CN208094000U - High-tension switch cabinet group - Google Patents
High-tension switch cabinet group Download PDFInfo
- Publication number
- CN208094000U CN208094000U CN201820694240.XU CN201820694240U CN208094000U CN 208094000 U CN208094000 U CN 208094000U CN 201820694240 U CN201820694240 U CN 201820694240U CN 208094000 U CN208094000 U CN 208094000U
- Authority
- CN
- China
- Prior art keywords
- cabinet
- phase
- busbar
- branch
- tension switch
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Measuring Instrument Details And Bridges, And Automatic Balancing Devices (AREA)
Abstract
本实用新型涉及一种高压开关柜组。该高压开关柜组包括并列设置的第一柜体和第二柜体,第一柜体内设有第一分支母线,第二柜体内设有第二分支母线,第一分支母线的三条单相线和第二分支母线的三条单相线通过联络母排对应连接,所述高压开关柜组还包括分别套设在联络母排的三条单相线上的三相电流互感器,第一柜体内设有与第一分支母线连接的进线电缆。该高压开关柜组的联络母排实现了第一分支母线和第二分支母线的连接,三相电流互感器分别套设在联络母排的三条单相线上,为第一柜体内留出了设置进线电缆的空间,使进线电缆与第一分支母线连接的接头与第一柜体柜底的距离符合国标要求。
The utility model relates to a high-voltage switch cabinet group. The high-voltage switchgear group includes a first cabinet and a second cabinet arranged side by side, the first branch bus is provided in the first cabinet, the second branch bus is provided in the second cabinet, and the three single-phase lines of the first branch bus The three single-phase lines of the second branch bus are correspondingly connected through the tie busbar. The high-voltage switchgear group also includes three-phase current transformers respectively set on the three single-phase lines of the tie busbar. The first cabinet is equipped with There is an incoming cable connected to the first branch busbar. The connecting busbar of the high-voltage switchgear group realizes the connection of the first branch busbar and the second branch busbar. Set the space for the incoming cables so that the distance between the incoming cables and the first branch busbar and the bottom of the first cabinet meets the requirements of the national standard.
Description
技术领域technical field
本实用新型涉及一种高压开关柜组。The utility model relates to a high-voltage switch cabinet group.
背景技术Background technique
随着我国城乡电网的发展和改造,KYN28A-12铠装型移开式交流金属封闭开关设备广泛使用于大型发电厂、变电站以及工况企业中额定电压3.6kV~12kV、额定频率为50Hz的交流电网中,开关设备在使用时,经常是多个开关柜并排排列形成开关柜组,用于接受和分配电能使用。With the development and transformation of my country's urban and rural power grids, KYN28A-12 armored removable AC metal-enclosed switchgear is widely used in large-scale power plants, substations and industrial enterprises in AC with a rated voltage of 3.6kV ~ 12kV and a rated frequency of 50Hz. In the power grid, when the switchgear is in use, multiple switchgears are often arranged side by side to form a switchgear group for receiving and distributing electric energy.
公布号为CN106159688A,公布日为2016.11.23的中国专利申请公开了一种背靠背12 kV开关柜组,该开关柜组包括第一柜体和第二柜体,第一柜体顶部设有带A、B、C三相端子的第一调相室,第二柜体顶部设有带A、B、C三相端子的第二调相室,第一柜体与第二柜体相互背靠背贴拢并重叠设置,第一调相室内的A、B、C三相支端子与第一调相室侧壁固定的一端分别固定设置有A、B、C三相支端子,A、B、C三相支端子均依次穿过第一柜体的背侧和第二柜体的背侧伸入第二调相室内,第二调相室内的A相端子跨过其内的B相端子的线路连接相支端子,第二调相室内的C相端子跨过其内的B相端子的线路连接C相端子。该开关柜组结构简单,空间占用小,使用成本低。The Chinese patent application with the publication number CN106159688A and the publication date of 2016.11.23 discloses a back-to-back 12 kV switchgear group. The switchgear group includes a first cabinet and a second cabinet. The top of the first cabinet is provided with a belt A , B, C three-phase terminals of the first phase modulation chamber, the top of the second cabinet is equipped with A, B, C three-phase terminals of the second phase modulation chamber, the first cabinet and the second cabinet are close to each other back to back and overlapped, the A, B, C three-phase branch terminals in the first phase modulation chamber and the fixed end of the side wall of the first phase modulation chamber are respectively fixed with A, B, and C three-phase branch terminals, and the A, B, and C three-phase branch terminals are fixed respectively. The phase branch terminals all pass through the back side of the first cabinet body and the back side of the second cabinet body in turn and extend into the second phase modulation chamber, and the A phase terminal in the second phase modulation chamber crosses the line connection of the B phase terminal in it The phase branch terminal, the C-phase terminal in the second phase modulation chamber is connected to the C-phase terminal across the line of the B-phase terminal in it. The switchgear group has the advantages of simple structure, small space occupation and low use cost.
许多国网项目对开关柜的电流互感器的要求高,为保证技术参数,只能使用尺寸较大的互感器,为了方便安装互感器并使电缆接线头与开关柜柜底的距离满足国标要求,常规采用的方案是加宽加长柜体,但是,加宽加长柜体不能使开关柜内的空间得到有效利用,柜体较大不便于现场安装。Many state grid projects have high requirements on the current transformer of the switch cabinet. In order to ensure the technical parameters, only larger size transformers can be used. In order to facilitate the installation of the transformer and make the distance between the cable lug and the bottom of the switch cabinet meet the national standard requirements , the routinely adopted scheme is to widen and lengthen the cabinet body, but widening and lengthening the cabinet body cannot make effective use of the space in the switch cabinet, and the large cabinet body is not convenient for on-site installation.
实用新型内容Utility model content
本实用新型的目的在于提供一种高压开关柜组,解决现有技术中的开关柜由于互感器尺寸较大而不能使开关柜内空间得到有效利用和安装不便的问题。The purpose of the utility model is to provide a high-voltage switchgear group, which solves the problem that the space in the switchgear cannot be effectively used and the installation is inconvenient due to the large size of the transformer in the switchgear in the prior art.
为实现上述目的,本实用新型高压开关柜组的技术方案是:该高压开关柜组包括并列设置的第一柜体和第二柜体,第一柜体内设有第一分支母线,第二柜体内设有第二分支母线,第一分支母线的三条单相线和第二分支母线的三条单相线通过联络母排对应连接,所述高压开关柜组还包括分别套设在联络母排的三条单相线上的三相电流互感器,第一柜体内设有与第一分支母线连接的进线电缆。In order to achieve the above object, the technical scheme of the high-voltage switchgear group of the present invention is: the high-voltage switchgear group includes a first cabinet body and a second cabinet body arranged side by side, a first branch bus bar is arranged in the first cabinet body, and a second cabinet body The body is provided with a second branch busbar, and the three single-phase lines of the first branch busbar and the three single-phase lines of the second branch busbar are correspondingly connected through the connecting busbar. The high-voltage switchgear group also includes For the three-phase current transformers on the three single-phase lines, the incoming cables connected to the first branch bus are arranged in the first cabinet.
其有益效果是:该高压开关柜组的联络母排实现了第一分支母线和第二分支母线的连接,三相电流互感器分别套设在联络母排的三条单相线上,为第一柜体内留出了设置进线电缆的空间,使进线电缆与第一分支母线连接的接头与第一柜体柜底的距离符合国标要求。Its beneficial effects are: the connection busbar of the high-voltage switchgear group realizes the connection between the first branch busbar and the second branch busbar, and the three-phase current transformers are respectively set on the three single-phase lines of the connection busbar, which is the first There is a space for setting the incoming cable in the cabinet, so that the distance between the connector connecting the incoming cable and the first branch busbar and the bottom of the first cabinet meets the requirements of the national standard.
所述进线电缆由第一柜体的底部引进。The incoming cables are introduced from the bottom of the first cabinet.
所述三相电流互感器设置在第一柜体和第二柜体的相向侧壁上,三相电流互感器的两端分别伸入第一柜体和第二柜体内。The three-phase current transformer is arranged on the opposite side walls of the first cabinet and the second cabinet, and the two ends of the three-phase current transformer extend into the first cabinet and the second cabinet respectively.
所述联络母排为贯穿第一柜体和第二柜体的水平母排。The connecting busbar is a horizontal busbar running through the first cabinet and the second cabinet.
所述联络母排的三条单相线沿上下方向排列布置。The three single-phase lines of the connecting busbar are arranged in an up-down direction.
所述第一分支母线和第二分支母线的三条单相线引出端的相序从上至下均为C相、B相、A相,联络母排的三条单相线的相序从上到下依次为C相、B相、A相。The phase sequence of the three single-phase line outlets of the first branch busbar and the second branch busbar is C phase, B phase, and A phase from top to bottom, and the phase sequence of the three single-phase lines connected to the busbar is from top to bottom Phase C, Phase B, and Phase A in sequence.
其有益效果是:这样的结构便于第一柜体内分支母线和第二柜体内的分支母线与联络母排的连接,减少了两个柜体内分支母线三条单相线在于联络母排连接时的交叉。Its beneficial effect is that such a structure facilitates the connection of the branch busbar in the first cabinet and the branch busbar in the second cabinet with the tie busbar, and reduces the crossing of the three single-phase lines of the branch busbars in the two cabinets when they are connected to the tie busbar. .
所述第一分支母线和第二分支母线的三条单相线的相序在联络母排延伸方向上均为A相、B相、C相,第一柜体和第二柜体沿联络母排延伸方向并排设置。The phase sequence of the three single-phase lines of the first branch busbar and the second branch busbar is A phase, B phase, and C phase in the extension direction of the tie busbar, and the first cabinet body and the second cabinet body are aligned along the tie busbar. The extension directions are arranged side by side.
所述第二柜体内设有供第二柜体内的分支母线的三条单相线穿过的三相电流互感器。The second cabinet is provided with a three-phase current transformer through which the three single-phase lines of the branch bus in the second cabinet pass.
附图说明Description of drawings
图1为本实用新型高压开关柜组的实施例1中两个柜体分支母线连接的结构示意图;Fig. 1 is the structural representation of the connection of two cabinet branch busbars in embodiment 1 of the high voltage switchgear group of the present invention;
图2为图1所示的高压开关柜组的第一柜体的侧视图的局部剖视图;Fig. 2 is a partial cross-sectional view of a side view of the first cabinet body of the high-voltage switch cabinet group shown in Fig. 1;
图3为图2所示的第一分支母线的A相线的布置图;Fig. 3 is a layout diagram of the A-phase line of the first branch bus shown in Fig. 2;
图4为图3沿M-M线的剖视图;Fig. 4 is the cross-sectional view along M-M line of Fig. 3;
图5为图2所示的第一分支母线的B相线的布置图;Fig. 5 is a layout diagram of the B-phase line of the first branch bus shown in Fig. 2;
图6为图5沿M-M线的剖视图;Fig. 6 is the cross-sectional view of Fig. 5 along M-M line;
图7为图2所示的第一分支母线的C相线的布置图;Fig. 7 is a layout diagram of the C-phase line of the first branch bus shown in Fig. 2;
图8为图7沿M-M线的剖视图;Fig. 8 is the sectional view of Fig. 7 along M-M line;
图9为图1所示高压开关柜组的第二柜体的侧视图的局部剖视图;Fig. 9 is a partial cross-sectional view of the side view of the second cabinet body of the high-voltage switch cabinet group shown in Fig. 1;
图10为图9所示的第二分支母线的A相线的布置图;Fig. 10 is a layout diagram of the phase A line of the second branch bus shown in Fig. 9;
图11为图10沿M-M线的剖视图;Fig. 11 is the sectional view of Fig. 10 along M-M line;
图12为图9所示的第二支母线的B相线的布置图;Fig. 12 is a layout diagram of the B-phase line of the second busbar shown in Fig. 9;
图13为图12沿M-M线的剖视图;Figure 13 is a cross-sectional view along the M-M line of Figure 12;
图14为图9所示的第二分支母线的C相线的布置图;Fig. 14 is a layout diagram of the C-phase line of the second branch bus shown in Fig. 9;
图15为图14沿M-M线的剖视图;Fig. 15 is a sectional view along the M-M line of Fig. 14;
附图标记说明:1.第一柜体;2.第二柜体;3.第一分支母线;4.第二分支母线;5.联络母排;6.第一触头盒;71.第一A相电流互感器;72.第一B相电流互感器;73.第一C相电流互感器;8.进线电缆;9.第二触头盒;101.第二A相电流互感器;102.第二B相电流互感器;103.第二C相电流互感器。Explanation of reference signs: 1. The first cabinet body; 2. The second cabinet body; 3. The first branch busbar; 4. The second branch busbar; 5. The connecting busbar; 6. The first contact box; 1st A-phase current transformer; 72. The first B-phase current transformer; 73. The first C-phase current transformer; 8. Incoming cable; 9. The second contact box; 101. The second A-phase current transformer ; 102. The second B-phase current transformer; 103. The second C-phase current transformer.
具体实施方式Detailed ways
下面结合附图对本实用新型的实施方式作进一步说明。Embodiments of the present utility model will be further described below in conjunction with the accompanying drawings.
本实用新型高压开关柜组的实施例1,如图1至图15所示,该高压开关柜组包括并列设置的第一柜体1和第二柜体2,第一柜体1内设有第一分支母线3,第二柜体2内设有第二分支母线4,第一分支母线3的三条单相线和第二分支母线4的三条单相线通过联络母排5对应连接,高压开关柜组还包括分别套设在联络母排5的三条单相线上的三相电流互感器,第一柜体1内设有与第一分支母线3连接的进线电缆8。Embodiment 1 of the high-voltage switchgear group of the present invention, as shown in Figures 1 to 15, the high-voltage switchgear group includes a first cabinet body 1 and a second cabinet body 2 arranged side by side, and the first cabinet body 1 is provided with The first branch bus 3, the second cabinet 2 is provided with the second branch bus 4, the three single-phase lines of the first branch bus 3 and the three single-phase lines of the second branch bus 4 are connected correspondingly through the connecting busbar 5, and the high voltage The switchgear group also includes three-phase current transformers respectively sleeved on the three single-phase lines of the connecting busbar 5 , and the incoming cable 8 connected to the first branch busbar 3 is arranged inside the first cabinet body 1 .
在本实施例中,联络母排5为贯穿第一柜体1和第二柜体2的水平母排,第一开关柜和第二开关柜内分支母线三条单相线引出端的相序从上至下为C相、B相、A相,联络母排5的三条单相线沿上下方向排列布置,联络母排5的三条单相线的相序从上到下依次为C相、B相、A相。In this embodiment, the connecting busbar 5 is a horizontal busbar that runs through the first cabinet body 1 and the second cabinet body 2, and the phase sequence of the three single-phase line leads of the branch busbars in the first switchgear and the second switchgear is from the top to the bottom. The bottom is C phase, B phase and A phase, and the three single-phase lines connecting busbar 5 are arranged in the up and down direction, and the phase sequence of the three single-phase lines connecting busbar 5 is C phase and B phase from top to bottom. , Phase A.
在本实施例中,进线电缆8由第一柜体1的底部引进,进线电缆8位于第一柜体1内第一触头盒6的下方。第一柜体1和第二柜体2的相向侧壁上设有第一三相电流互感器,第一三相电流互感器包括分别与联络母排5的三条单相线对应的第一A相电流互感器71,第一B相电流互感器72和第一C相电流互感器73,各相电流互感器的两端分别伸入第一柜体1和第二柜体2。In this embodiment, the incoming cable 8 is introduced from the bottom of the first cabinet body 1 , and the incoming cable 8 is located below the first contact box 6 in the first cabinet body 1 . The first three-phase current transformers are provided on the opposite side walls of the first cabinet body 1 and the second cabinet body 2, and the first three-phase current transformers include first A The phase current transformer 71, the first B-phase current transformer 72 and the first C-phase current transformer 73, the two ends of each phase current transformer extend into the first cabinet body 1 and the second cabinet body 2 respectively.
在本实施例中,第二柜体2内第二触头盒9的下方设有第二三相电流互感器,第二三相电流互感器包括分别与第二柜体2内的分支母线三条单相线对应的第二A相电流互感器101,第二B相电流互感器102和第二C相电流互感器103。In this embodiment, a second three-phase current transformer is provided below the second contact box 9 in the second cabinet body 2, and the second three-phase current transformer includes three busbars respectively connected to the branch bus bars in the second cabinet body 2. The second A-phase current transformer 101 , the second B-phase current transformer 102 and the second C-phase current transformer 103 correspond to the single-phase line.
在本实施例中,第一分支母线3和第二分支母线4的三条单相线的相序在联络母排5延伸方向上均为A相、B相、C相,第一柜体1和第二柜体2沿联络母排5延伸方向并排设置。In this embodiment, the phase sequences of the three single-phase lines of the first branch bus bar 3 and the second branch bus bar 4 are A phase, B phase, and C phase in the extension direction of the connecting bus bar 5, and the first cabinet body 1 and the The second cabinets 2 are arranged side by side along the extension direction of the connecting busbar 5 .
该高压开关柜组在进行配电的过程中,将进线电缆8与高压开关柜的第一柜体1内的触头盒下方的分支母线连接,第一柜体1内的分支母线与联络母排5对应连接,联络母排5的三条单相线分别经过第一三相电流互感器穿出第一柜体1,第二柜体2内的分支母线的三条单相线分别穿过第二三相电流互感器与伸入第二柜体2内的联络母排5连接,进而实现第一柜体1内的第一分支母线3和第二柜体2内的第二分支母线4的连接,第一柜体1和第二柜体2均能够进行配电工作,能够满足使用要求。During the power distribution process of the high-voltage switchgear group, the incoming cable 8 is connected to the branch busbar below the contact box in the first cabinet 1 of the high-voltage switchgear, and the branch busbar in the first cabinet 1 is connected to the connection The busbar 5 is correspondingly connected, and the three single-phase lines connecting the busbar 5 respectively pass through the first three-phase current transformer to pass through the first cabinet 1, and the three single-phase lines of the branch bus in the second cabinet 2 pass through the first cabinet body 2 respectively. The two-phase and three-phase current transformers are connected with the connecting bus bar 5 extending into the second cabinet body 2, thereby realizing the connection between the first branch bus bar 3 in the first cabinet body 1 and the second branch bus bar 4 in the second cabinet body 2 connected, both the first cabinet body 1 and the second cabinet body 2 can perform power distribution work, which can meet the use requirements.
本实用新型高压开关柜组的联络母排5实现了第一分支母线3和第二分支母线4的连接,三相电流互感器分别套设在联络母排5的三条单相线上,为第一柜体内留出了设置进线电缆8的空间,使进线电缆8与第一分支母线3连接的接头与第一柜体柜底的距离符合国标要求。The connection busbar 5 of the high-voltage switchgear group of the utility model realizes the connection between the first branch busbar 3 and the second branch busbar 4, and the three-phase current transformers are respectively set on the three single-phase lines of the connection busbar 5, which is the first branch busbar 5. There is a space for setting the incoming cable 8 in a cabinet, so that the distance between the joint connecting the incoming cable 8 and the first branch bus bar 3 and the bottom of the first cabinet meets the requirements of the national standard.
本实用新型高压开关柜组的实施例2,与实施例1的不同之处在于,联络母排5的三条单相线引出端的相序从上到下依次为A相、B相、C相。但是,这样设置可能会导致两个柜体内分支母线三条单相线在与联络母排5连接时出现交叉的情况。Embodiment 2 of the high-voltage switchgear group of the utility model is different from Embodiment 1 in that the phase sequence of the three single-phase line leads of the busbar 5 is A phase, B phase, and C phase from top to bottom. However, this setting may cause the three single-phase lines of the branch busbars in the two cabinets to cross when they are connected to the tie busbar 5 .
本实用新型高压开关柜组的实施例3,与实施例1的不同之处在于,第二柜体2内触头盒的下方不设置电流互感器。Embodiment 3 of the high-voltage switchgear group of the utility model differs from Embodiment 1 in that no current transformer is provided below the contact box in the second cabinet body 2 .
本实用新型高压开关柜组的实施例4,与实施例1的不同之处在于,第一三相电流互感器设置在第一柜体内的侧壁上,第一柜体1内引出联络母排5在第一柜体1内穿过第一三相电流互感器,再从第一柜体1的侧壁穿出并进入第二柜体。Embodiment 4 of the high-voltage switchgear group of the present utility model is different from Embodiment 1 in that the first three-phase current transformer is arranged on the side wall of the first cabinet body, and the connecting busbar is drawn out of the first cabinet body 1 5. Pass through the first three-phase current transformer in the first cabinet 1, then pass through the side wall of the first cabinet 1 and enter the second cabinet.
Claims (8)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201820694240.XU CN208094000U (en) | 2018-05-10 | 2018-05-10 | High-tension switch cabinet group |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201820694240.XU CN208094000U (en) | 2018-05-10 | 2018-05-10 | High-tension switch cabinet group |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN208094000U true CN208094000U (en) | 2018-11-13 |
Family
ID=64052975
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201820694240.XU Expired - Fee Related CN208094000U (en) | 2018-05-10 | 2018-05-10 | High-tension switch cabinet group |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN208094000U (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN108512057A (en) * | 2018-05-10 | 2018-09-07 | 河南森源电气股份有限公司 | A kind of high-tension switch cabinet group |
-
2018
- 2018-05-10 CN CN201820694240.XU patent/CN208094000U/en not_active Expired - Fee Related
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN108512057A (en) * | 2018-05-10 | 2018-09-07 | 河南森源电气股份有限公司 | A kind of high-tension switch cabinet group |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN208094000U (en) | High-tension switch cabinet group | |
| CN103701060A (en) | Steel-clad movable-type alternating current metal closed switch cabinet | |
| CN207782179U (en) | High-tension switch cabinet | |
| CN203690788U (en) | Steel-clad movable-type AC metal enclosed switch cabinet | |
| CN207368431U (en) | A kind of bus bridge of corner's commutation | |
| CN201813091U (en) | Single-phase pre-installed box-type substation | |
| CN207409809U (en) | A T-shaped bus bridge | |
| CN205452837U (en) | Cubical switchboard that cable chamber insulating barrier arranged on limit mutually | |
| CN103855625A (en) | Movable branch box | |
| CN103840380A (en) | PT2 type power distribution station | |
| CN103840378A (en) | Improved PT1 type power distribution station | |
| CN204497637U (en) | A kind of photovoltaic generation integral type transformer station | |
| CN108512057A (en) | A kind of high-tension switch cabinet group | |
| CN203445506U (en) | Connecting device of split cabinet-type gas insulated switchgear (GIS) and shared box-type gas insulated switchgear (GIS) | |
| CN217087302U (en) | Outgoing line arrangement structure for switching outgoing line intervals in substation | |
| CN205051235U (en) | Novel arrangement structure of gas insulation switch device | |
| CN206148836U (en) | A Miniaturized Air Insulated Switchgear | |
| CN206076964U (en) | Flexible direct current transmission layered access structure | |
| CN204361492U (en) | Phase shielded contact box matching used with ABB circuit breaker | |
| CN203813221U (en) | PT1 type power distribution station | |
| CN203813222U (en) | Two-input two-output PT2 power distribution station with subsections | |
| CN206023027U (en) | Indoor 10kV high-voltage metering cubicles | |
| CN205790963U (en) | Rhombus common box bus | |
| CN203826781U (en) | PT2 power distribution station | |
| CN205051174U (en) | Structure is arranged to high tension switchgear generating line |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20181113 |
|