CN208055883U - A kind of movable type Roadway Construction hanging barrier operating platform - Google Patents
A kind of movable type Roadway Construction hanging barrier operating platform Download PDFInfo
- Publication number
- CN208055883U CN208055883U CN201820361862.0U CN201820361862U CN208055883U CN 208055883 U CN208055883 U CN 208055883U CN 201820361862 U CN201820361862 U CN 201820361862U CN 208055883 U CN208055883 U CN 208055883U
- Authority
- CN
- China
- Prior art keywords
- rod
- fixed
- base
- frame
- operating platform
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)
Abstract
本实用新型提供了一种移动式桥面施工吊栏操作平台,属于建筑施工设备领域。其技术方案为:它包括主体支架和设置在主体支架上的升降机构;主体支架包括上下对应设置的顶架和底架,顶架和底架为主次梁结构的矩形框架,底架和顶架之间设置有升降机构,底架和顶架之间设置有若干伸缩套杆;底架上设置有底板,顶架内设置有若干次梁,顶架的主梁一侧设置有三道悬挑杆,两侧悬挑杆下端面设置有两组滑轮;升降机构包括底座、顶座、剪式升降架和联动组件。本实用新型的有益效果为:适用于桥梁护栏外侧等施工,适用于不同高度的护栏,高度调节方便,移动便捷,可两侧同时进行施工,减少了施工时间,大大提高了工作效率的同时,具有较高的安全性。
The utility model provides a mobile bridge deck construction hanging rail operating platform, which belongs to the field of building construction equipment. Its technical solution is: it includes a main body support and a lifting mechanism arranged on the main body support; There is a lifting mechanism between the frames, a number of telescopic rods are set between the bottom frame and the top frame; there is a bottom plate on the bottom frame, several secondary beams are set in the top frame, and three overhangs are set on one side of the main beam of the top frame. There are two sets of pulleys on the lower end of the cantilever rods on both sides; the lifting mechanism includes a base, a top seat, a scissor lifting frame and a linkage assembly. The beneficial effects of the utility model are: it is suitable for construction on the outside of the bridge guardrail, and is suitable for guardrails of different heights. It has high security.
Description
技术领域technical field
本实用新型涉及一种建筑施工设备领域,尤其涉及一种移动式桥面施工吊栏操作平台。The utility model relates to the field of building construction equipment, in particular to a mobile bridge deck construction hanging rail operating platform.
背景技术Background technique
桥面护栏进行施工时,在钢筋绑扎机模板安装等过程中需要在护栏外侧进行操作,对大部分桥梁来说,桥下净空较大,护栏外侧作业就属于高空作业,存在极大的危险性。During the construction of the bridge deck guardrail, it is necessary to operate on the outside of the guardrail during the installation of the steel bar binding machine formwork. For most bridges, the clearance under the bridge is relatively large, and the work on the outside of the guardrail is a high-altitude operation, which is extremely dangerous. .
实用新型内容Utility model content
本实用新型的目的在于提供一种适用于不同高度的护栏,高度调节方便,移动便捷的移动式桥面施工吊栏操作平台。The purpose of the utility model is to provide a mobile bridge deck construction hanging rail operating platform which is suitable for guardrails of different heights and is convenient for height adjustment and movement.
本实用新型是通过如下措施实现的:The utility model is achieved through the following measures:
一种移动式桥面施工吊栏操作平台,其特征在于,包括主体支架和设置在所述主体支架上的升降机构;A mobile bridge deck construction hanging rail operation platform, characterized in that it includes a main body support and a lifting mechanism arranged on the main body support;
所述主体支架包括上下对应设置的顶架和底架,所述顶架和所述底架为主次梁结构的矩形框架,所述底架和所述顶架之间设置有所述升降机构,所述底架和所述顶架之间竖直设置有若干伸缩套杆;所述底架上设置有底板,所述顶架内设置有若干次梁,所述顶架的所述主梁一侧设置有三道悬挑杆,所述悬挑杆一端固定在所述主梁侧面,所述悬挑杆另一端设置有支撑杆,所述两侧悬挑杆下端面两端对称设置有两组滑轮;The main body support includes a top frame and a bottom frame correspondingly arranged up and down, the top frame and the bottom frame are rectangular frames with primary and secondary beam structures, and the lifting mechanism is arranged between the bottom frame and the top frame , a number of telescopic rods are vertically arranged between the bottom frame and the top frame; a bottom plate is arranged on the bottom frame, several secondary beams are arranged in the top frame, and the main beam of the top frame One side is provided with three cantilever rods, one end of the cantilever rod is fixed on the side of the main beam, the other end of the cantilever rod is provided with a support rod, and two ends of the lower end surfaces of the cantilever rods on both sides are symmetrically arranged. group pulley;
所述升降机构包括底座、顶座、剪式升降架和联动组件,所述底座固定设置在所述底板上,所述顶座固定设置在所述顶架上,所述顶座和所述底座内部沿所述底板宽度方向均设置有两道平行的导轮槽。The lifting mechanism includes a base, a top base, a scissor lifting frame and a linkage assembly, the base is fixed on the bottom plate, the top base is fixed on the top frame, and the top base and the base Two parallel guide wheel grooves are arranged inside along the width direction of the bottom plate.
本实用新型的具体特点还有:Concrete features of the present utility model also have:
还包括设置在所述底板上所述升降机构两侧的两个卷扬机和吊栏,所述吊栏上设置有一对吊环,所述吊栏靠近所述主体支架一侧设置有旋转门,所述卷扬机的钢丝绳绕过所述滑轮缠绕在所述吊环上。It also includes two hoists and suspension rails arranged on both sides of the lifting mechanism on the bottom plate, a pair of suspension rings are arranged on the suspension rails, and a revolving door is provided on the side of the suspension rails close to the main body bracket. The wire rope of the winch is wound on the suspension ring around the pulley.
所述剪式升降架包括上中下设置的三层剪叉组件,所述顶座和所述底座之间对称设置有两组所述剪叉组件,所述剪叉组件包括呈X状铰接的内支撑杆和外支撑杆。The scissor lift includes three layers of scissor assemblies arranged up and down, two sets of scissor assemblies are arranged symmetrically between the top base and the base, and the scissor assemblies include X-shaped hinged Inner support rods and outer support rods.
所述联动组件包括丝杆机构和若干齿轮,所述丝杆机构包括丝杆和滑块,所述丝杆一端穿过所述底座外壁通过转轴固定在所述底座内部,所述丝杆另一端位于所述底座外侧设置有从动齿轮,所述从动齿轮上方设置有与所述从动齿轮啮合的驱动齿轮,所述底座上端面远离所述吊栏一端竖直设置有固定板,所述驱动齿轮通过转轴设置在所述固定板上;所述驱动齿轮上方所述固定板上设置有卡紧机构,所述丝杆外围设置有所述滑块,所述滑块两侧对称设置有固定杆,所述固定杆一端固定设置在所述滑块侧面、另一端设置有滚轮,所述滚轮设置在所述导槽内,所述顶座内部对应位置设置有所述滑块、所述固定杆、所述滚轮和穿过所述滑块固定在所述顶座两端的滑杆,下层所述剪叉组件外支撑杆下端和上层所述剪叉组件内支撑杆上端设置在所述固定杆上,下层所述剪叉组件内支撑杆的下端和上层所述剪叉组件外支撑杆的上端通过螺栓固定在所述底座和顶座内部。The linkage assembly includes a screw mechanism and several gears, the screw mechanism includes a screw and a slider, one end of the screw passes through the outer wall of the base and is fixed inside the base through a rotating shaft, and the other end of the screw A driven gear is arranged on the outside of the base, a driving gear meshing with the driven gear is arranged above the driven gear, a fixed plate is vertically arranged on the end surface of the base far away from the suspension rail, and the The driving gear is arranged on the fixed plate through the rotating shaft; the clamping mechanism is arranged on the fixed plate above the driving gear, the slider is arranged on the periphery of the screw rod, and the two sides of the slider are symmetrically arranged with fixed One end of the fixed rod is fixedly arranged on the side of the slider, and the other end is provided with a roller, the roller is arranged in the guide groove, and the corresponding position inside the top seat is provided with the slider, the fixed Rod, the roller and the slide bar passing through the slider and fixed at both ends of the top seat, the lower end of the outer support rod of the scissor assembly in the lower layer and the upper end of the inner support rod of the scissor assembly in the upper layer are arranged on the fixed rod The lower ends of the inner support rods of the upper and lower scissor assemblies and the upper ends of the outer support rods of the upper scissor assemblies are fixed inside the base and the top seat by bolts.
所述卡紧机构包括固定块和卡杆,所述固定块由上固定块和下固定块组成,所述卡杆由上到下依次包括圆形把手、细杆、粗杆和卡头,所述上固定块上端面设置有U形槽,所述U形槽中间位置开设有贯穿所述上固定块和所述下固定块的通孔,所述下固定块的所述通孔孔径略大于所述上固定块的所述通孔孔径,所述卡杆一端穿过所述通孔设置有和所述驱动齿轮配合使用的所述卡头,所述卡杆另一端所述细杆两侧设置有柱头,所述柱头抵在所述U形槽底部,所述卡杆外围位于所述通孔内设置有弹簧,所述弹簧上端抵在所述上固定块下端面上,所述弹簧下端抵在所述粗杆上。The clamping mechanism includes a fixed block and a clamping rod. The fixed block is composed of an upper fixed block and a lower fixed block. The clamping rod includes a circular handle, a thin rod, a thick rod and a chuck from top to bottom. The upper end surface of the upper fixing block is provided with a U-shaped groove, and the middle position of the U-shaped groove is provided with a through hole passing through the upper fixing block and the lower fixing block, and the diameter of the through hole of the lower fixing block is slightly larger than The aperture diameter of the through hole of the upper fixing block, one end of the clamping rod passes through the through hole and is provided with the chuck used in conjunction with the driving gear, and the other end of the clamping rod on both sides of the thin rod A stigma is provided, and the stigma is against the bottom of the U-shaped groove, and a spring is arranged on the periphery of the clamping rod in the through hole, and the upper end of the spring is against the lower end surface of the upper fixing block, and the lower end of the spring is against the thick rod.
所述伸缩支撑杆包括内套杆和外套杆,所述内套杆竖直设置在所述底架上端面,所述外套杆设置在所述顶架下端面,所述外套杆套接在所述内套杆外侧,所述内套杆和所述外套杆设置有若干个贯穿的定位孔,所述内套杆和所述外套杆通过穿过所述定位孔的螺栓固定连接。The telescopic support rod includes an inner sleeve rod and an outer sleeve rod, the inner sleeve rod is vertically arranged on the upper end surface of the bottom frame, the outer sleeve rod is arranged on the lower end surface of the top frame, and the outer sleeve rod is sleeved on the upper end surface of the top frame. On the outer side of the inner sleeve rod, the inner sleeve rod and the outer sleeve rod are provided with several through positioning holes, and the inner sleeve rod and the outer sleeve rod are fixedly connected by bolts passing through the positioning holes.
所述底板上设置若干方形重块,所述重块上端面设置有所述卷扬机,利用卷扬机调节所述吊栏高度。Several square weights are arranged on the bottom plate, and the hoist is arranged on the upper end of the weight, and the hoist is used to adjust the height of the hanging rail.
所述底架下端面设置有两组车轮,所述车轮上设置有刹车片,用于固定所述操作平台。Two sets of wheels are arranged on the lower end surface of the underframe, and brake pads are arranged on the wheels for fixing the operation platform.
施工时,先将所述操作平台移动到桥梁护栏一侧固定好车轮,将所述卷扬机收紧,依靠所述升降机构将所述操作平台调节到适宜的高度,使所述吊栏高于所述桥梁,然后将所述操作平台推向所述护栏,当吊栏位于护栏正上方时停止,施工人员依靠爬梯进入吊栏,之后继续将所述操作平台向所述护栏靠近,调整好位置后,释放卷扬机,将吊栏调节到适当的高度进行施工。During construction, first move the operating platform to the side of the bridge guardrail to fix the wheels, tighten the winch, and adjust the operating platform to a suitable height by means of the lifting mechanism so that the hanging rail is higher than the the bridge, and then push the operation platform to the guardrail, stop when the hanger is directly above the guardrail, the construction workers rely on the ladder to enter the hanger, and then continue to move the operation platform closer to the guardrail, after adjusting the position , release the hoist, and adjust the hanging rail to an appropriate height for construction.
本实用新型的有益效果为:适用于桥梁护栏外侧等施工,适用于不同高度的护栏,高度调节方便,移动便捷,可两侧同时进行施工,减少了施工时间,大大提高了工作效率的同时,具有较高的安全性。The beneficial effects of the utility model are: it is suitable for construction on the outside of the bridge guardrail, and is suitable for guardrails of different heights. It has high security.
附图说明Description of drawings
图1 为本实用新型实施例的结构示意图。Fig. 1 is a schematic structural diagram of an embodiment of the utility model.
图2 为本实用新型实施例中主体支架的结构示意图。Fig. 2 is a schematic structural diagram of the main body bracket in the embodiment of the present invention.
图3 为本实用新型实施例中升降机构的结构示意图。Fig. 3 is a structural schematic diagram of the lifting mechanism in the embodiment of the utility model.
图4 为图3中A部的局部放大图。Fig. 4 is a partially enlarged view of part A in Fig. 3 .
图5 为图3中B部的局部放大图。Fig. 5 is a partially enlarged view of part B in Fig. 3 .
图6 为本实用新型实施例中卡紧机构的结构示意图。Fig. 6 is a schematic structural diagram of the clamping mechanism in the embodiment of the present invention.
其中,附图标记为:1、底架; 2、底板;3、顶架;4、次梁;5、升降机构;6、吊栏;7、吊环;8、滑轮;9、悬挑杆;10、支撑杆;11、重块;12、卷扬机;13、内套杆;14、外套杆;15、车轮;16、顶座;17、底座;18、滑块;19、丝杆;20、固定杆;21、外支撑杆;22、内支撑杆;23、固定板;24、卡紧机构;25、驱动齿轮;26、从动齿轮;27、弹簧;28、把手;29、上固定块;30、下固定块;31、粗杆;32、细杆;33、卡头;34、滚轮。Among them, the reference signs are: 1. Underframe; 2. Bottom plate; 3. Top frame; 4. Secondary beam; 5. Lifting mechanism; 6. Hanging rail; 7. Hanging ring; 8. Pulley; 10. Support rod; 11. Heavy block; 12. Hoist; 13. Inner rod; 14. Outer rod; 15. Wheel; 16. Top seat; 17. Base; 18. Slider; 19. Screw rod; 20. Fixed rod; 21, outer support rod; 22, inner support rod; 23, fixed plate; 24, clamping mechanism; 25, drive gear; 26, driven gear; 27, spring; 28, handle; 29, upper fixed block ; 30, the lower fixed block; 31, the thick rod; 32, the thin rod; 33, the chuck; 34, the roller.
具体实施方式Detailed ways
为能清楚说明本方案的技术特点,下面通过具体实施方式,对本方案进行阐述。In order to clearly illustrate the technical features of the solution, the solution will be described below through specific implementation modes.
参见图1,本实用新型是一种移动式桥面施工吊栏操作平台,其特征在于,包括主体支架和设置在主体支架上的升降机构5;Referring to Fig. 1, the utility model is a mobile bridge deck construction hanging rail operating platform, which is characterized in that it includes a main body bracket and a lifting mechanism 5 arranged on the main body bracket;
参见图1和2,主体支架包括上下对应设置的顶架3和底架1,顶架3和底架1为主次梁结构的矩形框架,底架1和顶架3之间设置有升降机构5,底架1和顶架3之间竖直设置有若干伸缩套杆;底架1上设置有底板2,顶架3内设置有若干次梁4,顶架3的主梁一侧设置有三道悬挑杆9,悬挑杆9一端固定在主梁侧面,悬挑杆9另一端设置有支撑杆10,两侧悬挑杆9下端面两端对称设置有两组滑轮8;Referring to Figures 1 and 2, the main frame includes a top frame 3 and a bottom frame 1 correspondingly arranged up and down. The top frame 3 and the bottom frame 1 are rectangular frames with primary and secondary beam structures, and a lifting mechanism is arranged between the bottom frame 1 and the top frame 3. 5. A number of telescopic rods are vertically arranged between the bottom frame 1 and the top frame 3; the bottom frame 1 is provided with a bottom plate 2, and the top frame 3 is provided with several secondary beams 4, and the main beam side of the top frame 3 is provided with three A cantilever rod 9, one end of the cantilever rod 9 is fixed on the side of the main beam, the other end of the cantilever rod 9 is provided with a support rod 10, and two sets of pulleys 8 are symmetrically arranged at both ends of the lower end faces of the cantilever rod 9 on both sides;
参见图3,升降机构5包括底座17、顶座16、剪式升降架和联动组件,底座16固定设置在底板2上,顶座17固定设置在顶架3上,顶座16和底座17内部沿底板2宽度方向均设置有两道平行的导轮槽。Referring to Fig. 3, the lifting mechanism 5 includes a base 17, a top base 16, a scissor lifting frame and a linkage assembly. Two parallel guide wheel grooves are arranged along the width direction of the bottom plate 2 .
参见图1,还包括设置在底板2上升降机构5两侧的两个卷扬机12和吊栏6,吊栏6上设置有一对吊环7,吊栏6靠近主体支架一侧设置有旋转门,卷扬机12的钢丝绳绕过滑轮缠绕在吊环7上。Referring to Fig. 1, it also includes two winches 12 and a hanging rail 6 arranged on both sides of the lifting mechanism 5 on the bottom plate 2, a pair of suspension rings 7 are arranged on the hanging rail 6, and a revolving door is arranged on the side of the hanging rail 6 near the main body support, and the hoisting machine 12 wire ropes are wound around the pulley on the suspension ring 7.
参见图3,剪式升降架包括上中下设置的三层剪叉组件,顶座16和底座17之间对称设置有两组剪叉组件,剪叉组件包括呈X状铰接的内支撑杆22和外支撑杆21。Referring to Fig. 3, the scissor lift includes three layers of scissor assemblies arranged up and down, two sets of scissor assemblies are arranged symmetrically between the top base 16 and the base 17, and the scissor assemblies include inner support rods 22 hinged in an X shape And outer support rod 21.
参见图3和5,联动组件包括丝杆机构和若干齿轮,丝杆机构包括丝杆19和滑块18,丝杆19一端穿过底座17外壁通过转轴固定在底座17内部,丝杆19另一端位于底座17外侧设置有从动齿轮26,从动齿轮26上方设置有与从动齿轮26啮合的驱动齿轮25,底座17上端面远离吊栏6一端竖直设置有固定板23,驱动齿轮25通过转轴设置在固定板23上;驱动齿轮25上方固定板23上设置有卡紧机构24,丝杆19外围设置有滑块18,滑块18两侧对称设置有固定杆20,固定杆20一端固定设置在滑块18侧面、另一端设置有滚轮34,滚轮34设置在导槽内,顶座16内部对应位置设置有滑块、固定杆、滚轮和穿过滑块固定在顶座16两端的滑杆,下层剪叉组件外支撑杆下端和上层剪叉组件内支撑杆上端设置在固定杆20上,下层剪叉组件内支撑杆的下端和上层剪叉组件外支撑杆的上端通过螺栓固定在底座17和顶座16内部。3 and 5, the linkage assembly includes a screw mechanism and several gears. The screw mechanism includes a screw 19 and a slider 18. One end of the screw 19 passes through the outer wall of the base 17 and is fixed inside the base 17 through a rotating shaft. The other end of the screw 19 A driven gear 26 is arranged on the outside of the base 17, and a driving gear 25 meshing with the driven gear 26 is arranged above the driven gear 26. A fixed plate 23 is vertically arranged on the end surface of the base 17 away from the hanging rail 6, and the driving gear 25 passes through The rotating shaft is arranged on the fixed plate 23; the clamping mechanism 24 is arranged on the fixed plate 23 above the drive gear 25, the slider 18 is arranged on the periphery of the screw mandrel 19, the two sides of the slider 18 are symmetrically arranged with a fixed rod 20, and one end of the fixed rod 20 is fixed Be arranged on the side of the slider 18, the other end is provided with a roller 34, the roller 34 is arranged in the guide groove, and the corresponding position inside the top seat 16 is provided with a slider, a fixed rod, a roller and a slider fixed at both ends of the top seat 16 through the slider. Rod, the lower end of the outer support rod of the lower scissor assembly and the upper end of the inner support rod of the upper scissor assembly are arranged on the fixed rod 20, the lower end of the inner support rod of the lower scissor assembly and the upper end of the upper end of the outer support rod of the upper scissor assembly are fixed to the base by bolts 17 and top seat 16 inside.
参见图3和4,卡紧机构24包括固定块和卡杆,固定块由上固定块29和下固定块30组成,卡杆由上到下依次包括圆形把手28、细杆32、粗杆31和卡头33,上固定块29上端面设置有U形槽,U形槽中间位置开设有贯穿上固定块29和下固定块30的通孔,下固定块30的通孔孔径略大于上固定块29的通孔孔径,卡杆一端穿过通孔设置有和驱动齿轮25配合使用的卡头33,卡杆另一端细杆32两侧设置有柱头,柱头抵在U形槽底部,卡杆外围位于通孔内设置有弹簧27,弹簧27上端抵在上固定块29下端面上,弹簧27下端抵在粗杆31上。3 and 4, the clamping mechanism 24 includes a fixed block and a clamping rod, the fixed block is composed of an upper fixed block 29 and a lower fixed block 30, and the clamping rod includes a circular handle 28, a thin rod 32, and a thick rod from top to bottom. 31 and chuck 33, the upper end surface of the upper fixed block 29 is provided with a U-shaped groove, and the middle position of the U-shaped groove is provided with a through hole that runs through the upper fixed block 29 and the lower fixed block 30, and the through hole diameter of the lower fixed block 30 is slightly larger than that of the upper The through hole aperture of fixed block 29, one end of the clamping rod passes through the through hole and is provided with the chuck 33 that cooperates with drive gear 25, and the thin rod 32 both sides of the other end of the clamping rod is provided with stigma, and stigma is against U-shaped groove bottom, clamping A spring 27 is arranged on the periphery of the rod in the through hole, the upper end of the spring 27 is against the lower end surface of the upper fixing block 29 , and the lower end of the spring 27 is against the thick rod 31 .
参见图2伸缩支撑杆包括内套杆13和外套杆14,内套杆13竖直设置在底架1上端面,外套杆14设置在顶架3下端面,外套杆14套接在内套杆13外侧,内套杆13和外套杆14设置有若干个贯穿的定位孔,内套杆13和外套杆14通过穿过定位孔的螺栓固定连接。Referring to Figure 2, the telescopic support rod includes an inner sleeve rod 13 and an outer sleeve rod 14, the inner sleeve rod 13 is vertically arranged on the upper end surface of the bottom frame 1, the outer sleeve rod 14 is arranged on the lower end surface of the top frame 3, and the outer sleeve rod 14 is sleeved on the inner sleeve rod On the outside of 13, the inner sleeve rod 13 and the outer sleeve rod 14 are provided with several through positioning holes, and the inner sleeve rod 13 and the outer sleeve rod 14 are fixedly connected by bolts passing through the positioning holes.
参见图1,底板2上设置若干方形重块11,重块11上端面设置有卷扬机12,利用卷扬机12调节吊栏6高度;底架1下端面设置有两组车轮15,车轮上设置有刹车片,用于固定操作平台。Referring to Fig. 1, a plurality of square weights 11 are arranged on the bottom plate 2, and hoists 12 are arranged on the upper end of the weights 11, and the height of the hanging rail 6 is adjusted by the hoists 12; two sets of wheels 15 are arranged on the lower end of the chassis 1, and brakes are arranged on the wheels. piece, used to fix the operating platform.
参见图1,施工时,先将操作平台移动到桥梁护栏一侧固定好车轮,将卷扬机12收紧,依靠升降机构5将操作平台调节到适宜的高度,使吊栏6高于桥梁,然后将操作平台推向护栏,当吊栏6位于护栏正上方时停止,施工人员依靠爬梯进入吊栏6,之后继续将操作平台向护栏靠近,调整好位置后,释放卷扬机12,将吊栏调节到适当的高度进行施工。Referring to Figure 1, during construction, first move the operating platform to the side of the bridge guardrail to fix the wheels, tighten the winch 12, and adjust the operating platform to a suitable height by means of the lifting mechanism 5, so that the hanging rail 6 is higher than the bridge, and then move the Push the operation platform to the guardrail, and stop when the hanging rail 6 is directly above the guardrail. The construction workers rely on the ladder to enter the hanging rail 6, and then continue to approach the operating platform to the guardrail. After adjusting the position, release the winch 12 and adjust the hanging rail to a proper position. height for construction.
本实用新型未经描述的技术特征可以通过或采用现有技术实现,在此不再赘述,当然,上述说明并非是对本实用新型的限制,本实用新型也并不仅限于上述举例,本技术领域的普通技术人员在本实用新型的实质范围内所做出的变化、改型、添加或替换,也应属于本实用新型的保护范围。The undescribed technical features of the utility model can be realized by or using the prior art, so they will not be repeated here. Of course, the above description is not a limitation of the utility model, and the utility model is not limited to the above examples. Changes, modifications, additions or substitutions made by ordinary skilled persons within the essential scope of the present utility model shall also belong to the protection scope of the present utility model.
