CN208054674U - Buffer of elevator seat - Google Patents

Buffer of elevator seat Download PDF

Info

Publication number
CN208054674U
CN208054674U CN201820347748.2U CN201820347748U CN208054674U CN 208054674 U CN208054674 U CN 208054674U CN 201820347748 U CN201820347748 U CN 201820347748U CN 208054674 U CN208054674 U CN 208054674U
Authority
CN
China
Prior art keywords
elevator
plate
positioning portion
buffer seat
fixing plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820347748.2U
Other languages
Chinese (zh)
Inventor
李志鸣
洪水
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hitachi Elevator China Co Ltd
Original Assignee
Hitachi Elevator China Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hitachi Elevator China Co Ltd filed Critical Hitachi Elevator China Co Ltd
Priority to CN201820347748.2U priority Critical patent/CN208054674U/en
Application granted granted Critical
Publication of CN208054674U publication Critical patent/CN208054674U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Lift-Guide Devices, And Elevator Ropes And Cables (AREA)

Abstract

本实用新型公开了一种电梯缓冲器座,包括用于安装电梯缓冲器的安装板、固定板和设于所述安装板和所述固定板之间的支撑架,所述支撑架包括与所述安装板连接的第一支撑端及与所述固定板连接的第二支撑端,所述安装板和/或所述固定板上设有定位结构,所述定位结构包括第一定位部及与所述第一定位部连接的第二定位部;所述第一定位部沿第一方向限位所述第一支撑端和/或所述第二支撑端,所述第二定位部沿与所述第一方向相交的第二方向限位所述第一支撑端和/或所述第二支撑端,所述支撑架由至少一根电梯导轨组成。该电梯缓冲器座的结构简单、易于现场制作,成本低廉,能够满足电梯安装要求。

The utility model discloses an elevator buffer seat, which comprises a mounting plate for installing the elevator buffer, a fixing plate and a support frame arranged between the mounting plate and the fixing plate, and the support frame includes the The first supporting end connected to the mounting plate and the second supporting end connected to the fixing plate, the mounting plate and/or the fixing plate is provided with a positioning structure, the positioning structure includes a first positioning part and a The second positioning part connected to the first positioning part; the first positioning part limits the first support end and/or the second support end along the first direction, and the second positioning part is along with the The second direction intersecting the first direction limits the first support end and/or the second support end, and the support frame is composed of at least one elevator guide rail. The elevator buffer seat has a simple structure, is easy to manufacture on site, has low cost, and can meet elevator installation requirements.

Description

电梯缓冲器座Elevator buffer seat

技术领域technical field

本实用新型涉及电梯安装技术领域,具体涉及一种电梯缓冲器座。The utility model relates to the technical field of elevator installation, in particular to an elevator buffer seat.

背景技术Background technique

由于电梯缓冲器高度、轿底缓冲板位置是特定的,为了控制两者之间的距离(行业内称缓冲器间隙)满足国标要求,需在电梯井道底坑中的缓冲座下面,加装缓冲器座,以调整缓冲器间隙。现时配置在底坑的电梯缓冲器座是在电梯出厂前就设计制造完成,而电梯井道是建筑工程,电梯井道中的底坑深度或多或少地存在着尺寸偏差,所以电梯安装现场底坑深度与原缓冲器座的设计往往存在尺寸不符的问题,从而导致缓冲间隙不能满足安装要求,带来安全风险。Since the height of the elevator buffer and the position of the buffer plate on the car floor are specific, in order to control the distance between the two (called the buffer gap in the industry) to meet the national standard requirements, it is necessary to install a buffer under the buffer seat in the pit of the elevator shaft to adjust the buffer clearance. At present, the elevator buffer seat configured in the pit is designed and manufactured before the elevator leaves the factory, and the elevator shaft is a construction project, and there are more or less dimensional deviations in the depth of the pit in the elevator shaft, so the pit at the elevator installation site The depth and the design of the original buffer seat often have the problem that the size does not match, resulting in the buffer gap not meeting the installation requirements and bringing safety risks.

实用新型内容Utility model content

基于此,有必要针对电梯安装现场底坑深度与出厂时电梯缓冲器座存在尺寸偏差,从而导致电梯缓冲器的缓冲间隙不能满足安装要求的问题,提供一种结构简单、易于现场制作,能够满足电梯安装要求的电梯缓冲器座。Based on this, it is necessary to solve the problem that the depth of the elevator installation site pit has a size deviation from that of the elevator buffer seat when it leaves the factory, which leads to the problem that the buffer gap of the elevator buffer cannot meet the installation requirements. Elevator buffer seat required for elevator installation.

一种电梯缓冲器座,包括用于安装电梯缓冲器的安装板、固定板和设于所述安装板和所述固定板之间的支撑架,所述支撑架包括与所述安装板连接的第一支撑端及与所述固定板连接的第二支撑端,所述安装板和/或所述固定板上设有定位结构,所述定位结构包括第一定位部及与所述第一定位部连接的第二定位部;所述第一定位部沿第一方向限位所述第一支撑端和/或所述第二支撑端,所述第二定位部沿与所述第一方向相交的第二方向限位所述第一支撑端和/或所述第二支撑端,所述支撑架由至少一根电梯导轨组成。An elevator buffer seat, comprising a mounting plate for installing the elevator buffer, a fixing plate and a support frame arranged between the mounting plate and the fixing plate, the support frame includes a The first support end and the second support end connected with the fixing plate, the mounting plate and/or the fixing plate are provided with a positioning structure, the positioning structure includes a first positioning part and a part connected with the second positioning part; the first positioning part limits the first support end and/or the second support end along the first direction, and the second positioning part intersects with the first direction The first support end and/or the second support end are limited in the second direction of the support frame, and the support frame is composed of at least one elevator guide rail.

上述电梯缓冲器座的结构简单,易于制作,可以根据电梯现场安装的需要由现场底坑的深度来决定支撑架的长度,并截取合适长度的电梯导轨制成支撑架,在定位结构的作用下将支撑架的两端分别与安装板或固定板连接,所得电梯缓冲器座的尺寸与电梯井道底坑深度相匹配,从而使得电梯缓冲器的缓冲间隙更准确,适应性强,能够实现电梯井道在建筑工程方面的尺寸偏差的补偿,进而确保电梯系统的正常安装与运行。同时,以电梯安装剩余的电梯导轨作为支撑架的材料,可以起到一材两用的作用,节约制造成本,且其强度可靠,能满足国标相关要求。The structure of the above-mentioned elevator buffer seat is simple and easy to manufacture. The length of the support frame can be determined by the depth of the site pit according to the needs of the elevator on-site installation, and the elevator guide rail with a suitable length is cut to make the support frame. Under the action of the positioning structure Connect the two ends of the support frame to the mounting plate or the fixing plate respectively, and the size of the obtained elevator buffer seat matches the depth of the elevator shaft pit, so that the buffer gap of the elevator buffer is more accurate and adaptable, and can realize the elevator shaft. Compensation for dimensional deviation in construction engineering to ensure the normal installation and operation of the elevator system. At the same time, using the remaining elevator guide rails from the elevator installation as the material of the supporting frame can play a dual-purpose role, saving manufacturing costs, and its strength is reliable, which can meet the relevant requirements of the national standard.

在其中一个实施例中,所述第一定位部与所述第二定位部均为凸设于所述固定板和/或所述安装板表面的凸块。In one embodiment, both the first positioning portion and the second positioning portion are protrusions protruding from the surface of the fixing plate and/or the mounting plate.

在其中一个实施例中,所述第一定位部与所述第二定位部相互垂直设置,所述电梯导轨沿所述第一方向和所述第二方向设置的两个侧面分别与所述第一定位部和所述第二定位部相抵贴。In one of the embodiments, the first positioning part and the second positioning part are arranged perpendicular to each other, and the two sides of the elevator guide rail along the first direction and the second direction are respectively connected to the first positioning part. A positioning portion abuts against the second positioning portion.

在其中一个实施例中,所述电梯导轨为T型电梯导轨,所述T型电梯导轨具有第一导板及垂直连接于所述第一导板中部的第二导板,所述第二导板相互垂直的两个侧面分别与所述第一定位部和所述第二定位部相抵贴。In one of the embodiments, the elevator guide rail is a T-shaped elevator guide rail, and the T-shaped elevator guide rail has a first guide plate and a second guide plate vertically connected to the middle of the first guide plate, and the second guide plates are perpendicular to each other. The two side surfaces respectively abut against the first positioning portion and the second positioning portion.

在其中一个实施例中,所述电梯导轨的数量为两根,两根所述电梯导轨的两个所述第一导板相贴合并固定连接。In one of the embodiments, the number of the elevator guide rails is two, and the two first guide plates of the two elevator guide rails are attached and fixedly connected.

在其中一个实施例中,所述第一导板上设有多个螺接孔,多个所述螺接孔对称分布于所述第一导板的两侧。In one embodiment, the first guide plate is provided with a plurality of screw holes, and the plurality of screw holes are symmetrically distributed on both sides of the first guide plate.

在其中一个实施例中,所述电梯导轨由现场裁切形成。In one of the embodiments, the elevator guide rail is formed by cutting on site.

在其中一个实施例中,所述支撑架与所述安装板和/或所述固定板相互垂直,所述安装板与所述固定板平行设置。In one of the embodiments, the support frame is perpendicular to the mounting plate and/or the fixing plate, and the mounting plate is arranged parallel to the fixing plate.

在其中一个实施例中,所述安装板上设有多个安装孔,所述固定板上设有多个固定孔。In one of the embodiments, the mounting plate is provided with a plurality of mounting holes, and the fixing plate is provided with a plurality of fixing holes.

在其中一个实施例中,所述支撑架的一端与所述安装板和/或所述固定板的连接方式为焊接。In one embodiment, one end of the support frame is connected to the mounting plate and/or the fixing plate by welding.

附图说明Description of drawings

图1为本实用新型一实施例电梯缓冲器座的结构示意图;Fig. 1 is a schematic structural view of an elevator buffer seat according to an embodiment of the present invention;

图2为图1电梯缓冲器座的结构爆炸图;Fig. 2 is the structural explosion diagram of Fig. 1 elevator buffer seat;

图3为本实用新型一实施例电梯缓冲器座的安装示意图。Fig. 3 is a schematic diagram of the installation of an elevator buffer seat according to an embodiment of the present invention.

具体实施方式Detailed ways

为了便于理解本实用新型,下面将参照相关附图对本实用新型进行更全面的描述。附图中给出了本实用新型的较佳实施例。但是,本实用新型可以以许多不同的形式来实现,并不限于本文所描述的实施例。相反地,提供这些实施例的目的是使对本实用新型的公开内容的理解更加透彻全面。In order to facilitate the understanding of the utility model, the utility model will be described more fully below with reference to the relevant drawings. Preferred embodiments of the utility model are provided in the accompanying drawings. However, the invention can be embodied in many different forms and is not limited to the embodiments described herein. On the contrary, the purpose of providing these embodiments is to make the understanding of the disclosure of the present utility model more thorough and comprehensive.

需要说明的是,当元件被称为“固定于”另一个元件,它可以直接在另一个元件上或者也可以存在居中的元件。当一个元件被认为是“连接”另一个元件,它可以是直接连接到另一个元件或者可能同时存在居中元件。It should be noted that when an element is referred to as being “fixed” to another element, it can be directly on the other element or there can also be an intervening element. When an element is referred to as being "connected to" another element, it can be directly connected to the other element or intervening elements may also be present.

除非另有定义,本文所使用的所有的技术和科学术语与属于本实用新型的技术领域的技术人员通常理解的含义相同。本文中在本实用新型的说明书中所使用的术语只是为了描述具体的实施例的目的,不是旨在于限制本实用新型。本文所使用的术语“和/或”包括一个或多个相关的所列项目的任意的和所有的组合。Unless otherwise defined, all technical and scientific terms used herein have the same meaning as commonly understood by one of ordinary skill in the technical field of this invention. The terms used herein in the description of the utility model are only for the purpose of describing specific embodiments, and are not intended to limit the utility model. As used herein, the term "and/or" includes any and all combinations of one or more of the associated listed items.

如图1所示,本实用新型一实施方式的电梯缓冲器座10,包括安装板100、支撑架200和固定板300,支撑架200包括与安装板100连接的第一支撑端(图未标)及与固定板300连接的第二支撑端(图未标),支撑架200设于安装板100和固定板300之间。As shown in Figure 1, the elevator buffer seat 10 of one embodiment of the present utility model includes a mounting plate 100, a support frame 200 and a fixed plate 300, and the support frame 200 includes a first support end (not shown) connected with the mounting plate 100 ) and the second supporting end (not shown) connected with the fixing plate 300, the supporting frame 200 is arranged between the installing plate 100 and the fixing plate 300.

如图2所示,安装板100和/或固定板300上设有定位结构310,定位结构310包括第一定位部311及与第一定位部311连接的第二定位部313;第一定位部311沿第一方向限位第一支撑端和/或第二支撑端,第二定位部313沿与第一方向相交的第二方向限位第一支撑端和/或第二支撑端;支撑架由至少一根电梯导轨210组成。As shown in Figure 2, a positioning structure 310 is provided on the mounting plate 100 and/or the fixing plate 300, and the positioning structure 310 includes a first positioning portion 311 and a second positioning portion 313 connected with the first positioning portion 311; the first positioning portion 311 limits the first support end and/or the second support end along the first direction, and the second positioning portion 313 limits the first support end and/or the second support end along the second direction intersecting the first direction; the support frame It consists of at least one elevator guide rail 210.

如图3所示,安装板100用于安装电梯缓冲器20,固定板300提供固定安装于电梯底坑的安装基础。As shown in FIG. 3 , the installation plate 100 is used for installing the elevator buffer 20 , and the fixing plate 300 provides an installation base for fixed installation in the elevator pit.

上述电梯缓冲器座10的结构简单、且材料易得,易于现场制作。The structure of the elevator buffer seat 10 is simple, and the materials are readily available, so it is easy to manufacture on site.

该电梯缓冲器座10可根据电梯安装现场底坑的实际深度进行设计,由底坑深度决定支撑架200的长度,并截取适宜长度的电梯导轨作为支撑架200,然后在定位结构310的定位作用下,将支撑架200的两端分别与安装板100和固定板300固定连接,所得电梯缓冲器座10的尺寸与电梯井道底坑深度相匹配,使得电梯缓冲器的缓冲间隙更为准确,能够实现电梯井道在建筑工程方面的尺寸偏差的补偿,进而确保电梯系统的正常安装与运行。同时,电梯安装时常有电梯导轨裁切剩余,而该电梯缓冲器座的支撑架200可以直接利用电梯安装剩余的电梯导轨为材料进行裁切制作而成,避免了额外提供材料制作支撑架,可大大的节约成本,且其材料的强度可靠能满足国标要求。The elevator buffer seat 10 can be designed according to the actual depth of the pit at the elevator installation site. The length of the support frame 200 is determined by the depth of the pit, and the elevator guide rail of an appropriate length is taken as the support frame 200, and then the positioning function of the positioning structure 310 Next, the two ends of the support frame 200 are fixedly connected to the mounting plate 100 and the fixing plate 300 respectively, and the size of the obtained elevator buffer seat 10 matches the depth of the elevator shaft pit, so that the buffer gap of the elevator buffer is more accurate and can Realize the compensation of the size deviation of the elevator shaft in the construction engineering, and then ensure the normal installation and operation of the elevator system. Simultaneously, during elevator installation, there are often remaining elevator guide rails to be cut, and the support frame 200 of the elevator buffer seat can directly utilize the remaining elevator guide rails of the elevator installation as materials to be cut and made, thus avoiding the need to provide additional materials to make the support frame. The cost is greatly saved, and the strength of the material can reliably meet the requirements of the national standard.

在一实施例中,如图2所示,第一定位部311与第二定位部313均为凸设于固定板300表面的凸块。可以理解,第一定位部和第二定位部还可以是凹槽等其他可用来限位的结构。In one embodiment, as shown in FIG. 2 , both the first positioning portion 311 and the second positioning portion 313 are protrusions protruding from the surface of the fixing plate 300 . It can be understood that the first positioning portion and the second positioning portion can also be grooves and other structures that can be used for positioning.

进一步地,第一定位部311和第二定位部313相互垂直设置,电梯导轨230相互垂直的两个侧面分别与第一定位部311和第二定位部313相抵贴,以沿两个相互垂直的方向限位于第一定位部311和第二定位部313围设形成的限位空间内。Furthermore, the first positioning part 311 and the second positioning part 313 are arranged perpendicular to each other, and the two mutually perpendicular sides of the elevator guide rail 230 are respectively abutted against the first positioning part 311 and the second positioning part 313, so as to move along the two mutually perpendicular sides. The direction is limited in the limiting space formed by the first positioning part 311 and the second positioning part 313 .

更进一步地,定位结构310为呈L型的凸块。Furthermore, the positioning structure 310 is an L-shaped bump.

在一个实施例中,如图2所示,导轨210为T型电梯导轨,其具有第一导板211及垂直连接于第一导板211中部的第二导板213,第二导板213相互垂直的两个侧面分别与第一定位部311和第二定位部313相抵贴。如此,导轨210的第二导板213的一端有两个侧面与定位结构310的两个定位部紧贴,使支撑架200与安装板100和/或固定板300固定连接时的位置更为准确、方便,且固定连接的结构稳定性更高。In one embodiment, as shown in Figure 2, the guide rail 210 is a T-shaped elevator guide rail, which has a first guide plate 211 and a second guide plate 213 vertically connected to the middle of the first guide plate 211, and the two vertical guide plates 213 are perpendicular to each other. The side surfaces respectively abut against the first positioning portion 311 and the second positioning portion 313 . In this way, one end of the second guide plate 213 of the guide rail 210 has two side surfaces that are in close contact with the two positioning parts of the positioning structure 310, so that the position of the support frame 200 when it is fixedly connected with the mounting plate 100 and/or the fixing plate 300 is more accurate. It is convenient, and the structural stability of the fixed connection is higher.

进一步地,支撑架200由2根电梯导轨组成。具体的,支撑架200包括第一导轨210和第二导轨230,第一导轨210和第二导轨230背靠背相贴合并固定连接。如此,由两根T型电梯导轨背靠背紧固贴合而成支撑架200,电梯缓冲器座10的结构稳定性好。Further, the supporting frame 200 is composed of two elevator guide rails. Specifically, the support frame 200 includes a first guide rail 210 and a second guide rail 230, and the first guide rail 210 and the second guide rail 230 are attached back to back and fixedly connected. In this way, the support frame 200 is formed by fastening two T-shaped elevator guide rails back to back, and the structural stability of the elevator buffer seat 10 is good.

可以理解,导轨的横截面还可以呈L型等其他形状的导轨,为了满足结构稳定性,L型导轨的数量可以相应增加至3~4根,以满足结构稳定性的要求。It can be understood that the cross-section of the guide rail can also be L-shaped or other shaped guide rails. In order to meet the structural stability, the number of L-shaped guide rails can be correspondingly increased to 3-4 to meet the requirement of structural stability.

在一个实施例中,为了达到电梯导轨有两个侧面分别与第一定位部和第二定位部紧贴,L型凸块设于T型电梯导轨的第一导板与第二导板形成的垂直夹角处,并与导轨的第一导板和第二导板相抵贴。In one embodiment, in order to achieve that the two sides of the elevator guide rail are in close contact with the first positioning part and the second positioning part respectively, the L-shaped projection is arranged on the vertical clamp formed by the first guide plate and the second guide plate of the T-shaped elevator guide rail. corner, and abut against the first guide plate and the second guide plate of the guide rail.

在一个实施例中,电梯导轨210由现场裁切形成。如此,现场进行电梯导轨210的裁切制作,可以利用电梯安装剩余的电梯导轨,达到废物利用的作用,大大节约生产成本。In one embodiment, elevator guide rails 210 are formed by cutting on site. In this way, the cutting and manufacturing of the elevator guide rail 210 can be carried out on site, and the remaining elevator guide rails can be installed by using the elevator, so as to achieve the effect of waste utilization and greatly save the production cost.

在一个实施例中,第一导轨210与第二导轨230的固定连接方式为螺接,第一导轨210的第一导板211上设有多个螺接孔215,多个螺接孔对称分布于第一导板211的两侧,第二导轨230上设有与第一导轨210相对应的螺接孔(图未标)。可以理解,螺接孔的个数及分布位置应根据具体情况,综合考虑导轨的长度以及宽度而定。In one embodiment, the fixed connection between the first guide rail 210 and the second guide rail 230 is screw connection, the first guide plate 211 of the first guide rail 210 is provided with a plurality of screw connection holes 215, and the plurality of screw connection holes are symmetrically distributed on On both sides of the first guide plate 211 , the second guide rail 230 is provided with screw holes (not shown) corresponding to the first guide rail 210 . It can be understood that the number and distribution positions of the threaded holes should be determined according to the actual situation, taking into account the length and width of the guide rail.

在一实施例中,第一导轨210与第二导轨230的固定连接的方式为焊接或销接。可以理解,第一导轨210和第二导轨230的固定连接方式可以为螺接、也可以通过焊接或销接进行固定,还可以将多种固定方式进行配合以达到更好的稳固效果。In one embodiment, the fixed connection of the first guide rail 210 and the second guide rail 230 is welding or pinning. It can be understood that the fixed connection of the first guide rail 210 and the second guide rail 230 can be screwed, welded or pinned, and various fixing methods can be combined to achieve a better stabilizing effect.

在一个实施例中,安装板100上设有4个安装孔,固定板300上设有4个固定孔。如此,方便电梯缓冲器的安装,以及将电梯缓冲器座固定安装于底坑中。In one embodiment, the mounting plate 100 is provided with 4 mounting holes, and the fixing plate 300 is provided with 4 fixing holes. In this way, the installation of the elevator buffer is facilitated, and the elevator buffer seat is fixedly installed in the pit.

在一个实施例中,支撑架200的两端与安装板100和/或固定板300的连接方式为焊接。In one embodiment, the two ends of the support frame 200 are connected to the mounting plate 100 and/or the fixing plate 300 by welding.

进一步地,支撑架200与安装板100垂直设置,安装板100与固定板300平行设置。Further, the support frame 200 is arranged vertically to the installation board 100 , and the installation board 100 is arranged parallel to the fixing board 300 .

以上所述实施例的各技术特征可以进行任意的组合,为使描述简洁,未对上述实施例中的各个技术特征所有可能的组合都进行描述,然而,只要这些技术特征的组合不存在矛盾,都应当认为是本说明书记载的范围。The technical features of the above-mentioned embodiments can be combined arbitrarily. To make the description concise, all possible combinations of the technical features in the above-mentioned embodiments are not described. However, as long as there is no contradiction in the combination of these technical features, should be considered as within the scope of this specification.

以上所述实施例仅表达了本实用新型的几种实施方式,其描述较为具体和详细,但并不能因此而理解为对实用新型专利范围的限制。应当指出的是,对于本领域的普通技术人员来说,在不脱离本实用新型构思的前提下,还可以做出若干变形和改进,这些都属于本实用新型的保护范围。因此,本实用新型专利的保护范围应以所附权利要求为准。The above-mentioned embodiments only express several implementation modes of the utility model, and the description thereof is relatively specific and detailed, but it should not be understood as limiting the scope of the utility model patent. It should be noted that those skilled in the art can make several modifications and improvements without departing from the concept of the present invention, and these all belong to the protection scope of the present invention. Therefore, the scope of protection of the utility model patent should be based on the appended claims.

Claims (10)

1.一种电梯缓冲器座,其特征在于,包括用于安装电梯缓冲器的安装板、固定板和设于所述安装板和所述固定板之间的支撑架,所述支撑架包括与所述安装板连接的第一支撑端及与所述固定板连接的第二支撑端,所述安装板和/或所述固定板上设有定位结构,所述定位结构包括第一定位部及与所述第一定位部连接的第二定位部;所述第一定位部沿第一方向限位所述第一支撑端和/或所述第二支撑端,所述第二定位部沿与所述第一方向相交的第二方向限位所述第一支撑端和/或所述第二支撑端,所述支撑架由至少一根电梯导轨组成。1. A kind of elevator buffer seat, it is characterized in that, comprise the mounting plate that is used to install elevator buffer, fixing plate and be located at the support frame between described mounting plate and described fixing plate, described support frame comprises and The first supporting end connected to the mounting plate and the second supporting end connected to the fixing plate, the mounting plate and/or the fixing plate are provided with a positioning structure, the positioning structure includes a first positioning portion and A second positioning portion connected to the first positioning portion; the first positioning portion limits the first support end and/or the second support end along the first direction, and the second positioning portion is along the The second direction intersecting the first direction limits the first support end and/or the second support end, and the support frame is composed of at least one elevator guide rail. 2.如权利要求1所述的电梯缓冲器座,其特征在于,所述第一定位部与所述第二定位部均为凸设于所述固定板和/或所述安装板表面的凸块。2. The elevator buffer seat according to claim 1, characterized in that, the first positioning portion and the second positioning portion are protrusions protruding from the surface of the fixing plate and/or the mounting plate. piece. 3.如权利要求2所述的电梯缓冲器座,其特征在于,所述第一定位部与所述第二定位部相互垂直设置,所述电梯导轨沿所述第一方向和所述第二方向设置的两个侧面分别与所述第一定位部和所述第二定位部相抵贴。3. The elevator buffer seat according to claim 2, wherein the first positioning portion and the second positioning portion are arranged perpendicular to each other, and the elevator guide rail is along the first direction and the second positioning portion. The two side faces arranged in the direction abut against the first positioning portion and the second positioning portion respectively. 4.如权利要求3所述的电梯缓冲器座,其特征在于,所述电梯导轨为T型电梯导轨,所述T型电梯导轨具有第一导板及垂直连接于所述第一导板中部的第二导板,所述第二导板相互垂直的两个侧面分别与所述第一定位部和所述第二定位部相抵贴。4. The elevator buffer seat according to claim 3, wherein the elevator guide rail is a T-shaped elevator guide rail, and the T-shaped elevator guide rail has a first guide plate and a second guide plate vertically connected to the middle part of the first guide plate. Two guide plates, the two sides of the second guide plate perpendicular to each other abut against the first positioning portion and the second positioning portion respectively. 5.如权利要求4所述的电梯缓冲器座,其特征在于,所述电梯导轨的数量为两根,两根所述电梯导轨的两个所述第一导板相贴合并固定连接。5. The elevator buffer seat according to claim 4, wherein the number of the elevator guide rails is two, and the two first guide plates of the two elevator guide rails are attached and fixedly connected. 6.如权利要求5所述的电梯缓冲器座,其特征在于,所述第一导板上设有多个螺接孔,多个所述螺接孔对称分布于所述第一导板的两侧。6. The buffer seat of an elevator according to claim 5, wherein the first guide plate is provided with a plurality of threaded holes, and the plurality of threaded holes are symmetrically distributed on both sides of the first guide plate . 7.如权利要求1~6任一项所述的电梯缓冲器座,其特征在于,所述电梯导轨由现场裁切形成。7. The elevator buffer seat according to any one of claims 1-6, wherein the elevator guide rail is formed by cutting on site. 8.如权利要求7所述的电梯缓冲器座,其特征在于,所述支撑架与所述安装板和/或所述固定板相互垂直设置,所述安装板与所述固定板平行设置。8. The elevator buffer seat according to claim 7, characterized in that, the support frame and the mounting plate and/or the fixing plate are arranged perpendicular to each other, and the installing plate and the fixing plate are arranged in parallel. 9.如权利要求8所述的电梯缓冲器座,其特征在于,所述安装板上设有多个安装孔,所述固定板上设有多个与所述安装孔一一对应的固定孔。9. The elevator buffer seat according to claim 8, wherein the mounting plate is provided with a plurality of mounting holes, and the mounting plate is provided with a plurality of mounting holes corresponding to the mounting holes one by one . 10.如权利要求7所述的电梯缓冲器座,其特征在于,所述支撑架的一端与所述安装板和/或所述固定板的连接方式为焊接。10. The elevator buffer seat according to claim 7, characterized in that, one end of the support frame is connected to the installation plate and/or the fixing plate by welding.
CN201820347748.2U 2018-03-14 2018-03-14 Buffer of elevator seat Expired - Fee Related CN208054674U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820347748.2U CN208054674U (en) 2018-03-14 2018-03-14 Buffer of elevator seat

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820347748.2U CN208054674U (en) 2018-03-14 2018-03-14 Buffer of elevator seat

Publications (1)

Publication Number Publication Date
CN208054674U true CN208054674U (en) 2018-11-06

Family

ID=63989315

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820347748.2U Expired - Fee Related CN208054674U (en) 2018-03-14 2018-03-14 Buffer of elevator seat

Country Status (1)

Country Link
CN (1) CN208054674U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110271937A (en) * 2019-06-05 2019-09-24 五冶集团上海有限公司 A kind of buffer base no more than 3t rated load elevator

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110271937A (en) * 2019-06-05 2019-09-24 五冶集团上海有限公司 A kind of buffer base no more than 3t rated load elevator

Similar Documents

Publication Publication Date Title
CN101941627A (en) Adjustable guide rail bracket for elevator
CN203613690U (en) Curtain wall connecting structure
KR102027278B1 (en) Curvature-controllable concrete structure formwork
CN110042994A (en) A kind of quick levelling adjustment structure and inner corner trim integrated morphology
CN208054674U (en) Buffer of elevator seat
CN204126263U (en) A kind of beam, the pre-buried horizontal case fastening devices of wall
CN201817165U (en) Adjustable guide rail bracket for lifter
CN207120750U (en) A kind of Subway Station Platform gate threshold bottom adjustable support seat
CN109356389B (en) Prefabricated wallboard installation limiting device and construction method thereof
CN211850107U (en) Height-adjustable friction damper
CN218509030U (en) Auxiliary mounting tool for shear wall film-coated template
CN204691250U (en) Aluminium wood earth system
CN215254103U (en) An external wall panel hanging pendant system
CN211923116U (en) A pendant structure and precast concrete wall panel system
CN203859022U (en) Self-locking module of button switch
CN110091421B (en) Building PC prefabricated laminated slab die for plugging corners
CN218881601U (en) Building template suitable for quick assembly and disassembly
JP4404669B2 (en) Bus duct support device
CN219794664U (en) A concrete pouring device that can reduce grout leakage
CN210918221U (en) A settlement right-angle aluminum membrane plate for construction
CN204875384U (en) Gauge piece and rail fastener system
CN221276875U (en) Leveling connecting member of embedded integrated wallboard and wall building
CN201868744U (en) Bridge body side plate for retractable bridge box
CN211421835U (en) A structural column formwork reinforcement device
CN204175733U (en) A kind of connecting plate

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20181106

CF01 Termination of patent right due to non-payment of annual fee