyer belt 231 again, is squeezed protrusion 2111 effect will stick in the more fine crushing of block-like concrete extrusion on reinforcing bar, separate concrete and reinforcing bar, to fall Enter to next mechanism.
As shown in Figure 2 and Figure 4, vibrating screen mechanism 24 includes being set to 2326 lower section of the second compression roller 2325 and third compression roller Oblique discharge port 12 be arranged vibration sieve tray plate 241, vibration sieve tray plate 241 two sides be provided with baffle 242, one end and the machine of rectangle 1 inner wall of shell, which is fixedly connected with several springs 243 that the other end is fixedly connected with baffle 242 and fixes with vibration sieve tray plate 241, to be connected The vibrating motor 244 connect.Several circular filter hole 2411 are offered on vibration sieve tray plate 241.When concrete and reinforcing bar are fallen Shake sieve tray plate 241 on when, vibrating motor 244 open drive supporting plate on building waste vibration, make small concrete from Filter hole 2411 is fallen down, to reach the centrifugation of reinforcing bar and concrete, reinforcing bar can take advantage of a situation to be skidded off from discharge port 12.
As shown in Fig. 2, in casing 1 in primary roller press mechanism 21, hob mechanism 22, secondary roller press mechanism 23 and vibrating screen mechanism 24(Herein as shown in Figure 4)Lower section be provided with to 11 direction of feed inlet transmit collection conveyer belt 13.When primary roller press mechanism 21, the coagulation that mechanism 22, secondary roller press mechanism 23 and vibrating screen mechanism 24 will fall off by pulverizing cutting and the effect of vibration sieve is hobbed Soil, which is undertaken on, to be collected on conveyer belt 13, and transmits to have haved the function that separate concrete and reinforcing bar to feed inlet 11.If containing There is the concrete of bulk that can also be put into from feed inlet 11 and carries out roll-in again.
As depicted in figs. 1 and 2, dust-extraction unit 3 includes washing dust-falling mechanism 31 and wind-force dust collection mechanism 32.Wash depositing dust machine Structure 31 includes being arranged in several rotary nozzles 311 at the top of casing 1 and being directed toward in casing 1, being fixedly connected with 1 side of casing Water tank 312 and water pump 313.It is connected between rotary nozzle 311, water tank 312 and water pump 313 by connecting tube 314.Work as crushing device When 2 work, starting water pump 313 sprays the water in water tank 312 from rotary nozzle 311, will by the rotation of rotary nozzle 311 Water is sprayed inside casing 1, so that combining dust with water mist flows to 1 bottom of casing, 1 bottom of casing offers circular hole Hole 315, so that dirty water be made to flow out from hole 315.
As shown in Figure 1 and Figure 5, wind-force dust collection mechanism 32 includes several L-type pipes 321 for being arranged in 1 two sidewalls of casing, sets Be placed in the rotary components 322 of 321 circumferential surface of L-type pipe, be set to the outer air-exhausting duct 323 with the rotation connection of L-type pipe 321 of L-type pipe 321, It is set in air-exhausting duct 323 and the blower 324 being fixedly connected with air-exhausting duct 323 and the end and the row that are set to air-exhausting duct 323 The filter screen 325 that air hose 323 is fixedly connected.Rotary components 322 include the rack gear 3221 and rack gear that 321 circumferential surface of L-type pipe is arranged in 3221 meshed gears 3222 are fixedly connected with the 7th motor 3223 that driving gear 3222 rotates with casing 1.When crushing device 2 When starting, while concrete is pulverized in cutting, many dust can be generated, start the 7th motor 3223 and blower 324 at this time(This Place is as shown in Figure 6)It rotates L-type pipe 321 in casing 1, increases the range of 321 dust suction of L-type pipe, at the nozzle for making L-type pipe 321 Dust is sucked, then clean gas is discharged to outside air-exhausting duct 323 by the obstruction of filter screen 325.The rotation of L-type pipe 321 Dust can be sucked on a large scale, keep sucking dust more efficient.
The course of work:Building waste is placed on primary conveyer belt 4 and is come into from the feed inlet of casing 1 11, is passed sequentially through Primary roller press mechanism 21 hobs mechanism 22, secondary roller press mechanism 23 and vibrating screen mechanism 24 and pulverizes the concrete containing reinforcing bar, cuts Separation is cut, the separation and recycling of concrete and reinforcing bar are finally reached, during the treatment, by the effect of dust-extraction unit 3, is subtracted The diffusion of dust in the course of work is lacked.
This specific embodiment is only the explanation to the utility model, is not limitations of the present invention, ability Field technique personnel can according to need the modification that not creative contribution is made to the present embodiment after reading this specification, but As long as all by the protection of Patent Law in the scope of the claims of the utility model.

