CN208088051U - A kind of fast spreading road surface - Google Patents

A kind of fast spreading road surface Download PDF

Info

Publication number
CN208088051U
CN208088051U CN201820349594.0U CN201820349594U CN208088051U CN 208088051 U CN208088051 U CN 208088051U CN 201820349594 U CN201820349594 U CN 201820349594U CN 208088051 U CN208088051 U CN 208088051U
Authority
CN
China
Prior art keywords
permeable
road surface
water
flange
fast spreading
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820349594.0U
Other languages
Chinese (zh)
Inventor
褚伟超
周赵洋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Municipal Garden Tsukito Design Inc
Original Assignee
Zhejiang Municipal Garden Tsukito Design Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Municipal Garden Tsukito Design Inc filed Critical Zhejiang Municipal Garden Tsukito Design Inc
Priority to CN201820349594.0U priority Critical patent/CN208088051U/en
Application granted granted Critical
Publication of CN208088051U publication Critical patent/CN208088051U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Road Paving Structures (AREA)

Abstract

The utility model discloses a kind of fast spreading road surfaces, for mating formation for municipal road surface, it includes the soil matrix layer set gradually from the bottom to top, underlayment, porous base course, permeable screed-coat, porous pavement, porous pavement is spliced by water-permeable brick, two neighboring water-permeable brick is provided with splicing construction, splicing construction includes flange and the groove that coordinates with flange, has the advantages that porous pavement splicing fastening.

Description

A kind of fast spreading road surface
Technical field
The utility model is related to road construction technical field, more particularly to a kind of fast spreading road surface.
Background technology
Current existing road surface is asphalt paving mostly, or forms road surface, process of deployment ratio using concreting More complex, the laying period is longer, and be laid with to come into operation in time.
Application No. is CN201720421172.5, the Chinese patents that authorized announcement date is on December 05th, 2017 to disclose one Kind of fast spreading road surface, which includes the soil matrix set gradually from the bottom to top, underlayment, porous base course, permeable Screed-coat, porous pavement, porous pavement are spliced to form by polylith water-permeable brick, and the stitching portion of two neighboring water-permeable brick forms drain and leads to Road;It is respectively connected with catheter below apocenosis passage, catheter is communicated with drain pipe, and drain pipe is communicated with for will be in drain pipe The flow speed gone of group to mechanism.
The prior art is spliced by brick, and the effect being quickly laid with may be implemented, and can be satisfied the need area by dredging mechanism Water carries out dredging discharge, and dredges fireballing advantage to excess surface water, and still, porous pavement is by rolling and can send out for a long time Raw offset is that road surface generates crack, while rainwater is drained into the mechanism of dredging below porous pavement, structure by porous pavement The complex effect that can not achieve fast spreading.
Utility model content
The purpose of this utility model is to provide a kind of fast spreading road surface, and which solve porous pavements to splice unsteady ask Topic has the advantages that porous pavement splicing fastening.
The above-mentioned technical purpose of the utility model technical scheme is that:
A kind of fast spreading road surface, including set gradually from the bottom to top soil matrix layer, underlayment, porous base course, permeable look for Flat bed, porous pavement, porous pavement are spliced by water-permeable brick, and two neighboring water-permeable brick is provided with splicing construction, splicing construction Groove including flange and with flange cooperation.
Using above-mentioned technical proposal, construction personnel is laid with underlayment first on soil matrix layer and is used to support road surface, in base Laying porous base course is used for permeable on layer, and permeable screed-coat is laid on porous base course for the porous pavement that tiles, porous pavement It is spliced to form by water-permeable brick, it is possible to reduce porous pavement is quickly stitched together by the workload of construction personnel, realizes quick Mat formation, the more fastening of adjacent two pieces of water-permeable brick splicing is made by the cooperation of flange and groove, when preventing porous pavement long Between roll and shift.
Further preferably:The cross section of flange and groove is triangle or semicircle.
Using above-mentioned technical proposal, triangle has stability so that flange and groove cooperation it is even closer, secured.
Semicircle can disperse to contact between adjacent ribs and groove should poly- power, extend the service life of flange.
Further preferably:Waterproof membrane is socketed on flange.
Using above-mentioned technical proposal, prevents rainwater from corroding flange for a long time and make flanges break, extend the use of flange Service life.
Further preferably:Several lateral permeable holes are evenly arranged on water-permeable brick, lateral permeable hole is equipped with longitudinal row Water hole, lateral permeable hole are connected to longitudinal drainage hole.
Using above-mentioned technical proposal, rainwater, which is fallen on water-permeable brick, is drained the rainwater of porous pavement by lateral permeable hole, Rainwater imports longitudinal drainage hole after entering lateral permeable hole, and rainwater is discharged by longitudinal drainage hole.
Further preferably:It is provided with filter screen at the top of lateral permeable hole.
Using above-mentioned technical proposal, the rubbish on road surface is filtered, prevents rubbish from entering laterally permeable hole plug horizontal To permeable hole.
Further preferably:The longitudinal drainage hole of two adjacent water-permeable bricks corresponds to form drainage channel.
Using above-mentioned technical proposal, rainwater is facilitated to be discharged along drainage channel, rainwater is prevented to be drained into below porous pavement, Eroded soil base.
Further preferably:Drainage channel is provided at both ends with the gutter for draining.
Using above-mentioned technical proposal, facilitates rainwater being collected and be discharged into river along gutter.
Further preferably:Gutter is located above porous pavement, and gutter surface is laid with polyurethane water-proof layer.
Using above-mentioned technical proposal, prevents rainwater from corroding gutter for a long time and destroy gutter, extend the use in gutter Service life.
In conclusion the utility model has the advantages that:
1. by the way that splicing construction is arranged in two neighboring water-permeable brick, splicing construction includes flange and coordinates with flange recessed Slot, it is possible to reduce porous pavement is quickly stitched together by the workload of construction personnel, realizes fast spreading, by flange and The cooperation of groove is so that the more fastening that adjacent two pieces of water-permeable brick splices;
2. being triangle by the cross section of flange and groove, triangle has stability so that flange and groove cooperation It is even closer, secured;
3. by being socketed waterproof membrane on flange, prevents rainwater from corroding flange for a long time and make flanges break, extend convex The service life of edge;
4. being fallen on water-permeable brick by laterally saturating by the way that lateral permeable hole and longitudinal drainage hole rainwater are arranged on water-permeable brick The rainwater of porous pavement is drained in water hole, and rainwater, which enters, imports longitudinal drainage hole after permeable hole, by longitudinal drainage hole by rainwater Discharge;
5. by the way that filter screen is arranged at the top of lateral permeable hole, the rubbish on road surface is filtered, prevents rubbish from entering Laterally permeable hole plug transverse direction permeable hole;
6. corresponding to form drainage channel by the longitudinal drainage hole of two adjacent water-permeable bricks, facilitate rainwater along row Aquaporin is discharged, and prevents rainwater to be drained into below porous pavement, eroded soil base;
7. by the way that gutter is arranged, facilitates rainwater being collected and be discharged into river along gutter.
Description of the drawings
Fig. 1 is the sectional view of embodiment, illustrates the concrete structure on entire road surface;
Fig. 2 is the enlarged drawing of a-quadrant in embodiment Fig. 1, illustrates the concrete structure of water-permeable brick;
Fig. 3 is the schematic diagram of two neighboring water-permeable brick in embodiment Fig. 1, illustrates the concrete structure of splicing construction.
In figure, 1, soil matrix layer;2, underlayment;3, pervious bed;4, permeable screed-coat;5, porous pavement;51, water-permeable brick;52, Splicing construction;53, flange;54, groove;55, lateral permeable hole;56, longitudinal drainage hole;6, waterproof membrane;7, filter screen;8, it drains Channel;9, gutter;10, polyurethane water-proof layer.
Specific implementation mode
The utility model is described in further detail below in conjunction with attached drawing.
A kind of fast spreading road surface, for mating formation for municipal road surface.
As shown in Figure 1, it include by it is lower from the soil matrix layer 1 of upper laying, underlayment 2, porous base course, permeable screed-coat 4, thoroughly Water route face 5.
With reference to Fig. 2 and Fig. 3, porous pavement 5 is spliced by water-permeable brick 51, and two neighboring water-permeable brick 51 is provided with splicing knot The cross section of structure 52, the groove 54 that splicing construction 52 coordinates including flange 53 and with flange 53, flange 53 and groove 54 can be Triangle or semicircle are bonded with waterproof membrane 6 on flange 53.
Several lateral permeable holes 55 are uniformly provided on water-permeable brick 51 on water-permeable brick 51, lateral permeable hole 55 is equipped with longitudinal direction Osculum 56, lateral permeable hole 55 are connected to longitudinal drainage hole 56, and 55 top of lateral permeable hole is provided with filter screen 7, adjacent The longitudinal drainage hole 56 of two water-permeable bricks 51 corresponds and forms drainage channel 8, and 8 both ends of drainage channel are offered for draining Gutter 9, gutter 9 are located at 5 top of porous pavement, and 9 surface of gutter is laid with polyurethane water-proof layer 10.
The course of work:Construction personnel is laid with underlayment 2 first on soil matrix layer 1 and is used to support road surface, on 2 upper berth of underlayment If porous base course for permeable, is laid with permeable screed-coat 4 for the water-permeable brick 51 that tiles, using on water-permeable brick 51 on porous base course Flange 53 along groove 54 insertion spliced, it is possible to reduce the workload of construction personnel quickly splices porous pavement 5 Get up, realize fast spreading, by flange 53 and the cooperation of groove 54 so that more stepping up for adjacent two pieces of water-permeable brick 51 splicing Gu.
Rainwater, which is fallen on water-permeable brick 51, is drained the rainwater of porous pavement 5 by lateral permeable hole 55, and rainwater enters transverse direction Longitudinal drainage hole 56 is imported after permeable hole 55, rainwater is discharged by longitudinal drainage hole 56, is formed along longitudinal drainage hole 56 Drainage channel 8 is flowed into gutter 9, and rainwater is flowed by gutter 9 in river.
This specific embodiment is only the explanation to the utility model, is not limitations of the present invention, ability Field technique personnel can as needed make the present embodiment the modification of not creative contribution after reading this specification, but As long as within the protection scope of the present utility model all protected by Patent Law.