Claims (8)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201820361862.0U CN208055883U (en) | 2018-03-16 | 2018-03-16 | A kind of movable type Roadway Construction hanging barrier operating platform |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201820361862.0U CN208055883U (en) | 2018-03-16 | 2018-03-16 | A kind of movable type Roadway Construction hanging barrier operating platform |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN208055883U true CN208055883U (en) | 2018-11-06 |
Family
ID=63988981
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201820361862.0U Expired - Fee Related CN208055883U (en) | 2018-03-16 | 2018-03-16 | A kind of movable type Roadway Construction hanging barrier operating platform |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN208055883U (en) |
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN110851020A (en) * | 2019-11-13 | 2020-02-28 | 深圳市维冠视界科技股份有限公司 | A touch screen that prevents fog |
| CN112252205A (en) * | 2020-09-27 | 2021-01-22 | 上海宏信设备工程有限公司 | Bridge operation platform |
| CN112811346A (en) * | 2020-07-03 | 2021-05-18 | 天工俐德科技发展有限公司 | Totally closed installation device for sound barrier |
| CN117026818A (en) * | 2023-08-09 | 2023-11-10 | 中铁大桥局武汉桥梁特种技术有限公司 | Liftable rotatable formula construction platform |
-
2018
- 2018-03-16 CN CN201820361862.0U patent/CN208055883U/en not_active Expired - Fee Related
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN110851020A (en) * | 2019-11-13 | 2020-02-28 | 深圳市维冠视界科技股份有限公司 | A touch screen that prevents fog |
| CN112811346A (en) * | 2020-07-03 | 2021-05-18 | 天工俐德科技发展有限公司 | Totally closed installation device for sound barrier |
| CN112252205A (en) * | 2020-09-27 | 2021-01-22 | 上海宏信设备工程有限公司 | Bridge operation platform |
| CN117026818A (en) * | 2023-08-09 | 2023-11-10 | 中铁大桥局武汉桥梁特种技术有限公司 | Liftable rotatable formula construction platform |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN208055883U (en) | A kind of movable type Roadway Construction hanging barrier operating platform | |
| CN104453231B (en) | Gantry type building construction hoisting device and its manufacturing and construction method | |
| CN110228743B (en) | Overhead two-to-one suspension ratio construction elevator for elevator shaft traction and operation method thereof | |
| CN211340435U (en) | Large-tonnage assembled pier body and pier cap hoisting device | |
| CN202767491U (en) | Building operation overhanging type movable blanking platform | |
| CN106400701A (en) | Single-girder low-level balanced cantilever assembling bridge erection machine | |
| CN204310644U (en) | A kind of single suspension centre cage guide installation and maintenance hanging basket | |
| CN103274315B (en) | Installing and hoisting device for side plate and upright of gas chamber | |
| CN207748760U (en) | A kind of bridge crane of hoisting large-size drainpipe | |
| CN116062626A (en) | A super high-rise building tower crown part curtain wall hoisting equipment and hoisting method | |
| CN110485290A (en) | It is a kind of can the three-dimensional movable type cable-stayed bridge king-post of falling Y shape medial surface repair apparatus | |
| CN104677744A (en) | Static loading test device for missile wing | |
| CN205575428U (en) | Component hoisting system | |
| CN210031529U (en) | Automatic climbing platform for construction of hanging cable | |
| CN210856930U (en) | A maintenance system for the inverted Y-shaped tower column of a cable-stayed bridge | |
| CN106144929A (en) | Group hoist device and construction method | |
| CN205709649U (en) | A kind of simple suspension crane | |
| CN210563325U (en) | Attached lifting scaffold with guide rail guide wheels | |
| JP7213362B2 (en) | Elevator equipment for construction | |
| CN210480530U (en) | Elevator shaft traction overhead two-to-one suspension ratio construction elevator | |
| CN219240317U (en) | Large-span bridge girder steel concatenation rack | |
| CN217948788U (en) | Continuous steel structure transverse prestress construction auxiliary device | |
| JP2003020176A (en) | Elevator device | |
| WO2009003332A1 (en) | Wire rope space anti-interference arrangement for crane with multiple hoisting points | |
| CN205294547U (en) | Goods lift device goes up and down safely |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20181106 |