Claims (10)

1. a kind of construction waste crusher, including casing (1), the side of casing (1) offer feed inlet (11), feed inlet (11) Crushing device (2) are inside provided with, it is characterized in that:Fugitive dust is generated when being provided in the casing (1) for reducing breaking concrete Dust-extraction unit (3), the dust-extraction unit (3) include be set to casing (1) inner top washing dust-falling mechanism (31) and setting Wind-force dust collection mechanism (32) in casing (1) interior two sidewalls, the wind-force dust collection mechanism (32) include being arranged in casing (1) two sides Several L-type pipes (321) of wall are set to L-type pipe (321) circumferential surface for manipulating the rotary components of L-type pipe (321) rotation (322), be set to casing (1) outside with L-type pipe (321) rotation connection air-exhausting duct (323), be set in air-exhausting duct (323) Blower (324) and for reducing the filter screen (325) of air-exhausting duct (323) interior fugitive dust discharge air-exhausting duct (323) outside.
2. a kind of construction waste crusher according to claim 1, it is characterized in that:The washing dust-falling mechanism (31) includes By connecting tube (314) sequentially connected rotary nozzle (311), water pump (313) and water tank (312), rotary nozzle (311) is worn In casing (1) top and be directed toward in casing (1), be opened in casing (1) lower surface for the hole containing dust waste liquid to be discharged (315)。
3. a kind of construction waste crusher according to claim 2, it is characterized in that:The rotary components (322) include setting The rack gear (3221) and rack gear (3221) matched gear for being placed in L-type pipe (321) circumferential surface and being fixedly connected with L-type pipe (321) (3222) and driving gear (3222) rotation the second force piece.
4. a kind of construction waste crusher according to claim 3, it is characterized in that:The casing (1) deviates from feed inlet (11) one side offers discharge port (12), and the side of the casing (1), which is provided with, guides feed inlet (11) into for transmitting object The primary conveyer belt (4) of material, crushing device (2) include being set in turn in casing (1) at the beginning of wrapping up the concrete of reinforcing bar Primary roller press mechanism (21) that step roll-in is pulverized is set in casing (1) and hobs for that will wrap up the concrete cutting of reinforcing bar Mechanism (22), be set to secondary roller press mechanism (23) in casing (1) for the concrete roll-in fine crushing of reinforcing bar will to be wrapped up and It is set to the vibrating screen mechanism (24) in casing (1) for separating residual concrete and reinforcing bar.
5. a kind of construction waste crusher according to claim 4, it is characterized in that:It is described primary roller press mechanism (21) include The first transfer roller (211) for flushing with feed inlet (11) and being rotatablely connected with casing (1) inner wall, is fixedly connected simultaneously with casing (1) Drive the first transfer roller(211)First actuator of rotation, the first compression roller being set to right above the first transfer roller (211) (214) it and drives second actuator of the first compression roller (214) and is fixedly connected with the first compression roller of driving with casing (1) (214) it for squeezing the first force piece of the concrete of package reinforcing bar, is provided on first compression roller (214) for convenient The concrete for wrapping up reinforcing bar is squeezed into broken expression lobes (2111).
6. a kind of construction waste crusher according to claim 5, it is characterized in that:Described hob mechanism (22) include setting It is rotatablely connected away from the side of feed inlet (11) and the first transfer roller (211) level and in the first transfer roller (211) with casing (1) Several second transfer rollers (221), driving the second transfer roller (221) rotation the second actuator and be set to the second transmission For the cutting assembly (223) of the concrete chopping of reinforcing bar will to be wrapped up above roller (221).
7. a kind of construction waste crusher according to claim 6, it is characterized in that:The cutting assembly (223) includes setting Steel will be wrapped up by being placed in the cutter (2231) being vertically arranged above the second transfer roller (221) and driving cutter (2231) pushing Second force piece of the concrete chopping of muscle.
8. a kind of construction waste crusher according to claim 7, it is characterized in that:It is described secondary roller press mechanism (23) include It is set to the secondary conveyer belt that the second transfer roller (221) are arranged at the top of the oblique casing in side (1) of the first transfer roller (211) (231), secondary conveyer belt (231) are set to and squeeze broken component (232) below the end of the second transfer roller (221).
9. a kind of construction waste crusher according to claim 8, it is characterized in that:The broken component (232) that squeezes includes water It is flat that the first support plate (2323) for being separated by certain interval and the second support plate (2324) and the first support plate (2323) and the are set The second compression roller (2325) and third compression roller (2326), the second compression roller of driving of two support plates (2324) rotation connection (2325) it is driven with third compression roller (2326) to the third of rotation in the middle part of the second compression roller (2325) and third compression roller (2326) Moving part and fourth drive member and driving the second compression roller (2325) and the opposite mobile third power of third compression roller (2326) Part and the 4th force piece.
10. a kind of construction waste crusher according to claim 9, it is characterized in that:The vibrating screen mechanism (24) includes setting It is placed in below secondary roller press mechanism (23) and to discharge port(12)The vibration sieve tray plate (241) that is obliquely installed is opened in vibration sieve tray plate (241) several filter hole (2411) on, several elastic components that sieve tray plate (241) be fixedly connected with casing (1) of shaking, drive Dynamic vibration sieve tray plate(241)The vibrating motor (244) of vibration.
CN201820125423.XU 2018-01-24 2018-01-24 A kind of construction waste crusher Active CN208098202U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820125423.XU CN208098202U (en) 2018-01-24 2018-01-24 A kind of construction waste crusher

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820125423.XU CN208098202U (en) 2018-01-24 2018-01-24 A kind of construction waste crusher

Publications (1)

Publication Number Publication Date
CN208098202U true CN208098202U (en) 2018-11-16

Family

ID=64129456

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820125423.XU Active CN208098202U (en) 2018-01-24 2018-01-24 A kind of construction waste crusher

Country Status (1)

Country Link
CN (1) CN208098202U (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109759197A (en) * 2019-01-16 2019-05-17 湖北天运消音防振新材料有限公司 A kind of high speed leftover cloth grinding device
CN110102389A (en) * 2019-04-30 2019-08-09 湖北新济药业有限公司 A kind of calcite crushing oscillation production line
CN110102376A (en) * 2019-06-15 2019-08-09 中建二局第二建筑工程有限公司 A kind of building waste recyclable device
CN110603967A (en) * 2019-09-18 2019-12-24 禹州市植物保护植物检疫站 Straw smashing and recycling device for agricultural machinery
CN112047655A (en) * 2020-09-17 2020-12-08 深圳立豪建筑材料工程有限公司 Preparation method of high-strength green recycled concrete
CN112058386A (en) * 2020-08-28 2020-12-11 甘昌伟 Building garbage crushing device and crushing method
CN112657605A (en) * 2020-12-29 2021-04-16 深圳市宝安湾建筑废弃物循环利用有限公司 Crawler-type mobile crushing station for treating construction waste

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109759197A (en) * 2019-01-16 2019-05-17 湖北天运消音防振新材料有限公司 A kind of high speed leftover cloth grinding device
CN110102389A (en) * 2019-04-30 2019-08-09 湖北新济药业有限公司 A kind of calcite crushing oscillation production line
CN110102376A (en) * 2019-06-15 2019-08-09 中建二局第二建筑工程有限公司 A kind of building waste recyclable device
CN110603967A (en) * 2019-09-18 2019-12-24 禹州市植物保护植物检疫站 Straw smashing and recycling device for agricultural machinery
CN112058386A (en) * 2020-08-28 2020-12-11 甘昌伟 Building garbage crushing device and crushing method
CN112047655A (en) * 2020-09-17 2020-12-08 深圳立豪建筑材料工程有限公司 Preparation method of high-strength green recycled concrete
CN112657605A (en) * 2020-12-29 2021-04-16 深圳市宝安湾建筑废弃物循环利用有限公司 Crawler-type mobile crushing station for treating construction waste

Similar Documents

Publication Publication Date Title
CN208098202U (en) A kind of construction waste crusher
CN208098201U (en) A kind of building waste processing equipment
CN108993654A (en) A kind of stalk crushing device of the agricultural production with self-cleaning function
CN206996696U (en) A kind of construction waste crushing processing transport magnetic plant
CN108745483A (en) A kind of multi-stage crushing device for building
CN208944550U (en) A kind of ore dressing screening plant
CN109772566A (en) A kind of construction waste crusher
CN107971320A (en) A kind of refuse disposal installation with deodorization functions
CN210906361U (en) Mining solid waste sieving mechanism
CN209901385U (en) Collecting device is smashed to building waste
CN110215989A (en) A kind of environment-friendly multi-stage construction waste crushing processing unit
CN109355962A (en) A kind of environmental protection and energy saving stalk manufacture paper pulp device
CN208612582U (en) A kind of multi-stage crushing device for building
CN106863645B (en) A kind of sound-proof material waste recovery technique
CN108654776A (en) A kind of building stones processing crushing and screening collection integration apparatus
CN210357453U (en) Orthopedics gypsum breaker
CN107185672A (en) The refuse disposal installation and its method of work of a kind of automatic cleaning cutter
CN209910411U (en) Natural gas heating furnace for forging and pressing with flue cleaning device
CN208261226U (en) A kind of separate type blowback vibration dust remover
CN209093554U (en) Pulverizer is used in a kind of production of bone meal
CN108675381A (en) A kind of sewage disposal filter device being convenient to clean
CN206106100U (en) Concrete adds air parcel and irritates material device
CN214131923U (en) Civil engineering construction waste treatment device
CN212468269U (en) Building engineering residue processing apparatus
CN214390482U (en) Waste residue reducing mechanism for construction with dust removal function

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant