CN208054769U - A kind of special galianconism device of foundation construction - Google Patents

A kind of special galianconism device of foundation construction Download PDF

Info

Publication number
CN208054769U
CN208054769U CN201820462531.6U CN201820462531U CN208054769U CN 208054769 U CN208054769 U CN 208054769U CN 201820462531 U CN201820462531 U CN 201820462531U CN 208054769 U CN208054769 U CN 208054769U
Authority
CN
China
Prior art keywords
arm
bracket body
pulleys
foundation construction
short arm
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820462531.6U
Other languages
Chinese (zh)
Inventor
张渊
潘勋
赵会谦
马东溟
朱义伟
徐明亮
郭玉
王红民
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yutong Heavy Equipment Co ltd
Original Assignee
Zhengzhou Zhengyu Heavy Industry Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhengzhou Zhengyu Heavy Industry Co Ltd filed Critical Zhengzhou Zhengyu Heavy Industry Co Ltd
Priority to CN201820462531.6U priority Critical patent/CN208054769U/en
Application granted granted Critical
Publication of CN208054769U publication Critical patent/CN208054769U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Abstract

本实用新型提供一种基础施工专用短臂装置,包括支架本体,支架本体的后方固接水平向后延伸的两个连接臂,两个连接臂的上方均设有拉板,拉板的前端铰接在支架本体上且与连接臂之间的夹角可调;支架本体的前方为向前延伸的两个前叉臂,两个前叉臂之间设有至少两个间隔放置的滑轮,滑轮的前部、上部、下部均设有防止钢丝绳脱落的绳挡装置,绳挡装置两端分别连接伸长臂,伸长臂的另一端固接在前叉臂的前端。与现有技术相比,本实用新型结构简单实用,吊载能力强,在短臂安装至少2个滑轮,同时实现单倍率高速提升下放,同时主臂臂头可以多倍率吊载重物,即可实现至少3个卷扬同时提升下放,节约更换倍率时间,便于满足不同工况的需求,提高工作效率。

The utility model provides a special short arm device for foundation construction, which includes a bracket body, two connecting arms extending horizontally and backwards are fixedly connected to the rear of the bracket body, pull plates are arranged above the two connecting arms, and the front ends of the pull plates are hinged. The included angle between the bracket body and the connecting arm is adjustable; the front of the bracket body is two front fork arms extending forward, and at least two pulleys are arranged at intervals between the two front fork arms. The front part, the upper part and the lower part are all equipped with a rope stop device to prevent the wire rope from falling off. Compared with the prior art, the utility model has a simple and practical structure and a strong lifting capacity. At least two pulleys are installed on the short arm to realize single-rate high-speed lifting and lowering. At the same time, the main arm head can lift heavy objects at multiple rates. At least 3 winches can be lifted and lowered at the same time, saving the time for changing the magnification, convenient to meet the needs of different working conditions, and improve work efficiency.

Description

一种基础施工专用短臂装置A special short arm device for foundation construction

技术领域technical field

本实用新型涉及起重机设备领域,具体涉及一种用于履带起重机的基础施工专用短臂装置。The utility model relates to the field of crane equipment, in particular to a special short arm device for foundation construction of crawler cranes.

背景技术Background technique

目前,在基础施工领域,客户需求履带起重机要能满足两个卷扬同时高效提升下放,并且还要满足第3卷扬能够配合吊载较重的施工设备。然而,现有的履带起重机自带的短臂承载能力较低,只有一个滑轮,在施工时,主臂要么采用单倍率快速提升下放,要么采用多倍率提高起重能力,只能满足其中之一;且每次转换使用时需要将臂架放下,重新改变卷扬的穿绳倍率,大大影响了整体施工效率。At present, in the field of foundation construction, the crawler crane required by customers must be able to efficiently lift and lower two hoists at the same time, and also meet the requirements that the third hoist can cooperate with heavy-duty construction equipment. However, the short arm of the existing crawler crane has a low load-carrying capacity and only has one pulley. During construction, the main arm can either be quickly raised and lowered with a single rate, or the lifting capacity can be increased with multiple rates, which can only meet one of them. ; And the boom needs to be put down every time it is switched to use, and the rope-threading magnification of the winch is changed again, which greatly affects the overall construction efficiency.

发明内容Contents of the invention

本实用新型的目的是针对上述现有技术中所存在的不足而提供一种基础施工专用短臂装置,通过提高短臂承载力,在短臂安装至少2个滑轮,可以在短臂上实现双卷扬,同时实现单倍率高速提升下放,同时主臂臂头可以多倍率吊载重物,节约更换倍率时间,提高工作效率。为解决上述问题,本实用新型提供一种基础施工专用短臂装置。The purpose of this utility model is to provide a special short arm device for foundation construction in view of the deficiencies in the above-mentioned prior art. By increasing the bearing capacity of the short arm, at least two pulleys are installed on the short arm, and the double pulley can be realized on the short arm. Hoisting, at the same time realize single-rate high-speed lifting and lowering, and at the same time, the boom head of the main boom can hoist heavy objects at multiple rates, saving the time for changing the magnification and improving work efficiency. In order to solve the above problems, the utility model provides a special short arm device for foundation construction.

本实用新型的目的是以下述方式实现的:The purpose of this utility model is achieved in the following manner:

一种基础施工专用短臂装置,包括支架本体,支架本体的后方固接水平向后延伸的两个连接臂,两个连接臂的上方均设有拉板,拉板的前端铰接在支架本体上且与连接臂之间的夹角可调,连接臂的后端设有用于与履带起重机的主臂臂头的前下部相连接的通孔,拉板的后端设有用于与主臂臂头的前上部相铰接的通孔;支架本体的前方为向前延伸的两个前叉臂,两个前叉臂之间设有至少两个间隔放置的滑轮,滑轮的前部、上部、下部均设有防止钢丝绳脱落的绳挡装置,绳挡装置的两端分别连接伸长臂,伸长臂的另一端固接在前叉臂的前端。A special short-arm device for foundation construction, comprising a support body, two connecting arms extending horizontally and backwards are fixedly connected to the rear of the support body, pull plates are arranged above the two connecting arms, and the front ends of the pull plates are hinged on the support body And the angle between the connecting arm and the connecting arm is adjustable. The rear end of the connecting arm is provided with a through hole for connecting with the front lower part of the main arm head of the crawler crane. The front upper part of the hinged through hole; the front of the bracket body is two front fork arms extending forward, and at least two pulleys placed at intervals are arranged between the two front fork arms. A rope retaining device is provided to prevent the wire rope from falling off, and the two ends of the rope retaining device are respectively connected to the extension arm, and the other end of the extension arm is fixedly connected to the front end of the front fork arm.

所述间隔放置的滑轮之间设有用于固定滑轮位置的隔套。Spacer sleeves for fixing the position of the pulleys are arranged between the pulleys placed at intervals.

所述绳挡装置的轴为圆钢,圆钢上套有多个钢管,钢管的长度大于或等于滑轮上用于缠绕钢丝绳的槽的宽度。The shaft of the rope retaining device is a round steel, and a plurality of steel pipes are sheathed on the round steel, and the length of the steel pipes is greater than or equal to the width of the groove on the pulley for winding the wire rope.

所述前叉臂的前端设有通孔,通孔内安装滑轮轴,滑轮轴上套有滑轮。The front end of the front fork arm is provided with a through hole, and a pulley shaft is installed in the through hole, and a pulley is sleeved on the pulley shaft.

有益效果:与现有技术相比,本实用新型结构简单实用,吊载能力强,在短臂安装2个或多个滑轮,同时实现单倍率高速提升下放,同时主臂臂头可以多倍率吊载重物,即可实现至少3个卷扬同时提升下放,节约更换倍率时间,便于满足基础施工不同工况的需求,提高工作效率。Beneficial effects: Compared with the prior art, the utility model has a simple and practical structure and a strong lifting capacity. Two or more pulleys are installed on the short arm, and at the same time realize single-rate high-speed lifting and lowering, and at the same time, the main arm head can be hoisted at multiple rates. For heavy loads, at least 3 winches can be lifted and lowered at the same time, which saves time for changing the magnification, facilitates meeting the needs of different working conditions of foundation construction, and improves work efficiency.

附图说明Description of drawings

图1是本实用新型的结构示意图。Fig. 1 is the structural representation of the utility model.

图2是本实用新型与履带起重机的臂头相结合的结构示意图。Fig. 2 is a structural schematic diagram of the combination of the utility model and the arm head of the crawler crane.

其中,1是拉板;2是销轴;3是支架本体;4是滑轮;5是绳挡装置;6是连接臂;7是臂头;8是滑轮轴;9是前叉臂;10是伸长臂。Among them, 1 is the pull plate; 2 is the pin shaft; 3 is the bracket body; 4 is the pulley; 5 is the rope stop device; 6 is the connecting arm; 7 is the arm head; 8 is the pulley shaft; Extend your arms.

具体实施方式Detailed ways

如图1所示,一种基础施工专用短臂装置,包括支架本体3,支架本体3为箱形结构,支架本体3的俯视图为倒立的向前开口的U形,支架本体3的后方固接水平向后延伸的两个连接臂6,两个连接臂6的上方均设有拉板1,拉板1的前端通过销轴2铰接在支架本体3上且与连接臂6之间的夹角可调,连接臂6的后端设有用于与履带起重机的主臂臂头7的前下部通过滑轮轴8相连接的通孔,拉板1的后端设有用于与主臂臂头7的前上部通过销轴2相铰接的通孔;支架本体3的前方为向前延伸的两个前叉臂9,两个前叉臂9之间设有两个间隔放置的滑轮4,滑轮4的前部、上部、下部均设有防止钢丝绳脱落的绳挡装置5,对钢丝绳进行多方位的保护,绳挡装置5的两端分别连接伸长臂10,伸长臂10的另一端固接在前叉臂9的前端。As shown in Figure 1, a special short arm device for foundation construction includes a bracket body 3, the bracket body 3 is a box-shaped structure, the top view of the bracket body 3 is an inverted U-shaped front opening, and the rear of the bracket body 3 is fixed. The two connecting arms 6 extending horizontally backwards are provided with a pull plate 1 above the two connecting arms 6, and the front end of the pull plate 1 is hinged on the bracket body 3 through a pin shaft 2 and the angle between the connecting arms 6 is Adjustable, the rear end of the connecting arm 6 is provided with a through hole for connecting with the front lower part of the main arm head 7 of the crawler crane through the pulley shaft 8, and the rear end of the pull plate 1 is provided with a hole for connecting with the main arm head 7. The front upper part is through the through hole hinged by the pin shaft 2; the front of the bracket body 3 is two front fork arms 9 extending forward, and two pulleys 4 placed at intervals are arranged between the two front fork arms 9. The front part, the upper part and the lower part are all equipped with a rope stopper 5 to prevent the steel wire rope from falling off, and the steel wire rope is protected in multiple directions. The front end of front wishbone 9.

所述拉板1有多种规格,不同规格的拉板1的长度不同,这种不同长度的拉板1便于调节拉板1与连接臂6之间的夹角,从而调节短臂与主臂之间的夹角,改变短臂的受力状态,提高短臂的承载力,提供不同的承载力和工作半径。The pull plate 1 has a variety of specifications, and the pull plate 1 of different specifications has different lengths. The pull plate 1 of different lengths is convenient for adjusting the angle between the pull plate 1 and the connecting arm 6, thereby adjusting the short arm and the main arm. The angle between them can change the stress state of the short arm, improve the bearing capacity of the short arm, and provide different bearing capacity and working radius.

所述间隔放置的滑轮4之间设有用于固定滑轮4位置的隔套,通过调节滑轮4的位置来改变吊钩之间的相对位置,满足吊钩之间的安全距离。Spacer sleeves for fixing the position of the pulleys 4 are arranged between the pulleys 4 placed at intervals, and the relative position between the hooks is changed by adjusting the position of the pulleys 4 to meet the safety distance between the hooks.

所述绳挡装置5的轴为圆钢,圆钢上套有多个钢管,多个钢管使得无论滑轮4的位置如何变化都可以对钢丝绳进行防脱落保护,钢管的长度大于或等于滑轮4上用于缠绕钢丝绳的槽的宽度,这样的结构使钢丝绳不容易脱落。The shaft of the rope retaining device 5 is a round steel, and the round steel is covered with a plurality of steel pipes, so that no matter how the position of the pulley 4 changes, the wire rope can be protected against falling off, and the length of the steel pipe is greater than or equal to that on the pulley 4. The width of the groove for winding the wire rope, such a structure makes the wire rope not easy to fall off.

优选地,所述前叉臂9的前端设有通孔,通孔内安装滑轮轴8,滑轮轴8上套有滑轮4。Preferably, the front end of the front fork arm 9 is provided with a through hole, the pulley shaft 8 is installed in the through hole, and the pulley 4 is sleeved on the pulley shaft 8 .

本实用新型的专用短臂装置与履带起重机的臂头相结合的工作状态如图2所示,连接臂6的后端与履带起重机的主臂臂头7前下部的吊重滑轮轴8相连接,拉板1后端与臂头7前上部通过销轴2铰接。工作时,主臂臂头7前部的滑轮可以多倍率吊载重物,短臂上的2个滑轮可以实现双卷扬,即可实现3个卷扬同时提升下放,便于满足不同工况的需求。The working state of the combination of the special short arm device of the utility model and the arm head of the crawler crane is shown in Figure 2, the rear end of the connecting arm 6 is connected with the hoisting pulley shaft 8 at the front lower part of the main arm arm head 7 of the crawler crane , the rear end of the pull plate 1 is hinged with the front upper part of the arm head 7 through the pin shaft 2. When working, the pulley at the front of the boom head 7 can hoist heavy objects with multiple ratios, and the two pulleys on the short arm can realize double hoisting, which can realize three hoisting and lowering at the same time, which is convenient to meet the needs of different working conditions .

以上所述的仅是本实用新型的优选实施方式,应当指出,对于本领域的技术人员来说,在不脱离本实用新型整体构思前提下,还可以作出若干改变和改进,这些也应该视为本实用新型的保护范围,这些都不会影响本实用新型实施的效果和专利的实用性。The above is only the preferred embodiment of the utility model, it should be pointed out that for those skilled in the art, without departing from the overall concept of the utility model, some changes and improvements can also be made, and these should also be regarded as The protection scope of the utility model, these all can not affect the effect that the utility model implements and the practicability of the patent.

Claims (4)

1.一种基础施工专用短臂装置,其特征在于:包括支架本体(3),支架本体(3)的后方固接水平向后延伸的两个连接臂(6),两个连接臂(6)的上方均设有拉板(1),拉板(1)的前端铰接在支架本体(3)上且与连接臂(6)之间的夹角可调,连接臂(6)的后端设有用于与履带起重机的主臂臂头(7)的前下部相连接的通孔,拉板(1)的后端设有用于与主臂臂头(7)的前上部相铰接的通孔;支架本体(3)的前方为向前延伸的两个前叉臂(9),两个前叉臂(9)之间设有至少两个间隔放置的滑轮(4),滑轮(4)的前部、上部、下部均设有防止钢丝绳脱落的绳挡装置(5),绳挡装置(5)的两端分别连接伸长臂(10),伸长臂(10)的另一端固接在前叉臂(9)的前端。1. A special short arm device for foundation construction, characterized in that: it includes a bracket body (3), the rear of the bracket body (3) is fixedly connected with two connecting arms (6) extending horizontally and backwards, and the two connecting arms (6) ) are provided with pull plates (1), the front end of the pull plate (1) is hinged on the bracket body (3) and the angle between it and the connecting arm (6) is adjustable, and the rear end of the connecting arm (6) There is a through hole for connecting with the front lower part of the main arm head (7) of the crawler crane, and the rear end of the pull plate (1) is provided with a through hole for hinged connection with the front upper part of the main arm head (7) ; The front of the bracket body (3) is two front fork arms (9) extending forward, and at least two pulleys (4) placed at intervals are arranged between the two front fork arms (9). The front part, the upper part and the lower part are all equipped with a rope stopper (5) to prevent the wire rope from falling off. The two ends of the rope stopper (5) are respectively connected to the extension arm (10), and the other end of the extension arm (10) is fixed on the front end of the front wishbone (9). 2.如权利要求1所述的基础施工专用短臂装置,其特征在于:所述间隔放置的滑轮(4)之间设有用于固定滑轮(4)位置的隔套。2. The special short arm device for foundation construction according to claim 1, characterized in that: spacers for fixing the position of the pulleys (4) are provided between the pulleys (4) placed at intervals. 3.如权利要求1所述的基础施工专用短臂装置,其特征在于:所述绳挡装置(5)的轴为圆钢,圆钢上套有多个钢管,钢管的长度大于或等于滑轮(4)上用于缠绕钢丝绳的槽的宽度。3. The special short arm device for foundation construction according to claim 1, characterized in that: the shaft of the rope retaining device (5) is a round steel, and a plurality of steel pipes are sheathed on the round steel, and the length of the steel pipes is greater than or equal to the pulley (4) The width of the groove for winding the wire rope. 4.如权利要求1所述的基础施工专用短臂装置,其特征在于:所述前叉臂(9)的前端设有通孔,通孔内安装滑轮轴(8),滑轮轴(8)上套有滑轮(4)。4. The special short arm device for foundation construction according to claim 1, characterized in that: the front end of the front fork arm (9) is provided with a through hole, and a pulley shaft (8) is installed in the through hole, and the pulley shaft (8) Pulley (4) is covered with on.
CN201820462531.6U 2018-04-03 2018-04-03 A kind of special galianconism device of foundation construction Expired - Fee Related CN208054769U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820462531.6U CN208054769U (en) 2018-04-03 2018-04-03 A kind of special galianconism device of foundation construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820462531.6U CN208054769U (en) 2018-04-03 2018-04-03 A kind of special galianconism device of foundation construction

Publications (1)

Publication Number Publication Date
CN208054769U true CN208054769U (en) 2018-11-06

Family

ID=63988089

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820462531.6U Expired - Fee Related CN208054769U (en) 2018-04-03 2018-04-03 A kind of special galianconism device of foundation construction

Country Status (1)

Country Link
CN (1) CN208054769U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117383449A (en) * 2023-10-11 2024-01-12 徐工集团工程机械股份有限公司建设机械分公司 Extended boom assemblies and crawler cranes

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117383449A (en) * 2023-10-11 2024-01-12 徐工集团工程机械股份有限公司建设机械分公司 Extended boom assemblies and crawler cranes

Similar Documents

Publication Publication Date Title
CN202346637U (en) Holding rod of double-flat-arm spinning self-lifting seat
CN201686432U (en) 800 tons of hanging row
CN106744263B (en) Hook mechanism and its working state conversion method and tower crane
CN113772559B (en) Cable crane cable saddle self-adaptive adjusting system
WO2022111218A1 (en) Pile casing hoisting arm
CN202107425U (en) Oil drum sling
CN203529798U (en) Lifting devices and cranes
CN102864770A (en) Efficient dynamic compaction machine
CN115367638A (en) Turntable mechanism and operation machine
CN201722053U (en) Hoisting mechanism used for upright column hoisting
CN201284186Y (en) Section steel hoisting clamp
CN212151341U (en) Quick hoisting tool for battery module
CN209242475U (en) A kind of suspender
CN207419427U (en) A kind of ocean platform with cross-platform work crane
CN102745598B (en) Tower crane
CN220766256U (en) Folding lifting appliance
CN205442379U (en) Balanced sling
CN205973449U (en) Jack -up handling rigging of buffering pulley
CN201280390Y (en) Large-tonnage suspending beam
CN210944589U (en) Self-detaching attachment mechanism
CN116281674A (en) A variable magnification hook pulley block structure
CN205590168U (en) Overturning lifting device
CN214359922U (en) Grab bucket arm head with hoisting function
CN210655793U (en) Double-machine lifting sling
CN201686400U (en) None-pressing fast suspension hook for suspending

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 451482, three story, general office building, 88 oyu Road, Zhengzhou economic and Technological Development Zone, Henan.

Patentee after: Yutong heavy equipment Co.,Ltd.

Address before: 451482, three story, general office building, 88 oyu Road, Zhengzhou economic and Technological Development Zone, Henan.

Patentee before: ZHENGZHOU ZHENGYU HEAVY INDUSTRY Co.,Ltd.

CP01 Change in the name or title of a patent holder
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20181106

CF01 Termination of patent right due to non-payment of annual fee