CN208009729U - Assembled horse tooth trough overlap edge-punching sheet metal floorslab with bars - Google Patents
Assembled horse tooth trough overlap edge-punching sheet metal floorslab with bars Download PDFInfo
- Publication number
- CN208009729U CN208009729U CN201820368020.8U CN201820368020U CN208009729U CN 208009729 U CN208009729 U CN 208009729U CN 201820368020 U CN201820368020 U CN 201820368020U CN 208009729 U CN208009729 U CN 208009729U
- Authority
- CN
- China
- Prior art keywords
- floor
- concrete
- horse
- steel plate
- slab
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
Abstract
Description
技术领域:Technical field:
本实用新型属于建筑结构工程中装配式楼板制作技术领域,具体涉及一种装配式马牙槎搭接边-冲孔薄钢板带肋楼板及作法。The utility model belongs to the technical field of fabrication of assembled floor slabs in building structure engineering, and in particular relates to an assembled horse-toothed lap joint-perforated thin steel plate ribbed floor and a method thereof.
背景技术:Background technique:
我国新农村住宅的建设目前存在着建设任务数量巨大、现有住宅多为自建、抗震能力低甚至无抗震能力等问题,成为我国新农村建设的一大难题。装配式建筑具有工业化生产、标准化制作、易地重建等绿色建筑的特点,加之施工周期短、节约劳动力的优点,在新农村建筑中拥有广阔的发展前景和应用价值。随着国家及政府的推动,建筑科技的进步,装配式结构构件的生产与设计也将得到较大变革。其中,楼板构件占有非常重要的比重,从受力角度来看,建筑结构中楼板是水平受力构件,楼板将其上各种荷载传递给竖向的受力构件,与竖向受力构件共同组成空间受力体系,从而增加结构的稳定性,因此楼板要具有足够的刚度和强度;从工程造价角度来看,混凝土楼板在整个建筑材料的用量和造价等方面均占据相当大的比例。The construction of new rural housing in our country currently has problems such as a huge number of construction tasks, most of the existing housing is self-built, low or even no earthquake resistance, etc., which has become a major problem in the construction of new rural areas in our country. Prefabricated buildings have the characteristics of green buildings such as industrialized production, standardized production, and ex situ reconstruction. In addition, they have the advantages of short construction period and labor saving. They have broad development prospects and application value in new rural buildings. With the promotion of the country and the government and the advancement of construction technology, the production and design of prefabricated structural components will also undergo major changes. Among them, the floor components occupy a very important proportion. From the perspective of force, the floor in the building structure is a horizontal force-bearing component, and the floor transmits various loads on it to the vertical force-bearing components. To form a space force system to increase the stability of the structure, the floor slab must have sufficient rigidity and strength; from the perspective of project cost, the concrete floor slab occupies a considerable proportion in the amount and cost of the entire building material.
然而,从受力角度来看,应用于模块化装配式结构中的装配式楼板,往往由于拼接板缝的存在,使得楼板平面刚度不连续,影响楼板的整体作用。而通常所谓的整浇楼板拥有较大的平面刚度,可以传递水平力到各个竖向抗侧力构件,并且协同这些竖向抗侧力构件共同工作,特别是当竖向抗侧力构件分布不均匀、布置复杂或各抗侧力构件水平变形特征不同时,整个结构就要依靠楼板使各抗侧力构件能协同工作。装配式楼板拼接板缝的存在,恰恰使得楼板的这种作用不能充分有效地发挥;从工程造价角度来看,现有装配式楼板模块小,后处理连接缝较多,费时费工,增加造价。However, from the perspective of force, the prefabricated floor slabs used in modular prefabricated structures often have discontinuous plane stiffness due to the existence of splicing slab seams, which affects the overall function of the floor slab. Usually, the so-called monolithic floor slab has a relatively large plane stiffness, which can transmit horizontal force to each vertical lateral force-resisting member, and work together with these vertical lateral-force-resisting members, especially when the vertical lateral force-resisting members are unevenly distributed. When the structure is uniform, the layout is complex, or the horizontal deformation characteristics of the lateral force-resisting members are different, the whole structure must rely on the floor to make the lateral-force-resisting members work together. The existence of splicing seams in prefabricated floor slabs just prevents the function of the slab from being fully and effectively exerted; from the perspective of project cost, the existing prefabricated floor slab modules are small, and there are many post-processing joints, which is time-consuming and labor-intensive, increasing the cost .
发明内容:Invention content:
本实用新型提供的一种装配式马牙槎搭接边-冲孔薄钢板带肋楼板及作法,为村镇低多层框架结构房屋提供了一种板与框架梁之间、板与板之间具有可靠连接措施的装配式楼板的作法,以解决目前装配式楼板连接弱、整体性差而导致水平力不能足够地在竖向抗侧力构件间传递的问题。同时,构件现场装配、施工简单,抗震效果好,适合广泛推广。The utility model provides a prefabricated horse-tooth bridge lap-perforated thin steel plate ribbed floor and its method, which provides a kind of space between the slab and the frame beam, and between the slab and the slab for the low-story frame structure houses in villages and towns. The method of prefabricated floor slabs with reliable connection measures is to solve the problem that the current prefabricated floor slabs are weakly connected and poor in integrity, which leads to insufficient transmission of horizontal forces between vertical lateral force-resistant components. At the same time, the on-site assembly and construction of the components are simple, and the anti-seismic effect is good, so it is suitable for widespread promotion.
为实现上述目的,本实用新型采用如下技术方案:In order to achieve the above object, the utility model adopts the following technical solutions:
装配式马牙槎搭接边-冲孔薄钢板带肋楼板,包括型钢(1)、圆钢管(2)、冲孔薄钢板(3)、连接栓钉(4)、马牙槎(5)、预留锚孔(6)、板肋(7)、楼板混凝土(8)、施工缝(9)、框架梁(10)和框架柱(11);所述的冲孔薄钢板(3)是在板厚不超过5mm的钢板上经冲床通过模具冲压出孔的钢板,孔心距不小于80mm,冲孔面积不低于冲孔薄钢板(3)面积的1/2;型钢(1)垂直焊接,形成楼板肋格,型钢(1)末端焊接圆钢管(2),将冲孔薄钢板(3)置于型钢(1)底部,并与型钢(1)底部接触位置焊接固定,至此形成楼板钢骨架;浇筑楼板混凝土(8),浇筑时,冲孔薄钢板(3)浇筑在楼板混凝土(8)中部,型钢(1)位置浇筑板肋(7)混凝土,板边浇筑成马牙槎(5)形状,马牙槎凸槎位置预留锚孔(6),锚孔位置与框架梁(10)上的连接栓钉(4)位置对应,混凝土养护后形成装配式马牙槎搭接边-冲孔薄钢板带肋楼板;装配时预留锚孔(6)将框架梁(10)上的连接栓钉(4)套入孔内,向孔内浇筑灌浆料,将连接栓钉(4)锚固在楼板上,实现楼板与框架梁(10)连接;相邻楼板板边间的施工缝(9)采用灌浆料、混凝土或砂浆填充,将相邻楼板浇筑在一起,实现相邻楼板连接。Prefabricated buttress lap joint-perforated thin steel plate ribbed slab, including profile steel (1), round steel pipe (2), punched thin steel plate (3), connecting studs (4), and buttress (5) , reserved anchor holes (6), slab ribs (7), floor concrete (8), construction joints (9), frame beams (10) and frame columns (11); the punched thin steel plate (3) is The steel plate with a thickness not exceeding 5mm is punched out by a punching machine through a die. Welding to form the floor ribs, weld the round steel pipe (2) at the end of the section steel (1), place the punched thin steel plate (3) on the bottom of the section steel (1), and weld and fix it at the contact position with the bottom of the section steel (1), so as to form the floor Steel skeleton; pouring floor concrete (8), during pouring, punched thin steel plate (3) is poured in the middle part of floor concrete (8), steel plate (1) position is poured slab rib (7) concrete, and slab edge is poured into horse teeth ( 5) Shape, Anchor hole (6) is reserved at the convex position of the horse-toothed frame. The position of the anchor hole corresponds to the position of the connecting stud (4) on the frame beam (10). After the concrete is cured, an assembled horse-toothed frame is formed. - Punched thin steel plate ribbed floor; reserve anchor holes (6) during assembly, insert the connecting studs (4) on the frame beam (10) into the holes, pour grout into the holes, and place the connecting studs (4) ) is anchored on the floor to realize the connection between the floor and the frame beam (10); the construction joints (9) between the edges of adjacent floor slabs are filled with grouting materials, concrete or mortar, and the adjacent floors are poured together to realize the connection of adjacent floors .
所述的装配式马牙槎搭接边-冲孔薄钢板带肋楼板,其特征在于:Said assembled horse-toothed-jaw lap-perforated thin-steel ribbed floor is characterized in that:
所述的型钢(1)包括工字钢、H型钢、槽钢、角钢;根据楼板尺寸垂直焊接的型钢,各垂直方向至少各设置一道型钢(1);楼板混凝土(8)浇筑时,型钢(1)底部及下部型钢截面浇筑在楼板混凝土(8)内,上部其余型钢截面浇筑在板肋(7)混凝土中。Described shaped steel (1) comprises I-beam, H-shaped steel, channel steel, angle steel; According to the shaped steel vertically welded according to the size of the floor, each vertical direction is provided with at least one shaped steel (1); when the floor concrete (8) is poured, the shaped steel ( 1) The bottom and lower steel sections are poured in the floor concrete (8), and the rest of the upper steel sections are poured in the slab rib (7) concrete.
所述的圆钢管(2)直径与预留锚孔(6)直径相同,高度为楼板混凝土(8)厚度与板肋(7)高度之和。装配时,套在框架梁(10)上的连接栓钉(4)上,浇筑灌浆料填充,将楼板与框架梁(10)可靠连接在一起。The diameter of the round steel pipe (2) is the same as that of the reserved anchor hole (6), and the height is the sum of the thickness of the floor concrete (8) and the height of the slab rib (7). During assembly, the connecting studs (4) on the frame beam (10) are sleeved, filled with pouring grout, and the floor slab and the frame beam (10) are reliably connected together.
所述的冲孔薄钢板(3)是经冲床通过模具冲压出圆形孔、方形孔或矩形孔的钢板,在楼板混凝土(8)中单片铺设;制作楼板所需尺寸的冲孔薄钢板(3),在冲孔薄钢板(3)板边对应楼板马牙槎(5)位置处,焊接弯成马牙槎形状的钢筋。冲孔薄钢板(3)浇筑在混凝土中起到加筋的作用,但又比配置钢筋施工更简易,具有整体性强、网孔均匀、亦于加工、成本低廉等特点,提高了墙板平面外刚度,提高了墙板抗震能力。The punched thin steel plate (3) is a steel plate with a circular hole, a square hole or a rectangular hole punched out by a die through a punching machine, and is laid in a single piece in the floor concrete (8); the punched thin steel plate of the required size for the floor slab (3), weld the reinforcing bar bent into the shape of the horse-toothed frame at the position corresponding to the floor-shaped horse-toothed frame (5) at the edge of the punched thin steel plate (3). The perforated thin steel plate (3) plays the role of reinforcement in the concrete, but it is easier to construct than the configuration of steel bars. It has the characteristics of strong integrity, uniform mesh, easy processing, and low cost, which improves the plane of the wall panel. The outer rigidity improves the anti-seismic ability of the wall panel.
所述的连接栓钉(4)固定在框架梁(10)上,框架梁(10)为钢筋混凝土梁时,预埋在框架梁(10)上;在框架梁(10)为钢管混凝土梁或型钢梁时,预焊在框架梁(10)上;连接栓钉(4)在框架梁(10)上的外露高度小于楼板混凝土(8)浇筑厚度。The connecting stud (4) is fixed on the frame beam (10), and when the frame beam (10) is a reinforced concrete beam, it is pre-embedded on the frame beam (10); when the frame beam (10) is a steel pipe concrete beam or When the shaped steel beam is used, it is pre-welded on the frame beam (10); the exposed height of the connecting stud (4) on the frame beam (10) is less than the pouring thickness of the floor concrete (8).
所述的马牙槎(5)沿板边设置,凸槎、凹槎形状相同,均为梯形,凸槎位置对应相邻板边凹槎位置;在框架梁(10)上安装楼板时,楼板马牙槎(5)凸槎底边与框架梁(10)搭接边的水平距离(即楼板在框架梁上的最小搭接长度)不少于30mm。The horse-toothed rafts (5) are arranged along the edge of the slab, and the convex and concave rafts have the same shape, both of which are trapezoidal. The horizontal distance between the bottom edge of the horse teeth (5) and the lap edge of the frame beam (10) (ie the minimum lap length of the floor slab on the frame beam) is not less than 30mm.
所述的预留锚孔(6)为圆形孔,孔径不小于40mm,沿楼板板边布置在所有马牙槎(5)凸槎内。填充预留锚孔(6),将连接栓钉(4)锚固在楼板上,实现楼板与框架梁(10)可靠连接,使楼板与框架有效传递应力。The reserved anchor hole (6) is a circular hole with a diameter of not less than 40mm, and is arranged in all the horse-toothed (5) protrusions along the edge of the floor slab. The reserved anchor holes (6) are filled, and the connecting studs (4) are anchored on the floor to realize reliable connection between the floor and the frame beam (10), so that the floor and the frame can effectively transmit stress.
所述的板肋(7)是型钢(1)浇筑混凝土后形成,板肋(7)的高度及宽度取值不小于40mm。The slab ribs (7) are formed after the section steel (1) is poured with concrete, and the height and width of the slab ribs (7) are not less than 40mm.
所述的楼板混凝土(8)浇筑厚度40mm~80mm,混凝土强度等级为C30~C60;混凝土(5)为普通混凝土、不同再生粗骨料掺量的再生混凝土或高性能混凝土。再生混凝土为旧建筑拆除后的废弃混凝土块经过破碎、清洗、分级后,得到的混凝土骨料制备而成,采用再生混凝土,实现了废弃混凝土的资源化和减量化的处理原则,能起到保护环境和节约资源的作用,具有显著的社会效益,促进国家可持续发展。根据工程需要,可配置抗裂、抗腐蚀等性能的高性能混凝土。The pouring thickness of the floor concrete (8) is 40mm-80mm, and the concrete strength grade is C30-C60; the concrete (5) is ordinary concrete, recycled concrete or high-performance concrete with different recycled coarse aggregate content. Recycled concrete is prepared by crushing, cleaning and grading waste concrete blocks after demolition of old buildings. Recycled concrete is used to realize the principle of recycling and reducing waste concrete, which can play a role The role of protecting the environment and saving resources has significant social benefits and promotes the sustainable development of the country. According to engineering needs, high-performance concrete with properties such as crack resistance and corrosion resistance can be configured.
所述的施工缝(9)为相邻楼板马牙槎间的空隙,宽度不小于30mm;施工缝(9)填充采用的灌浆料、混凝土或砂浆强度不低于楼板混凝土(8)强度。填充材料强度高,可以加强相邻楼板及框架梁(10)节点区连接。The construction joints (9) are gaps between adjacent floor slabs, and the width is not less than 30mm; the strength of the grouting material, concrete or mortar used for filling the construction joints (9) is not lower than that of the floor concrete (8). The filling material has high strength and can strengthen the joint area connection of adjacent floor slabs and frame beams (10).
与现有技术相比,本实用新型的装配式马牙槎搭接边-冲孔薄钢板带肋楼板具有如下优势:Compared with the prior art, the utility model has the following advantages of the assembled horse-toothed bridge lap-perforated thin steel plate with ribs:
(1)栓钉连接具有较高的抗剪强度,楼板在栓钉对应位置预留锚孔并在楼板装配完成后进行灌浆料填充,将楼板与框架梁可靠锚固在一起,形成整体,有利于水平力在楼板与竖向受力构件之间的传递。(1) The stud connection has high shear strength. The floor slab reserves anchor holes at the corresponding positions of the studs and fills them with grouting material after the floor slab is assembled. The floor slab and frame beams are reliably anchored together to form a whole, which is beneficial The transfer of horizontal forces between the floor slab and vertically loaded members.
(2)楼板有梁搭接边马牙槎式的设计形式,使相邻楼板在框架梁位置均具有足够的搭接长度,同时马牙槎之间的施工缝增加了楼板与灌浆料等填充材料的接触面积,使相邻楼板更加可靠的与填充材料连接,形成一体,进而增加相邻楼板的整体性。(2) The floor slab has a beam-lapped edge horse-toothed design form, so that adjacent floors have sufficient lap length at the frame beam position, and at the same time, the construction joints between the horse-toed woods increase the filling of floor slabs and grouting materials The contact area of the material makes the adjacent floor slabs more reliably connected with the filling material to form a whole, thereby increasing the integrity of the adjacent floor slabs.
(3)板肋的设置,可显著提高楼板的抗弯刚度及平面外刚度。同时,板肋内型钢一部分位于楼板内,加强了板肋与楼板的连接,有利于板肋发挥楼板加劲肋的作用。(3) The setting of slab ribs can significantly improve the bending stiffness and out-of-plane stiffness of the floor slab. At the same time, a part of the profile steel inside the slab rib is located in the floor slab, which strengthens the connection between the slab rib and the floor slab, and facilitates the slab rib to play the role of the floor stiffener.
(4)冲孔薄钢板在混凝土楼板中起到加筋的作用,但比配置钢筋施工简易,易于定位,具有整体性强、网孔均匀、亦于加工等特点,提高了墙板平面外刚度,提高了墙板抗震能力。同时,冲孔薄钢板在楼板中单片铺设,显著降低构件用钢量,成本低廉,降低造价。(4) The perforated thin steel plate plays the role of reinforcement in the concrete floor, but it is easier to construct than the configuration of steel bars, easy to locate, has the characteristics of strong integrity, uniform mesh, and easy processing, which improves the out-of-plane rigidity of the wall panel , Improve the seismic capacity of the wall panel. At the same time, the perforated thin steel plate is laid in a single piece in the floor, which significantly reduces the amount of steel used for the components, and the cost is low and the cost is reduced.
(5)本实用新型中楼板为工厂生产,构件生产质量有保证,楼板厚度相对较小,自重轻,造价低,现场方便起吊与安装。同时,本实用新型为大模块化楼板设计,仅施工缝与预留锚孔填充材料后浇,施工简单便捷,极大缩短了施工时间。有助于快速推进量大面广的新农村建设步伐,实现住宅产业化、建筑工业化目标。(5) The floor slab in the utility model is produced in a factory, and the production quality of the components is guaranteed. The thickness of the floor slab is relatively small, the weight is light, the cost is low, and the site is convenient for lifting and installation. At the same time, the utility model is designed for large modular floor slabs, only the construction joints and the reserved anchor hole filling materials are poured afterward, the construction is simple and convenient, and the construction time is greatly shortened. It is helpful to quickly promote the pace of new rural construction with a large amount and a wide range, and realize the goals of housing industrialization and construction industrialization.
附图说明:Description of drawings:
图1是装配式马牙槎搭接边-冲孔薄钢板带肋楼板装配构造局部详图;Figure 1 is a partial detailed drawing of the assembly structure of the prefabricated horse-toothed bridge lap-perforated thin steel plate ribbed floor slab;
图2是装配式马牙槎搭接边-冲孔薄钢板带肋楼板钢骨架示意图;Fig. 2 is a schematic diagram of the steel skeleton of the assembled horse-toothed-cha lap-perforated thin steel plate ribbed floor;
图3是装配式马牙槎搭接边-冲孔薄钢板带肋楼板示意图;Fig. 3 is a schematic diagram of a prefabricated horse-tooth bridge lap-perforated thin steel plate with ribs;
图4是连接栓钉定位示意图;Fig. 4 is a schematic diagram of connecting peg positioning;
图5是装配式马牙槎搭接边-冲孔薄钢板带肋楼板装配效果图。Fig. 5 is an assembly effect diagram of the assembled horse-toothed bridge lap edge-perforated thin steel plate ribbed floor.
图中:1-型钢;2-圆钢管;3-冲孔薄钢板;4-连接栓钉;5-马牙槎;6-预留锚孔;7-板肋;8-楼板混凝土;9-施工缝;10-框架梁;11-框架柱。In the figure: 1-shaped steel; 2-round steel pipe; 3-punched thin steel plate; 4-connecting studs; Construction joint; 10-frame beam; 11-frame column.
具体实施方式:Detailed ways:
发明中的装配式马牙槎搭接边-冲孔薄钢板带肋楼板,结合附图1~5阐明本实用新型制作方法如下:In the invention, the assembly-type horse-tooth bridge lap joint edge-punched thin steel plate ribbed floor slab, in conjunction with accompanying drawings 1 to 5, illustrates the utility model production method as follows:
第一步:型钢垂直焊接,形成楼板肋格,型钢末端焊接圆钢管;The first step: vertical welding of section steel to form floor ribs, and the end of section steel is welded with round steel pipe;
第二步:制作冲孔薄钢板,板边焊接弯成马牙槎形状的钢筋,将冲孔薄钢板置于型钢底部,与型钢焊接固定,至此,形成楼板钢骨架;Step 2: Make punched thin steel plates, weld the steel bars bent into the shape of horse teeth, place the punched thin steel plates at the bottom of the section steel, and weld and fix them with the section steel, so far, the floor steel skeleton is formed;
第三步:支模浇筑混凝土,板边支模形成马牙槎,在板面位置浇筑楼板混凝土,在型钢位置浇筑板肋混凝土,马牙槎凸槎位置预留与框架梁连接栓钉位置对应的锚孔;浇筑时,冲孔薄钢板浇筑于楼板混凝土中部,型钢底部及下部型钢截面浇筑在楼板混凝土内,上部其余型钢截面浇筑在板肋混凝土中;混凝土养护后形成装配式马牙槎搭接边-冲孔薄钢板带肋楼板;Step 3: Concrete is poured with the formwork, the slab side formwork is formed to form a horse-toothed frame, the floor concrete is poured on the surface of the slab, and the slab-rib concrete is poured on the section steel position, the position of the horse-toothed frame is reserved to correspond to the position of the frame beam connection bolts When pouring, the perforated thin steel plate is poured in the middle of the floor concrete, the bottom and lower section of the steel section are poured in the floor concrete, and the rest of the section steel section in the upper part is poured in the ribbed concrete; after the concrete is cured, an assembled horse-tooth bridge is formed Edge-punched sheet steel ribbed floor;
第四步:施工现场装配,框架梁预埋或预焊连接栓钉,将楼板放置在框架梁上,连接栓钉分别置于楼板相应的锚孔内;Step 4: Assembling at the construction site, the frame beams are pre-embedded or pre-welded with connecting studs, the floor is placed on the frame beams, and the connecting studs are respectively placed in the corresponding anchor holes of the floor;
第五步:填充连接锚孔及相邻楼板间马牙槎施工缝,实现楼板与框架梁及相邻楼板间的连接,至此,将相邻楼板及框架梁连接成一个整体。Step 5: Fill the connection anchor holes and the construction joints between the adjacent floors to realize the connection between the floor and the frame beam and the adjacent floors. At this point, the adjacent floors and frame beams are connected into a whole.
以上是本实用新型的一个典型的实施案例,但是本实用新型的实施不限于此。本实用新型中所列举的各结构尺寸及材料的选取均可根据实际需要选取,在此不再一一列举。The above is a typical implementation case of the utility model, but the implementation of the utility model is not limited thereto. The selection of various structural dimensions and materials listed in the utility model can be selected according to actual needs, and will not be listed one by one here.
Claims (9)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201820368020.8U CN208009729U (en) | 2018-03-19 | 2018-03-19 | Assembled horse tooth trough overlap edge-punching sheet metal floorslab with bars |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201820368020.8U CN208009729U (en) | 2018-03-19 | 2018-03-19 | Assembled horse tooth trough overlap edge-punching sheet metal floorslab with bars |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN208009729U true CN208009729U (en) | 2018-10-26 |
Family
ID=63889643
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201820368020.8U Expired - Fee Related CN208009729U (en) | 2018-03-19 | 2018-03-19 | Assembled horse tooth trough overlap edge-punching sheet metal floorslab with bars |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN208009729U (en) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN108277918A (en) * | 2018-03-19 | 2018-07-13 | 北京工业大学 | Assembled horse tooth trough overlap edge-punching sheet metal floorslab with bars |
| CN117052033A (en) * | 2023-09-01 | 2023-11-14 | 兰州理工大学 | Prefabricated composite panel and construction method thereof |
-
2018
- 2018-03-19 CN CN201820368020.8U patent/CN208009729U/en not_active Expired - Fee Related
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN108277918A (en) * | 2018-03-19 | 2018-07-13 | 北京工业大学 | Assembled horse tooth trough overlap edge-punching sheet metal floorslab with bars |
| CN108277918B (en) * | 2018-03-19 | 2024-03-26 | 北京工业大学 | Assembled type toothed joint edge-punched steel sheet ribbed floor |
| CN117052033A (en) * | 2023-09-01 | 2023-11-14 | 兰州理工大学 | Prefabricated composite panel and construction method thereof |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN109339229B (en) | Prefabricated assembled concrete-filled steel tube frame structure of perforation thick liquid anchor | |
| CN111749365B (en) | H-shaped steel-based assembled composite wall and construction method thereof | |
| CN104032854B (en) | Assembled T-shaped mixing coupled wall and construction method thereof | |
| CN111749364B (en) | A C-steel-based assembled composite wall and construction method thereof | |
| CN105952044A (en) | A fully prefabricated prestressed concrete floor structure and prestressed assembly method | |
| CN110777998A (en) | Building floor and combined floor system | |
| CN212836086U (en) | A prefabricated composite wall based on H-beam | |
| CN208009729U (en) | Assembled horse tooth trough overlap edge-punching sheet metal floorslab with bars | |
| CN108625491B (en) | Assembled H profile steel column-isolated footing-concrete collar tie beam L shape connecting node | |
| CN208105477U (en) | Assembly concrete-filled steel tube column-isolated footing-concrete collar tie beam L shape connecting node | |
| CN212053436U (en) | Strenghthened type precast concrete wallboard and connection structure with from structure of taking one's place | |
| CN108756038A (en) | Assembly concrete shear wall and floor support plate rigid connection node and construction method | |
| CN104032855A (en) | Assembly-type cross-shaped mixed coupled wall and construction method thereof | |
| CN104032859B (en) | Assembled L-shaped mixing coupled wall and construction method thereof | |
| CN203475609U (en) | Connecting structure of composite floor slab and steel tube shear wall of building | |
| CN207998964U (en) | The assembled floorslab with bars of reserved anchor hole and horse tooth trough overlap edge construction | |
| CN103572891B (en) | A kind of pregroove plate | |
| CN207987777U (en) | A kind of high pier girder steel pushing tow support device | |
| CN108277918A (en) | Assembled horse tooth trough overlap edge-punching sheet metal floorslab with bars | |
| CN219011479U (en) | Assembled frame connecting node and assembled frame | |
| CN111101645A (en) | Self-in-place reinforced precast concrete wallboard, connecting structure and construction method | |
| CN215977872U (en) | Overlapped integral prefabricated shear wall edge component | |
| CN212772980U (en) | A prefabricated composite wall based on C-shaped steel | |
| CN213539882U (en) | A CFST column H steel beam supports the middle node of the π-shaped connecting side column | |
| CN206245595U (en) | A kind of pre-manufactured steel Combination beam of steel and concrete |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20181026 |