Claims (8)

1. a kind of fast spreading road surface, including the soil matrix layer (1), underlayment (2), the porous base course, thoroughly that set gradually from the bottom to top Water screed-coat (4), porous pavement (5), it is characterised in that:The porous pavement (5) is spliced by water-permeable brick (51), the phase Adjacent two water-permeable bricks (51) are provided with splicing construction (52), and the splicing construction (52) includes flange (53) and matches with flange (53) The groove (54) of conjunction.
2. a kind of fast spreading road surface according to claim 1, it is characterised in that:The flange (53) and groove (54) Cross section is triangle or semicircle.
3. a kind of fast spreading road surface according to claim 1, it is characterised in that:It is socketed with waterproof on the flange (53) Film (6).
4. a kind of fast spreading road surface according to claim 1, it is characterised in that:It is uniformly arranged on the water-permeable brick (51) There are several lateral permeable holes (55), the transverse direction permeable hole (55) to be equipped with longitudinal drainage hole (56), the transverse direction permeable hole (55) it is connected to longitudinal drainage hole (56).
5. a kind of fast spreading road surface according to claim 4, it is characterised in that:It is set at the top of the transverse direction permeable hole (55) It is equipped with filter screen (7).
6. a kind of fast spreading road surface according to claim 5, it is characterised in that:Two adjacent water-permeable bricks (51) longitudinal drainage hole (56) corresponds and forms drainage channel (8).
7. a kind of fast spreading road surface according to claim 6, it is characterised in that:Drainage channel (8) the both ends setting It is useful for the gutter (9) of draining.
8. a kind of fast spreading road surface according to claim 7, it is characterised in that:The gutter (9) is located at permeable road Above face (5), gutter (9) surface is laid with polyurethane water-proof layer (10).
CN201820349594.0U 2018-03-14 2018-03-14 A kind of fast spreading road surface Active CN208088051U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820349594.0U CN208088051U (en) 2018-03-14 2018-03-14 A kind of fast spreading road surface

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820349594.0U CN208088051U (en) 2018-03-14 2018-03-14 A kind of fast spreading road surface

Publications (1)

Publication Number Publication Date
CN208088051U true CN208088051U (en) 2018-11-13

Family

ID=64062778

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820349594.0U Active CN208088051U (en) 2018-03-14 2018-03-14 A kind of fast spreading road surface

Country Status (1)

Country Link
CN (1) CN208088051U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111648186A (en) * 2020-06-19 2020-09-11 厦门美益绿建科技有限公司 Sand base brick that permeates water with filtering capability

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111648186A (en) * 2020-06-19 2020-09-11 厦门美益绿建科技有限公司 Sand base brick that permeates water with filtering capability

Similar Documents

Publication Publication Date Title
CN207919282U (en) A kind of permeable pavement structure
CN206052536U (en) Asphalt bridge floor with discharge structure and bridge
CN209568327U (en) A new type of road with bioretention strips
CN211256552U (en) Sponge type high-permeability pavement paving structure
CN207176440U (en) A kind of discharge structure for the water-permeable pavement of pavement half
CN208088051U (en) A kind of fast spreading road surface
CN215210279U (en) Modular permeable pavement system
CN209836713U (en) A hard road with a modified permeable structure
JPH033010B2 (en)
CN208023406U (en) A kind of asphalt bridge floor discharge structure
CN207988098U (en) A kind of road oozes drainage system
JP2006097229A (en) Pavement plate and pavement structure using the same
CN214271562U (en) Sponge is infiltration system for city
CN211689725U (en) Landscape drainage road surface
JP2019210682A (en) Drainage structure of block pavement
CN219450302U (en) Municipal road design waterproof construction
CN209482082U (en) A kind of assembled gap porous pavement of novel belt rain water collecting system
CN222227490U (en) Beach storm drain structure
CN216838801U (en) City permeable pavement
CN209194275U (en) A kind of road ditch and french drain integration drainage system
CN207714483U (en) One kind being used for the low-lying place's drainage system of city asphalt concrete pavement
CN208250846U (en) Surface drainage
CN219218572U (en) A garden pavement structure to reduce the subsidence and fracture rate of granite in rainy season
CN206607657U (en) Road runoff discarding system and road runoff filtration system
CN114108409B (en) Ecological garden landscape road that permeates water

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant