CN208072431U CN201721887275.7U CN201721887275U CN208072431U CN 208072431 U CN208072431 U CN 208072431U CN 201721887275 U CN201721887275 U CN 201721887275U CN 208072431 U CN208072431 U CN 208072431U
Authority
CN
China
Prior art keywords
drainage
foundation pit
ditch
water
slope
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721887275.7U
Other languages
Chinese (zh)
Inventor
刘怀刚
谢明
高世强
肖向荣
费永忠
杨卫平
杨杰
赵升辉
路宏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Road and Bridge International Co Ltd
Road and Bridge South China Engineering Co Ltd
Original Assignee
Road and Bridge International Co Ltd
Road and Bridge South China Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Road and Bridge International Co Ltd, Road and Bridge South China Engineering Co Ltd filed Critical Road and Bridge International Co Ltd
Priority to CN201721887275.7U priority Critical patent/CN208072431U/en
Application granted granted Critical
Publication of CN208072431U publication Critical patent/CN208072431U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

本实用新型公开一种锚锭基坑排水系统,采用多级排水系统结构,包括坑顶排水结构、边坡排水结构和坑底排水结构,坑顶排水包括截水沟和挡水墙,边坡排水结构设置在基坑的四周斜坡上,包括排水沟和水管,坑底排水结构位于基坑的底部,包括汇水沟和集水井,各层结构中根据具体的结构,设置不同排水结构,各种排水结构组合起来,组成一个完整的排水系统,整个系统结构简单,通过至上而下施工方式,逐步对各级排水系统进行施工,施工起来也简单,稳定、可靠,排水顺畅,可以起到防潮、排涝的作用。

The utility model discloses a drainage system for an anchor ingot foundation pit, which adopts a multi-stage drainage system structure, including a pit top drainage structure, a side slope drainage structure and a pit bottom drainage structure. The drainage structure is set on the surrounding slopes of the foundation pit, including drainage ditches and water pipes. The drainage structure at the bottom of the pit is located at the bottom of the foundation pit, including catchment ditches and water collection wells. Different drainage structures are set in each layer of structure according to the specific structure. The combination of various drainage structures forms a complete drainage system. The structure of the whole system is simple. Through the top-down construction method, the construction of the drainage system at all levels is carried out step by step. The construction is also simple, stable, reliable, and the drainage is smooth, which can prevent moisture. , The role of drainage.

Description

锚锭基坑排水系统Anchor Pit Drainage System

【技术领域】【Technical field】

本实用新型涉及建筑基坑排水技术领域,尤其涉及一种锚锭基坑排水系统。The utility model relates to the technical field of building foundation pit drainage, in particular to an anchor foundation pit drainage system.

【背景技术】【Background technique】

基坑是在基础设计位置按基坑底部标高和基础平面尺寸所开挖的土坑。普通基坑在开挖完成后,需要做好基坑防水,否则会导致基坑渗水,影响基坑内设备正常使用。由于基坑内渗漏时间和渗水量上存在不确定因素,因而将严重影响基坑正常使用,并且重新做防水费时费力,成本较高,影响正常生产活动的有序进行。The foundation pit is an earth pit excavated at the foundation design position according to the elevation of the bottom of the foundation pit and the plane size of the foundation. After the excavation of the ordinary foundation pit is completed, the foundation pit needs to be waterproofed, otherwise it will cause water seepage in the foundation pit and affect the normal use of the equipment in the foundation pit. Since there are uncertain factors in the leakage time and water seepage amount in the foundation pit, it will seriously affect the normal use of the foundation pit, and re-waterproofing is time-consuming, laborious and costly, which affects the orderly progress of normal production activities.

在深基坑的开挖过程中,由于切断地下渗水层,地下水会从边坡渗出,外加降雨因素的影响,基坑都会存在积水现象;故需要一种全面的基坑排水系统以进行排水。During the excavation of deep foundation pits, due to cutting off the underground water seepage layer, groundwater will seep out from the slope, plus the influence of rainfall factors, there will be water accumulation in the foundation pit; therefore, a comprehensive foundation pit drainage system is needed to carry out drain.

【实用新型内容】【Content of utility model】

针对上述现有技术,本实用新型提供一种锚锭基坑排水系统,分级进行排水,多级排水结构,能有效快速地进行排水,适用于雨量集中、滑坡泥石流地址灾害较多的地区,本实用新型的排水系统,稳定、可靠,排水顺畅,可以起到防潮、排涝的作用。Aiming at the above-mentioned prior art, the utility model provides a drainage system for anchor foundation pits, which can drain water in different stages and have a multi-level drainage structure, which can effectively and quickly drain water. It is suitable for areas with concentrated rainfall and landslide debris flow. The utility model drainage system is stable and reliable, and the drainage is smooth, which can play the role of moisture-proof and drainage.

本实用新型公开一种锚锭基坑排水系统,包括坑顶排水结构、边坡排水结构和坑底排水结构,所述坑顶排水结构位于基坑顶部的坑口位置,所述坑顶排水结构包括截水沟,所述截水沟绕着所述基坑顶部向下延伸,并延伸出基坑的施工范围之外,将所述截水沟内的积水排出基坑施工范围之外;The utility model discloses an anchor ingot foundation pit drainage system, which comprises a pit top drainage structure, a side slope drainage structure and a pit bottom drainage structure. The pit top drainage structure is located at the pit mouth at the top of the foundation pit. The pit top drainage structure An intercepting ditch, the intercepting ditch extends downward around the top of the foundation pit, and extends out of the construction range of the foundation pit, and discharges the accumulated water in the intercepting ditch out of the construction range of the foundation pit;

所述边坡排水结构设置在基坑的边坡上,所述边坡排水结构包括排水沟和水管,所述边坡为多阶结构,包括位于地面之上的边坡和位于地面之下的边坡,所述排水沟设置在各阶结构的底部,所述水管铺设在各阶结构上并与该阶上的排水沟连通,各阶结构上的积水通过水管流入排水沟中;在地面之上的边坡上,所述排水沟与所述截水沟连通,排水沟中的积水通过截水沟流出;在地面之下的边坡上,所述排水沟上开设有集水井,排水沟中的积水流入集水井,所述集水井内设置有用于排除积水的排水设备;The side slope drainage structure is arranged on the side slope of the foundation pit, the side slope drainage structure includes drainage ditches and water pipes, and the side slope is a multi-level structure, including a side slope above the ground and a side slope under the ground. For slopes, the drainage ditch is arranged at the bottom of each step structure, the water pipe is laid on each step structure and communicates with the drainage ditch on the step, and the accumulated water on each step structure flows into the drainage ditch through the water pipe; on the ground On the slope above, the drainage ditch communicates with the intercepting ditch, and the accumulated water in the drainage ditch flows out through the intercepting ditch; on the slope below the ground, a water collection well is opened on the drainage ditch, The accumulated water in the drainage ditch flows into the water collection well, and the drainage equipment for removing the accumulated water is arranged in the water collection well;

所述坑底排水结构位于基坑的底部,包括汇水沟和集水井,所述汇水沟设置在边坡与基坑底部的连接位置,且为环形结构,所述汇水沟与最下层边坡上的水管连通,以使得所述水管中的水流入汇水沟中,所述集水井开设于汇水沟内,汇水沟中的水流朝各个方向流入集水井中,所述集水井内设置有用于排除积水的排水设备。The drainage structure at the bottom of the pit is located at the bottom of the foundation pit, and includes a water collection ditch and a water collection well. The water pipes on the side slope are connected so that the water in the water pipes flows into the water collection ditch, the water collection well is opened in the water collection ditch, and the water flow in the water collection ditch flows into the water collection well in all directions, and the water collection well Drainage equipment for removing accumulated water is provided inside.

进一步的,所述截水沟与基坑的坑口之间还设置有用于截水沟溢出的水流的挡水墙,所述挡水墙沿着截水沟设置。Further, a retaining wall for overflowing water from the intercepting ditch is also provided between the intercepting ditch and the mouth of the foundation pit, and the retaining wall is arranged along the intercepting ditch.

进一步的,所述截水沟的坡度不小于0.4%。Further, the slope of the intercepting ditch is not less than 0.4%.

进一步的,所述截水沟采用浆砌片石砌筑。Further, the intercepting ditch is built with mortar rubble.

进一步的,所述挡水墙包括钢筋、立柱和墙体,所述钢筋固定在地面,所述立柱通过混凝土固定在钢筋上,所述立柱设置有多个,所述墙体连接各个立柱。Further, the water retaining wall includes steel bars, columns and walls, the steel bars are fixed on the ground, the columns are fixed on the steel bars through concrete, there are multiple columns, and the walls are connected to each column.

进一步的,所述排水沟采用红砖砌筑,所述排水沟的坡度不小于4%。Further, the drainage ditch is built with red bricks, and the slope of the drainage ditch is not less than 4%.

进一步的,所述水管呈树状结构分布在各阶边坡上。Further, the water pipes are distributed on the slopes of each step in a tree structure.

进一步的,所述水管包括主管和支管,主管底端与排水沟或者汇水沟连通,所述支管设置有多个,不同的支管从上至下间隔与主管连接。Further, the water pipe includes a main pipe and a branch pipe, and the bottom end of the main pipe is connected with a drainage ditch or a catchment ditch. There are multiple branch pipes, and different branch pipes are connected to the main pipe at intervals from top to bottom.

进一步的,所述水管为弹簧排水管,包括钢丝骨架和PVC薄膜,所述PVC薄膜铺设在钢丝骨架上围合成所述水管。Further, the water pipe is a spring drain pipe, including a steel wire framework and a PVC film, and the PVC film is laid on the steel wire framework to form the water pipe.

进一步的,所述基坑顶部的坑口外侧为混凝土喷射结构。Further, the outside of the top of the foundation pit is a concrete shotcrete structure.

与现有技术相比,本实用新型具备如下优点:采用多级排水系统结构,包括坑顶排水结构、边坡排水结构和坑底排水结构,坑顶排水包括截水沟,边坡排水结构设置在基坑的四周斜坡上,包括排水沟和水管,坑底排水结构位于基坑的底部,包括汇水沟和集水井,各层结构中根据具体的结构,设置不同排水结构,各种排水结构组合起来,组成一个完整的排水系统,整个系统结构简单,通过至上而下施工方式,逐步对各级排水系统进行施工,施工起来也简单,稳定、可靠,排水顺畅,可以起到防潮、排涝的作用。Compared with the prior art, the utility model has the following advantages: a multi-stage drainage system structure is adopted, including a pit top drainage structure, a side slope drainage structure and a pit bottom drainage structure, the pit top drainage includes an intercepting ditch, and the slope drainage structure is set On the slope around the foundation pit, including drainage ditches and water pipes, the drainage structure at the bottom of the foundation pit is located at the bottom of the foundation pit, including catchment ditches and water collection wells. Different drainage structures are set in each layer structure according to the specific structure. Various drainage structures Combined to form a complete drainage system, the structure of the whole system is simple, and the drainage system at all levels is gradually constructed through the top-down construction method. The construction is also simple, stable, reliable, and the drainage is smooth, which can prevent moisture and drain waterlogging. effect.

【附图说明】【Description of drawings】

图1为本实用新型锚锭基坑排水系统结构示意图;Fig. 1 is the schematic structural diagram of the drainage system of anchor ingot foundation pit of the present invention;

图2为本实用新型坑顶排水结构示意图;Fig. 2 is a schematic diagram of the pit top drainage structure of the utility model;

图3为本实用新型排水沟结构示意图;Fig. 3 is a schematic diagram of the utility model drainage ditch structure;

图4为本实用新型水管铺设结构示意图;Fig. 4 is the utility model water pipe laying structure schematic diagram;

图5为本实用新型坑底排水结构示意图;Fig. 5 is a schematic diagram of the drainage structure at the bottom of the pit of the utility model;

图6为本实用新型锚锭基坑排水系统施工步骤。Fig. 6 is the construction steps of the anchor foundation pit drainage system of the utility model.

【具体实施方式】【Detailed ways】

下面结合附图和示例性实施例对本实用新型作进一步地描述,其中附图中相同的标号全部指的是相同的部件。此外,如果已知技术的详细描述对于示出本实用新型的特征是不必要的,则将其省略。The utility model will be further described below in conjunction with the accompanying drawings and exemplary embodiments, wherein the same reference numerals in the accompanying drawings all refer to the same components. Also, if a detailed description of known technologies is unnecessary to illustrate the features of the present invention, it will be omitted.

请参阅图1,本实用新型公开一种锚锭基坑排水系统,本实施例中,以一种其中一侧靠山坡,且上口大,下口小,整体呈一个锲形倒台体的锚锭基坑的排水系统进行介绍说明。Please refer to Figure 1. The utility model discloses a drainage system for an anchor ingot foundation pit. In this embodiment, an anchor with a wedge-shaped inverted platform is used as a whole, with one side leaning against the hillside, the upper opening is large, and the lower opening is small. The drainage system of the ingot foundation pit will be introduced and explained.

本实施例中,锚锭基坑排水系统包括坑顶排水结构10、边坡排水结构20和坑底排水结构30,所述坑顶排水结构10位于基坑100顶部开口位置,包括截水沟11,所述截水沟11绕着所述基坑100顶部向下延伸至地面,并延伸出所述基坑的施工范围之外,并将所述截水沟11内的积水排出;In this embodiment, the anchor foundation pit drainage system includes a pit top drainage structure 10, a side slope drainage structure 20 and a pit bottom drainage structure 30. The pit top drainage structure 10 is located at the top opening of the foundation pit 100 and includes a water intercepting ditch 11. , the intercepting ditch 11 extends down to the ground around the top of the foundation pit 100, and extends out of the construction range of the foundation pit, and discharges the accumulated water in the intercepting ditch 11;

所述边坡排水结构20设置在基坑100的边坡上,包括排水沟21和水管22,所述边坡为多阶结构,所述排水沟21设置在各阶结构的底部,所述水管22铺设在各阶结构上并与该阶的排水沟21连通,使各阶边坡上的渗水通过所述水管22流入到排水沟21中;本实用新型中,当基坑100是依山坡而建的时候,基坑100的边坡包括地面之上的边坡和位于地面之下的边坡,地面之上的边坡包括基坑倚靠山坡的一侧,以及位于地面上,但是稍微高于基坑顶部开口的位置,地面之下的边坡包括在地面上向下挖掘至坑底的边坡。对于地面之上的边坡,由于山坡顶端有截水沟11向地面延伸,故将各阶的排水沟21与截水沟11连通进行排水,而对于地面之下的边坡,则在边坡的排水沟21上再开设集水井23,排水沟21中的水流入集水井23中,通过排水设备(图未示)将集水井内的水排出,此部分的排水沟21与前述的集水井23的结构与下面将要介绍的汇水沟31与集水井32的结构相类似。The slope drainage structure 20 is arranged on the slope of the foundation pit 100, and includes a drainage ditch 21 and a water pipe 22. The slope is a multi-level structure, and the drainage ditch 21 is arranged at the bottom of each step structure. 22 is laid on the structure of each step and communicated with the drainage ditch 21 of the step, so that seepage water on the side slope of each step flows into the drainage ditch 21 through the water pipe 22; During construction, the side slope of the foundation pit 100 includes the side slope above the ground and the side slope below the ground. The side slope above the ground includes the side of the foundation pit leaning against the hillside, and the side slope on the ground but slightly higher than the side slope. The position of the opening at the top of the excavation, the slope below the ground includes the slope excavated above the ground down to the bottom of the pit. For the slope above the ground, since the intercepting ditch 11 extends to the ground at the top of the hillside, the drainage ditch 21 of each step is connected to the intercepting ditch 11 for drainage; On the drainage ditch 21, set up the sump well 23 again, the water in the drainage ditch 21 flows in the sump well 23, the water in the sump well is discharged by drainage equipment (figure not shown), the drainage ditch 21 of this part and the aforementioned sump well The structure of 23 is similar to the structure of the catchment ditch 31 and the water collection well 32 to be introduced below.

所述坑底排水结构30位于基坑100的底部,包括汇水沟31和集水井32,所述汇水沟31设置在边坡与基坑100底部的连接位置,且为环形结构围绕基坑底部,所述汇水沟31与最下层边坡上的水管22连通,以使得该水管22中的水流入汇水沟31中,所述集水井32开设于汇水沟31内,所述集水井32位置设置有排水设备,用于将流入集水井32内的水排除。The pit bottom drainage structure 30 is located at the bottom of the foundation pit 100, and includes a water collection ditch 31 and a water collection well 32. The water collection ditch 31 is arranged at the connection position between the slope and the bottom of the foundation pit 100, and is an annular structure surrounding the foundation pit At the bottom, the water collection ditch 31 communicates with the water pipe 22 on the bottom slope, so that the water in the water pipe 22 flows into the water collection ditch 31, and the water collection well 32 is opened in the water collection ditch 31. The position of the water well 32 is provided with a drainage device for draining the water flowing into the water collection well 32 .

本实用新型中,采用三级排水系统结构,即采用坑顶排水结构10、边坡排水结构20和坑底排水结构30共同排水的方式,各层结构中根据具体的结构,设置不同排水结构,各种排水结构组合起来,组成一个完整的排水系统,该系统结构简单,施工起来也简单,稳定、可靠,排水顺畅,可以起到防潮、排涝的作用。In the utility model, a three-level drainage system structure is adopted, that is, the pit roof drainage structure 10, the side slope drainage structure 20 and the pit bottom drainage structure 30 are jointly drained. Different drainage structures are set in each layer structure according to the specific structure. Various drainage structures are combined to form a complete drainage system. The system is simple in structure, simple in construction, stable, reliable, and smooth in drainage, which can play the role of moisture-proof and drainage.

需要注意的,以上的边坡上的排水沟21仅在基坑100是一侧或者多侧靠山坡的结构中才与截水沟11连接,若基坑100直接是在平底上开设的,则不存在边坡上的排水沟21与截水沟11连通,此时,排水沟21中的水直接通过开设的集水井23,用排水设备将集水井23中的水排出,截水沟11仅设置在基坑100顶端地面地势相对较高的位置,便于地面水的引流。It should be noted that the drainage ditch 21 on the above slope is only connected to the intercepting ditch 11 in the structure where the foundation pit 100 is on one or more sides of the hillside. If the foundation pit 100 is directly opened on the flat bottom, then There is no drainage ditch 21 on the side slope to communicate with the water intercepting ditch 11. At this time, the water in the drainage ditch 21 directly passes through the water collection well 23 opened, and the water in the water collection well 23 is discharged with drainage equipment. The water interception ditch 11 only It is arranged at the top of the foundation pit 100 at a relatively high position on the ground, so as to facilitate the drainage of surface water.

进一步的,当在雨水较多的地方,还需要在所述截水沟11与基坑的坑口之间设置有用于阻挡从截水沟11溢出的水流的挡水墙12,所述挡水墙12沿着截水沟11设置,并在与排水沟21相交的位置设置有供排水沟21中的水流向截水沟11的通孔。进一步的,在挡水墙12的基础上,还可以进一步设置钢丝网以形成用于阻挡从山坡上落下来的碎砂石等物质的防护栏,此种结构依据基坑设置的地理位置以及当地的气候选择性设置。Further, when there is a lot of rainwater, it is also necessary to be provided with a retaining wall 12 for blocking the water flow overflowing from the intercepting ditch 11 between the intercepting ditch 11 and the mouth of the foundation pit. 12 is arranged along the water intercepting ditch 11 , and a through hole for the water in the drainage ditch 21 to flow to the water intercepting ditch 11 is provided at a position intersecting with the drainage ditch 21 . Further, on the basis of the water retaining wall 12, steel wire mesh can be further set up to form a protective fence for blocking materials such as broken sand and gravel falling from the hillside. This structure depends on the geographical location of the foundation pit and the local climate selectivity settings.

锚碇基坑开挖之前,先对场地表面进行处理,清除松动岩石、杂草和树根,便于后续工作的开展,为防止基坑开挖阶段坑顶坡口位置松动岩石掉入坑内,对坑顶坡口之外的2.0m范围喷射混凝土进行防护,优选采用3cm厚标号为C20的混凝土进行防护。同时根据基坑所在位置的实际情况以及开挖前的设计施工图在坡顶坡口位置施工截水沟11、挡水墙12等截排水设施,截水沟11和挡水墙12主要开设在顺坡侧,以避免水流顺坡流入基坑底部,对于基坑顶部的反向坡侧则无需再设置截水沟11与挡水墙12,水流也不会流入基坑底部。Before the excavation of the anchorage foundation pit, the surface of the site should be treated first to remove loose rocks, weeds and tree roots, so as to facilitate the development of follow-up work. Spray concrete for protection within 2.0m outside the groove top of the pit, and preferably use 3cm thick concrete marked C20 for protection. Simultaneously according to the actual situation of the location of the foundation pit and the design and construction drawing before the excavation, the cut-off and drainage facilities such as the cut-off ditch 11 and the water-retaining wall 12 are constructed at the top of the slope. Along the side of the slope, to avoid water flowing into the bottom of the foundation pit along the slope, for the reverse slope side of the top of the foundation pit, there is no need to set the intercepting ditch 11 and the water retaining wall 12, and the water flow will not flow into the bottom of the foundation pit.

需要说明的是,由于各个地方的降水以及土质情况不同,为了防止由于降水过多导致的截水沟11中的水流过大时向外溢出通过顶部坡口滑落到基坑之中,将截水沟11尽量设置在基坑顶部坡口距离大于5m之外,若降水更多,不仅需要更加远离基坑顶部坡口,还需要加深截水沟11的深度。It should be noted that due to the different precipitation and soil conditions in various places, in order to prevent the water flow in the intercepting ditch 11 from overflowing due to excessive precipitation and slipping into the foundation pit through the top groove, the water interception The ditch 11 should be set as far as possible beyond the groove top groove distance of the foundation pit greater than 5m. If there is more precipitation, it will not only need to be farther away from the groove top groove of the foundation pit, but also need to deepen the depth of the intercepting ditch 11.

请参阅图2,一般情况下,截水沟11为顶端开口的梯形结构,截水沟11的两内壁为坡形结构,截水沟11的深度可以体现在两内壁坡形结构的坡度上,优选的,截水沟11的坡度不小于0.4%,以利于水流能够顺着斜坡落入沟中,进一步的,坡度越大,在沟底宽度不变的情况下,截水沟11的容积越大,能够容纳的积水更多,为了保证必要的排水,坡度不应小于0.4%,深度不小于60cm,底宽不小于60cm,而位于开口位置的顶宽不小于180cm。由于截水沟11是在泥土上直接人工开设的,为了防水水流过大,对泥土冲刷或者淤泥的附着,需要在截水沟11的表面采用浆砌片石砌筑,优选的采用M7.5浆砌片石砌筑,厚度30cm。当然以上的截水沟11的大小,浆砌片石砌筑采用的型号和厚度都是本实用新型为了举例说明本锚锭基坑施工所举的一个实施例,实际施工中,根据基坑100所在的地理位置,地质情况以及气候情况进行灵活调整,但是截水沟11在开设前,需要利用自然地形开设而成。Please refer to Fig. 2, in general, the intercepting ditch 11 is a trapezoidal structure with an opening at the top, the two inner walls of the intercepting ditch 11 are slope-shaped structures, and the depth of the intercepting ditch 11 can be reflected in the slope of the slope-shaped structures on the two inner walls, Preferably, the slope of the intercepting ditch 11 is not less than 0.4%, so that the water flow can fall into the ditch along the slope. Further, the greater the slope, the greater the volume of the intercepting ditch 11 when the width of the ditch bottom is constant. Larger, it can accommodate more accumulated water. In order to ensure the necessary drainage, the slope should not be less than 0.4%, the depth should not be less than 60cm, the bottom width should not be less than 60cm, and the top width at the opening position should not be less than 180cm. Since the intercepting ditch 11 is artificially opened directly on the soil, in order to prevent excessive water flow, soil erosion or silt attachment, it is necessary to use mortar masonry on the surface of the intercepting ditch 11, preferably using M7.5 slurry Laminated stone masonry, thickness 30cm. Of course, the size of the above intercepting ditch 11, the model and the thickness used in the mortar masonry masonry are all an embodiment of the utility model in order to illustrate the construction of the anchor ingot foundation pit. In actual construction, according to the location of the foundation pit 100 The geographical location, geological conditions and climate conditions of the country can be flexibly adjusted, but the intercepting ditch 11 needs to be opened by using the natural terrain before opening.

为了防止雨水从截水沟11内侧地表渗入,引起截水沟11坡口附近土体开裂甚至滑塌,需要把截水沟11开口顶部左右两边的外侧2m范围内采用C20混凝土喷射进行封闭,封闭厚度不小于5cm。In order to prevent rainwater from infiltrating from the surface inside the intercepting ditch 11, causing cracking or even slumping of the soil near the slope of the intercepting ditch 11, it is necessary to spray C20 concrete within 2m outside the top left and right sides of the opening of the intercepting ditch 11. The thickness is not less than 5cm.

当在雨水大的地方,还需要在基坑附近设置临时排水通道(图未示)进行集中排水,需要注意的是,此种情况下,需要尽量将临时通道排水设置在远离基坑的地方,以防回水。When there is heavy rain, it is necessary to set up a temporary drainage channel (not shown) near the foundation pit for centralized drainage. It should be noted that in this case, it is necessary to set the temporary drainage channel as far away from the foundation pit as possible. In case of backwater.

进一步的,为了避免暴雨时地表水从坡顶截水沟11溢出往基坑内汇集,所述挡水墙12设置在截水沟11与基坑顶部坡口之间。在本实施例中在截水沟11朝基坑坡顶方向且距坡口线1.0m处设置一道高15cm、宽15cm的C20混凝土挡水墙12。Further, in order to prevent surface water from overflowing from the intercepting ditch 11 at the top of the slope to collect in the foundation pit during heavy rain, the water retaining wall 12 is arranged between the intercepting ditch 11 and the top groove of the foundation pit. In this embodiment, a C20 concrete water retaining wall 12 with a height of 15 cm and a width of 15 cm is set at the direction of the intercepting ditch 11 towards the slope top of the foundation pit and 1.0 m away from the groove line.

在另一实施例中,所述挡水墙12还可以包括埋在地下的钢筋121、套在钢筋上并露在地表处的立柱122和墙体(图未示),墙体可以是由混凝土浇筑而成,进一步的,立柱122通过混凝土固定在钢筋121上,所述立柱122设置有多个,墙体连接各个立柱,从而形成了整个挡水墙。进一步的,在该挡水墙12位置,还可以依据其立柱结构,加设多层钢丝网构成防护栏,以防止作业人员和松动的土石掉入基坑中。In another embodiment, the water retaining wall 12 may also include a steel bar 121 buried in the ground, a column 122 covered on the steel bar and exposed on the ground surface, and a wall (not shown), the wall may be made of concrete It is formed by pouring, and further, the upright column 122 is fixed on the steel bar 121 through concrete, and there are multiple upright columns 122, and the wall body connects each upright column, thereby forming the entire retaining wall. Further, at the position of the water retaining wall 12, multi-layer steel wire mesh can also be added to form a protective fence according to its column structure, so as to prevent workers and loose earth and stone from falling into the foundation pit.

当设置好坑顶排水结构10后,对基坑从上向下,从外到内的顺序分台阶逐层逐段进行开挖,同时遵循“边开挖,边防护”的原则保证边坡稳定。After the pit top drainage structure 10 is installed, excavate the foundation pit step by step from top to bottom, from the outside to the inside, and follow the principle of "excavation while protection" to ensure slope stability .

需要注意的是,当基坑100是依据山坡而开挖的时候,上述的坑顶排水结构10在施工过程中,还需要对山坡进行边坡排水结构的施工,即,需要在由山坡形成的边坡,设置排水沟21和水管22,此时,排水沟21是与坑顶排水结构10中的截水沟11连通的,以便于水管22中的水流入排水沟21,排水沟21再将水通过截水沟11流出。但是,当开挖到地面以下的时候,请参阅图3,由于锚锭的结构为上端开口大,下端开口小的结构,故在上端与下端之间形成斜坡,为了防止降雨带来的积水全部流入基坑底部,需要在基坑的地面以下的边坡上设置另一种边坡排水结构20,边坡排水结构20也包括排水沟21和水管22,排水沟21分布在边坡的各台阶上,尤其是设置在边坡的碎落台的内边缘,碎落台是在路堑边坡坡脚与排水沟21外侧边缘之间或边坡上,为防止碎落物落入边沟而设置的有一定宽度的纵向平台,其宽度视边坡高度和土质而定,最小不得小于1米。排水沟21采用红砖砌筑,其坡度由碎落台中心向两侧保持4%纵坡,在排水沟21上再开设集水井23,排水沟21中的水流入到集水井23中,通过排水设备将集水井23中的积水排除。It should be noted that when the foundation pit 100 is excavated according to the hillside, during the construction process of the above-mentioned pit roof drainage structure 10, it is also necessary to construct the side slope drainage structure on the hillside, that is, it needs to be constructed on the slope formed by the hillside. Slope, set drainage ditch 21 and water pipe 22, at this moment, drainage ditch 21 is communicated with intercepting ditch 11 in pit top drainage structure 10, so that the water in water pipe 22 flows into drainage ditch 21, drainage ditch 21 again Water flows out through the intercepting ditch 11. However, when excavating below the ground, please refer to Figure 3. Since the structure of the anchor has a large opening at the upper end and a small opening at the lower end, a slope is formed between the upper end and the lower end. In order to prevent water accumulation caused by rainfall All flow into the bottom of the foundation pit, another slope drainage structure 20 needs to be set on the slope below the ground of the foundation pit. The slope drainage structure 20 also includes drainage ditches 21 and water pipes 22, and the drainage ditches 21 are distributed on each side of the slope. On the steps, especially the inner edge of the broken-down platform arranged on the side slope, the broken-down platform is set between the slope foot of the cutting side slope and the outer edge of the drainage ditch 21 or on the side slope to prevent debris from falling into the side ditch The longitudinal platform with a certain width depends on the slope height and soil quality, and the minimum width shall not be less than 1 meter. Drainage ditch 21 adopts red brick masonry, and its slope maintains 4% vertical slope from the center of falling platform to both sides, and set up water collection well 23 on drainage ditch 21 again, and the water in drainage ditch 21 flows in the collection well 23, passes through Drainage equipment gets rid of the accumulated water in the sump 23.

请参阅图4,边坡上除了排水沟21,还设置有水管22,在本实施例中,水管22呈树状结构分布在各阶边坡上,所述水管22为弹簧排水管,由于边坡为多阶结构,每阶结构上都设置有多个树状的弹簧排水管,以利于边坡喷射混凝土护面后坡体地下水的排出。在本实施例中,水管22包括主管221和支管222,主管221底端与所在阶的排水沟21连通,最下一层边坡的主管221与汇水沟31连通,所述支管222设置有多个,不同的支管222从上至下间隔与主管221连接,水管22为PVC薄膜铺设在钢丝骨架上的结构,每10m宽的坡面为一个树状单元结构,即铺设一个主管221,支管222分别依据主管221而设,在本实施例中,支管222顶口距离主管221间距为5m,支管222与主管221接口从顶端往下依次按4.75m一道布置,主管221底端留0.5m高与排水沟21或汇水沟31连通。Please refer to Fig. 4, besides the drain 21, water pipes 22 are also arranged on the side slope. The slope is a multi-stage structure, and each stage structure is equipped with multiple tree-shaped spring drainage pipes to facilitate the discharge of groundwater from the slope body after the slope is sprayed with concrete protection. In this embodiment, the water pipe 22 includes a main pipe 221 and a branch pipe 222. The bottom end of the main pipe 221 communicates with the drainage ditch 21 of the step, and the main pipe 221 of the bottom slope communicates with the catchment ditch 31. A plurality of different branch pipes 222 are connected to the main pipe 221 at intervals from top to bottom. The water pipe 22 is a structure in which PVC film is laid on a steel wire framework. 222 are respectively set according to the main pipe 221. In this embodiment, the distance between the top of the branch pipe 222 and the main pipe 221 is 5m, and the interface between the branch pipe 222 and the main pipe 221 is arranged in order from the top to the bottom according to 4.75m. The bottom of the main pipe 221 is 0.5m high. It communicates with the drainage ditch 21 or the catchment ditch 31 .

请参阅图5,基坑的边坡铺设好之后,在基坑底部开设坑底排水结构30,坑底排水结构30主要包括汇水沟31和集水井32,汇水沟31为环形结构,围绕基坑底部而设,位于基坑边坡与基坑底部交接的位置,进一步的,还可以在边坡底部与汇水沟31之间设置一个碎落台。集水井32设置在汇水沟31内部,若汇水沟31的环形形状为方形形状,最好是设置在汇水沟31的四个角的位置,方便水流从各个方向流入集水井32内,需要注意的是集水井32的位置最好比汇水沟31低,以便于汇水沟31内的水流入到集水井32中。在本实施例中,在每个集水井32内需要设置排水设备,以便于将集水井32内的积水及时排除,避免集水井32内的水溢出,此处的排水设备优选为排水泵。进一步,汇水沟31和集水井32也可以采用红砖砌筑。Please refer to Fig. 5, after the side slope of the foundation pit is laid, set up the drainage structure 30 at the bottom of the foundation pit, the drainage structure 30 at the bottom of the foundation pit mainly includes a catchment ditch 31 and a sump well 32, and the catchment ditch 31 is an annular structure, surrounding It is provided at the bottom of the foundation pit, and is located at the junction of the side slope of the foundation pit and the bottom of the foundation pit. Further, a crushing platform can also be set between the bottom of the side slope and the catchment ditch 31 . The water collection well 32 is arranged inside the water collection ditch 31. If the annular shape of the water collection ditch 31 is a square shape, it is preferably arranged at the four corners of the water collection ditch 31, so that the water flow flows into the water collection well 32 from all directions. It should be noted that the position of the water collection well 32 is preferably lower than that of the water collection ditch 31 , so that the water in the water collection ditch 31 flows into the water collection well 32 . In this embodiment, drainage equipment needs to be provided in each water collection well 32, so as to remove the accumulated water in the water collection well 32 in time, and prevent the water in the water collection well 32 from overflowing. The drainage equipment here is preferably a drainage pump. Further, the catchment ditch 31 and the water collection well 32 can also be built with red bricks.

基于以上的岸锚基坑排水系统的结构,请参阅图6,其施工方法包括:Based on the structure of the shore anchorage pit drainage system above, please refer to Figure 6, and its construction methods include:

基坑开挖前,在基坑顶部开口处设置截水沟11,以防止施工期间地表水汇入基坑。Before the excavation of the foundation pit, an intercepting ditch 11 is provided at the top opening of the foundation pit to prevent surface water from flowing into the foundation pit during construction.

开挖过程中,各级边坡碎落台的排水沟21在其边坡防护施工完成后进行施工,并同步在各级斜坡上铺设水管22,水管与该阶的排水沟21连通;在地面之上的边坡上的排水沟21与截水沟11连通,在地面之下的边坡上的排水沟21内设置有集水井23,用排水设备将集水井内的积水排除;此处的地面之上的边坡则为基坑是有一侧或者多侧依据山坡而建,该山坡则为地面之上的边坡。During the excavation process, the drainage ditches 21 of the slopes at all levels are constructed after the slope protection construction is completed, and the water pipes 22 are laid on the slopes at all levels simultaneously, and the water pipes are connected with the drainage ditches 21 of the steps; The drainage ditch 21 on the side slope above communicates with the intercepting ditch 11, and a sump well 23 is arranged in the drainage ditch 21 on the side slope below the ground, and the accumulated water in the sump well is removed with drainage equipment; here The side slope above the ground is the foundation pit, and one or more sides are built according to the hillside, and the hillside is then the side slope above the ground.

坑开挖结束前,在坑底四周设置汇水沟31和集水井32,用排水设备将坑内积水排出。Before the pit excavation finishes, catchment ditch 31 and sump well 32 are set around the bottom of the pit, and drainage equipment is used to discharge accumulated water in the pit.

进一步的,所述基坑开挖前,还包括在截水沟11与基坑100的坡口之间还设置有挡水墙12,挡水墙12的结构有多种,其结构与上述锚锭基坑排水系统中的结构进行依次施工得到。Further, before the excavation of the foundation pit, a water retaining wall 12 is also provided between the intercepting ditch 11 and the groove of the foundation pit 100. There are various structures of the water retaining wall 12, and its structure is similar to that of the above-mentioned anchor The structures in the ingot foundation pit drainage system are constructed sequentially.

进一步的,基坑开挖前,在基坑顶部开口处的外侧喷射混凝土进行封闭。Further, before the excavation of the foundation pit, the outer side of the opening at the top of the foundation pit is sprayed for sealing.

进一步的,施工过程中遇到地下水量大、水位高的情况,在基坑四周埋设多个滤水管22或滤水井,利用抽水设备抽除滤水管22或滤水井内的水。Further, when the groundwater volume is large and the water level is high during the construction process, a plurality of water filter pipes 22 or water filter wells are buried around the foundation pit, and the water in the water filter pipes 22 or water filter wells is pumped out by pumping equipment.

需要注意的是,若基坑开挖在雨季,需加强天气的监测,在可能有大到暴雨的情况下,暂停基坑开挖,及时进行边坡防护并用塑料薄膜和彩条布进行覆盖,未能完成支护的边坡也需加强覆盖;检查坡顶截水沟11、边坡排水沟21的畅通情况,若已挖至基底,则要详细检查基底汇水沟31、集水井32的设置,确保抽水泵能处于正常工作状态;在下小雨的情况下,基坑开挖仍可进行,边坡防护无法进行的,加强边坡覆盖,可进行的,要做到分段覆盖,分段支护,完成后及时恢复覆盖。It should be noted that if the excavation of the foundation pit is in the rainy season, it is necessary to strengthen the monitoring of the weather. In the case of heavy rain, the excavation of the foundation pit should be suspended, and the slope should be protected in time and covered with plastic film and colored strips. The slope that has not been supported also needs to be strengthened; check the smoothness of the intercepting ditch 11 at the top of the slope and the drainage ditch 21 of the slope. Set up to ensure that the water pump can be in normal working condition; in the case of light rain, the excavation of the foundation pit can still be carried out, and if the slope protection cannot be carried out, the slope coverage should be strengthened. Support and restore coverage in a timely manner after completion.

虽然上面已经示出了本实用新型的一些示例性实施例,但是本领域的技术人员将理解,在不脱离本实用新型的原理或精神的情况下,可以对这些示例性实施例做出改变,本实用新型的范围由权利要求及其等同物限定。Although some exemplary embodiments of the present invention have been shown above, those skilled in the art will appreciate that changes can be made to these exemplary embodiments without departing from the principle or spirit of the present invention. The scope of the invention is defined by the claims and their equivalents.

Claims (10)

1. a kind of anchor ingot drainage of foundation pit system, which is characterized in that including hole top row water-bound, slope drainage structure and the draining of hole bottom Structure, the hole top row water-bound are located at the near coal-mine position at the top of foundation pit, and the hole top row water-bound includes intercepting ditch, described section Ditch extends around the foundation pit top down, and extends except the boundary of works area of foundation pit, by the ponding in the intercepting ditch It is discharged except foundation pit construction range;
For the slope drainage structure setting in the side slope of foundation pit, the slope drainage structure includes gutter and water pipe, described Side slope is multiple-rank arrangement, includes the side slope on ground and the side slope positioned at underground, and the gutter is arranged each The bottom of stage structure, the water pipe are laid on each stage structure and are connected to the gutter on the rank, the ponding on each stage structure It is flowed into gutter by water pipe;In the side slope on ground, the gutter is connected to the intercepting ditch, in gutter Ponding is flowed out by intercepting ditch;In the side slope of underground, sump is offered on the gutter, the ponding in gutter Sump is flowed into, the drainage equipment for draining the water away is provided in the sump;
The hole bottom discharge structure is located at the bottom of foundation pit, including charge for remittance ditch and sump, the charge for remittance ditch setting in side slope and The link position of bottom of foundation ditch, and be loop configuration, the charge for remittance ditch is connected to the water pipe in lowest level side slope, so that described Water in water pipe flows into charge for remittance ditch, and the sump is opened in charge for remittance ditch, and the flow one way or another in charge for remittance ditch flows into In sump, the drainage equipment for draining the water away is provided in the sump.
2. anchor ingot drainage of foundation pit system according to claim 1, which is characterized in that the intercepting ditch and foundation pit it is near coal-mine it Between be additionally provided with the waterwall of the flow overflowed for intercepting ditch, the waterwall is arranged along intercepting ditch.
3. anchor ingot drainage of foundation pit system according to claim 1, which is characterized in that the gradient of the intercepting ditch is not less than 0.4%.
4. anchor ingot drainage of foundation pit system according to claim 1, which is characterized in that the intercepting ditch is built using mortar flag stone It builds.
5. anchor ingot drainage of foundation pit system according to claim 2, which is characterized in that the waterwall includes reinforcing bar, column And wall, the reinforcing bar are fixed on ground, the column is fixed on by concrete on reinforcing bar, the column be provided with it is multiple, The each column of wall connecting.
6. anchor ingot drainage of foundation pit system according to claim 1, which is characterized in that the gutter uses red brick masonry, The gradient in the gutter is not less than 4%.
7. anchor ingot drainage of foundation pit system according to claim 1, which is characterized in that the water pipe is distributed in tree In each rank side slope.
8. anchor ingot drainage of foundation pit system according to claim 1, which is characterized in that the water pipe includes supervisor and branch pipe, Supervisor bottom end is connected to gutter or charge for remittance ditch, and the branch pipe is provided with multiple, different branch pipes and is spaced from top to bottom and master Pipe connects.
9. anchor ingot drainage of foundation pit system according to claim 1, which is characterized in that the water pipe is spring drainpipe, packet Steel-wire carcass and PVC film are included, the PVC film, which is laid on steel-wire carcass, encloses the water pipe.
10. anchor ingot drainage of foundation pit system according to claim 1, which is characterized in that the near coal-mine outside at the top of the foundation pit For concrete ejection structure.
CN201721887275.7U 2017-12-27 2017-12-27 Anchor ingot drainage of foundation pit system Expired - Fee Related CN208072431U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721887275.7U CN208072431U (en) 2017-12-27 2017-12-27 Anchor ingot drainage of foundation pit system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721887275.7U CN208072431U (en) 2017-12-27 2017-12-27 Anchor ingot drainage of foundation pit system

Publications (1)

Publication Number Publication Date
CN208072431U true CN208072431U (en) 2018-11-09

Family

ID=64034082

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721887275.7U Expired - Fee Related CN208072431U (en) 2017-12-27 2017-12-27 Anchor ingot drainage of foundation pit system

Country Status (1)

Country Link
CN (1) CN208072431U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107964973A (en) * 2017-12-27 2018-04-27 中交路桥华南工程有限公司 Anchor foundation pit drainage system and its construction method
CN111894102A (en) * 2020-08-10 2020-11-06 中铁第四勘察设计院集团有限公司 Cut-off trough unit and cut-off ditch structure of side slope
CN113463648A (en) * 2021-06-11 2021-10-01 中国五冶集团有限公司 Foundation pit supporting method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107964973A (en) * 2017-12-27 2018-04-27 中交路桥华南工程有限公司 Anchor foundation pit drainage system and its construction method
CN111894102A (en) * 2020-08-10 2020-11-06 中铁第四勘察设计院集团有限公司 Cut-off trough unit and cut-off ditch structure of side slope
CN113463648A (en) * 2021-06-11 2021-10-01 中国五冶集团有限公司 Foundation pit supporting method

Similar Documents

Publication Publication Date Title
CN107964973A (en) Anchor foundation pit drainage system and its construction method
CN103883328B (en) The dark construction method of half lid half of high steep V-type coombe biased segment is worn under separate tunnel
CN104818721A (en) Geological environment treatment method suitable for steep wall and deep pit type abandoned mine
CN111139840B (en) Ecological restoration method for tableland slope of fixed ditch in gully region of loess plateau of longdong
CN103882880A (en) Buried type side slope drainage system and construction method thereof
CN105927272A (en) Floor anchoring constraint tunnel lining structure
CN105256876A (en) Siphon type draining system of superhigh excavation section of road
CN104653195B (en) A kind of coombe landforms tunnel portal structure and its construction method
CN106192665A (en) A kind of sponge urban road rain infiltration system and construction method thereof
CN106087953B (en) A kind of drainage and construction method for preventing and treating mountain area large size spoil ground mud-rock flow
CN205134481U (en) Highway superelevation excavation highway section hydrocone type drainage system
CN103866774A (en) Ditch pipe network protection body for slope protection and collapsing hill drainage and soil fixation
CN104499560A (en) Combined rainwater seepage well and construction method
CN104818734B (en) Control completely decomposed granite side slope damage by water waterproof and water drainage system and construction method thereof
CN210002425U (en) structure of seepage roadbed side slope drainage system
CN110172884B (en) A mountain road subgrade and construction method
CN210177294U (en) A mountain road subgrade
CN110055983B (en) Fast-assembling component formula protective structure of refuse dump side slope
CN106836243A (en) A kind of sponge greenery patches of suitable mountain topography and its building method
CN106368288A (en) Shallow disc type moniliform wave type water-cutting off and drainage system for refuse dump
CN115323862A (en) Drainage construction process for slope tops around anti-infiltration foundation pit
CN114086444A (en) Underground networking system and method based on heavy ground drainage
CN210315599U (en) Slope greening water and soil protection structure
CN110777821A (en) Method for treating water burst disaster of fissures of weathered rock slope
CN110185051A (en) Deep narrow excavation water discharge method

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20181109

CF01 Termination of patent right due to non-payment of annual fee