CN208039861U - A kind of building prefabrication block special hanger - Google Patents

A kind of building prefabrication block special hanger Download PDF

Info

Publication number
CN208039861U
CN208039861U CN201721798886.4U CN201721798886U CN208039861U CN 208039861 U CN208039861 U CN 208039861U CN 201721798886 U CN201721798886 U CN 201721798886U CN 208039861 U CN208039861 U CN 208039861U
Authority
CN
China
Prior art keywords
worm screw
clamping plate
fixed
crossbeam
transverse slat
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721798886.4U
Other languages
Chinese (zh)
Inventor
汪建锋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201721798886.4U priority Critical patent/CN208039861U/en
Application granted granted Critical
Publication of CN208039861U publication Critical patent/CN208039861U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Holders For Apparel And Elements Relating To Apparel (AREA)

Abstract

A kind of building prefabrication block special hanger,Effective solution prefabricated section suspender is inconvenient for operation,Poor safety performance,The problems such as unprotect measure,Including crossbeam,It is equipped among crossbeam and revokes hole,Two-way worm screw is rotatably connected in crossbeam,Two-way worm screw right end is engaged with the first worm gear,First worm gear is coaxially fixed with the first cam,Crossbeam lower end is equipped with groove,Two-way worm screw slidably connects the first clamping plate positioned at groove right end,Two-way worm screw left end is engaged with the second worm gear,Second worm gear is coaxially fixed with the second cam,Two-way worm screw slidably connects the second clamping plate positioned at groove left end,First clamping plate front and rear sides are hinged with transverse slat,Transverse slat lower end offers multiple U-type grooves,It is fixed with bearing on the right side of transverse slat lower end,It horizontally slips in bearing and is connected with telescopic rod,It is fixed with fixed block on the left of transverse slat lower end,Through-hole corresponding with telescopic rod is equipped in fixed block,Second clamping plate front and rear sides are respectively and fixedly provided with bumping post corresponding with U-type groove.

Description

A kind of building prefabrication block special hanger
Technical field
The utility model is related to construction engineering technical fields, more particularly to a kind of building prefabrication block special hanger.
Background technology
Currently, with the quickening of social paces, various economic items are constantly accelerated, and various economic items arrived rapidly Development, building trade also arrived development at full speed, while also promote in the market build corollary equipment rapid development, When building every profession and trade is constructed, it usually needs the equipment of practicality lifting and hoist engine, it is in most cases, much live under normal conditions Since conditions permit is difficult to use large-scale hanging device, because the required space of large scale equipment and condition are difficult to meet, together When even more a kind of waste when carrying small workpiece, existing prefabricated section suspender activity is dumb, in hoisting process be easy knocked It touches, poor safety performance, unprotect measure is susceptible to contingency, causes damages to the safety of operating personnel.
It is therefore desirable to which a kind of building prefabrication block special hanger solves the problems, such as this.
Utility model content
For the above situation, to overcome the defect of the prior art, the purpose of the utility model to be just to provide a kind of build in advance The problems such as clamp dog special hanger, effective solution prefabricated section suspender is inconvenient for operation, poor safety performance, unprotect measure.
Its technical solution solved is that the utility model includes crossbeam, and crossbeam centre position is equipped with boss, and boss is equipped with Hole is revoked, two-way worm screw is rotatably connected in crossbeam, two-way worm screw right end is engaged with the first worm gear, and the first worm gear is coaxially fixed with First cam, crossbeam lower end are equipped with groove, and two-way worm screw slidably connects the first clamping plate positioned at groove right end, and two-way worm screw is left End is engaged with the second worm gear, and the second worm gear is coaxially fixed with the second cam, and two-way worm screw slidably connects positioned at groove left end Second clamping plate, first clamping plate front and rear sides are hinged with transverse slat, and transverse slat lower end offers multiple U-type grooves, and transverse slat lower end right side is solid Surely there is bearing, horizontally slip in bearing and be connected with telescopic rod, fixed block is fixed on the left of transverse slat lower end, is equipped with and stretches in fixed block The corresponding through-hole of contracting bar, second clamping plate front and rear sides are respectively and fixedly provided with bumping post corresponding with U-type groove.
The utility model clever structure, flexibly practical, security performance is high, easy to operate, quick rapid, improves work effect Rate facilitates staff to operate, and has more ensured operating personnel's safety.
Description of the drawings
Fig. 1 is the schematic diagram of the utility model front view.
Fig. 2 is the schematic diagram of transverse slat stereochemical structure in the utility model.
Fig. 3 is the schematic diagram of A-A sectional views in figure.
Specific implementation mode
Specific embodiment of the present utility model is described in further detail below in conjunction with attached drawing.
It is provided by Fig. 1 to Fig. 3, a kind of building prefabrication block special hanger, including crossbeam 1,1 centre position of crossbeam is equipped with convex Platform, boss are equipped with and revoke hole 2, and two-way worm screw 3 is rotatably connected in crossbeam 1, and 3 right end of two-way worm screw is engaged with the first worm gear 4, First worm gear 4 is coaxially fixed with the first cam 5, and 1 lower end of crossbeam is equipped with groove 6, and two-way worm screw 3 slidably connects positioned at groove 6 The first clamping plate 7 of right end, 3 left end of two-way worm screw are engaged with the second worm gear 8, and the second worm gear 8 is coaxially fixed with the second cam 9, double The second clamping plate 10 positioned at 6 left end of groove is slidably connected to worm screw 3,7 front and rear sides of first clamping plate are hinged with transverse slat 11, horizontal 11 lower end of plate offers multiple U-type grooves 12, is fixed with bearing 13 on the right side of 11 lower end of transverse slat, horizontally slips to be connected in bearing 13 and stretch Contracting bar 14,11 lower end of transverse slat left side are fixed with fixed block 15, and through-hole corresponding with telescopic rod 14, the second folder are equipped in fixed block 15 10 front and rear sides of plate are respectively and fixedly provided with bumping post corresponding with U-type groove 12 16.
3 centre position of two-way worm screw is smooth surface.
First worm gear 4 and the second worm gear 8 is oppositely oriented.
3 both ends of two-way worm screw are rotatablely connected through bearing and crossbeam 1.
3 right side of two-way worm screw is fixed with handle 17.
7 left side of first clamping plate and 10 right side of second clamping plate is respectively and fixedly provided with non-slip mat 18.
When the utility model is used, by one or more prefabricated section be placed on first clamping plate 7 and second clamping plate 10 it Between, rotational handle 17, two-way worm screw 3 drives the first worm gear 4 and the second worm gear 8 to rotate simultaneously, the first worm gear 4 and the second worm gear 8 Oppositely oriented, the first cam 5 and the second cam 9 are rotated to intermediate direction simultaneously, and then control first clamping plate 7 and second clamping plate 10 It is clamped simultaneously to middle slip, selects suitable gripping angle, 7 left side of first clamping plate and 10 right side of second clamping plate fixed There is non-slip mat 18, tighten handle 17, worm gear mechanism is that have certain self-locking performance, can clamp prefabricated section completely, and will Prefabricated section navigates to centre position, ensures the stationarity of suspender during lifting, and high safety is easy to operate, convenient and efficient, into And first of clamping protection mechanism is formed, effectively fixed prefabricated section is rotated further by transverse slat 11, by the U-type groove 12 and bumping post of transverse slat 11 16 clampings are further fixedly clamped to the bottom of prefabricated section, form second clamping protection mechanism, in order to prevent about 11 transverse slat Sliding, then telescopic rod 14 is slid into through-hole to the left, the position of transverse slat 11 is further fixed, third road clamping plate is formed and protects machine Structure, last hawser locking revoke hole 2, prefabricated section are hung to and needs position, security performance is protected.
The more traditional device of the utility model has following benefit:1)Structure novel, operation is flexible, using two-way worm screw and convex Wheel construction is conducive to adjusting stretching angle, and worm and gear has certain self-locking performance, easy to operate;2)Three-level safeguard procedures, have Effect ensures prefabricated clamping, ensures operating personnel's safety.
The utility model clever structure, security performance is high, and multistage protection mechanism facilitates staff to operate, improves work Make efficiency, has more ensured operating personnel's safety, there are good market prospects.

Claims (6)

1. a kind of building prefabrication block special hanger, which is characterized in that including crossbeam(1), crossbeam(1)Centre position is equipped with boss, Boss is equipped with and revokes hole(2), crossbeam(1)Inside it is rotatably connected to two-way worm screw(3), two-way worm screw(3)Right end is engaged with first Worm gear(4), the first worm gear(4)Coaxially it is fixed with the first cam(5), crossbeam(1)Lower end is equipped with groove(6), two-way worm screw(3)It is sliding It is dynamic to be connected with positioned at groove(6)The first clamping plate of right end(7), two-way worm screw(3)Left end is engaged with the second worm gear(8), the second snail Wheel(8)Coaxially it is fixed with the second cam(9), two-way worm screw(3)It slidably connects and is located at groove(6)The second clamping plate of left end (10), first clamping plate(7)Front and rear sides are hinged with transverse slat(11), transverse slat(11)Lower end offers multiple U-type grooves(12), transverse slat (11)It is fixed with bearing on the right side of lower end(13), bearing(13)It inside horizontally slips and is connected with telescopic rod(14), transverse slat(11)Lower end is left Side is fixed with fixed block(15), fixed block(15)It is inside equipped with and telescopic rod(14)Corresponding through-hole, second clamping plate(10)Front and back two Side is respectively and fixedly provided with and U-type groove(12)Corresponding bumping post(16).
2. a kind of building prefabrication block special hanger according to claim 1, which is characterized in that the two-way worm screw(3) Centre position is smooth surface.
3. a kind of building prefabrication block special hanger according to claim 1, which is characterized in that first worm gear(4) With the second worm gear(8)It is oppositely oriented.
4. a kind of building prefabrication block special hanger according to claim 1, which is characterized in that the two-way worm screw(3) Both ends are through bearing and crossbeam(1)Rotation connection.
5. a kind of building prefabrication block special hanger according to claim 1, which is characterized in that the two-way worm screw(3) Right side is fixed with handle(17).
6. a kind of building prefabrication block special hanger according to claim 1, which is characterized in that the first clamping plate(7) Left side and second clamping plate(10)Right side is respectively and fixedly provided with non-slip mat(18).
CN201721798886.4U 2017-12-21 2017-12-21 A kind of building prefabrication block special hanger Expired - Fee Related CN208039861U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721798886.4U CN208039861U (en) 2017-12-21 2017-12-21 A kind of building prefabrication block special hanger

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721798886.4U CN208039861U (en) 2017-12-21 2017-12-21 A kind of building prefabrication block special hanger

Publications (1)

Publication Number Publication Date
CN208039861U true CN208039861U (en) 2018-11-02

Family

ID=63955662

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721798886.4U Expired - Fee Related CN208039861U (en) 2017-12-21 2017-12-21 A kind of building prefabrication block special hanger

Country Status (1)

Country Link
CN (1) CN208039861U (en)

Similar Documents

Publication Publication Date Title
CN108448489B (en) Convenient installation device for insulating puncture wire clamp
CN210854928U (en) Crane lifting lug
CN206782622U (en) One kind building brick clamp
CN211992601U (en) Fixing device for environment-friendly machinery
CN217148279U (en) Portable lifting appliance for tire mold
CN208039861U (en) A kind of building prefabrication block special hanger
CN202089680U (en) Automatic lifting hook
CN107089607A (en) Sheet material carries special cantilever crane
CN207209770U (en) A kind of efficient handling apparatus of aluminium section bar production aluminium bar
CN212356248U (en) Horizontal coil lifting appliance with protection structure
CN211627255U (en) Steel strength detection device for building detection
CN207890887U (en) A kind of hanging device of building prefabrication block
CN208829116U (en) The hanger structure of color steel plate
CN111673500A (en) Clamping device
CN209890101U (en) Electric hoist convenient to fix
CN107497103B (en) The fitness equipment for being suitble to high intensity arm strength to take exercise
CN214462473U (en) Multi-use architecture safety protection scaffold board
CN211393543U (en) Hoisting clamp for welding ball
CN214059670U (en) A construction trolley for bridge anti-collision guardrail
CN208845979U (en) The express delivery cabinet being easily installed
CN219654306U (en) Supporting device for building curtain wall construction
CN207466695U (en) A kind of construction Portable safety template transport vehicle
CN222389453U (en) Crane for construction
CN213707537U (en) Bridge type aviation of convenient maintenance hangs equipment
CN217044837U (en) Aluminum product tractor clamping device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20181102

Termination date: 20181221

CF01 Termination of patent right due to non-payment of annual fee